HomeMy WebLinkAbout20010699 Ver 1_Complete File_20010508TO: Mr. Eric Alsmeyer, USACOE
Raleigh Field Office
FROM: Maryellen Haggard, DOT Permit Coordinator
Habitat Conservation Program
DATE: May 31, 2001
SUBJECT: NCDOT culvert placement in an unnamed tributary to a tributary to Rich Fork
Creek, Davidson County.
The North Carolina Department of Transportation (NCDOT) is requesting a concurrence
letter from the North Carolina Wildlife Resources Commission (NCWRC) to obtain a 404•permit'
from the U.S. Army Corps of Engineers. Biologists on staff with the NCWRC have reviewed the `
proposed improvements and are familiar with habitat values of the project area. These
comments are provided in accordance with the provisions of the Fish and Wildlife Coordination
Act (48 Stat. 401, as amended; 16 U.S.C. 661-667d) and the Clean Water Act of 1977 (33 U.S.C.
466 et seq.).
NCDOT proposes to install a 36' culvert on an intermittent unnamed tributary to Rich
Fork Creek in order to construct a new road. This action will impact 80 feet of the unnamed
tributary to Rich Fork Creek. The project will not impact trout waters. We will not object to the
project as proposed provided that the following conditions are implemented:
1. Disturbance of the stream channel must be limited to only what is necessary
to install the culvert. Heavy equipment should be operated from the bank
rather than in the stream channel in order to minimize sedimentation and
reduce the likelihood of introducing other pollutants into the stream.
2. The 36-inch culvert should be buried below the streambed. The dimension, pattern,
and profile of the stream above and below the pipes should not be modified by
widening the stream channel or reducing the depth of the stream. All waters should
flow without freefalling or damming on either end during low flow conditions to
maintain aquatic life passage.
3. Stringent erosion control measures should be installed where soil is disturbed
and maintained until project completion.
4. Temporary or permanent herbaceous vegetation should be planted on all bare soil
within 15 days of ground disturbing activities to provide long-term erosion control.
We encourage NCDOT to utilize onsite vegetation and materials for streambank
stabilization, to minimize the use of riprap (or hard stabilization methods) and to
maximize the use of native vegetation for stabilization and shade.
5. Work must be accomplished so that wet concrete does not contact stream
water.
Thank you for the opportunity to review and comment on this project during the early
planning stages. If you have any questions regarding these comments, please contact me at (336)
527-1549.
cc: Cynthia Van Der Wiele, NCDWQ
Diane K. Hampton, NCDOT
O?O? W AT ?RQG
r
Michael F. Easley _
Governor
William G. Ross, Jr., Secretary
Department of Environment and Natural Resources
Kerr T. Stevens
Division of Water Quality
May 22, 2001
Davidson County
DWQ Project No. 010699
-U-1767Y New Road
APPROVAL of 401 Water Quality Certification
Ms. Diane K. Hampton, P.E., Division Environmental Officer
NCDOT Division 9
2125 Cloverdale Avenue
Winston-Salem, NC 27103
Dear Ms. Hampton:
You have our approval, in accordance with the attached conditions and those listed below, to impact
80 linear feet of an unnamed tributary to Rich Fork Creek for the purpose of constructing -U-1767
New Road in Davidson County. The project should be constructed in accordance with your
application dated 3 May 2001. After reviewing your application, we have decided that this fill is
covered by General Water Quality Certification No. 3289 corresponding to the U.S. Army Corps of
Engineers Nationwide Permit Number 14. In addition, you should acquire any other federal, state or
local permits before you proceed with your project including (but not limited to) Sediment and
Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire
with the accompanying 404 permit unless otherwise specified in the Water Quality Certification.
This approval is valid solely for the purpose and design described in your application (unless
modified below). Should your project change, you must notify the DWQ and submit a new
application. If the property is sold, the new owner must be given a copy of this Certification and
approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills
for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the
future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC
2H.0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed
in the attached certification.
If you do not accept any of the conditions of this certification, you may ask for an
adjudicatory hearing. You must act within 60 days. of the date that you receive this letter.
To ask for a hearing, send a written petition which conforms to Chapter 150B of the North
Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service
Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and
binding unless you ask for a hearing.
North Carolina Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetlands/
Page 2 of 2
This letter completes the review of the Division of Water Quality under Section 401 of the Clean
Water Act. If you have any questions, please telephone John Dorney at 919-733-1786.
Sincerely,
err T. Stevens
Attachment
cc: Wilmington District Corps of Engineers
Corps of Engineers Raleigh Field Office
NCDWQ Winston-Salem Regional Office
Central Files
File Copy
4o y /Ssv
Ei)
STATE of NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY LYNDO TIPPET
GOVERNOR SECRETARY
May 3, 2001
SUBJECT: Davidson County - U-1767Y New Road High Point ,-
Mr. John Domey
NC Division of Water Quality
4401 Reedy Creek
Raleigh, NC 27607
Dear Mr. Dorney,
d }
In an effort to obtain the necessary permits for the subject culvert placement, we are providing a
pre-construction notification application with supporting documentation and $200 fee for the placement of
a 36-inch pipe in Davidson County. There are no wetlands to be impacted and there will be 80 feet of
intermittent stream impacts. We propose to construct a new road to ease existing and future traffic
congestion. We believe this project can be accomplished under General Permit number 31.
