Loading...
HomeMy WebLinkAbout20010667 Ver 1_Complete File_20010430TO: Steve Lund, USACOE Asheville Field Office FROM: Ron Linville, Regional Coordinator Habitat Conservation Program DATE: May 1, 2001 SUBJECT: North Carolina Department of Transportation (NCDOT), SR1573, Fox Bottoms Road, UT Snow Creek, Iredell County These comments are provided in accordance with the provisions of the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661-667d) and the North Carolina Environmental Policy Act (G.S. 113A-1 through 113A-10; NCAC 25). The NCDOT proposes to improve and pave the referenced road along existing alignments from SR1572 to SR1561N. Existing CMPs will be replaced in the area of Station 25+00 with a 60'long 24" CMP for a total of 35 feet of additional impacts. We will not object to the project as proposed in the letter of April 25, 2001 from Ms. Trish Simon providing the methods and procedures described are followed. If concrete will be used, work must be accomplished so that wet concrete does not contact stream water. Stringent erosion control measures should be installed where soil is disturbed and maintained until project completion. Thank you for the opportunity to review and comment on this project during the early planning stages. If you have any questions regarding these comments, please contact me at 336/769-9453. Cc: Trish Simon, NCDOT Cynthia Van Der Wiele, DWQ O?O? W A T FRQG Michael F. Easley Governor r? r William G. Ross, Jr., Secretary Department of Environment and Natural Resources Kerr T. Stevens Division of Water Quality May 8, 2001 Iredell County DWQ Project No. 010667 SR 1573, Fox Bottoms Road APPROVAL of 401 Water Quality Certification Ms. Trish Simon, Environmental Officer NCDOT Division 12 P.O. Box 47 Shelby, NC 28151-0047 Dear Ms. Simon: You have our approval, in accordance with the attached conditions, to permanently impact 35 linear feet and temporarily impact 10 linear feet of an unnamed tributary to Snow Creek for the purpose of upgrading SR 1573 (Fox Bottoms Road) in Iredell County. The project should be constructed in accordance with your application dated April 19, 2001 (received 25 April 2001). After reviewing your application, we have decided that this fill is covered by General Water Quality Certification No. 3289 corresponding to the U.S. Army Corps of Engineers Nationwide Permit Number 14. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit unless otherwise specified in the Water Quality Certification. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetlands/ Page 2 of 2 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-1786. Sincerely, Stevens Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Asheville Field Office NCDWQ Mooresville Regional Office Central Files File Copy 401 ISSUED s- STATE of NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPETT GOVERNOR SECRETARY PO BOX 47, SHELBY, NC 28151 April 25, 2001 Mr. Steve Lund US Army Corps of Engineers 151 Patton Avenue, Room 143 Asheville, NC 28801-5006 -D M r C-) -< Sub'ect: Nationwide Permit #14 SR 1573, Fox Bottoms Road o Iredell County, NC Dear Mr. Lund: The North Carolina Department of Transportation, Division of Highways, proposes the following project for your issuance of a Section 404 Permit. We believe this pTiect can be accomplished under NWP #14, Road Crossing. I have enclosed a straight line diagram with erosion control plan, a PCN application for NWP #14, and a location map relative to the paving project on SR 1573, Fox Bottoms Road, Iredell County, NC. Fox Bottoms Road is currently an unpaved gravel road. Division of Highways plans to pave the road from SR 1572 to SR 1561N. It will be graded and paved to current standards and typical section to a width of 20 feet wide (32 feet shoulder point to shoulder point). The equipment to be used in these improvements will consist of bulldozers, pans, backhoes, rollers, and pavers. The project will include upgrading existing alignment as well as construct areas of new alignment. The approximate acreage of project area is 5.5 acres of NC DOT right of way. Mr. Steve Lund Page 3- SRI 573, Iredell County April 25, 2001 The project proposal includes the replacement of a pond drainage pipe and crosspipe at Station 25+00. An existing 