Loading...
HomeMy WebLinkAbout20011199 Ver 1_Complete File_20010807a' ?To STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION = iM'CHAEL F. EAsLEY DIVISION OF HIGHWAYS GOVERNOR August 3, 2001 Mr. Rob Ridings Division of Water Quality 401 ?etlands Unit 6564ail Service Center 011199 Raleigh, NC 27699-1650 Dear Mr. Ridings: Subject: Crossing pipe replacement for SR 1413 in Randolph County. LYNDO TIPPETT SECRETARY . ®l In an effort to obtain the required permits for a crossing pipe upgrade and replacement, we are providing the pre construction notification and the supporting documents for the site on -SR 1413 in Randolph County. This road has a population of Schweinitz's sunflowers. Included in this package are provisions submitted by Dale Suiter of the U.S. Fish and Wildlife Service to protect the sunflower population during the road construction and the pipe replacement. To our knowledge there are no Wetlands, High Quality water, or Outstanding Resource waters within the area of this project. We anticipate that a Nationwide Permit No. 3 will be required for this project. A copy of this letter will be included with packages to the U.S. Fish and Wildlife Service, N.C. Division of Water Quality, State Historic Preservation Office, and the U.S. Army Corps of Engineers. If you need additional information, please contact our office at (910) 944-2344. Thank you for your cooperation in this matter. Sincerely, Art C. King Division Environmental Officer Highway Division 8 cc: U.S. Fish and Wildlife Service N.C. Division of Water Quality U.S. Army Corps of Engineers HIGHWAY DIVISION 8 P.O. BOX 1067, ABERDEEN N.C.28315 PHONE (910) 944-2344 FAx (910) 944-5623 0 01 Office Use Only: 011199 Form io*Ph USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. I. -Processing 1. - Check all of the approval(s) requested for this project: Section 404 Permit Section 10 Permit 0 401 Water Quality Certification Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide #3 3. If this notification is solely a c esy copy because written approval for the 401 Certification is not required, check here: 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: F R. Applicant Information 1. Owner/Applicant Information Name: W F Rosser. P E Division Engineer Mailing Address: N.C. Department of Transportation Division 8 P.O. Box 1067 Aberdeen N.C. 28315 Telephone Number: 910-944-2344 Fax Number: 910-944-5623 E-mail Address:-brosser@dot-state.nc.us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: R Thomas McManus Jr -County Maintenance Engineer Company Affiliation: N.C. Department of Tran sportation - Mailing Address: 948 Southmont Drive Asheboro NC 27203 Telephone Number: (336. 5-2078 Fax Number: (236) 625-0146 E-mail Address: tmcmanusna dot state nc us - Page 3 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Mountain View Church Road (SR 1413) 2. T.I.P. Project Number (NCDOT Only): 6.572055T 3. Property Identification Number (Tax PIN): 4. Location County: Randolph Nearest Town: Asheboro Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From Asheboro go Hwy. 64 west 3.8 miles and turn right on Spencer Mountain Road (SR 1418) for 1.2 miles turn left on Old Lexington Road (SR 1416) for 0.2 miles turn right on Mountain View Church Road for 14 miles to project 5. Site coordinates, if available (UTM or Lat/Long): N 35° 45' 03" W 79° 54' 23" (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Unpaved Second= Road Pipe Crossing 7. Property size (acres): N/A Roadway 8. Nearest body of water (stream/river/sound/ocean/lake): Caraway Creek 9. River Basin: Yadkin River Basin (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at h=:/ih2o.enr.state.nc.us/adminLmaps/.) Page 4 of 12 10. Describe the purpose of the proposed work: Pipe r lacement 50'L x 54" RCP with a 60'L x 69" x 98" CMP with headwall and