By copy of this letter, we are also seeking approval from the State Historic Preservation Office, the
Corps of Engineers, the Fish and Wildlife Service and the NC Wildlife Resources Commission. Therefore,
we are submitting the enclosed material to them.
If you have any questions, comments or need additional information after reviewing this material,
please contact me at (336) 761-2613. Thank you for your cooperation in this matter.
Respectfully,
Diane K Hampton, P.E.
Division Environmental Engineer
Enclosures
CF: Mr. Pat Ivey, PE., Division Engineer
Mr. John Rhyne, E.I.T., Assistant District Engineer
File
01 0699
PAYMENT
RECEIVED
Division of Highways • Division Nine • 2125 Cloverdale Avenue, Winston-Salem, NC 27103
Telephone (336) 761-2613 • Fax (336) 761-2606 • Courier Box 13-12-04
Office Use Only: Form Version April 2001
USACE Action ID No. DWQ No. 01069 9
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
1. Processing
Check all of the approval(s) requested for this project:
® Section 404 Permit
? Section 10 Permit
® 401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: GP-31
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
H. Applicant Information
Owner/Applicant Information
Name: NC Department of Transportation - Division 9
Mailing Address: 2125 Cloverdale Ave.
Winston-Salem, NC 27055
Telephone Number: 336-761-2613
E-mail Address:
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Diane Hampton, PE, DEO
Company Affiliation: NCDOT - Division 9
Mailing Address: 2125 Cloverdale Ave.
Winston-Salem NC 27055
Telephone Number: 336-761-2613 Fax Number: 336-761-2606
E-mail Address: dkhampton@dot state nc us
Fax Number: 336-761-2606
Page 3 of 12
M. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: U-1767Y New Road -High Point
2. T.I.P. Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Davidson Nearest Town: High Point
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): Take Hwy 311 south from
Winston Salem to High Point Take N Main Street exit turn right and go approx. 0.2 miles
to the next left onto Hedgecock Rd Go approx. 0 5 miles and the road will be on the right
next to a new soccer complex
5. Site coordinates, if available (UTM or Lat/Long): 36°00' 19.7" N 80°02'30.3" W
(Note- If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
Suburban road site next to soccer complex.
7. Property size (acres):
8. Nearest body of water (stream/river/sound/ocean/lake): Unnamed Tributary to Trib. To
Rich Fork Creek
9. River Basin: Yadkin
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://`h2o.enr.state.ne.us/admin/mgps /.)
Page 4 of 12
10. Describe the purpose of the proposed work: to place culvert for construction of new road.
11. List the type of equipment to be used to construct the project: standard construction
equipment including a trackhoe
12. Describe the land use in the vicinity of this project: suburban / city sports complex
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
V. Future Project Plans
Are any additional permit requests anticipated for this project in the future? If so, describe the
anticipated work, and provide justification for the exclusion of this work from the current
application: N/A
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
Page 5 of 12
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Wetland Impacts
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(yes/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
N/A
rn
* List each impact separately and identify temporary impacts. impacts include, but are not imutea to: mechanized cteutmg, giauuig, iui,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at htty:/hvtivw.fema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond;
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property:
Total area of wetland impact proposed:
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact
Site Number
(indicate on ma)
Type of Impact* Length of
Impact
(linear feet)
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
(please scify)
1 Culvert 80 ITT. To Rich Fork Ck 2 Intermittent
==r -ter
List each impact separately and identity temporary impacts. impacts include, ouL are not uuuicu to: ?uivelLs WIG .-C-CU
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
,N-tiv.usgs.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., ww,w.toDoozone.com,
www.map_.Ic uest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 80 feet
Page 6 of 12
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U. S.
Open Water Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Name of Waterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
N/A
* List each impact separately and identify temporary nnpacts. Impacts include, but are not unutea to: 1111, exUavauvu, iucuguiy,
flooding, drainage, bulkheads, etc.
4. Pond Creation N/A
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The new road is being constructed to relieve existing roads of congestion and traffic due to
the newly constructed 1000+ home subdivision nearby and a new soccer complex constructed by
the City of High Point The road follows high ground to the maximum extent possible and
crosses a small intermittent draw at one point A 36-inch culvert will be placed (partially buried)
to allow the flow to pass All efforts to insure erosion control and to minimize the placement of
rip rap will be made Natural materials will be used to stabilize the banks where possible.
Construction will be completed in a timely fashion to not upset the natural community.
Page 7 of 12
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetlands/strmgide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
Page 8 of 12
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/Nvrp/index.htm. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
IX.
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):-
Amount of Non-riparian wetland mitigation requested (acres
Amount of Coastal wetland mitigation requested (acres):
Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes ® No ?
X.