20 foot, 15" CMP which drains from the pond to the ditch line will be replaced with a 20 foot, 18"CMP on existing alignment. Also, a 30 foot, 18" CMP which crosses underneath the road from ditch line to ditch line will be replaced with a 60 foot, 24" CMP on existing alignment. A 4'x5'x9" dissipater will be placed at the outlet end of the pipe. The total linear footage of the unnamed tributary to Snow Creek (Class WS-IV waters) to be impacted is 35 feet. Please note that although the USGS topographical map (Central Quadrangle, 1969) indicates a secondary intermittent stream on SR 1573; however, the land use in this area has changed the topography and the stream no longer exists. The stream is approximately 0.5 feet wide and 0.50 inches deep. The pipes will be placed below existing streambed elevation and disturbed areas associated with the culvert replacement will be stabilized. Existing channel morphology will be maintained upstream and downstream of the culvert. It is proposed that due to the small size and low flow of the stream, the pipe will be replaced without diverting the stream flow. The pipe is < 48" and the in-stream work will be completed within eight hours. An instream rock dam will be constructed to trap sediment from the installation. The rock dam and the sediment will be removed after pipe installation. There are no wetlands; however, the stream is classified "WS-IV" waters. Enclosed is a NCDOT Hazardous Spill Basin checklist documenting the roadway and water quality criteria for this project. Proper erosion and sedimentation control measures will be implemented during the project construction. A review of the Natural Heritage information for the threatened (T/SA -Threatened due to similarity of appearance) species listed for Iredell County, the bog turtle (Clemmys muhlenbergii), did not reveal any known sites in the vicinity of the proposed project. I have conducted a survey for the bog turtle in the project area on April 16, 2001. None were observed. It was determined that neither the bog turtle nor suitable habitat was located in the proposed project area. No significant effect on this species is anticipated. A review of the National Register of Historic Places was also conducted. No sites listed on the National Register will be affected by the proposed project. By copy of this letter, we are asking Edward L. Ingle, Area Roadside Environmental Engineer to comment on the above project. By copy of this letter, we are also requesting concurrence from the Wildlife Resources Commission, U.S. Fish & Wildlife Service, and the State Historic Preservation Office. Mr. Steve Lund Page 3- SRI 573, Iredell County April 25, 2001 By copy of this letter, I am forwarding seven (7) copies of the application package to John Domey, NCDENR, Division of Water Quality, 401[Wetland Unit for review. A $200.00 check is enclosed for application processing. Your earliest consideration for this request would be greatly appreciated. Should you have any questions, please call me at 704-480-9020. Sincerely, Trish Simon Division 12 Environmental Officer Enclosures cc: Mr. Michael L. Holder, P.E., Division Engineer Mr. Doug McNeal, Iredell County Maintenance Engineer Mr. Ed Ingle, Area Roadside Environmental Engineer Mr. Ron Linville, WRC i Mr. Brian Cole, USF & WS _ Ms. Renee Gledhill-Earley, SHPO Mr. John Dorney, DENR,DWQ,401/Wetlands Unit File 1 ?`y W A T ?qG? ?O G o ' -c Pre-Construction Notification (PCN) Application Form For Section 404 and/or Section 10 Nationwide, Regional and General Permits, Section 401 General Water Quality Certifications, and Riparian Buffer and Watershed Buffer Rules This form is to be used for projects qualifying for any of the U.S. Army Corps of Engineers' (USACE) Nationwide, Regional or General Permits as required by Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act, and for the North Carolina Division of Water Quality's (DWQ) associated General 401 Water Quality Certifications. This form is also to be used for any project requiring approval under any Riparian Buffer Rules implemented by the N.C. Division of Water Quality. This form should not be used if you are requesting an Individual 404 Permit or Individual 401 Water Quality Certification. The USACE