Loading...
HomeMy WebLinkAbout20011290 Ver 1_Complete File_20010824State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary Gregory J. Thorpe, Ph.D., Acting Director 1 o • "Wft WPM A? ;1k NC ENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES September 26, 2001 Pamlico County DWQ Project No. 011290 APPROVAL OF 401Water Quality Certification and ADDITIONAL CONDITIONS and Neuse River Buffer Rules Mr. C.E. Lassiter, P.E., Division Engineer NCDOT, Division 2 PO Box 1587 Greenville, NC 27835 Dear Mr. Lassiter: You have our approval, as described in your application dated August 21, 2001, and in accordance with the attached conditions and those listed below, to place fill material in 28 linear feet of streams for the purpose of replacing bridge number 39 over the South Prong of the Bay River in Pamlico County. The project should be constructed in accordance with your application dated August 21, 2001. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3289. This certification corresponds to the General Permit 198200031 issued by the Corps of Engineers. This approval is also valid for the Neuse River buffer rules (15A NCAC 2B .033). In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire when the accompanying 404 permit expires unless otherwise specified in the General Certification. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). ). This approval shall -expires with the corresponding Nationwide Permit expires or as otherwise provided in the General - -- Certification. For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. 1. Stormwater shall be directed to sheetflow at nonerosive velocities through the protected stream buffers. 2. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certification of Completion Form" to notify DWQ when all work included in the 401 Certification has been completed. The responsible party shall-complete the attached form and return it to the 40l/Wetlands Unit of the Division of Water Quality upon completion of the project. Wetlands/401 Unit 1621 Mail Service Center Raleigh, North Carolina 27699-1621 Telephone 919-733-1786 FAX 733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/16% post consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality ly:'?WA 1 0 • 10 Michael F. Easley, Governor NCDENR William G. Ross, Jr., Secretary NORTH CAROLINA DEPARTMENT OF Gregory J. Thorpe, Ph.D., Acting Director ENVIRONMENT AND NATURAL RESOURCES If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact John Hennessy at 919-733-5694, or Deborah Sawyer at 252- 946-6481. incerely, ^ it 9)f, go Thorpe, Ph.D., tin Di i ector Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Washington Field Office DWQ Washington Regional Office File Copy Central Files - - - - - - - - - - c-\ncdot\SR 1205\wgc\011290wgc.doc Wetlands/401 Unit 1621 Mail Service Center Raleigh, North Carolina 27699-1621 Telephone 919-733-1786 FAX 733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post consumer paper 4. 401 ISSUED •? QNM VOy STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY GOVENOR August 21, 2001 Michael F. Bell, Regulatory Project Manager U.S. Army Corps of Engineers Washington Regulatory Field Office P.O. Box 1000 Washington, North Carolina 27889 Dear Mr. Bell: ? (ens LINDO TIPPE'IT SECRETARY` ? -7tv SUBJECT: Pamlico County, Replacement of Bridge No. 39 over South Prong of Bay River. The North Carolina Department of Transportation is planning to replace bridge No. 39 in Pamlico County. Bridge No. 39 is located on SR 1205 approximately 0.1 miles northeast from the intersection of N.C. 55 and SR 1205. This is a tributary to the Neuse River in the Neuse River Basin. The deteriorated condition of the Bridge necessitates replacement. Bridge No. 39 is a timber bridge built. in 1957. The NCDOT proposes to replace the bridge at the existing location with a 24'3" x 7'4" corrugated aluminum box culvert with headwalls. All