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Page 9 of 12
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet) Multiplier Required
Miti tion
1 3
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular trom near banr, oI cnannei; Gone / extenas an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
N/A
XH. Sewage Disposal (DWQ Only)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
N/A
XHI. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
Page 10 of 12
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
5- 2
Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
US Army Corps Of Engineers Field Offices and County Coverage
Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell
US Army Corps of Engineers Avery Clay Jackson Polk
151 Patton Avenue Buncombe Cleveland Lincoln Rowan
Room 208 Burke Gaston Macon Rutherford
Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley
Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain
Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania
Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham
US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes
6508 Falls of the Neuse Road Ashe Franklin Nash Surry
Suite 120 Caswell Forsyth Northampton Vance
Raleigh, NC 27615 Chatham Granville Orange Wake
Telephone: (919) 876-8441 Davidson Guilford Person Warren
Fax: (919) 876-5283 Davie Halifax Randolph Wilkes
Washington Regulatory Field Office Beaufort Currituck Jones
US Army Corps Of Engineers Bertie Dare Lenoir
Post Office Box 1000 Camden Gates Martin
Washington, NC 27889-1000 Carteret* Green Pamlico
Telephone: (252) 975-1616 Chowan Hertford Pasquotank
Fax: (252) 975-1399 Craven Hyde Perquimans
Wilmington Regulatory Field Office Anson Duplin Onslow
US Army Corps Of Engineers Bladen Harnett Pender
Post Office Box 1890 Brunswick Hoke Richmond
Wilmington, NC 28402-1890 Carteret Montgomery Robeson
Telephone: (910) 251-4511 Columbus Moore Sampson
Pitt
Tyrrell
Washington
Wayne
Union
Watauga
Yancey
Wilson
Yadkin
*Croatan National Forest Only
Page 11 of 12
w LL.
uNno?- - - -
- abO?iin? 1°
-i'- - - I- - - - --------a
I
i I
?
i ?? $
ZI • $I
/ ?I I
ro•
9Z' 60' 11 I
O'LO• \ I
jFj
\ I
Z
I
J H i ` I
I
?I
/ I
/ I
1 ?I I
1 / I
l I
?s. °
/ s2 n
I '
- I
_
I
1 ° m
I ? •" I
?
/dam nl
I
I
/ 0D
1 o_
?I
El
N
,It
d
N/
g ! Z` !ii
o I
I
I
\ \ I
\ I
I
\ I
I I?
I
I I
I
I
I
? I
I
I
I
I
?I
I
?o
I
i
Z
0
Q
?Z C 0
QZ) I < Z
Z
O . Z
NU
Z
o J
0 LL
o
Q Q
m
U
W Z
W<
<
<Z U
o =6
Z
z
? ® W Q
Z
z
0
LLI
04
\
m
V
Z
w ? _
® O
z
D
w
U
Q
Z ?O
F-
LU CL N
O Z?
co 3 ?
Q
COQ
?? F-I
Q oz=
u w
_
?
S I? _
= d
w w
LL ? ?
O N w
LL
Z
O
t!?
o?
oM
JJN3? 3?/M N / ? i
O?
?S
109 = „/
9LD 6d lool Qp
olola.?od J.M V
U6nDq'4-JoMS *Cl uuor
1059
301330 isi
10 1HOIl
0
M
k
?a ? 26g?
aIQOS
NOISE.
mM
4
n?
m
2
E
r+?i
d3dd1 31 dnO m
106 z
m
z
0
N W
? T
la
?l
m rZI rGI
d13
V
.
4J f__.
• \?, /s?j1111?N3?32-/J
300189 1003
888 6d - L711 9p
aouclllV _leoocs -l.uowpold
'oul 'uol-I-oloossd .?ulod U61N
888 bd - L511 4p
aoucllly -IOoocs •4-uowpalcJ
•oul uoj-Ploossd 4.ulod U61H
I??G )11sV3d.
431V0112i80J.bZ ._..
see 6d - Lsu 4p
aourllly _leooc? .{ Uowpalcl
•oul •uol-ploossd -l-ulod U61H
la
' dWJ.Sl 10
.. k.
6
Office Use Only: ® 1 U 6 g onn Version April 2001
USACE Action ID No. DWQ No.
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
I. Processing
401 iSSlIED
1. Check all of the approval(s) requested for this project:
® Section 404 Permit
? Section 10 Permit
® 401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: GP-31
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
H. Applicant Information
1. Owner/Applicant Information
Name: NC Department of Transportation - Division 9
Mailing Address: 2125 Cloverdale Ave.
Winston-Salem NC 27055
Telephone Number: 336-761-2613
E-mail Address:
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Diane Hampton PE DEO
Company Affiliation: NCDOT - Division 9
Mailing Address: 2125 Cloverdale Ave.
Winston-Salem NC 27055
Telephone Number: 336-761-2613 Fax Number: 336-761-2606
E-mail Address: dkhampton e dot state nc us
Fax Number: 336-761-2606
Page 3 of 12 PAY M -ENT
RECEIVED
•r
. a
M. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: U-1767Y New Road - High Point
2. T.I.P. Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Davidson Nearest Town: High Point
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): Take Hwy 311 south from
Winston Salem to High Point Take N Main Street exit turn right and go approx. 0.2 miles
to the next left onto Hedgecock Rd Go approx 0.5 miles and the road will be on the right
next to a new soccer complex
5. Site coordinates, if available (UTM or Lat/Long): 36°00'19.7" N 80°02'30.3" W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
Suburban road site next to soccer complex.
