Loading...
HomeMy WebLinkAbout20011864 Ver 1_Complete File_20011217 e xs4q ??o.w?? STATE of NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY P.O. Box 25201, RALEIGH, N.C. 27611-5201 LYNDO TIPPETT GOVERNOR SECRETARY P.O. BOX 47, 1710 East Marion Street r? Shelby, N. C. 28151-0047 December 10, 2001 Mr. John W. Hendrix - NCDOT Projects US Army Corp of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 `?f ! Asheville, N. C. 28801-5006 Dear Mr. Hendrix: The North Carolina Department of Transportation, Division of Highways, proposes the following project for your issuance of a Section 404 Permit. We believe this project can be accomplished under NWP #13, Bank Stabilization. COUNTY: Iredell LOCATION: Bridge #328 on SR 2152, northeast of Statesville STREAM: South Yadkin River, WS-V Waters, Yadkin River Basin PROJECT DESCRIPTION: The project consists of the stabilization of 90 linear feet of the stream bank and flood plain around the existing bridge bents of Bridge #328. The project is necessary to prevent the continued scouring and erosion of the bank that is compromising the structural integrity of the bridge. It is proposed that this area (0.10 acres of NCDOT right of way) will be stabilized using Class 11 riprap (three feet thick and twenty feet wide). I have enclosed a PCN application, a sketch of planned activities, and a location map relative to the proposed project. The floodplain of the Yadkin River will be minimally impacted by the proposed project; however, there are no wetlands involved. The project is located within a protected watershed area; however, the stream crossing is not located within '/Z mile of the watershed critical area. The roadway is not an urban or rural arterial roadway; therefore hazardous spill basins are not required. Enclosed is the NCDOT hazardous spill basin checklist. Mr. John W. Hendrix Bridge #328, SR 2152 December 10, 2001 - Page 2 A review of the Natural Heritage information for the threatened (T/SA -Threatened due to similarity of appearance) species listed for Iredell County, the bog turtle (Clemmys muhlenbergii), did not reveal any known sites in the vicinity of the proposed project. I have conducted a survey for the bog turtle in the project area on December 3, 2001. None wererobserved. It was determined that neither the bog turtle nor suitable habitat was located in the proposed project area. No significant effect on this species is anticipated. A review of the available information from the National Register of Historic Places was also conducted. It is anticipated that no historic sites will be affected by the proposed project. By copy of this letter, we are asking Neil Trivette, NCDOT Roadside Environmental Field Engineer to comment on the above project. By copy of this letter, we are also requesting concurrence from the Wildlife Resources Commission, U. S. Fish & Wildlife Service, and the State Historic Preservation Office. Your earliest consideration for this request would be greatly appreciated. Should you have any questions, please call me at 704-480-9020. Respectfully yours, M.L. Holder, P.E. Division Engineer Twelfth Division BY: Trish Simon Division 12 Environmental Officer Enclosures cc: Mr. Michael L. Holder, P.E., Division Engineer Mr. Dan Holderman, P.E. , Division Bridge Engineer Mr. Neil Trivette, Roadside Environmental Field Engineer Mr. Ron Linville, WRC Mr. Brian Cole, USF & WS Mr. John Dorney, DENR,DWQ,401/Wetlands Unit (courtesy copy) File Office Use Only: Form Version October 2001 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: ` ® Section 404 Permit ? Section 10 Permit ? 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 13 If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: Mike Holder NCDOT Mailing Address: P.O. Box 47 Shelby, NC 28151 Telephone Number: 704-480-9020 _ Fax Number: 704-480-5401 E-mail Address: 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Trish Simon Company Affiliation: NCDOT Mailing Address: P.O. Box 47 Shelby, NC 28151 Telephone Number: 704-480-9044 Fax Number: 704-480-5401 E-mail Address: tsimon@dot.state.nc.us Page 5 of 12 M. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRC9 Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. Name of project: Bank stabilization around pile bents of Bridge #328, SR 2152, Iredell Coun 2. T.I.P. Project Number or State Project Number (NCDOT Only): 5.8252 3. Property Identification Number (Tax PIN): NCDOT Right of way 4. Location County: Iredell Nearest Town: Harmony Subdivision name (include phase/lot number): NA Directions to site (include road numbers, landmarks, etc.): North on NC 115 to SR 1561. 1.5 miles south on SR 1561 to Brid eg #132 5. Site coordinates, if available (UTM or Lat/Long): 35°53'32N/80°46'45W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: The flood plain around bridge pile bents on a paved secondary road 7. Property size (acres): 0.10 acres NCDOT right of way 8. Nearest body of water (stream/river/sound/ocean/lake): South Yadkin River. WS-V waters 9. River Basin: Yadkin (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 10. Describe the purpose of the proposed work: The project consists of the installation of riprap for slope protection to stop erosion around existing bridge piles. It is proposed that 90 linear Page 6 of 12 feet of the bank around the pile bents will be stabilized using Class Il riprap Q ft thick and 20 ft wide). 11. List the type of equipment to be used to construct the project: A trackhoe and a front end loader will be used to construct the project. 12. Describe the land use in the vicinity of this project: The surrounding area is wooded and r pastureland. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: There are no plans at this time to replace Bridge #328; therefore, no future permit requests are anticipated at this time. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Wetland Impacts NO WETLAND IMPACTS Wetland Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** (es/no) Distance to Nearest Stream (linear feet) Type of Wetland*** Page 7 of 12 List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at httn:/h????n'. fema. eov. * * List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: 0 Total area of wetland impact proposed: 0 2. Stream Impacts, includin all intermittent and perennial streams Stream Impact Length of Average Width Perennial or Site Number Type of Impact* Impact Stream Name** of Stream Intermittent? (indicate on (linear feet) Before Impact (please specify) map) Placement of " fo I nation (some feet South Yadkin River 40 feet Perennial be placed 7 below mean water level) List each impact tely an ' tify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately I due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. "• Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at NNw%v.usas.eov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.mapquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 90 feet of riprap impacts along stream bank Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. NO OPEN WATER IMPACTS Open Water Impact Area of Name of Waterbody Type of Waterbody Site Number Type of Impact* Impact (if applicable) (lake, pond, estuary, sound, indicate on ma (acres) bay, ocean, etc. List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation NO POND CREATION If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Page 8 of 12 Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. It is estimated that 90 linear feet of riprap will be needed around the bridge pile bents to prevent further scouring around the bents and to maintain the structural integrity of the bridge. Riprap will to be limited only to what is needed to stabilize this area. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strm,izide.html. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, Page 9 of 12 preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. IMPACTS < 150 FEET, MITIGATION NOT ANTICIPATED 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at htip://h2o.cnr.state.nc.iis/wry/l*ndex.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Page 10 of 12 Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No N If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact feet Multiplier tii Mit cation 1 3 2 1.5 Total one 1 extetm out -iv Ieet perpenatcular trout near banx oI channel; Gone 2 extends an additional 20 feet fivtn the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. XL Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. No additional impervious surface is proposed in this project. XH. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XJK Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No N Is this an after-the-fact permit application? Yes ? No N Page 11 of 12 XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). NA 1,2 Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 i??r' , J v a d ^? 4r' G FCao? pt-+0 ) 6 a t7 ? ? V G v C? c ? ? C- b?? ? ?i? b ti a ? v` GGrf IL ?? ?7e 4 3 '7-h4i ?LA-0 ?l CW9S77A-`i r 4-- S2 Zi5Z, i IZ" 6&OC?c-n5 5-eaz pa-C5 S C ; / IL zo' NG?oT ??vI Z - $i2i l?c,? rn?4?tir2?r4-UGC ? ?ZG-? EC.C? Gr.?u,vTi? LIPIZA00 G 362, vt?, 3?8 IL/0/ Area of proposed bank stabilization around Bridge #328 pile bents on SR 2152 on the Yadkin River in Iredell County - n / / ° J 279 r - , 1!1] ? 7 a - :ru ? 77 •' E'er 10 9°I 340 L ? 288 ? ? ?1 L ? o ? 6..?. I o.l rA3 21 11 '? " ., ? -, 270, roc .70 337 338 v Po..l 1 95 LLU "" L 1 lJSf a ? 1 ' ? 8 u11 ..1 ` ., ,. i"' K' L" 33 ` ?"' 1?1 33 39 92 187 32 .. -31 292 ,? • ,? ' ,i- ll11 ]1 ,13. 186 229 :,3. 334 2?1 I ° . 1134 r.? X65`'°" r.J ,?? 9 266 ALI 2 9 S . u ? Fq c.d s 55 •? ?- i .4 22Q .? 223 206 224 1b1. = , „328 12G2 ua "'; 0 323 , ?,, , •, .?-?• .264 . ?? ^ 22 ? ' '? 4 f ,,• ' , gg -„? a 33 0 ? P-7- um un 'LW2 0 263 , , 1 7 r 4 , 221 ? ue11rH WHO .1.° 1 r 59 22 ` tell s 220 x,...222 1 81 ? a, • it" I..o 19 7 322 l... I..!, a,• ... 2.56 201. 48 46 12. ra LM 'M I I `"' ., 214 '" o.• ,?` 255 244 IAN J 7 P218 '" I.J I..: ... ro. 3 » - . 217 I.9, 5 CI96 19 242 366 194 ` L ? J I f ? ? / ? I°. P159 / LM ' ? ? , .9 19? ^ 1 Iwo ` 771 W n LOVIi VyjtY POP. 33 lllL'j C64 ? J I '7 73 " Tp >"2 199 / 200 I, 2111 -II.) ' ° 17 ?1 C170 I / ` •,. '\ T !111 V\'?? R%? (ifs ?? ?'., 9 7I r ? - I I I71c • 132 ? .7 /• / .M 0.1 O 14 ? + °a 129 ,r F r .s d "p -1'' \ O?'y 1l1 1504 1 a WA 1 . MS 70 713 p 7? , ` i STATE SVILLE OUT . !212 / I POP. 15;622 . 1171 32! . I - .::: 136 ° 125 , \ 1273 Y 00",1 .211 ? c 7 1222 ,`° 1 I I _ S foray 1 TATf5V1 \ 511 rpr.1..03 .0 \ IAS Aiy.rl 6A V4- 10 , ? r./?/?•`r1 EC ° \ e/?/r? L? ?Q . moo. 3 Z G \ F It NCDOT GLI HAZARDOUS SPILL BASIN CHECKLIST Division: 12- County: /4AC-a- Project ID: S t3z 52, River Basin: Bridge No: 3Z F, Route: -?;e Z?SZ Stream: -SvZ..,,7-1 -. k. j Water Quality Criteria: Yes No Stream Crossing Blue Line On USGS r? r ORW r r_? WSI r r? WS H,IlI OR IV, Crossing Within 0.5mi of W.S. Critical Area r r? Roadway Criteria: Route Designation- Yes No Arterial Urban r r-' Arterial Rural F F. ' Additional Site Information: Yes No Is a Hazardous Spill Basin Required? r_ r_?? Criteria Based Upon NCDOT "Best Management Practices for the Protection of Surface Waters" (March, 1997). 44T STATE of NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPETT GOVERNOR SECRETARY MEMO TO: John Dorney, DENR/DWQ/401/Wetland Unit FROM: Trish Simon, Division 12 Environmental Officer 0 DATE: December 10, 2001 SUBJECT: Pre-construction Notification (Courtesy Copy) Enclosed is a courtesy copy of a pre-construction notification permit application for a bank stabilization project in Iredell County for your review and comments. is Post Office Box 47 Shelby, North Carolina 28151-0047