Individual Permit application form is available online at http://www.saw.usace.army.miI/wetiands/Perm app.htm. The USACE is the lead regulatory agency. To review the requirements for the use of Nationwide, Regional or General permits, and to determine which permit applies to your project, please go to the USACE website at http://www.saw.usace.army.nii]/wetlands/rectour.litm, or contact one of the field offices listed at the end of this application. The website also lists the responsible project manager for each county in North Carolina and provides additional information regarding the identification and regulation of wetlands and waters of the U. S. The DWQ issues a corresponding Certification (General or Individual), and cannot tell the applicant which 401 Certification will apply until the 404 Permit type has been determined by the USACE. Applicants are encouraged to visit DWQ's 401[Wetlands Unit website at http://h2o.enr.state.ne.us/ncwet]ands to read about current requirements for the 401 Water Quality Certification Program and to determine whether or not Riparian Buffer Rules are applicable. The applicant is also advised to read the full text of the General Certification (GC) matching the specific 404 Permit requested. In some cases, written approval for some General Certifications is not required, provided that the applicant adheres to all conditions of the GC. Applicants lacking access to the internet should contact DWQ's Central Office in Raleigh at (919) 733-1786. Trout Waters Coordination - Special coordination with the North Carolina Wildlife Resources Commission (NCWRC) is also required for projects occurring in any of North Carolina's twenty-five counties that contain trout waters. In such cases, the applicant should contact the appropriate NCWRC regional coordinator (listed by county on the last page of this application). Page 1 of 12 CAMA Coordination - If the project occurs in any of North Carolina's twenty coastal counties (listed on the last page of this application) the applicant should also contact the North Carolina Division of Coastal Management (DCM) at (919) 733-2293. DCM will determine whether or not the project involves a designated Area of Environmental Concern, in which case DCM will act as the lead permitting agency. In such cases, DCM will require a Coastal Area Management Act (CAMA) Permit and will coordinate the 404/401 Permits. USACE Permits - Submit one copy of this form, along with supporting narratives, maps, data forms, photos, etc. to the applicable USACE Regulatory Field Office (addresses are listed at the end of this application). Upon receipt of an application, the USACE will determine if the application is complete as soon as possible, not to exceed 30 days. This PCN form is designed for the convenience of the applicant to address information needs for all USACE Nationwide, Regional or General permits, as well as information required for State authorizations, certifications, and coordination. Fully providing the information requested on this form will result in a complete application for any of the USACE Nationwide, Regional or General permits. To review the minimum amount of information that must be provided for a complete PCN for each USACE Nationwide permit, see Condition 13, 65 Fed.Reg. 12893 (March 9, 2000), available at http://www.saw.usace.army.miI/wetlands/nwpfina]FedRep pdf. Processing times vary by permit and begin once the application has been determined to be complete. Please contact the appropriate regulatory field office for specific answers to permit processing periods. 401 Water Quality Certification or Buffer Rules - All information is required unless otherwise stated as optional. Incomplete applications will be returned. Submit seven collated copies of all USACE Permit materials to the Division of Water Quality, 401/Wetlands Unit, 1650 Mail Service Center, Raleigh, NC, 27699-1650. If written approval is required or specifically requested for a 401 Certification, then a non-refundable application fee is required. In brief, if project impacts include less than one acre of cumulative wetland/water impacts and less than 150 feet cumulative impacts to streams, then a fee of $200 is required. If either of these thresholds is exceeded, then