Loading...
HomeMy WebLinkAbout20011073 Ver 1_Complete File_20010709f, CO QG Cl 'C Aug 27 '01 13:54 P.03/06 Michael i`. Easley Governor William 0. Ross, Jr., Secretary Department of Environment and Natural Resources Kerr T. Stevens Division of Water Quality DWQ Project No.: b? 1073 County: Applicant: N C.00 T Project Name: g r 17 7 Date of Issuance of 401 Water Quality Certification: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return, this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1.621 Mail Service Center, Raleigh, NC, 27699-1621.This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer.It is not necessary to send certificates from all of these. Applicant's Certification hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and .intent of the 401 Water Quality Certification and Buffer Rules, the approved planet,ptnd specii;i,4t s, and other supporting materials. Agent's Certification I> , hereby state that, to. the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: -Date:._ . If thls project was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, ect.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date NCDERR- ROW 1 .-... Division of Water Quality 1650 Mail Service Center Raleigh. NC 27699-1650 Wetlands/401 Unit: (919) 733-1786 Fax- (919) 733-6898 OF WA rFR ?0 QG . LALU > Michael F. Easley Governor William G. Ross, Jr., Secretary Department of Environment and Natural Resources O Kerr T. Stevens Division of Water Quality July 20, 2001 Rowan County Bridge No. 177 on SR 2359 (George Tobas Road) DWQ Project No. 011073 APPROVAL of 401 Water Quality Certification with Additional Conditions Ms. Diane Hampton, Environmental Officer NCDOT Division 9 2125 Cloverdale Avenue Winston-Salem, NC 27055 Dear Ms. Hampton: You have our approval, in accordance with the attached conditions and those listed below, to impact 0.03 acres of wetlands 60 linear feet of an unnamed tributary to Second Creek for the purpose of replacing Bridge No. 177 on SR 2359 (George Tobas Road) in Rowan County. The project must be constructed in accordance with your application dated 6 July 2001. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification No. 3289 corresponding to the U.S. Army Corps of Engineers General (Regional) Permit Number 198200031. In addition, you must acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying §404 permit unless otherwise specified in the Water Quality Certification. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWQ and submit a new application.: -If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. 1. The pipe installation must be performed such that one pipe is placed in line with the stream and set below the streambed as described in the application. The second pipe must be placed at higher elevation or blocked to guide the low flow through one pipe only. 2. The original stream profile shall not be altered (i.e. the depth of the channel must not be reduced by a widening of the streambed). Existing stream dimensions are to be maintained above and below locations of culvert extensions. 3. All work shall be performed during low flow conditions. 4. The presence of equipment in the channels must be minimized. Under no circumstances should rock, sand or other materials be dredged from the wetted stream channel under authorization of this permit, except in the immediate vicinity of the culverts. 5. Mowing of existing vegetated buffers is strongly discouraged, so that they may be utilized for storm water sheet flow. 6. Use of rip-rap for bank stabilization is to be minimized; rather, native vegetation is to be planted when practical. If necessary, rip-rap must be limited to the stream bank below the high water mark, and vegetation must be used for stabilization above high water. 7. Rock silt scr . North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893.(fax), hftp://h2o.enr.state.nc.us/ncwetlands/ Page 2 of 2 Upon completion of the project, the NCDOT shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §40J Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ms. Cynthia Van Der Wiele at 919.73-1 '. 1786 or Ms. Jennifer Frye of the Winston-Salem Regional Office at 336.771.4600. Attachment Sincerely, r n. Asts cc: Wilmington District Corps of Engineers Corps of Engineers Asheville Field Office DWQ Winston-Salem Regional Office Central Files File Copy 401 ISSUE Office Use Only: 011073 Form Version April 2001 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Section 10 Permit ® 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: GP-31 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? H. Applicant Information 1. Owner/Applicant Information Name: NC Department of Transportation - Division 9 Mailing Address: 2125 Cloverdale Ave. Winston-Salem NC 27055 Telephone Number: 336-761-2613 Fax Number: 336-761-2606 E-mail Address: 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Diane Hampton. PE, DEO Company Affiliation: NCDOT - Division 9 Mailing Address: 2125 Cloverdale Ave. Winston-Salem NC 27055 Telephone Number: 336-761-2613 Fax Number: 336-761-2606 E-mail Address: dkhamp on@a dot state nc us z/ RECEIVED Page 3 of 12 M. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Bridge 177 - SR 2359 George Tobas Road 2. T.I.P. Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): N/A 4. Location County: Rowan Nearest Town: Rockwell Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): Take SR 2337 south from Rockwell approx 2.8 miles, turn right onto SR 2359 George Tobas Road and bridge is .5 miles down the road. 5. Site coordinates, if available (UTM or Lat/Long): 35°30'37.5" N 80°24'51.9" W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Rural bridge site - 7. Property size (acres): 8. Nearest body of water (stream/river/sound/ocean/lake): Tributary to Second Creek 9. River Basin: Yadkin (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Page 4 of 12 10. Describe the purpose of the proposed work: to replace old bridge with new on same location, using two CMP pipes 120" in diameter. 11. List the type of equipment to be used to construct the project: standard bridge construction equipment including La trackhoe 12. Describe the land use in the vicinity of this project: rural / agricultural IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility. to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream Page 5 of 12 mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Wetland Impacts Wetland Impact Site Number indicate on ma) Type of Impact* Area of Impact (acres) Located within 100 year Floodplain** (es/no) Distance to Nearest Stream linear feet) Type of Wetland*** 1 Fill .03 Yes 0 riverine * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechamzed clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at htty://www.fem&gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: .09 acres Total area of wetland impact proposed: .03 acres 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number (indicate on ma) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) 1 Culvert 60 UT. To Second Creek 10 Perennial * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated np-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net losstgain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. * * Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usas.aov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.tomzone.com, www.MMuest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 60 feet Page 6 of 12 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U. S. Open Water Impact Site Number indicate on, ma) Type of Impact* Area of Impact (acres) Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) N/A * List each impact separately and identify temporary impacts. Impacts include, but are not lumted to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation N/A If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The bridge is aging and may become unsafe in the near future for the travelling public. The NCDOT proposes to install two CMP pipes to simulate the bottom effect of a natural channel while still maintaining adequate flow passage This alternative is much more cost effective than a bridge supported on piles The culverts will be partially buried below the natural grade to insure the passage of fish and other aquatic organisms All efforts to insure erosion control and to minimize the placement of rip rap will be made Natural materials will be used to stabilize the banks where possible Construction will be completed in a timely fashion to not upset the natural and human community. Page 7 of 12 VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. 'An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http: //h2o. enr. state. ne.u s/ncwettands/strmp-ide. html . Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Page 8 of 12 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wmrindex.htrn. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Page 9 of 12 Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 2 1.5 Total " Zone 1 extends out 3U ieet perpendicular rrom near oanx or cnannei; cone I extenuS au additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or. 0260. XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. XH. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XHI. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Page 10 of 12 Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Agent's Signature' 'Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) US Army Corps Of Engineers Field Offices and County Coverage Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell US Army Corps of Engineers Avery Clay Jackson Polk 151 Patton Avenue Buncombe . Cleveland Lincoln Rowan Room 208 Burke Gaston Macon Rutherford Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes 6508 Falls of the Neuse Road Ashe Franklin Nash Surry Suite 120 Caswell Forsyth Northampton Vance Raleigh, NC 27615 Chatham Granville Orange Wake Telephone: (919) 876-8441 Davidson Guilford Person Warren Fax: (919) 876-5283 Davie Halifax Randolph Wilkes Washington Regulatory Field Office Beaufort Currituck Jones US Army Corps Of Engineers Bertie Dare Lenoir Post Office Box 1000 Camden Gates Martin Washington, NC 27889-1000 Carteret* Green Pamlico Telephone: (252) 975-1616 Chowan Hertford Pasquotank Fax: (252) 975-1399 Craven Hyde Perquimans Wilmington Regulatory Field Office Anson Duplin Onslow US Army Corps Of Engineers Bladen Harnett Pender Pitt Tyrrell Washington Wayne Union Watauga Yancey Wilson Yadkin *Croatan National Forest Only Page 11 of 12 I 8 2415 `?_\-< - - - -'? ' •? / ?/.._.•\ .16 r? fi, 2416 1 tV 2325 i -- 1 1 - - 2343 /.. .65 - . / / J ' -- 417 '• 2369 C296 2 - 24174-? -------- ry , 9? 244 5 \ 1 . ..? •2324 2329' r 10 \ -11 P / . _ • 93 2331 i \ • ? 2340 i - 185 2326 9 C77 2 \ .. \ ? ?. ' • , '•? 2332 "? ? w` 1 2369 Rocllwall ? .. ? ` •43 ' - q,y p •' Ip Gob lar .65 .12 \ -' 7 nlno Wor. ?. 2339 52 _ / 2320 2401 ?_333 1 2337 1 1 `` 28 ) 95 2340 ) I i 2 . U • • . \ 2334 ad` ' /' ' S3\. v 23M - 2,67 184 '\ ---- i 1 '? 2333 `4 421 \ • • Cam' UNA / ?O 2444 2335 1l Z-42 76 183- ?•,-•.1-., - J '- '- - 178 I3 ; I 2347 •61 -?, 26 / 179 /: •' \ / I 2338 2345 i 23317 2335 182 -181 > > 2346 1221 1 ' • 9 \ ? /• 2358 / •_ 2347 2427 1 $ 130 / 2337 2338 i ' 60 / .73 I ? 1 1.00 i 2359 I I . • 1006 - A '\ 2M5 177 2357 •\ . \ ENLARGED MUNICIPAL AND SUBURBAN AREAS .......... 2361 .80 _ROWAN COUNTY C ASp?RRw3 co. \ BRIDGE LOCATION MAP NORTH CAROLINA PREPARED BY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATIO'. DIVISION OF HIGHWAYS - BRIDGE MAINTENANCE UNIT SCALE IN COOPERATION WITH THE T 0 1 AVLES U.S.DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION ?,??j _: r 49 'I i7. `\ 1: t,?.-?e?f "??k •' '?T3? ? ., T1i"'-s 4.` lt ? I ?„•, •t ?? ?.; ?i ceei ?¢31 n t N. A -? ,?.?.^` r ?77 fi? \? ?,,??'? ?s?:, yl?J ?` ?? fit' ?? ? J,; t 0I4a` .71 r ?j'S'. L J,?•.r- .,...(, Grece-..owQi $tau+e f i (i20 `` - ,1 _ _ L i2 1 +? Cb Concotice . f"?' S 1 ?f , j u'? '?1. ??? ? •• 1-\??1 ?1} ?? ? ? ? 6Eq T?Y T.J? . V av ., ( t1 t 1 C2 -?K eaa ?T ry C3?R \P?TSaaa, a 7° W Name: ROCKWELL Location: 035° 31'31.9" N 080° 24'46.2" W Date: 715/2001 Scale: 1 inch equals 2000 feet (C) 1997, a r PRIMATE D R. Fy ? ,:Y 6 : r'.'' d cr N `tT 0 ? Z LO N W 3 . 01 + J N ` o o Q w " ? oc W rA ? . ?'?_. `SY -S? • r Ate- ? (` r xv ' `f M ?}L , Ks Bl1 M M N d 0 3 a ?o r- u W rn 0 Ngo? V] ?u)N -- F STATE of NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPET GOVERNOR SECRETARY July 6, 2001 SUBJECT: Rowan County - SR 2359 Bridge 177 George Tobas Road Mr. John Domey NC Division of Water Quality 4401 Reedy Creek Raleigh, NC 27607 1®7 3 Dear Mr. Dorney, In an effort to obtain the necessary permits for the subject bridge replacement, we are providing a pre-construction notification application with supporting documentation for the replacement of bridge D l w l number 177 in Rowan County. You are holding a $200.00 credit for us and we have opted to use it for this application. There are .03 acres of wetlands to be impacted and there will be 60 feet of stream impacts. We propose to replace the old timber and steel girder bridge with two pipes (120" in diameter) at the same location. We believe this project can be accomplished under General Permit number 31. By copy of this letter, we are also seeking approval from the State Historic Preservation Office, the Corps of Engineers, the Fish and Wildlife Service and the NC Wildlife Resources Commission. Therefore, we are submitting the enclosed material to them. If you have any questions, comments or need additional information after reviewing this material, please contact me at (336) 761-2613. Thank you for your cooperation in this matter. Respectfully, Diane K. Hampton, P.E. Division Environmental Engineer Enclosures CF: Mr. Pat Ivey, P.E., Division Engineer -O Mr. George Teague, Bridge Maintenance Superintendent File ?G 2 fl, Division of Highways • Division Nine • 2125 Cloverdale Avenue, Winston-Salem, NC 27103 Telephone (336) 761-2613 * Fax (336) 761-2606 • Courier Box 13-12-04