construction will be contained within the existing roadway section. No wetlands will be impacted by this project. Approximately 0.03 acres of surface waters will be impacted by the placement of the proposed culvert. Construction will begin as soon as all permits are received and will last approximately three weeks. Please find attached the permit drawings and adjacent property owners for the proposed work. The NCDOT requests that this project be authorized by a Regional General Permit No. 31. If you have any questions or would like additional information, please don't hesitate to call. DIVISION Two • P.O. BOX 1587 • GREENVILLE, N.C. 27835 PHONE (252) 830-3490 • FAX (252) 830-3352 1' cc: Mr. David Cox, WRC Mr. John Hennessy, DWQ, Raleigh Mr. Kevin Moody, USFWS Mr. Ron Sechler, NMF Mr. Sean McKenna, NCDMF Mr. Dwayne Alligood,P.E., NCDOT Mr. C. E. Lassiter,P.E., NCDOT Sincerely, j J B. ohnson Division Environmental Officer I9 3• :.0 '.ti c 'J J ? Z Q Q C-A Y \\ 1111 \ i L .................. I- -1 p 1 U \ 1 , 1 I? 1 I 9 ? /l I I 1 I? ? ' N 1 ' I 1 1 I I Y?•-_ 1 i : ........... -Ig.. '---------------- I ` ------------------- ------I yz ? I I ?• 1 m , I QO N a - ? to .p , 1- - 1 Ii t! 5 1 1' 1 l I 1 , , I? ?- a V / i N W Topo7_one - The Web's Topographic Map r wysiwyg:H 15/http://www.topozone.com/print.asp?z=18&n=3890378&e=335795 0 2000 4000 6000 8000 meters I 1 1 0 2.0 4.0 miles i i 1 of 1 8/14/01 10:10 AM Com Target is UTM Z W ? 3 x C7 o ?rn x 43 Ir ?C 4E) ?e i? ?? td l N 0 z r) vi vi 20 0 Ln y t 40 1C! ?, ^C C G A :U ? ttT tpron v?r?d N ?U U' o (W? rt tb C> n r Z za?- o o o W y Z n 2 n L N? N? :p Z ? 1,7 J . Q_ z ATE AUGUST 14, 2001 ROAD SR 1205 AD NAME C A M P E N RD EXISTING TIMBER BRIDGE OUNTY PAMLICO RIDGE 39 , EXISTING WIDTH: 33' EXISTING LENGTH: 20' SUPERSTRUCTURE: REINFORCED CONCRETE FLOOR ON TIMBER JO SUBSTRUCTURE: TIMBER CAPS ON TIMBER PILES @ VARS CTRS HEIGHT CROWN TO BED: 98' WATER DEPTH:29' SKEW 83 DEGREES EXISTING BULK HEAD PROPOSED ALUMINIUM BOX CULVERT 1@ 24' 3' x 7' 4' AABC W/ HEAD WALLS EXISTING TING HEAD WALL WING WALL Y LIT -Y, --['MINIMUM BEDDING I ??I (BOX CULVERT BURIED I' INTO EXISTING STREAM BED) EXCAVATION ABOVE NWL: REMOVING OLD BRIDGVE AND BENTS- EXISTING HEAD WALLS WILL REMAIN AND BOX CULVERT WILL BE PROPOSEDuWIDTH:2a SUPERSROPOSEDTRUTURE.-:ALUMINIUM BOX CULVERT PLACED BETWEEN THEM PROPOSED HEIGHT: 7' 4" PROPOSED LENGTH: 49' 6' HEIGHT CROWN TO BED:100' WATER DEPTH:29' EXCAVATION BELOW NWL 50'L x 26'W x 15D = 73 CUBIC YARDS ISTS SR 1205 CIO NwL CREEK BED J We ti r xn P, ::? k f Ay 7f y .t ( ' v ' i? \? ? r 1a 4 n? ?AL ? v ,? t n `? t L ?•? 11.4 \ ? j R ? ?:-. ? .. 4?? t % 1 ?''?y {d?i y ?Z Fe? " 'Y FF t1L r / ? Sk ?: 1 } • `SG tr ?. }: Y?f.y /r, ry Y ofy 4 \ 1} .d;.jr i .? r ?' j+e 7 y t,' +'F :1 li f C+ 'y a s ! # ?f, r t.. ?<,{ FCrk ? t f '.. '?y? M1 1 '.z \ ? i.' ?^y : 5 z f = ? : v ?7 s, } • Sk ; i +S :(, r ? -a - i j' i t 9 + ^ \ 2`c? ? + ?, '° ^Ea'pp t Y 1./ y J a 4?4?7' ?i -"• k rar.5 y? tt 1S1 i r (? J' { r_, flay , ti: ,? ?f ' J y ti r f - - . '.. ± 'jr ,?xr .< ....?? _"4 .?! 1 .7':1?t .', `, .. i `.9L 1\ . '. E . I ._ -.•.° I• .. __ -_ 4S?A'?^, ?} fl: Sk ? •'t ? i ? w ate' ?+' ! i r 'CS ? ? v r r r Y? .n?? r 1. t ! y.. ? 7 s- _' 'r Z + 7i:? -d f'' h r } Al iz' r f- f ? yt ? q''yet-? Cs ? t: try.: k' Al-I3 ? '?,?r tP irk! 'f J. t n R } r - r ^ ?• 6 ? f } {}? +: J a tt a' "Y 4 x3'? w 4 i t ?, r'F tom, L.•. 4000 3000 2000 s d t k 47. r ?E k , { A i rt'• `'t i fx.:t F J'' „rye, \ J - _ t ? w y' 1 z •; E L ! I ? f asp . J• Y o ?+ + ??, t r ` ? E jJo ns shee' 7' 1000 0 S 00C 0 Scale - 1 :2400 , PAIIMLICO COUNTY. NORTH CAROLINA NO. 3 Fo j.1 ~r 3JJ F \l !. ? ?,Yo ?d ??JS DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) ProjecUSite: ? R S Jf OS ???? Date: Applicant/Owner: __-_ --- County: jaQ "Ic e-a Investigator: i.,??S?N..