a fee of $475 is required. A check made out to the North Carolina Division of-Water Quality, with the specific name of the project or applicant identified, should be stapled to the front of the application package. For more information, see the DWQ website at http://h2o.chnr.state.nc.us/newetIands/fees.html. The fee must be attached with the application unless the applicant is a federal agency in which case the check may be issued from a separate office. In such cases, the project must be identifiable on the U.S. Treasury check so that it can be credited to the appropriate project. If written approval is sought solely for Buffer Rules, the application fee does not apply, and the applicant should clearly state (in a cover letter) that only Buffer Rule approval is sought in writing. Wetlands or waters of the U.S. may not be impacted prior to issuance or waiver of a Section 401 Water Quality Certification. Upon receipt of a complete application for a 401 Certification, the Division of Water Quality has 60 days to prepare a written response to the applicant. This may include a 401 Certification, an on-hold letter pending receipt of additional requested information, or denial. Page 2 of 12 Office Use Only: Form Version April 2001 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. I. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Section 10 Permit ® 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? H. Applicant Information 1. Owner/Applicant Information Name: N.C. Department of Transportation Mailing Address: P.O. Box 47 Shelby, North Carolina 28151 Telephone Number: 704-480-9020 Fax Number: 704-480-5401 E-mail Address: 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Trish Simon Company Affiliation: N.C.Department of Transportation Mailing Address: P.O. Box 47 Shelby, North Carolina 28151 Telephone Number: 704-480-9044 Fax Number: 704-480-5401 E-mail Address: tsimon@dot.state.ne.us Page 3 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. Name of project: Secondary Road Paving project- Pipe replacement on SR 1573, Station 25+00. 2. T.I.P. Project Number (NCDOT Only): N/A 3. Property Identification Numbers (Tax PINs): See attached man 4. Location County: Iredell Nearest Town: Statesville Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): Take Hwy 115 North from Statesville. Travel approximately 7.5 miles Turn left onto SR 1837 and proceed approximately 0.8 miles. Turn left onto SR 1573. 5. Site coordinates, if available (UTM or Lat/Long): 35°54'29N/80°58' 14W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Pipe crossing on a unpaved seconda road 7. Property size (acres): 5.5 acres (NCDOT right of way) 8. Nearest body of water (stream/river/soundlocean/lake):Unnamed tributaries to Snow Creek 9. River Basin: Yadkin (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Page 4 of 12 10. Describe the purpose of the proposed work: Upgrade of an existing unpaved road to current paved road standards for the safety of the travelling public. Will upgrade existing alignment with areas of new alignment. At Station 25+00 will removed an existing 20 foot 15" CMP which drains from pond to the ditch line) and replace with a 20 foot, 18" CMP on existing alignment. At this same location, the 30 foot, 18" CMP which crosses the road from ditch line to ditch line will be removed and replaced with a 60 foot, 24" CMP on existing alignment. 11. List the type of equipment to be used to construct the project: Work will be done using bulldozers, pans, backhoes, rollers, and pavers. 12. Describe the land use in the vicinity of this project: The surrounding area at stream crossing is fenced pastureland (with livestock access). IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: SR 1573 is an unpaved road which is to be paved: there is a bridge located on this road which will not be replaced within the next five years. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 5 of 12 1. Wetland Impacts NO WETLAND IMPACTS Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located ,,within 100-}ear Floodplain** yes/no Distance to Nearest Stream linear feet Type of Wetland*** * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http:/h%-,vw. Tema. eov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: 0 Total area of wetland impact proposed: 0 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Lcngth of Average Width Perennial or Site Number Type of Impact* Impact Stream Name** of Stream Intermittent? (indicate on ma (linear feet Before Impact least specify) Placement of 30 ft (Pipe Unnamed tributary to I additional fill in extension) Snow Creek 0.5 R Intermittent r .im Placement of 5 feet on , - « I riprap dissipater outlet Temporary 10 feet placement of in- from outlet I stream rock dam of length of to trap sediment new pipe List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and alter, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. "• Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at xvwNv.uses.fzo . Several internet sites also allow direct download and printing of USGS maps (e.g., X«vw.topozone.com, Rwxy.mapquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: The pipe extension and riprap dissipater will impact a total of 35 additional feet of stream. Temporary impacts of instream rock dam = 10 feet. The rock dam and any sediment trapped will be removed after pipe installation. NOTE: The USGS map (1969) for this area indicates a second intermittent stream on SR 1573. The land use in this area has impacted the topography and this stream no longer exists. Page 6 of 12 . 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. NO OPEN WATER IMPACTS Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact (acres) Name Watcrbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation NO POND CREATION If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The existing rosspiipe is to be replaced with a larger and longer new crosspipe (the new pipe is 30 feet longer & 6 inches larger) The pipe length must be increased to bring the road up to current paved road standards and to provide a safe roadway shoulder width. NCDOT has minimized the impact by maintaining the road on the existing alignment. The small stream at this location is degraded greatly by livestock access. The invert of the crosspipe will be set approximately 6 inches below the streambed elevation. The stream is 0.5 feet in width and is a low flow stream-, therefore, the pipe will be replaced without diverting stream flow and will be completed within 8 hours. An instream rock dam will be constructed to minimize sediment flow in stream. The dam and any sediment trapped will be removed after pipe installation. Page 7 of 12 VHL Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http•//hoo enr state nc us/newet]ands/strm,qidc.html. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. STREAM IMPACTS < 150 FEET MITIGATION NOT ANTICIPATED 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://l12o.enr.state.nc.us/w-mlindex.htni. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Page 8 of 12 .4 Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal %vetland mitigation requested (acres): IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? - X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. * Zone Impact Multiplier Required (square feet Mitigation Page 9 of 12 ,4• If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. SR 1573 is a 0.8 mile unpaved road that is to be paved. There is no additional impervious surface proposed. Erosion and sedimentation control measures will be in place during construction. XU. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XM. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 211.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may Page 10 of 12 • Zone 1 extends out 30 feet perpendicular from near bawl: of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 4 choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). ? ?olv- Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) US Army Corps Of Engineers Field Offices and County Coverage Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell Union US Army Corps of Engineers Avery Clay Jackson Polk Watauga 151 Patton Avenue Buncombe Cleveland Lincoln Rowan Yancey Room 208 Burke Gaston Macon Rutherford Asheville, NC 28801-5006 Cabamns Graham Madison Stanley Telephone: (828) 271-3854 Caldwell Haywood McDowell Swain Fax: (828) 271-3858 Catawba Henderson Mecklenburg Transylvania Raleigh