HomeMy WebLinkAbout20010842 Ver 1_Complete File_20010605o
rn
0
O
0
CrJ
OD
,A
ul
w
o z
a
?
0
L
N
A
O
n
N
O
O ty
y
?
N
N
O
O 0
A
?
C
O
O y
V /, f 1
N
C}
N
O z
r?
y
O
O
O
O y
D
X
Z
Z
O
?o
Ol
N
D
m
O
rn
0
N
N
0
O
N
z
n
v
m
a
T
3z
m?
Z0
y?
O0
?i
?;o
cM
zZ
0)
-0Z
O
O
z
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
.Michael F. Easley, Governor
William G. Ross, Jr., Secretary
Kerr T. Stevens, Director
/ •
N.CDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
July 4, 2001
Nash County
DWQ Project No. 010842
APPROVAL OF 401 Water Quality Certification and ADDITIONAL CONDITIONS and Neuse
River Buffer Rules
Mr. James H. Trogdon, Division Engineer
NCDOT, Division 4
PO Box 3165
Wilson, NC 27895-3165
Dear Mr. Trogdon:
You have our approval, as described in your application dated May 29, 2001, and in accordance with the
attached conditions and those listed below, to place fill material in 60 linear feet of streams. In addition,
you are authorized to impact 70 linear feet of streams for purposed of dewatering the construction site. The
project's purpose is the widening and improving SR 1514 (Hickory Road) from SR 1500 to the end of the
project in Nash County. The project shall be constructed in accordance with your application dated May
29, 2001. After reviewing your application, we have decided that this fill is covered by General Water
Quality Certification Number 3289. This certification corresponds to the Nationwide Permit Number 14
issued by the Corps of Engineers. This approval is also valid for the Neuse River buffer rules (15A NCAC
2B .033). In addition, you should acquire any other federal, state or local permits before you proceed with
your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply
Watershed regulations. This approval will expire when the accompanying 404 permit expires unless
otherwise specified in the General Certification.
This approval is valid solely for the purpose and design described in your application (unless modified
below). Should your project change, you must notify the DWQ and submit a new application. If the
property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby
responsible for complying with all the conditions. If total wetland fills for this project (now or in the future)
exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory
mitigation may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). ). This approval shall
expire with the corresponding Nationwide Permit expires or as otherwise provided in the General
Certification. For this approval to be valid, you must follow the conditions listed in the attached
certification and any additional conditions listed below.
1. Stormwater shall be directed to sheetflow at nonerosive velocities through the protected stream buffers.
2. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certification of
Completion Form" to notify DWQ when all work included in the 401 Certification has been completed.
The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the
Division of Water Quality upon completion of the project.
3. For the 70 linear feet of streams being impacted due to site dewatering activties, the site shall be graded
to its preconstruction contours and revegetated with native vegetation.
Wetlands/401 Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1621
Telephone 919-733-1786 FAX 733-9959
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post consumer paper
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
Michael F. Easley, Governor
William G. Ross, Jr., Secretary
Kerr T. Stevens, Director
4 •
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
4. For the impacts to Zone 1 of the protected riparian buffer at station 61+00, the site shall be graded to
its preconstruction contours and revegetated with native tree vegetation.
5. The DOT shall strictly adhere to North Carolina regulations entitled "Design Standards in Sensitive
Watersheds" (15A NCAC 04B .0024) throughout design and construction of the project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing.
You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written
petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of
Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 276 1 1-7447. This certification and its conditions
are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act. If you have any questions, please contact John Hennessy at 919-733-1786, or Steve Mitchell at 919-
571-4700.
Sincerely,
Attachment
cc: Wilmington District Corps of Engineers
Corps of Engineers Raleigh Field Office
DWQ Raleigh Regional Office
r
Central Files
c:\ncdot\SR 1514\wqc\010842wgc.doc
e 0?
. Stevens
Wetlands/401 Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1621
Telephone 919-733-1786 FAX 733-9959
An Equal Opportunity Affirmative Action Employer 50% recycled/10% post consumer paper
P
r?
MICHAEL F:
GovERN, OR
401 ISSUED
V ? D
STATE of NORTH CAROLINA
ARTMENT OF TRANSPORTATION
Y LYNDO TIPPETT
SECRETARY
May 29, 2001
U.S. Army Corps of Engineers
Raleigh Regulatory Field Office
6508 Falls of the Neuse Road, Suite 120
Raleigh, NC 27609
Attention: Mr. Eric Alsmeyer 01 0 8 4 2
NCDOT Coordinator
Subject: Secondary road improvements to SR 1514 (Hickory Road) from SR 15D0
to end of project in Nash County. (W.O.#6.322249)
The North Carolina Department of Transportation (NCDOT) proposes to upgrade SR
1514 (Hickory Road) from SR 1500 to the end of pavement in Nash County. SR 1514 is
an unpaved roadway that will be upgraded to a paved roadway. Total project length is
1.47 miles.