upgrade in conjunction with Secondary Road Improvement PWject• Grade, Drain, Base, Pave and Erosion Control on SR 1413 (Mountain View Road) from SR 1004 (Archdale Road) to SR 1413 (Mountain View Road tie to existing pavement 11. List the type of equipment to be used to construct the project: Tractor, dozer, backhoe. pan.compactor motor grader, milling machine 12. Describe the land use in the vicinity of this project: Private homes and a church IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a Page 5 of 12 delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Wetland Impacts Wetland Impact Site Number (indicate on map) Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** (yes/no) Distance to Nearest Stream (linear feet) Type of Wetland*** None * List each impact separately and identity temporary impacts. impacts mciuae, out are not urmtea to: mecnanizea clearing, grda,ng, till, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** •100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at hU://www.fema.izov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: Total area of wetland impact proposed: 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number (indicate on map) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please specify) None * List each impact separately and identify temporary impacts. impacts mciuae, out are not umttea to: culverts and associates rip-rap, darns (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net losstgain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at Page 6 of 12 www.uses.gov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.topgzone.com, www.maNuest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number (indicate on map) Type of Impact* Area of Impact (acres) Name of Waterbody ( applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) None * List each impact separately and identify temporary impacts. impacts mc?ude, but are not ?imited to: till, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): E] uplands Fj stream E] wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Erosion control devices will be installed prior to and during construction. Page 7 of 12 VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at ht-tl2://h2o.enr.state,nc.us/ncwetlands/strtngide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A Q Page 8 of 12 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at hhu:/Jao.enr.state.nc.us/=/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No E If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes E] No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes F-1 No X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Page 9 of 12 Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ? If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. * Zone Impact (square feet) Multiplier Required Mitigation 1 3 2 1.5 Total Gone I extenas out )V Ieei perpenaicular uolII HUM UUILL VI GIIaluirl, L V11c G VALGIlua all additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. N/A M. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. N/A XH. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XIH. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Page 10 of 12 Is this an after-the-fact permit application? Yes E] No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). 