-. State: Do Normal Circumstances exist on the site? No Community ID: Is the site significantly dish rbed (Atypical Situation)? lsec Transept ID: Is the area a potential Problem Area? Yes (Fo Plot ID: (1` needed, explain on reverse.) VEGETATION Cominant Plant Soecies Stratum Indicator Dominant Plant Species Stratum Indicator 2.- lZ?c1 ' -- - ---- --- 10.----- -- --- ----- _ 3.- 4j?--- '~???''-- ---- ----- 11.---------- - ----- 6.-- -- ---- 14- 16- .f Percent of Dominant Species that are 061-, FAUN or FAC Percent (excluding FAC-). Is ---------------------------------------------------- Remarks: I Remarks: w II li HYDROLOGY - Recorded Data (Describe in Remarks): l Wetland Hydrology Indicators: - Stream, Lake, or Tde Gauge Primary indicators: _ Aerial Photographs _ Inundated ?s Other - Saturated in Upper 12 Inches q Recorded Data Available _ Water l'Aarks _ Dnft Lines _ Sediment Deposits Field Observations: _ Drainage Patterns in'Ne"ands Secondary Indicators (2 or more required): Depth of Surface Water: (in.) - Oxidized Root Channels in Upper 12 Inches Depth to Free Water in Pit (in.) _ Water-Stained Leaves _ Local Soil Survey Data l _ FAC-Neutral Test Depth to Saturated Soil: 2?(in.) - Other (Explain in Remarks) Remarks: Ou/ ?? /?f0?PY81 I' B2 Appendix B Blank and Example Cata Forms SOILS Map Unit Name (Series and Phase): 0--'s v_'tl 6?'_ yak - Drainage Class: Taxonomy (Subgroup): - ? Gc Field Observations Confirm Mapped Type? Yes No Profile Description t Depth Matrix Color Mottle Colors Mottle Abundance/ Texture, Concretions, (inches) Horizon (Munsell Moistl (Munsell Moist) Size/Contrast Str ct r t Hydric Soil Indicators: Histosol - Concretions - Nistic Epipedon High Organic Content in Surface Layer in Sandy Soils _ Sulfidic Odor - Organic Streaking in Sandy Soils - Aquic Moisture Regime Listed on Local Hydric Soils List _ Reducing Conditions - Listed on National Hydric Soils List - Gleyed or Lov -Chroma Colors r - Other (Explain in Remarks) Remarks: 2? lL? ?e`?iJ ?"-v- t ?- 3 6 i? `?•? WETLAND DETERMINATION Hydrophytic Vegetation Present? Yes N Circle) (Circle) Wetland Hydrology Present? Yes Hydric Soils Present? Yes Is this Sampling Point Within a Wetland? Yes OD Remarks: Al 0111-l ?? f! CLA- • a- `/ jQatrQ'? -. It 421- lb Aro Approved by HQUSACE 3/92 Appendix B Blank and Example Data Forms B3 Office Use Only: 01 12 9 Q Form Version April 2001 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Section 10 Permit ® 401 Water Quality Certification ® Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: GP 31 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: North Carolina Department of Transportation Mailing Address: P.O. Box 1587 Greenville. N.C. 27835 Telephone Number: 252 830 3490 E-mail Address: Fax Number: 252 830 3341 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Jav Johnson Company Affiliation: Division 2 Environmental Officer Mailing Address: Same as above Telephone Number: Same Fax Number: Same E-mail Address: ibjohnson(iWot.state.nc.us Page 3 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Pamlico 39 2. T.I.P. Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): N/A 4. Location County: Pamlico Nearest Town: Alliance Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): N.C. 55 east from New Bern toward Bavboro. Take left on SR 1205 to first bridge crossing. 5. Site coordinates, if available (UTM or Lat/Long): UTM 18 334589E 3890325N (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application:ExistinE 33' timber bridge on SR 1205 crossing South Prong of Bay River. 7. Property size (acres): N/A 8. Nearest body of water (stream/river/sound/ocean/lake): South Prong of Bay River 9. River Basin: Neuse (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Page 4 of 12 10. Describe the purpose of the proposed work: Bridge to be replaced with an aluminum box culvert. 11. List the type of equipment to be used to construct the project: Typical road construction equipment. 