Transportation and highway laws of North Carolina (G.S. 136-44.6, 136-44.7,
136-44.7A, 136-44.8, and 136-44.9) require the NCDOT to develop annual work
programs for construction and maintenance of secondary roads. These general statutes
specifically set forth requirements for annual construction and paving of existing unpaved
roads. Paving of these roads is performed in priority order as established by the NCDOT
for each unpaved road within a given county. This number is based on characteristics of
each road, including number of homes, schools, churches, businesses, industries,
recreational facilities, traffic counts, presence of school bus routes, and value as a
thoroughfare. Hickory Road is scheduled for paving in the 2000-2001 Secondary Roads
Construction Program.
Impacts to Waters of the United States
PAYMENT
RECEIVED
Post Office Box 3165, Wilson, North Carolina 27895-3165
Construction of the project will require impacts to waters of the United States in
the Neuse River Basin. The project crosses one intermittent tributary to Black Swamp.
Impacts to the stream from construction include approximately 60 square feet (0.0014
acres) fill in surface water and a total of 60 linear feet of existing channel impacted, due to
a slight realignment of the proposed pipe to align more closely with the existing stream
channel.
LOCATION EXISTING EXISTING PROPOSED PROPOSED
Station Width in. Length ft.) Width in. Length ft.
61+00 24 34 36 60
No impacts to wetlands associated with roadside shoulder and ditch construction
are anticipated.
Waters of the U.S. Mitigation
Avoidance: All wetlands or surface waters not affected by the project will be
protected from unnecessary encroachment. No staging of construction equipment or
storage of construction supplies will be allowed in or near wetlands or surface waters.
Minimization: The side slopes have been steepened to the extent possible at
jurisdictional sites. Sedimentation and erosion control Best Management Practices for the
protection of wetlands and surface waters will be strictly enforced during project
construction. Continued coordination will occur with maintenance forces and the
Environmental Officer during construction to minimize impacts to waters of the U. S. at
these sites.
Compensatory Mitigation: Construction of the project will result in no impacts
to jurisdictional wetlands, therefore no mitigation is required. Impacts have been
minimized to the maximum extent possible during the design process.
Riparian Buffer Impacts
The construction of the project involves one road crossing of an intermittent
stream, which is subject to the Tar-Pamlico Riparian Buffer Rule. Construction impacts at
the crossing are less than 40 linear feet of riparian buffer. A slight realignment of the
proposed pipe will reduce the stream channel length from approximately 80 feet to 60 feet.
Approximately 200 square feet of Zone 1 buffer will be temporarily impacted during the
pipe replacement. Vegetation will be reestablished adjacent to the proposed pipe, within
six months of project completion. Based on the impacts to the riparian buffer at the
stream crossing, the subject project is exempt from the Rule. Efforts will be made to
minimize the impacts of any additional storm water by the installation of extra check dams,
level spreaders and vegetated swales wherever possible.
Dewatering
The NCDOT proposes to temporarily dewater the stream during construction of
the subject project. This will involve the temporary placement of sandbags, sheet metal
cofferdams, or Class B or Class 2 rip rap covered with filter fabric in the stream channel
approximately 10 feet upstream of the proposed pipe inlet. To maintain water flow-during
construction, water upstream of this impervious structure will be temporarily puml3ed out
and conveyed downstream of the construction activity where it will be allowed to filter
through vegetation before flowing into the stream. The stream will be dewatered for less
than five consecutive working days. This will result in temporary impacts to these surface
waters.
Temporary impacts to the stream from this activity will result in the dewatering of a total
of 0.006 ac of streambed and approximately 70 linear feet stream channel for the proposed
pipe replacement. The sandbags or riprap covered with filter fabric will be entirely
removed after construction.
Regulatory Review
The subject project has been reviewed and concurrence obtained from the State
Historic Preservation Office that there is no effect to any National register or Study-listed
properties within the subject projects area of potential effects.
The subject project has been reviewed by the Environmental Officer and by the
U.S. Fish and Wildlife Service (USFWS) representative for the presence of listed
threatened and endangered species. The subject project has been determined to have no
effect on any listed threatened or endangered plant or animal species.