Regulatory Field Office Alamwce Durham Johnston Rockingham Wilson US Army Corps Of Engineers Allcghany Edgecombe Lee Stokes Yadkin 6508 Falls of the Neuse Road Ashe Franklin Nash Surry Suite 120 Caswell Forsyth Northampton Vance Raleigh, NC 27615 Chatham Granville Orange Wake Telephone: (919) 876-8441 Davidson Guilford Person Warren Fax: (919) 876-5283 Davie Halifax Randolph Wilkes Washington Regulatory Field Office Beaufort Currituck Jones Pitt US Army Corps Of Engineers Bertie Dare Lenoir Tyrrell Post Office Box 1000 Camden Gates Martin Washington Washington, NC 27889-1000 Carteret* Green Pamlico Wayne Telephone: (252) 975-1616 Chowan Hertford Pasquotank Fax: (252) 975-1399 Craven Hyde Perquimans *Croatan National Forest Only Wilmington Regulatory Field Office Anson Duplin Onslow US Army Corps Of Engineers Bladen Harnett Ponder Post Office Box 1890 Brunswick Hoke Richmond Wilmington, NC 28402-1890 Carteret Montgomery Robeson Telephone: (910) 2514511 Columbus Moore Sampson Fax: (910) 2514025 Cumberland New Hanover Scotland US Fish and Wildlife Service / National Marcie Fisheries Service US Fish and Wildlife Service US Fish and Wildlife Service National Marine Fisheries Service Raleigh Field Office Asheville Field Office Habitat Conservation Division Post Office Box 33726 160 Zillicoa Street Pivers Island Raleigh, NC 27636-3726 Asheville, NC 28801 Beaufort, NC 28516 Page 11 of 12 d Telephone: (919) 8564520 Division of Water Quality 401 Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Telephone: (919) 733-1786 Fax: (919) 733-9959 Telephone: (828) 665-1195 Telephone: (252) 728-5090 North Carolina State Agencies Division of Water Quality Wetlands Restoration Program 1619 Mail Service Center Raleigh, NC 27699-1619 Telephone: (919) 733-5208 Fax: (919) 733-5321 State Historic Preservation Office Department Of Cultural Resources 4617 Mail Service Center Raleigh, NC 27699-4617 Telephone: (919) 733-4763 Fax: (919) 715-2671 CAMA and NC Coastal Counties Division of Coastal Management Beaufort Chowan Hertford Pasquotank 1638 Mail Service Center Bertie Craven Hyde Pender Raleigh, NC 27699-1638 Brunswick Currituck New Hanover Perquirnans Telephone: (919) 733-2293 Camden Dare Onslow Tyrrell Fax: (919) 733-1495 Carteret Gates Pamlico Washington NCWRC and NC Trout Counties Western Piedmont Region Coordinator 3855 Idlewild Road Kcrnersville, NC 27284-9180 Telephone: (336) 769-9453 Mountain Region Coordinator 20830 Great Smoky Mtn. Expressway - Waynesville, NC 28786 Telephone: (828) 452-2546 Fax: (828) 506-1754 Alleghany Caldwell Watauga Ashe Mitchell Wilkes Avery Stokes Burke Surry Buncombe Henderson Polk Cherokee Jackson Rutherford Clay Macon Swain Graham Madison Transylvania Haywood McDowell Yancey Page 12 of 12 . i EROSION AND SEDIMENTATION CONTROL PLAN SR IS 7Z IREDELL COUNTY ?o X ? o 77'o s DATE op / zo /, DIVISION OF HIGHWAYS DEPARTMENT OF TRANSPORTATION STATE OF NORTH CAROLINA I WO. 6•SZC449 SR 7-3 ROAD NAME 14OX gap7T4/W T COUNTY- -Z- e- FROM41'7F /Y/ WIDTH STAKED R/W WIDTH D PROPOSED R,4PROVEMENT g:g!f gQ9F c: y<S- DATE Oq - Z O "C? / SCALE I" = 100' /0.1.00 O O h Q 8 to 0 4 O . h' I 4 ?fvo 9+ oo 7f oo B- P, 4, +5 a sf pd A 7X7X6' ol +OC7 ./SAC. C l? I -? 00 4 h 0400= C/L ?Slo/ .2/ Ac- 7 4 I REr?CAC E B?'- 30" C,m, p . h h /4-oo I zo 4-oo 0 ti 1 I 0 4 f OD Q 4 / l t o0 0 I /Z X/SXIv•.57 A c. l 4 :? oa I Q I / ` r' JJ Q Q 1 /o-too ? /9 too / ?.,'-Oo / S-t-eyo // 7`-oo ,moo+oo 1 4 e9+00 8'x II 'x - z9 Ac. Z8-too G/ VI f- .ExIs Y'IN(g BR/DG E J'o RE?+'1,?-i?v h /N l eACE 4 fh ??r' 00 h I Zq"RC.p DISSAPAT04 4 - ZQ f 00 0 Q h ?z?oa Q - /o x/3'XG' ID= - _ . q3 A c ?O'f'00 I 0 _ z 7+ oo fh h I .clv_E ?St o 0 Z4 AC _? * c go Z/too /45 "R.C.P• 4,0+00 ,3ef 00 .3l4o0 `34+00 // "X "s x 6, 2e +o o • S/ Ac ?3o t o0 4 lq 9 T O 1 T OA C/G S. R- /S 7Z 39-s-oo 37too 3.s + oo 1 00 3/?ao p'v Al r P? A )lo \ ?•5 I- i li?° I? V _ ' Jb, C!O Im N \ ? }'• r "'l .•Is < ? o(: \ ..•r I e / / Iv {'?•. \ N '?• a 3r. \ ? \ ° - o o J(:?.?' .i /. •Iti 's' s. , 9• As, ?•? •? /!MI6 ??•? ?!? !$\5 v • ?c!? zl"° - !?'u ?' \ / 11?IY3 la. ? e ImR ? .u .6 .?,. ,. /'.. _ ? 1. /• W 3 Is i ?:: , - ? = _9 ia. .o. ) ? ' v"•I ? , Im ? q'\ ?,?a•. ?,. , T. I$ ''NIA s > ?' \!? l \\lI- `!? ?I?'. - \I?1 ?. L) ..a .r 'ems` .' Im •? ° v?.