7. Property size (acres):
8. Nearest body of water (stream/river/sound/ocean/lake): Unnamed Tributary to Trib. To
Rich Fork Creek
9. River Basin: Yadkin
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o,enr.state.ne.us/admin/maps/.)
Page 4 of 12
10. Describe the purpose of the proposed work: to place culvert for construction of new road.
11. List the type of equipment to be used to construct the project: standard construction
equipment includi_ng_ a trackhoe
12. Describe the land use in the vicinity -of this project: suburban/ city sports complex
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
V. Future Project Plans
Are any additional permit requests anticipated for this project in the future? If so, describe the
anticipated work, and provide justification for the exclusion of this work from the current
application: N/A
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
Page 5 of 12
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Wetland Impacts
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(es/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mecnamzed clearing, graautg, iui,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://utivw.fema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond;
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property:
Total area of wetland impact proposed:
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact
Site Number
(indicate on ma)
Type of Impact* Length of
Impact
(linear feet)
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
(please sc' )
1 Culvert 80 UT. To Rich Fork Ck 2 Intermittent
List each impact separately and identify temporary impacts. impacts include, out are not arruteu to: culverts and aaavcaatw
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
x * Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
usgs.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., wwtiv.topozone.com,
wi%vv.mapdt uest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 80 feet
Page 6 of 12
Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U. S.
Open Water Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres)
(if Name of applicable) Waterbody Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
N/A
* List each impact separately and identify temporary unpacts. impacts mctude, but are not Imutea to: im, excavauon, weuguig,
flooding, drainage, bulkheads, etc.
4. Pond Creation N/A
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The new road is being constructed to relieve existing; roads of congestion and traffic due to
the newly constructed 1000+ home subdivision nearby and a new soccer complex constructed by
the Cif of High Point The road follows high ground to the maximum extent possible and
crosses a small intermittent draw at one point A 36-inch culvert will be placed (partially buried)
to allow the flow to pass All efforts to insure erosion control and to minimize the placement of
rip rap will be made Natural materials will be used to stabilize the banks where possible.
Construction will be completed in a timely fashion to not upset the natural community.
Page 7 of 12
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/newetlands/strmgide.html.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
Page 8 of 12
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/«-rp/index.litm. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Page 9 of 12
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet) Multiplier Required
Miti
gation 3
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from near bate: of cnannei; Lone G emenus an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
XH. Sewage Disposal (DWQ Only)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
N/A
XIII. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
Page 10 of 12
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
US Army Corps Of Engineers Field Offices and County Coverage
Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell
US Army Corps of Engineers Avery Clay Jackson Polk
151 Patton Avenue Buncombe Cleveland Lincoln Rowan
Room 208 Burke Gaston Macon Rutherford
Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley
Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain
Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania
Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham
US Army Corps of Engineers Alleghany Edgecombe Lee Stokes
6508 Falls of the Neuse Road Ashe Franklin Nash Surry
Suite 120 Caswell Forsyth Northampton Vance
Raleigh, NC 27615 Chatham Granville Orange Wake
Telephone: (919) 876-8441 Davidson Guilford Person Warren
Fax: (919) 876-5283 Davie Halifax Randolph Wilkes
Washington Regulatory Field Office Beaufort Currituck Jones
US Army Corps Of Engineers Bertie Dare Lenoir
Post Office Box 1000 Camden Gates Martin
Washington, NC 27889-1000 Carteret* Green Pamlico
Telephone: (252) 975-1616 Chowan Hertford Pasquotank
Fax: (252) 975-1399 Craven Hyde Perquimans
Wilmington Regulatory Field Office Anson Duplin Onslow
US Army Corps Of Engineers Bladen Harnett Pender
Post Office Box 1890 Brunswick Hoke Richmond
Wilmington, NC 28402-1890 Carteret Montgomery Robeson
Telephone: (910) 251-4511 Columbus Moore Sampson
Pitt
Tyrrell
Washington
Wayne
Union
Watauga
Yancey
Wilson
Yadkin
*Croatan National Forest Only
Page 11 of 12
- ......
...... ........
- - - - - --?
I
i
i ?I I
I
-? I
- I
ez
roO G0
eo 11
!•-. ? i ?I ?I I
Z i .?
I
•
? N i ? I
I
1 I
1 ? I
?a, nI I
i o2 I
? I
/
/v I
I
i - at I
I ?,
/ I
_Ol
? i
I
Oln EI' ? I
I
I?
I
I,
I
I
I
I
N _
? e I
I
R
.1<
y? I
N
o I ? I
s, . I
/ ?I I
w
z
O
Q
i?Z G" O
Qa 1 Q N
Z
Z
O
Z Q
Q
d
?
on
N U
z
0 J
0
C
O
?-
o
z
Q Q
V o Z
O Q
g
V
0
Q
U 0
Z W
M?