Permit Issues
The purpose of this letter is to provide notification under Section 404 Nationwide
Permit (NWP) 14, Linear Transportation Crossings. Notification for the use of this NWP
to the USACE is provided as a courtesy for this project, because the project does not
require any impacts to jurisdictional wetlands. Also, notification to the North Carolina
Division of Water Quality (NCDWQ) for Section 401 Water Quality Certificate (WQC)
No. 3289 is required for this project. NCDOT will comply with all conditions associated
with this NWP and WQC.
Additionally, the purpose of this letter is to request authorization under a Section
404 NWP 33 to dewater the stream during project construction. The 401 WQC No. 3114
(which corresponds to NWP 33) does not require written concurrence from the NCDWQ
as NCDOT intends to comply with conditions for the WQC.
Summary
NCDOT proposes to upgrade and pave SR 1514 in Nash County. Temporary
impacts to the stream from dewatering activity will involve 0.006 ac. of streambed and 70
linear feet of stream channel for the proposed stream crossing. Impacts associated with
the pipe replacements at this project include 0.0014 acres of fill in surface water and 25
linear feet existing channel impacted. The project is located in the Tar River Basin.
Impacts to the riparian buffer at the stream crossing are less than 40 linear feet in the
buffer and are therefore exempt from the Riparian Buffer Rule. The NCDOT asks that the
dewatering of the stream be authorized under a Section 404 NWP 33. The NCDOT will
adhere to all applicable Section 404 NWPs and Section 401 WQCs conditions. If you
have any questions or need additional information, please contact Ms. Robin MLittle at
-(252) 237-6164.
Y,
i ionjEngineer
III, P.E.
cc: Mr. David Franklin, USACE,WiI in on
Mr. John Dorney, NCDWQ, Ralei
Mr. David Cox, NCWRC, Creedmoor
Mr. Garland Pardue, USFWS, Raleigh
Ms. Renee Gledhill-Early, SHPO, Raleigh
Mr. Terry Ellis, Assistant District Engineer
Mr. Bryant Bunn, P.E., NCDOT Division Maintenance Engineer
Mr. Don Goins, P.E., Chief Engineer, Operations
Use Only:
Action ID No.
DWQ No.
010842 Fonn Version April 2001
any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
wing the space blank.
Processing
Check all of the approval(s) requested for this project:
® Section 404 Permit
? Section 10 Permit
® 401 Water Quality Certification
® Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: NWT 14, 33
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
Applicant Information
Owner/Applicant Information
Name: Mr. James H. Troadon III P.E. Division Engineer
Mailing Address: North Carolina Department of Transportation /Division 4
P.O. Box 3165
Wilson NC 27895-3165
Telephone Number: (252) 237-6164 Fax Number: (252) 234-6174
E-mail Address: jtrog_don o,dot.state.nc.us
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Ms. Robin M. Little
Company Affiliation: Division Environmental Officer
Mailing Address: North Carolina Department of Transportation/Division 4
P.O. Box 3165
Wilson NC 27895-3165
Telephone Number: (252) 237-6164 Fax Number: (252) 234-6174
E-mail Address: rmlittle@dot.state.nc.us
Page 3 of 12
Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailedsite plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11. by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SR 1514, Hickory Road, 6.322249
2. T.I.P. Project Number (NCDOT Only);
3. Property Identification Number (Tax PIN): NA
4. Location
County: Nash Nearest Town: Whitaker
Subdivision name (include phase/lot number): NA
Directions to site (include road numbers, landmarks, etc.): I-95 to Exit 150, west on NC 33,
south onto NC 48, approx.1.6 miles to SR 1514 on rim
5. Site coordinates, if available (UTM orLat/Long): UTM 18 245100E 3999992N, Drake Quad
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinctwaterbody.)
6. Describe the existing land use or condition of the site at the time of this application: Rural,
residential.
7. Property size (acres): NA
8. Nearest body of water (stream/river/sound/ocean/lake): UT to Black Swamp (DWQ ID #
28-79-27-1, WS-IV NSW
9. River Basin: Tar River
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available athttp:/.ih2o.enr.state.ric.us/adm_in/ma.ps/.)
10. Describe the purpose of the proposed work: Grading drainage, base, paving and erosion
control to bring existing gravel road in compliance with standard safety design specifications,
replace culvert.