12. Describe the land use in the vicinity of this project: Residential IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. No previous permits have been issued. V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: No additional permit requests are anticipated in the near future. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be Page 5 of 12 included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Wetland Impacts No fill in stream or open water Wetland Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** (yes/no) Distance to Nearest Stream (linear feet) Type of Wetland*** * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://wwxy.fcma.=ov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: N/A Total area of wetland impact proposed: 0 2. Stream Impacts, including all intermittent and perennial streams N/A Stream Impact Site Number (indicate on ma) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Im act Perennial or Intermittent? leasespecify) Area A Culvert & ripra 28' Bay River 27' P * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditch ing/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usgs.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., NNww.topozone.com, www.mapquest.com, etc.). Page 6 of 12 Cumulative impacts (linear distance in feet) to all streams on site: 28' 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open water cover and excavation from box culvert Open Water Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) Area A Open water cover from .03 South Prong of Bay River Stream Box culvert * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation N/A If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Page 7of12 VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at littp://ii2o.enr.state.nc.us/ncwetlaiids/strnigide.litml. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A Page 8 of 12 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at littp://h2o.enr.state.nc.us/M/index.htm. If use of the NCWRP is, proposed, please check the appropriate box on page three and provide the following information: N/A Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may. also be included at the applicant's discretion. Page 9 of 12 Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 2 1.5 Total * Zone 1 extends out 30 teet perpendicular trom near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream fiom the property. When adeauate upland is present in the existing R/W new side ditches from the Proiect will contain and transport stormwater toward wetlands or streams however the stormwater will flow through a silt basin and over velietated uplands prior to entering wetlands or the stream bufffer area. A detail map is enclosed. When no upland exists to construct side ditches stormwater will sheet flow over the vegetated road shoulder and into wetlands. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 10 of 12 XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Age Kur:l Si at Date (Agent's signa is valid only if an authorization letter from the applicant is provided.) US Army Corps Of Engineers Field Offices and County Coverage Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell US Army Corps of Engineers Avery Clay Jackson Polk 151 Patton Avenue Buncombe Cleveland Lincoln Rowan Room 208 Burke Gaston Macon Rutherford Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes 6508 Falls of the Neuse Road Ashe Franklin Nash Surry Suite 120 Caswell Forsyth Northampton Vance Raleigh, NC 27615 Chatham Granville Orange Wake Telephone: (919) 876-8441 Davidson Guilford Person Warren Fax: (919) 876-5283 Davie Halifax Randolph Wilkes Washington Regulatory Field Office Beaufort Currituck Jones Pitt US Army Corps Of Engineers Bertie Dare Lenoir Tyrrell Post Office Box 1000 Camden Gates Martin Washington Washington, NC 27889-1000 Carteret* Green Pamlico Wayne o1 Union Watauga Yancey Wilson Yadkin Page 11 of 12