?
® W Z z
-1
w
g>
p
m O
Q
v
w
Z Q
=
c
® O
LL
f-
Z
D
W
U
O Z
Z
Z O
Q ?
w O N
z?
m ??o
?- Q
FO U-
; 0
a oz=
W
= z F?- _
(7 Q 4J
= W
LL p Q
O to w
z U-
0
H
1
O
o
e
_ ? ^ f e f?rt f ? ? {` lam ??? \ M4`
O-A
• ??'r ? ti. c;/ --?-??,?? `??' _! f.V-" \ '\\ ? rat..-? 'I'"?
'-..-. e ? .? ? ? "0+4:,3:/•^-`?`-`.?. - j'? may, ,._. ??/-? ? v/.
LLJ
ci L )
=rf? Ly ?•.? i i'? J O
04
a
W c) c
cl U)
DI
15' CMP
DI
High Point Association, Inc.
Pledmont _Soccer Alliance
db 1157 - pg 888
DI 24'-CORRUGATED PLASTIC
High Point Association, Inc.
Pledmont 50CCal- Alliance
db 1157 - P9 888
EIP
_ 112' 1211 ?Q
In N
G
z
z 90'
4 CURVE TAPER
w
3
o Z
36o4oir " High Point Association, Inc.
R Piedmont Soccer- Alliance
El _ db 1157 - pg 888
N87415>5-W
I Nr /• "? !\." FOOT BRIDGE
CREEK j?
q?\
John D.Swartzbaugh
& wf Patricia L.
db 1081 pg 1276
Sccleo-
601
R 50`
\\ ?BRCp EIP
\ w iv
\ k
\ \\\ ?1
/wv
wv (D of \ \
/ L7 LIGHT DI
v \-?
ISF OFFICE \
/ VP
WO VI
i \ f N W !Rf FENCe
Nag^S6-l6'W
t
.C
Office Use Only: Form Version April 2001
USACE Action ID No. DWQ No. 01 0 6 9 9
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
1. Processing
Check all of the approval(s) requested for this project:
® Section 404 Permit
? Section 10 Permit
® 401 Water Quality Certification -
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: GP-31
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
H. Applicant Information
1. Owner/Applicant Information
Name: NC Department of Transportation - Division 9
Mailing Address: 2125 Cloverdale Ave.
Winston-Salem NC 27055
Telephone Number: 336-761-2613 Fax Number: 336-761-2606
E-mail Address:
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Diane Hampton PE DEO
Company Affiliation: NCDOT - Division 9
Mailing Address: 2125 Cloverdale Ave.
Winston-Salem, NC 27055
Telephone Number: 336-761-2613 Fax Number: 336-761-2606
E-mail Address: dkhampton e dot state nc us
PAYMENT
Page 3 of 12 RECEIVED
. ik
M. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: U-1767Y New Road - Hi hg Point
2. T.I.P. Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Davidson Nearest Town: High Point
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): Take Hwy 311 south from
Winston Salem to High Point Take N Main Street exit turn right and go approx. 0.2 miles
to the next left onto Hedgecock Rd Go approx 0 5 miles and the road will be on the right
next to a new soccer complex
5. Site coordinates, if available (UTM or Lat/Long): 36°00'19.7" N 80°02'30.3" W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
Suburban road site next to soccer complex.
7. Property size (acres):
8. Nearest body of water (stream/river/sound/ocean/lake): Unnamed Tributary to Trib. To
Rich Fork Creek
9. River Basin: Yadkin
(Note - this must be one of North Carolina's seventeen designated major river basins. The
s/.)
River Basin map is available at http://h2o.enr.state.ne.us/admin/map
Page 4 of 12
10. Describe the purpose of the proposed work: to place culvert for construction of new road.
11. List the type of equipment to be used to construct the project: standard construction
equipment including a trackhoe
12. Describe the land use in the vicinity of this project: suburban / city sports complex
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
N/A
V. Future Project Plans
Are any additional permit requests anticipated for this project in the future? If so, describe the
anticipated work, and provide justification for the exclusion of this work from the current
application: N/A
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also `
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
Page 5 of 12
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Wetland Impacts
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(es/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not lmuted to: mechanized cleanng, grading, fill;
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both stricture and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at httv//wti,.,v.fema.sov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property:
Total area of wetland impact proposed:
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact
Site Number
(indicate on ma)
Type of Impact* Length of
Impact
(linear feet)
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
(please sc' )
1 Culvert 80 UT. To Rich Fork Ck 2 Intermittent
d ted
List each impact separately and identify temporary impacts. Impacts mclude, but are not lmuted to. culverts an assocra np-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
wlvw.usgs.gov. Several intemet sites also allow direct download and printing of USGS maps (e.g., wytiv.topozone.com.
Nv,rw.mapquest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 80 feet
Page 6 of 12
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U.S.
Open Water Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres)
Name Wate)
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
N/A
* List each impact separately and identify temporary impacts. impacts include, but are not ii tea to: um, excavauun, wcugmg,
flooding, drainage, bulkheads, etc.