Page 4 of 12
11. List the type of equipment to be used to construct the project:
Heavy construction equipment back hoe, track hoe excavator, dump truck)
12. Describe the land use in the vicinity of this project: Rural residential/agricultural mix.
Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
NA
Future Project Plans
Are any additional permit requests anticipated for this project in the future? If so, describe the
anticipated work, and provide justification for the exclusion of this work from the current
application: NA
Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
Page of 12
1. Wetland Impacts
( Wetland Impact
Site Number
indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-yearFloodplain**
(es/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at 1df111_/hv_w;v.fema_goy
** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property: NA
Total area of wetland impact proposed: 0
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact Length of Average Width Perennial or
Site Number Type of Impact* Impact Stream Name** of Stream Intermittent?
indicate on ma) (linear feet) Before Im act especify)
Stn 61+00 136" RCP 60 UT to Black Swamp 2 Intermittent
List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associatedip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
wuw.us?;s.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., wwwjopozonc.conr
www.nraI)quest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 60
Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U. S.
pen Water Impact
Site Number
indicate on ma)
Type of Impact* Area of
Impact
(acres)
Name Waterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
List each impact separately and identify temporary impacts. Impacts include, but are not limited to: till, excavation, dredging,
flooding, drainage, bulkheads, etc.
4. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Page 6 of 12
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
All wetlands or surface waters not affected by the project will be protected from unnecessary
encroachment No staging of construction equipment will be allowed in or near wetlands or
waters of the U.S. Strict enforcement of sedimentation and erosion control Best Mana eg ment
Practices for the protection of wetlands and surface waters will be enforced during project
construction.
Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
L
http:/,h2o enr state nc.us/ncwetlands/strmgi de. htm
Page 7 of 12
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more. space is needed.
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at http_! h2o _cnr_stte.nc _us!«r/index_h#.nt. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres
Amount of Non-riparian wetland mitigation requested (acres
Amount of Coastal wetland mitigation requested (acres):
Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
Page 8 of 12
Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ® No ? If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet) Multiplier Required
Mitigation
1 0 3 0
2 0 1.5 0
Total 0 0
* Zone 1 extends out 30 feet perpendicular trom near banK of channel; Gone L extenas an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or.0260.
Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Existing gravel road surface area will not be widened within riparian buffer. Level spreaders
outside the riparian buffer or grassed swales inside the riparian buffer will be utilized in order to
minimize water- quality impacts Temporary dewateri ng and all appropriate best management
practices for sediment and erosion control will be implemented during pipe replacement.
Page 9 of 12
this
this
U? Arn
l J Pat
(8:
Arn
Sewage Disposal (DWQ Only)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) o:
wastewater generated from the proposed project, or available capacity of the subject facility.
NA
Violations (DWQ Only)
>ite in violationof DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes ? No
in after-the-fact permit application?
Yes ? No
Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desire
construction dates to allow processing time for these permits. However, an applicant ma,
choose to list constraints associated with construction or sequencing that may impose limits of
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered an(
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
ant)Ag t'' Signature D to
is signa re is valid only if an authorization letter from the applicant s pr vided.)
S Army Corps Of Engineers Field Offices and County Coverage
le Regulatory Field Office Alexander Cherokee Iredell Mitchell Union
ty Corps of Engineers Avery Clay Jackson Polk Watauga
ton Avenue Buncombe Cleveland Lincoln Rowan Yancey
08 Burke Gaston Macon Rutherford
le, NC 28801-5006 Cabarrus Graham Madison Stanley
me: (828) 271-4854 Caldwell Haywood McDowell Swain
!8) 271-4858 Catawba Henderson Mecklenburg Transylvania
Regulatory Field Office Alamance Durham Johnston Rockingham Wilson
ry Corps Of Engineers Alleghany Edgecombe Lee Stokes Yadkin
Page 10 of 12
A
14
' X C O U 14
i
46.14 r`t. t i U. b..€ \3
11114%, W.
?•/
15Q7 1303 • ` 448 5
{ 1303 i5W ?' •1•'. 1313 ?p 1 (y
7 ti, 150 h ...
G 1501 1512 1 1 1310
` 1304 301
1520
0
' Salem 4? QY/ J lp 131 WMrrAK@R$
1319 101.1161
•? 1371 Ch. \ 1514 rY 150 IMU h - [NA1N l1:
J' fOG[COAIIf /4
_ 1512,
• ) 1 1 1 1300 1313 /
43 S.Irr '? 341411(} ,•
Ch O
33 m n
4an I3to i-..- •?/ _
"I 1.3' 1300 1 10 ./ 1317 / 51
/ 14hp 1548 131
t l C1q.
Mal /• / A,• _ ? ? 56 ?