-.Y ?, .,?L N ? .>' ? ? ICY ?, V / !N 1 'v ? ?? V op" ? \ ??•' ? c' ? ' !W? . 10 _ ? ) -• \ -• 9. !'_ ? VI '.I '\ .? '/ ° IW ? I? V .. iS !? , ?? 6 I? N •? J? •• '. ? Iu r• I? \ lo" - IN '' y Ik r It •?,? la ? I? ' I? t ? o ' '/ ` /? IN ?I? -?'.AI?'•?• ? ') ?- nor ILA I ? ?\ J. /f\ ??• V / 4 ? OR cV- W N IN ,? f •? Qom: /.P C ?) I'E:.'? )'? p / / ?'.\ ? a N??? / ?!k; •t v'?e. N'm `? /'• s y i-.io z la Irs lit 1 I" It, rAavN \ ?? // ??Y ? ? F ? ° _ / _ ?\,v\,? V? ? 'Q ? r ? Lai'!.. l \,? '? / . • ? / N?? d? EROSION CONTROL DETAILS AND SPECIFICATIONS DAB ,r'?tion Svmbol P', 021-t 245.03 Temporary Silt Ditch - VI-2 .____•....... ._-• ............. T , o 245.05 Temporary Diversion V1-4 893.01 Temporary Silt Fence ....... .•........... ., --H H ------ -- VI-6 890.05 Temporary Slope Drain with Earth Berm .......... ?-- ? - VI - g 245.01 Silt Basin Type A ................................ _._ . ---------- VI -10 -- 245.02 Silt Basin Type B _.__.___.__ . , VI - 12 892.04 Temporary Rock Silt Check Type-A ___.____ _ ---------- - V1 - 14 895.10 Temporary Rock Silt Check Type-B ___.,_ ---------- -- VI - 16 892.01 Temporary Rock Sediment Dam Type-A . ........... _- - VI - 18 892.02 Temporary Rock Sediment Dam Type-B . __ _ V1 - 20 897.01 Rock Pipe Inlet Protection ae 7 _ 22 I 894.01 Rock Silt Screen ..................................... .... _ °? ?;----- - VI 24 245.04 Stilling Bas in ......................................... ........ .. . VI - 26 Rock Inlet Protection: 896.01 Type A ............................... A 0-- OR -- A)) ----- VI - 30 896.02 Type 6 ............................... B 12-• OR •- B )? ----- VI - 32 896.03 Type C .................... C 0-- OR •C ) ---- `I - 34 VIA March, 1993 il,1 _ - ! r1 i i ? ?: ?i l lI }- 1 1 u C IJ f-) _w J O f-- U L`I I? O L V Qi ?I G; rl Zl=iai o(io• -I r ltP -., I); i i I - liN L W ? z^ CD LIJ ?7 I-I 0 A D F >1 V) VI-5 March, 1993 u Ld F•=' o m U W ¢ J Z JM. a O J F- o (nO=OZZ O MOu00 W > W F- F- MZOW (n ¢ OZ=(rO Z JUQF-WM. O QZ^F-?W^ LL F- 20• QWCC• O Q m -m (U O M ' > (n - (r ..-. lL • . J W O O Cr_ a W ZCrU) iMWN OW(n ZCn a. i WF- Q0F-O(T = F-U)frJ-?F-J cU O OU<EZCnU ~ W Z W--M=)• - 0 a_ --- J cI) ;_ C O 2 ° U = LL O F- o ?] N W C] o CL oz U1 O J Q W 0 m LL F- > ° 1J a F- tL LL a- a _J O O O --- J (11 W Lij - Q cn cn - 0 rn O Q] co F- - p \') U 3 Q i? O O F- 00 W ?j F- O _i U f - U J LL Q - o. W ?!\I M0 (f) LLI • O> O LLJ M U U Q m _ g . F- 040 ?1 3ai 7 OI O W! g. ?az w O• ai r . ?a o m Q Ia ) m W F- U w U ?n J '-' O -r; J U r'?7 U m: CD Qom p O . Q C?: w Q ?Q CL F. LLJ F- Cr Q F- A° VI-17 March, 1993 _ l W z O F N J Q Cl: U Cl- Cn J Q z O F- m U -? m Q LL m W LL N •o A, ?I WO zErW O z O W O t- U) O Ln O f U W W J LL LL- A a W C7 < b x p z V) O -7 O a. E- W C W F z Ca a O O W F W V) O W W O F a. .-a F W z z a a F o V) u EO- O CO H N G. C4 t- V) V) z ` E- -3 c41:1 ) VZCaE- °0 VV z < W < F < < z W W U E- r-- CL a at = a: F O q F W W O W E- uC.. Fa.z?to mC E4 W < W O Q O .4 W WFzV) VU]Wz -.aF F V) O J O V) < z z W WYE E W m V) U Q 0 W z CfJ O W ?a- z Cn O W Q F- J d ~ >- W W m J U) ~ O U W Cr r U) z ? LL W C7 3 Cl: O WJ J ? z W J-Wm O Li. _ z O W > O l1J L7 Lit I Lr W O z ?- L = z O V) cn Z LLJ Q - - Q U LL LL .I-. .?li z O LL W o o w :- ?? o o wl-?- V / L? U. O Pc L- G] W z ? u O W_ooooo V) JLL -;,Dm ON a w O E E - w z 'rN O aw L) vu -Nm t1[1 as E- z W O U W /n /c nJ (cn1 U dIN z m lICO 3i Q Z o; ° F UJI v', C 01 z c Zr O J QI ° W! N > I ?I FI_I 7_I <1 m i L1J F- Q C f- W ? cn L7 u 'wS? O f ? Ur ? ?c O Lij I CE: Q 0 Q f- 0 D a? VI-21 March; 1993. W a n 3 j, C J W LL Z-- \ ( <a J w iJ (? F- '- J w -Z Q F- O - - r (. O '- Q O w o N p F- U) O 0- Z W (n - F- -- O W <7 L, n J W U 0 W o w C C© O C M C W (n o (,J -- . F- F- J rC- (n Q LsJ LL C V) O (_- LO L') J C J U F- C F- O U) O C O W LJ J (? •-- -- w C. U U O Z (n O C C C C J D In F- O U) W C m m O w U F- Z w ?- O W W Z:) - O _ C U) -- J W - (n W F- O W W Z F- W (n © U) •- U 0 O U F- J z m C C J - C- (3 D C C 0 0 -- F- O W F- 3 z J C C O J W C W C C C W w F- U J F- r- W J Z U F- = W W -(n a z--(n¢0r--,OU - W W O O o F- O C O U F- T M U U F- U (-f) (n LLI C U Q 0 F-- 0 z O Cr (7 J 3 X cc O O LL F Q - LJ z _ ' L i C i i a- i CD ? W ? C 1 .J i > z i O ' Cn l Q J ? • C z U z n r)o F-i r-r T ?,^ w ?)? 