6 X-C,, 8j:3 lzaoI Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) US Army Corps Of Engineers Field Offices and County Coverage Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell US Army Corps of Engineers Avery Clay Jackson Polk 151 Patton Avenue Buncombe Cleveland Lincoln Rowan Room 208 Burke Gaston Macon Rutherford Asheville, NC 28801-5006 Cabamis Graham Madison Stanley Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain Fax: (828) 2714858 Catawba Henderson Mecklenburg Transylvania Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes 6508 Falls of the Neuse Road Ashe Franklin Nash Surry Suite 120 Caswell Forsyth Northampton Vance Raleigh, NC 27615 Chatham Granville Orange Wake Telephone: (919) 876-8441 Davidson Guilford Person Warren Fax: (919) 876-5283 Davie Halifax Randolph Wilkes Washington Regulatory Field Office Beaufort Currituck Jones US Army Corps Of Engineers Bertie Dare Lenoir Post Office Box 1000 Camden Gates Martin Washington, NC 27889-1000 Carteret* Green Pamlico Telephone: (252) 975-1616 Chowan Hertford Pasquotank Fax: (252) 975-1399 Craven Hyde Perquimans Wilmington Regulatory Field Office Anson Duplin Onslow US Army Corps Of Engineers Bladen Harnett Pender Pitt Tyrrell Washington Wayne Union Watauga Yancey Wilson Yadkin *Croatan National Forest Only Page 11 of 12 Post Office Box 1890 Brunswick Hoke Richmond Wilmington, NC 28402-1890 Carteret Montgomery Robeson Telephone: (910) 251-4511 Columbus Moore Sampson Fax: (910) 251-4025 Cumberland New Hanover Scotland US Fish and Wildlife Service / National Marine Fisheries Service' US Fish and Wildlife Service US Fish and Wildlife Service National Marine Fisheries Service Raleigh Field Office Asheville Field Office Habitat Conservation Division Post Office Box 33726 160 Zillicoa Street Pivers Island Raleigh, NC 27636-3726 Asheville, NC 28801 Beaufort, NC 28516 Telephone: (919) 856-4520 Telephone: (828) 665-1195 Telephone: (252) 728-5090 North Carolina State Agencies Division of Water Quality 401 Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Telephone: (919) 733-1786 Fax: (919) 733-9959 Division of Water Quality Wetlands Restoration Program 1619 Mail Service Center Raleigh, NC 27699-1619 Telephone: (919) 733-5208 Fax: (919) 733-5321 State Historic Preservation Office Department Of Cultural Resources 4617 Mail Service Center Raleigh, NC 27699-4617 Telephone: (919) 733-4763 Fax: (919) 715-2671 CAMA and NC Coastal Counties Division of Coastal Management Beaufort Chowan Hertford Pasquotank 1638 Mail Service Center Bertie Craven Hyde Pender Raleigh, NC 27699-1638 Brunswick Currituck New Hanover Perq»imans Telephone: (919) 733-2293 Camden Dare Onslow Tyrrell Fax: (919) 733-1495 Carteret Gates Pamlico Washington NCWRC and NC Trout Counties Western Piedmont Region Coordinator Alleghany Caldwell Watauga 3855 Idlewild Road Ashe Mitchell Wilkes Kemersville, NC 27284-9180 Avery Stokes Telephone: (336) 769-9453 Burke Surry Mountain Region Coordinator Buncombe Henderson Polk 20830 Great Smoky Mtn. Expressway Cherokee Jackson Rutherford Waynesville, NC 28786 Clay Macon Swain Telephone: (828) 452-2546 Graham Madison Transylvania Fax: (828) 506-1754 Haywood McDowell Yancey Page 12 of 12 ------- ----- -- M • 0 01,4 See SW I -A For In*vx d Staft See SW f-6 For Canltidand SzjvWs - ------------------------------------ ---? 1 J i I ? ! 1 1 I SR ` 1413 - 1004 I ?p ``? ' Pp 1 1 LOCA ? Gp t4t4 j 13 - FRO ON, -` 1413 ` 1 t 1 /? r' I r 3 1T.iS ?? 1412 6 1004 O • LOCA. 1 411 s 1419 s 1. I 1 TYPE 1411 1413 1416 \ • 2.3 1 , I 1 410 32a C t 1 142D 3136 ti 64 -, • 4 1418 J , n ' 1 I I cq: 2 L01417 I v 1 x ' 1 1318 I ?)v 9 1422 , ?-' 1328 1331 J 1318 1329.61 ?? •? /?, ? °i J • S I 1 - VICINITY MAP ( not to scale ) ------------------------------------- i --- 100 50 0 too 200 - O 11111 -? BEGEV PRO vZ".av T-vv.vv AT SR 1413 PAVEMENT J-P s SURVEYED BY : DATES : 091 << > > M MW MD CQ1L'MJCIIQ1' RIGHT OF WAY DAM DESIGNED BY : DATES : ltv- DRAWN BY : DATES : ?'! Tel. 3 y / j'1 ;oh- Fi.W r 1 Helianthus schwein ? I l ?' J, - SP? 21 r - i' ' . 7< 5 I I 2*M n , ? / ? ? QnA { - F Sunflower 1 220 S 1311 -_ - i-_- I 1735 6 \ 39 I }L 1;. ?, 35] ' b 3136: `--Ib 420 `J- ASHEBORO 1 n` ' II?`J' J 1339 64' ^ `J L aye .1 J -I rW 11.1u 1 \/ ? it ?V ?? / .1a17 341 `? %.? t 9•'6 - J1 ' ? ?'t ? ^ II 11 // 1 0 1 y Sr 1332 1 .a O 1619 , • / '? \ ( _ I / / '/ ??