! ) j 1003 ?• '
s\+±s ??? • ?. a6 os 2
l?\ \ . sto ?? S J
r _/ /J / 1330 / Geld lade .•-,p'.J ?JV.7 ,?, ^•r?'j
1346
•1347
b3314 it V
1 /? I 4
43 RED OAK ao3 /' / // ' 3r5 e13eo m1V
4 1. / 7344 V O all - _
'1! 1576 ° ..1 '•?. ?' / •?
1 // \ 1506
I 6ai _ !/ iVR14H0ES \ -_ cear WARM OF SPXMW WiTM RAAWAD
{; (/ \ ?., - •.• MIT OF WAY 1$ RWp 4000OMU CO. L"L
7589 /'.. r i I 1( _ ) A AMTCM _ . IItR A
437 ' 11 1 1 14
I w _ , /\ r ROCKY MOUNT
u \ s II N
K>P. 50,383
law maecown ,"J
43
1601 `+r ? wvcli •\ ?')
1670
64 ?. ' aa1E?3 61 ! .. 97
s \n /?
1770 l_-.? _ l )
? Isla nas ) _. •.? .7
Ma+n ) ?? o
? ? ?3 ., i '. ? 0 i
°? X I s J ® ce
1696 0
12"41 97
IOU 1703
?' ?..- • . ?. • -- - h 1
??• Jt1 1 7707 /- ?\M J 1 I J
y -1822 ! v? I t?_ .1
1710 , N
I --APT
a
"SIT VICINITY MAP" Y "°,.A `
SCAL
a•
m.._) lit.. ..+r
5456 Ill NE RINGWOOD rsr.
244 50' 246 RINGWOOD) 248r:r:xoav
n r" _ 1
u?° 1 Jn
/ 56 hp Of
it %
,? ? II 1 p ? II _ _.?
II \ i
1
r ) II
II u
I _ -? ?? ll o rr
. II ? tl q \ i? 140
7?j \v
\ ° .I Williams ` I
Cem
-120
129
58
S alghYga ti luo `•
h Powell
a I! Cem '.?j •)?_
\ _. 16 If
11=------
lf--------- n _ ..
o I
t
50 li -\. 140
i
If _ ' Powell Cem
f46 1,0
-,,u N 0 R._.T H W- I T A K E
C'.
- von -
Yam v / ? ; -1
-140-
147 41
53
146
d.. I;C
LL-M
USGS QUAD MAP
SCALE 1= - ?,,
pate)
,a
(Joins sheet 12
Try--i. •?.1 :. ?! i`. [ .. f-/, f Y?
Bhp
,? 5F'
.
'
• Y I
r I
l
l} N o B L
,
? ,
?, .
i
Fy
?
a' .
Go,.``..K
Y
oA ® R 7ya"
NoA
.
r.
a. Y
Y
oB ?e 't
R
NprBv
`
NoB
GoA NoA
• ,
'
j .s 41
NcA
G
Gr8
oA
'".
i
p
GoA sW NoA NaC+
(d x , r
_ ..
?
NcA
NcA
NoA
<? L, r•- a GoA 4
_ _ r w •
fNoA ?1 e
Ra
_ Cfl
? 7?
Ra
-47 +- ?
NoA
Bob K ??aFY? ?K :NoA v f?"ww ..?Y 1 ar
NnA
:" I
ro R ,
f•[
r;
Nc
,
y Ro Ott I ,
Nob
ei*
USDA/N-RCS SOIL SURVEY
COUNTY ?/?
5 i4 SHEET
-
_
(II ?
/ -
'- ?'
SCALE 1=
v.RWV.v o. nLnvno i
dj PROFESSMAL LAND SURVEYOR
ROANOKE RAPIDS. NORTH OAROIJNA Vwo
0 ?'y PHOC•E: 252 537-8383
0-3 SCALE DATE.
SEPTEMM le. 1999
\x:2 "r t „(FF= n
' WTWS
) MEMBER29. 1999
2x7 x2
-29 PROP.
II
?t ±'I !NV 77.70
EOP
INV. 78.42 -.- _ _
79.9 g-.9
PROP. R/W
?(.OF'ZoL.17
WOODS P+P„
78.2
i
i
I
I
I
I
I
I
I M
1
1
I
co ly
co ?'
X)
L
L 60+00 61+00 62+00 33+00
i
CDOT SITE PLANS
SCALE: 1=
rC !
CS?iDFiP'!I
A;,, , t
(Namc)y (Date) '??`'' or ?r?'"t?o