0 U U ?Kyc U) r o .--. J v J r 0 c o Ln L7 U ?- W t1 J Li U) N N w -= J/ J C J J / 1 `IF- -- ri a L -, C ?I© LU v O F- W F-- 0 a- z W O > -j r u s Q f Cf) ^? I I o°oDD D pOqO O ? T OO ,, In ?i i D Opp DDDO° > V1 G? VI-23 March, 1993 .? ! I ? ? ,r•` ? t' i1?ti ?:_;_r?•-?-' •?? ? fr', 'j?I? 1??1 i -? ?J ! _ j1?''?t??:-'• ? ? ?i ?f```• (?S, `•? + f - :?/??'?I;.e?( ?j i? ? ? '? .. ?L?? /l •?' ?l? ? ,'?'JI (j/.? (?. `.` '` ? ?^: • ?,rr.' t ? L,'•.' .J? t9' i i?,f • ??El,?y 1 !? ?? '?'r' ii'? • r', i?. f/ t\y?.?`i•-i !? ?_.. ? - +,,`,.•"f ? `,' I /' r ?` ?k???r ,rr ?A?3?? i ,• ,' ;j,? fir'' r/ `I S '.,,,??[?C.? ? j} ? tl ? t ?` ?,f?t i`y t1 ,`, ? 1? ?••yy i ?,! `- ?•, ` -•.? 1 , ^ `I.J?r / {r' (?? ~ J-'' -- ? ? /)?l ?? z?a., flit t ? v..•., \1 }l ? _r? ?/'?y 'ice'' ?? ..e,• )I r . ..• r.'_'__ -?.? ? j /??{/?f i \ ...,,,,.i 1) ( t? ti tF (? ? ', ?? ? ,?`tt? r" ?J.?y .•• j / ? ?` ?? ' % `?'-- -'? -'?, ? ? IV } I ',• //r.f1 1?' \....f ?1 t . ;''r , } F : ?, ..^?y, r>'i-^;V ? ? ?.,,, ; i r' J ` r?'"? . .._ ? ? ?.J ??.\ "? y ! f• ? 1`? f? I . ? ? D >, ` ? ? • 1 .,??/'' j /? r?`+,??,..,. ?. „_j ? ,. "'4•,1,. }? •?" ,: ?...._?,.: /!'? _...?"•? t{ r 1,.,, -?\?? , r.1 ? J r ? ice' I ? +)? .. 10 NN"``) ?",+^' +?{ Lll i f ?. S r r r? Pf j `l _ } i' }'f '_?1t f ' „??1 ?}? ' Qe f1 t ? ., + ? ,? r'."'.,>? ^. '^,?* / ? 1 i ?"?. sit ?\`I , ,? 1. _,.M,. ? • ? •'` '.;? _ ? 11 , . ' )r4 J tr!' ? r 1 ? ' f ?? { /?"??;1.) i?a'.?,'???,` ? 5?,.°jt 1=; ?! tl?f`•; ;?1 "yi'1 rfrf/ f??y' ti r' ' } t't ft i,it ??{?. I 1` '?' ? 1 -? ?! +?°• ?'- S.-}7??-'J??? ??f •,' F `?h--- --->1r 1 ???-'t1+J?R''?r / '?• /rJr? 1 tf `?, - 11?,i?? ?.'s`'?•~ ""."?.Jrt i r t, ,. II `? ) C??+ 1 f? rr. F. - 1 { +r, `-'' ' .-J f { ' r t t ''y ,tt ` t4;i?t 1t 1 -.J .f i .l ?5 ?l? ?1?? _ C lr+ 'iI?" ? (jlr •'{? )Ili t?_. f ?'? ' f! ???, ?? ? 1 '!?` `?•``-^? ? ??" ?`i #,,??i t ...-----•_, i ?/? --"`-?;>, '?`, 1?`' 1,t ./` :?1' f-^.__ .r fla?t?+ ?I4,'? j? ?' ? ? ?' ? 1 -1 ?1(? 1 y f ' tr!!? t ! y-L rf 6i. ink Pit i - ? ++yy a -, ?,?.- ?'? - ;+ls ;~., ?, f??` --per.^•? I's 850 9 00 -?.i _' e---....r ?*t y? ~ _-..r tr_..r- ...• r l?-} ?, f '--??r/?• ?/' ._..'.?"-•.` 'y\?`?`..;y`C`-J,..j.. i Name: CENTRAL Location: 035° 54'37.6" N 080° 58'06.1" W Date: 3)2712001 Caption: Fox Bottoms Road, SR 1573, Iredell, Yadkin River Basin Scale: 1 inch equals 1000 feet Unnamed tributary to Snow Creek, Class WS-IV waters Copyright (C) 1997, Maptech, Inc. R r?: o cx ` O? N 'i c Q. Cl? c x n O< w I C cti l- t12 r" - Z a)c as m? Na caw r p7 ~ ? CL I Cr a o;-, o"\ ,- ~ O. 4r-c _ rx L , H Ltl"> >" F- Qr of c c N CC -44 Fl. ?C1 N gi- 0 N N rr l O E:l M f? \? 4 N G' X17 ? f? m 0 `S M 1 1 1 ? ?•r A ? ? 1 r- ILn J yf ! f Upstream of pipe replacement project on SR 1573 on an unnamed tributary to Snow Creek in Iredell County (pond overflow) MVC-U13S.Jpg kOgUAgOVX101.1 JrGyJ MVC-U145.JPY ,0°4VA40VA1VP1 JNcyJ { . 1 , Downstream of pipe replacement project on SR 1573 on an unnamed tributary to Snow Creek in Iredell County A ER. 17 (Joins sheet 13) s JEII ? rao CtD2 ?C, °O 4 v lj? 11 1 ee 0 5000 Feet 5-R 673 (Joins sheet 2 1) NCDOT HAZARDOUS SPILL BASIN CHECKLIST Division: 19 County: Tredell Project ID: River Basin: Yadkin Bridge No: Pipe Replacement Route: SR 1573, Fox Bottoms Road Stream: Unnamed tributary to Snow Creek, WS-IV Waters Water Ouality Criteria: Yes No Stream Crossing Blue Line On USGS r r- ORW r r WSI I- F WS 11,111 OR IV, Crossing Within 0.5mi of W.S. Critical Area t- r Roadway Criteria: Route Designation- Yes No Arterial Urban r F Arterial Rural r r Additional Site Information: Yes No Is a Hazardous Spill Basin Required? r- r Criteria Based Upon NCDOT "Best Management Practices for the Protection of Surface Waters" (March, 1997). l 11 ?APR309,001 STATE of NORTH CAROLINA i DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPETT GOVERNOR SECRETARY 401 ISSUED MEMO TO: John Dorney, DENR, DWQ/401/Wetlands Unit FROM: Trish Simon, Division 12 Environmental Officer DATE: April 25, 2001 SUBJECT: Pre-construction Notification$ Enclosed are seven copies of pre-construction notification nationwide permit applications for a secondary road paving/pipe replacement project in Iredell County for your review and comments. is 010667 Post Office Box 47 Shelby, North Carolina 28151-0047