4. Pond Creation N/A
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The new road is being constructed to relieve existing roads of congestion and traffic due to
the newly constructed 1000+ home subdivision nearby and a new soccer complex constructed by
the City of High Point The road follows high ground to the maximum extent possible and
crosses a small intermittent draw at one point A 36-inch culvert will be placed (partially buried)
to allow the flow to pass All efforts to insure erosion control and to minimize the placement of
rip rap will be made Natural materials will be used to stabilize the banks where possible.
Construction will be completed in a timely fashion to not upset the natural community.
Page 7 of 12
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetiands/strmgide.html.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
Page 8 of 12
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.usl-vv /index.htm. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Page 9 of 12
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet) Multiplier Required
Mitigation
1 3
2 1.5
Total
* Gone 1 extends out 30 teet peipencticutar from near uanx of cnannei; cone /_ exienuzi an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
N/A
XH. Sewage Disposal (DWQ Only)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
N/A
X1H. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
Page 10 of 12
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
US Army Corps Of Engineers Field Offices and County Coverage
Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell
US Army Corps of Engineers Avery Clay Jackson Polk
151 Patton Avenue Buncombe Cleveland Lincoln Rowan
Room 208 Burke Gaston Macon Rutherford
Asheville. NC 28801-5006 Cabarrus Graham Madison Stanley
Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain
Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania
Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham
US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes
6508 Falls of the Neuse Road Ashe Franklin Nash Surry
Suite 120 Caswell Forsyth Northampton Vance
Raleigh, NC 27615 Chatham Granville Orange Wake
Telephone: (919) 876-8441 Davidson Guilford Person Warren
Fax: (919) 876-5283 Davie Halifax Randolph Wilkes
Washington Regulatory Field Office Beaufort Currituck Jones
US Army Corps Of Engineers Bertie Dare Lenoir
Post Office Box 1000 Camden Gates Martin
Washington, NC 27889-1000 Carteret* Green Pamlico
Telephone:. (252) 975-1616 Chowan Hertford Pasquotank
Fax: (252) 975-1399 Craven Hyde Perquimans
Wilmington Regulatory Field Office Anson Duplin Onslow
US Army Corps Of Engineers Bladen Harnett Pender
Post Office Box 1890 Brunswick Hoke Richmond
Wilmington, NC 28402-1890 Carteret Montgomery Robeson
Telephone: (910) 251-4511 Columbus Moore Sampson
Pitt
Tyrrell
Washington
Wayne
Union
Watauga
Yancey
Wilson
Yadkin
*Croatan National Forest Only
Page 11 of 12
p w LL.
ALNno.j_
- adojiin0 ?o
- - ---1--- - • - - -•-•--?
I
i ?I I
I
1
i .. I
• I
i
,\ I
I
^
1 ?I $
zl • $I ?
ez•
1 ?I
I?
m•
Vz' 60' I l • I
nl
F-• ?;?I ?I ?•
I
I
I
?
J H
1 ? I
d
°z •
? I
J I
i I
P
. V '. I
C
4
; I
/ I
/ ?I I
1 ? I
rP• nl I
I Pa I -
' I
?
1 I
•
'
?I $I i " i
t c
I
? I I
I o m I
1 ?'• ? I
n
?
?d5 l
I
I
1 - of
/ 0
h
S3
I 1y I
I
I
ol• el? ??? I
I?eo
frhI
? I
Ell 01?
I
I
?. I
I
I
1? I
I
V
CV
CL-
- -I
10
N
l $ / Z`
o I ,Y, I
z
O
Q
?Z O
a Q IL
z z
03
?0
U
Z 0
NU 0 0
D
F- Q z
z m W
< QVof
O Z V a
OW
V O J P Q
z
Z
CQ
D a
W O
Qo
?
z> CO u
?
W
Fe-
® O
z
D
W
U
z
LLI 0
z 0
a?
E-
F-
W O N
a z
0?0 ? 1:•. Q
? ? LL ?.
?oQ
z 1:
W
Z
3 0
S f- _
? Q
W
LL C Q
O Nw
z ?LL
0
1
R
J('"M
•' '- 9 ??1 ? iii
c
O
00
?
L, Y
t N
FA
y
i'\ J v
i C)
l? - m
J ? ?' c U
r?.
-ww
` _ J r, ??_? * J ? •.ji r ? _ / 1 '' .."? i4?/ \ Oda i ?? I? \ u` .?.??,..`.. ? ?.
61
iL
? L ? _ ? ? '?''- rr • ?•S. ?_ L ?w?W??) :cy Q ? ? . - 1./,.,I ?,7 ?'. ?J Y? r ? ?? ? •? ?
:4 F?• !7` ?? fir, k `. J:, l.. i l/ ?... ?t "-?*;-;. - O
CO
Z CD
LLI CD
z 0 (D
? 4
M.91.95.6LN
-IS'?hZ
3J
O
109 -1,/
331JAO dSJ
to
0
IQ
?,% cdp
k? S\ d' ?'JpJJ?'
a y
6
ea1oOs
83dd1 -3ndn)
106
A
1HOIl
NOISA A?