/// 343 J\ 133e -„/? a _... /. I '? -\ I i / •ji i m 13z9 • 1 \ I 3+ 17!O 1311 1331 , 1318 .l• 11. \.. c??6a->? / --j ?r7 r r-` n "?', n ^ r329-'n 1Gw _ .s `J\w+ - rlL'? I? ? I? '`` 1 I \ ?? / / 1312 123: ?J .3 I^ 11365 387 I \ ?:, I'? /.?O ??I :/ ; I ? ?( ? r- 1351 .; .. •0 11313 1336 r n 1319 /1- , ow i 314 tf . - 1332 / G- 1320 ASHEBCEO wE53 . C ?'I + 1\\ '? I`' I 310 ,t? 1312 131. 7 . _ . 'J3B41 •JK' - ?. n 1718 -360 (1721 1 EO'M'- •? ,- I y 2' 136 1.n 1366 ?. ^ s 1362 .? i O ,. 1311 1313•, a. 317 1317 '?. ` 319 1385 IIQ9V V On O.. hhw ^ J 1318 1386. .1361:. 1 1 - / I . 1 n 1308 .5 1 , / .. 116-1' 13 7 3 ~ , . <49 IT79 .1368 M1 - / ?. • !!! J - •+ 1381 n n G '- _ r1i0H- Ci - we ?SMEBORO .a- o - 1312 p2 vl 4 JC SOUTH 2828 O I ?f. ? ?I TA r.3 ? y3 / _ 3'9 6 UN,- Wrno015r wN++1HC.1 $ 4 1 ' 2 'P 1 166 - id• 1107 ` 1388. .2 c1> ?? L .Or 3.n1i -2931. 380- \ 3? 369 5 -r63' Alh bw. F- 1193 Mwliepoi Yt ' 7. 299. .' 13]0• \ 1 - ..-. L > ^ ?f? \f - A.ryer3 ., 163 ? \ >I?'a /? ?? z6.3: - P 1306 ` - G?_ ?l 119 Id50 9 1163 y I19 i ¢ V ? / 2989 `T y \ 1 193 I I T1 n • 5 ?--'' - .. 1193 - 1 f 1 2976 l 1305 n• 2 3 1 , as •' 1196 Y `a9 11yj ° 1 Wd1o.K :s '1 11• 5 Bw 1303 1 3 11]3' v `. - 1168 1 I U1ol. IZ N L. 3°J 1 - ZOOIOC cG S.1- 01. , - 1107 PA21( 1174 nn 4 1304 `'• 3 ,3' / I VV 0 ` n S 4 1 W H A R 'R I E 1 i 283 283e .? n] _ / '335 I' 2" 3 lJ ( - / .a nr] ./' ;? ?: 136 / /2M 1, I , 2865 /11 1191 1143 J Y 113 F 1107 1113 - 1 / - .1 :f 3 .A .? - NIOn i!Ma' .3 28-30 8• ?: J. , ] Cn. 1 1133 1 I I - 1183 1212 ( 1218 - ./b P MidK.y ?a3 16 O ?.. , 181 N A 7 I, O N A L 3 l 5 1 35 I 2865 ^ / 11 urrr,.- -?.. ? Uwr + I la3 1112 121 29x6 290 IIJd J. A . 1 t...1.r 1 12 ` ° ?, 1.0 11. Mi 1113 ' 1180 ' / r'0~ / / J 3 1103 1.8 ./ Y 1LT ' '1 11 i IT ? g Z 0 N Q w J w Z O M U w N Cl) U O Q U i' I' 9 a r x tG N CL } U1 J V co 0 x co m y J LU J w zd3< - W Q .i CL ?- O X r 1 I is PI i r r i? l' 0 N W m 1- y Subject: Re: sr-1413 Randolph Co. Date: Thu, 2 Aug 2001 17:45:36 -0400 From: DaleSuiter@fws.gov To: "Art C. King" <acking@dot.state.nc.us> CC: "Mary E. Frazer" <MEFrazer@dot.state.nc.us> Measures to protect Schweinitz's Sunflowers on SR 1413 Delineate population with orange mesh fencing ***just prior to project construction.*** No staging areas within the sunflower areas No stock piling rock, soil or other materials within the sunflower areas Have the Division Environmental officer on site during all project construction with the sunflower area Notify U.S. Army Corps of Engineers (Richard Spencer) and U.S. Fish and Wildlife Service (Dale Suiter) immediately of any changes in project plans. No ditch work in the area where Schweinitz's Sunflowers are fenced. This seems like a hard promise to keep so I've added the following measures if ditch work is required: moving all impacted plants to the sunflower mitigation area (during the appropriate transplanting time - after October 31) revegetating any exposed soil immediately after project construction (use seeds of native species) no rip-rap in the ditches where the sunflowers are found Identify a stock pile area (on the Howell-easement property) where soil that may contain sunflower seeds and tubers can be stored and later spread over a suitable planting area. (Surround pile with silt fencing). Keep in mind, that if the project can be built by avoiding all sunflowers using the milling machine and existing gravel then I don't think formal consultation is required. However, if ditch work or any other disturbance to the sunflowers will take place then we are back to square one with formal consultation, mitigation, etc. Dale W. Suiter Fish and Wildlife Biologist U.S. Fish and Wildlife Service Raleigh Field Office P.O. Box 33726 Raleigh NC 27636-3726 phone: (919) 856-4520 ext. 18 fax: (919) 856-4556 email: Dale-Suiter@fws.gov 1 of 2 08103/20018:07 AM