T doM
dJy
,P/
E
A
m
m
2
C)
M
w
m
/I
9L"'1 (5(31201 qp
' I olola-r.od 3.M V
U6nDQ4-jDms "0 uUof
d13
`I
V
?a
J?
3001HO 1003
-
888 bd - Lgfl qP
acur?lfftl _ISaacs .I.uowpolC!
"oul 'uol+oloossV 4-ulod L451H
ICI
dWJ.51 10
?OM
,of d
888 6d - L911 qP
aouc111V -Iea,:?cs +uowPald
•oui •uol-?oloossd 4-ulod u61H
`` 17
,,9? _ ?71sd7d a?v?n?ao??6a = -==o
??sod ova la
888 6d - LSII qP
aouo111V -18ooc,5 .I.uowpold
•ou1 'uo1..?D1Oossd 4-ulod IAH
Office Use Only: Form Version April 2001
USACE Action ID No. DWQ No. 010699
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
d
1. Processing"
.z?
1. Check all of the approval(s) requested for this project:
® Section 404 Permit *111'- 9nol , 4?-
? Section 10 Permit
® 401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: GP-31
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
H. Applicant Information
1. Owner/Applicant Information
Name: NC Department of Transportation - Division 9
Mailing Address: 2125 Cloverdale Ave.
Winston-Salem NC 27055
Telephone Number: 336-761-2613 Fax Number:-336-761-2606
E-mail Address:
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Diane Hampton, PE, DEO
Company Affiliation: NCDOT Division 9
Mailing Address: 2125 Cloverdale Ave.
Winston-Salem NC 27055
Telephone Number: 336-761-2613 Fax Number: 336-761-2606
E-mail Address: dkhampton@dot state nc us
PAYMENT
RECE1 VED
Page 3 of 12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: U-1767Y New Road - Hi hg Point
2. T.I.P. Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Davidson Nearest Town: High Point
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): Take Hwy 311 south from
Winston Salem to High Point Take N Main Street exit turn right and go approx. 0.2 miles
to the next left onto Hedgecock Rd Go approx 0.5 miles and the road will be on the right
next to a new soccer complex
5. Site coordinates, if available (UTM or Lat/Long): 36000'19.7"N 80°02'30.3" W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
Suburban road site next to soccer complex.
7. Property size (acres):
8. Nearest body of water (stream/river/sound/ocean/lake): Unnamed Tributary to Trib. To
Rich Fork Creek
9. River Basin: Yadkin
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.ne.us/admin/maps/.)
Page 4 of 12
10. Describe the purpose of the proposed work: to place culvert for construction of new road.
11. List the type of equipment to be used to construct the project: standard construction
equipment including a trackhoe
12. Describe the land use in the vicinity of this project: suburban / city sports complex
IV. Prior Project History
if jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
V. Future Project Plans
Are any additional permit requests anticipated for this project in the future? If so, describe the
anticipated work, and provide justification for the exclusion of this work from the current
application: N/A
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
Page 5 of 12
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Wetland Impacts
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(es/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
N/A
rn
* List each impact separately and identify temporary impacts. impacts include, but are not imutea to: mecnamzeu cteatmg, gtauutg, Iu1,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at htty://w-,vw.fema.Rov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property:
Total area of wetland impact proposed:
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact
Site Number
(indicate on ma)
Type of Impact* Length of
Impact
(linear feet)
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
(please scify)
1 Culvert 80 UT. To Rich Fork Ck 2 Intermittent
* List each impact separately and identity temporary impacts. impacts mciuae, out are nut nnuiCU w. cu1VCILJ c LL aZsVV1"- -F-.may,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
ww%v.usas.aov. Several intemet sites also allow direct download and printing of USGS maps (e.g., wutiv.topoozone.com,
w,\ztiv.mapquest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 80 feet
Page 6 of 12
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U. S.
Open Water Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres)
Name Wate)
( applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: till, excavation, dredging,
flooding, drainage, bulkheads, etc.
4. Pond Creation N/A
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The new road is being constructed to relieve existing roads of congestion and traffic due to
the newly constructed 1000+ home subdivision nearby and a new soccer complex constructed by
the City of High Point The road follows high ground to the maximum extent possible and
crosses a small intermittent draw at one point A 36-inch culvert will be placed (partially buried)
to allow the flow to pass All efforts to insure erosion control and to minimize the placement of
rip rap will be made Natural materials will be used to stabilize the banks where possible.
Construction will be completed in a timely fashion to not upset the natural community.
Page 7 of 12
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetlands/strmgide.html.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
Page 8 of 12
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/-vvm/index.htm. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Page 9 of 12
Yes ? No N If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet) Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from near oamc of cnannei; zone z exienus an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or.0260.
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
N/A
XH. Sewage Disposal (DWQ Only)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
N/A
XM. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No N
Is this an after-the-fact permit application?
Yes ? No N
Page 10 of 12
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Applicant/Agent's Signature r Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
US Army Corps Of Engineers Field Offices and County Coverage
Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell
US Army Corps of Engineers Avery Clay Jackson Polk
151 Patton Avenue Buncombe Cleveland Lincoln Rowan
Room 208 Burke Gaston Macon Rutherford
Asheville, NC 28801-5006 Cabamzs Graham Madison Stanley
Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain
Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania
Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham
US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes
6508 Falls of the Neuse Road Ashe Franklin Nash Surry
Suite 120 Caswell Forsyth Northampton Vance
Raleigh, NC 27615 Chatham Granville Orange Wake
Telephone: (919) 876-8441 Davidson Guilford Person Warren
Fax: (919) 876-5283 Davie Halifax Randolph Wilkes
Washington Regulatory Field Office Beaufort Currituck Jones
US Army Corps Of Engineers Bertie Dare Lenoir
Post Office Box 1000 Camden Gates Martin
Washington, NC 27889-1000 Carteret* Green Pamlico
Telephone: (252) 975-1616 Chowan Hertford Pasquotank
Fax: (252) 975-1399 Craven Hyde Perquimans
Wilmington Regulatory Field Office Anson Duplin Onslow
US Army Corps Of Engineers Bladen Harnett Pender
Post Office Box 1890 Brunswick Hoke Richmond
Wilmington, NC 28402-1890 Carteret Montgomery Robeson
Telephone: (910) 251-4511 Columbus Moore Sampson
Pitt
Tyrrell
Washington
Wayne
Union
Watauga
Yancey
Wilson
Yadkin
*Croatan National Forest Only
Page 11 of 12
C w
uNno:j- _ - -
- abojimo
- -
-- ---?--- ------
- -?
I
i
i 't ?I I
I
-? I
i I
LO
I
, RI
? I ?
. z
lw DZ' °
60' l 1 '
I
Z ?; •\ I
I
'
A • m
` I
,-
J V1 ; . I
I
i
N •.I
14
; I
% I
I ?I I
f a. /
F) I
f a2 I -
/ - I
0 o
f /dam I
I
f ,
01
?
Z
O Z
N w
U
Q CL ZQ
?Q Z oZ
z Z Z Qo
mp
NU 0 °?z
-
Q Zo
Q Z m
Z Q Um w Zr^Q
W ? LL
O Q I
7 V
??L Oa a8.WIz- =
ZO o Lu ::E
M _FW
? a
g Lu Z = W
z 0
Q LL
N
?- v o
Z?
W = Q
® O
I
?I p O1O El' `y n ??
&I °i \
I I?
1
? I
I
I
? I
I
Y
CV
'It
_ I
I
10
N
s , ? I
I
of
i
'
r
T Z
[^- h
/N1
e?.... J r , ' f t3'{\,, ._ I. sn? ! / .t\ ??\ u \? L ?_ ^u?j9 } F . _ rn
fit
'> ? • Ilk 0 i
A:? t 14'
Y'Erl
'?, ? ?- ) r•`r?'yrKwP:"s,'a?.-^?..,??11 ?.?? ?. ?- .?f; i '?'?? tl •`( l Y.?\ \ .b ;??
??' f -?_ ? t :•, a ?y ,}1[iy ) ? r(t V I `} 1 \ \:-?? r'-
t' ? ry .. ?1 -•t.,.. C,` _ t t {M? 1? ?' J r ,r ,::,. r? - ??_?/`..! c? tf??. }, \ y? 1 ??:.:4?? i
Q?G•{,
_;.? ?; \?? -' / r ; / i ." jr Y r?y? 1 '` ??'\?\ .Y. ? ?`i ? k ?,•5 ' 1 Y c jk t ?.? o- ?\ \ ;, C
?F" ?l ? `\c ail ;, _ f :,? ?.,,.{\•' o
'NL
LLJ
z C)
ire \? / ..,,? ``? ' _ 1 •? ?1 ( uJ
O C
Val
(6 (6 U
D U)
??. ee ?? '•'? /J/. \ fir' .' ?.. J//'f" 1 I - - - _-..
M•9I,9S.bLN
,IS•s?,Z - / ?
3jN3? 3biM nn . `/`
0
i
xx
301.30 3SI
?\ \ IQ 1 H JII
0
?k \ \
?k \D'?/ Gbpd, \ \
\ 'yJpJ???y
,0S y
,09 = /// ° OI DDS
83db'1 311,vnj
.06
.B/ -7N01S(D
\
?m
dl3 J?
T m
2
F
m
m
m
z
0
? la
v _
m
9LZ1 bd 1001 qp
•1 DID1.,7,J.Dd ?.M
U6f1D(?Z?JDMS •Q UL40r
d13
3001x9 1003 ? _ •?xr °?'-?tV j
888 60
- L?II QP
aou0111V _IGoocS .I.uoulpolcJ
'oul 'uol--oloossb -I-ulod (461H
a .a 189E
Asodo,4cl
888 5d - L511 QP
aouc.11{V _I?ooc? .).uowPOICJ
•oul •uolA-0I00ssd 4-ulod y6lH
a
888 5d - L511 QP
aouo111V _looo05 .{_uowpolcj
•oul 'uol-Dloossd +ulod y61H
la
dWJ .SI 10
ti