Loading...
HomeMy WebLinkAbout20011678 Ver 1_Complete File_20011114D STATE OF North CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY DIVISION OF HIGHWAYS LYNDo TIPPETT GOVERNOR SECRETARY November 13, 2001 011678 Mr. Rob Ridings Divsion of Water Quality 401 Wetlands Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Dear Mr. Ridings: Subject: Chatham - Bridge #50 Construction of Temporary Causeway for Removal of Drift (U.S. 421) In an effort to obtain the permits needed for the Construction of a temporary causeway for the purpose of drift removal from bridge bents in Deep River at the Chatham - Lee County line, we are providing the pre construction notification application and the supporting materials. To our knowledge there are No High Quality Waters or Outstanding Water Resources occurring in the project a e anticipate that these activities will be authorized under Nationwide Permit numbe 3: This letter and a copy of the application materials will be submitted to N.C. Division of Water Quality, U.S. Fish and Wildlife Service, and U.S. Army Corps. of Engineers for approval. If you have any questions or comments, or need additional information, please contact our office at (910) 944-2344. Thank you for your cooperation in this matter. Sincerely, Art C. King Division Environmental Officer P.O. BOX 1067, ABERDEEN, NORTH CAROLINA 28315 PHONE (910) 944-2344 FAX (910) 944-5623 Office Use Only: USACE Action ID No. DWQ No. Form Version October 2001 01 1678 If anv particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. I. Processing Check all of the approval(s) requested for this project: © Section 404 Permit F1 Section 10 Permit 17 401 Water Quality Certification, F] Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: #33 If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: II. Applicant Information Owner/Applicant Information Name: North farolina llenartment of lransnor<a??on Mailing Address: W F Rosser P F Division Engineer North Carolitla_IZepa=t of Transportation. Dtvtslon 8_ P O Box 1067 Aberdeen North Carolina X8315 Telephone Number: 910-944-2344 Fax Number: E-mail Address Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: B. 1 n Company Affiliation: NCDOT Division 8 Bridge Maintenance Unit Mailing Address: P.O. Box 289 Her CihyLJ ?'. 27344 - Telephone Number: Fax Number: E-mail Address: Page 5 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local . 4andmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Dri ft Removal 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): Chatham Co Bridge #50 over Deep River 4. Location County: Chatham Nearest Town: Sanford Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): Hwy 421 South at Lee-Chatham County Line Site coordinates, if available (UTM or Lat/Long): (Note - If project is linear, such as a road or utility line, attach a sheet that separately coordinates for each crossing of a distinct waterbody.) lists the 6. Describe the existing land use or condition of the site at the time of this application: Rural 7. Property size (acres): / 8. Nearest body of water (stream/river/sound/ocean/lake): Deep River - 9. River Basin: (Note - this must be one of North Carolina's seventeen designated major river basins. The ns/.) River Basin map is available at hUp://h2o.enr,state.nc.us/adminZma Pave 6 of 12 10. Describe the purpose of the proposed work: Removal of driftwood and debris from bridge bents via a temporary n12 causeway, ,11. List the type of equipment to be used to construct the project: Track excavator 12. Describe the land use in the vicinity of this project: Rural/ g_ricultural IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along, with construction schedules. N/A V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing, or description, please attach a separate sheet. Nee 7 of 12 1. Wetland Impacts Wetland Impact Site Number (indicate on map) Type of Impact* Area of Impact (acres) Located within Distance to 100-year Floodplain** Nearest Stream (yes/no) (linear feet) i Type of Wetland*** None i I I ? i I I "List each impact separately and identity temporary impacts. impacts nnctude, out are not u1nucu w. 111VC11 IzeV ,. Ca-5, s s, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. •• 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Nlaps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616. or online at hup://www,fema.gov. "•• List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond. Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: Total area of wetland impact proposed: 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number (indicate on map) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please specify) Temporary 40' x 20' Deep River 1001+ Perennial I i List each impact separately and identify temporary impacts. Impacts include, but are not limited to: cwverts and assuciairu ;ii,- sy. dams (separately list impacts due to both structure and flooding), relocation (irc:ude linear feet before and after, and net loss gain). stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavatio:% ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and -elocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest do%%nstream named stream into which it flows. USGS maps are available &xough the USGS at 1-800-358-9616, or online at ?vxvw. uses. gov. Several internet sites also allow direct download and pi-m ing of USGS maps (e.g., w??,v t4pozone.com, ?????? maoduest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 20' x 40' Page 8 of 12 Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site"Vumber (indicate on map) Type of Impact* Area of Impact (acres) Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound. bay, ocean, etc.) None I i List each impact separately and identify temporary impacts. Impacts include, but are not firnited to: nu, excavanon, oreagmg. flooding, drainage, bulkheads, etc. 4. Pond Creation if construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): F? uplands E] stream wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Drift debris will be removed from the stream channel and moved off site Rip ran will be removed from the stream channel and added to the existing armor along the stream bank above normal water surface and within current armor limits VIII. Miti;ation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when . necessary to ensure that adverse effects to the aquatic environment are minimal. Factors `including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining %vetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o enr state nc us/ncwetlands/strm, 'dgL e.htm1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 'Ol/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at hh :/'h2o enr state nc us ndcx.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Pave 10 of 12 Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federaUstate. local) land? Yes ® No 0 If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes F? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes 0 No X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes F-I No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. I buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone' I Impact (square feet) Multiplier Required Mitigation 1 I 3 2 I 1.5 Total • Zone 1 extends out su teet perpenaicuiar irum near vanti ui additional 20 feet from the edge of Zone 1. Page 11 of 12 If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donatioi, of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation o; Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information a_ `identified within 15A NCAC 2B .0242 or.0260. XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and %vetlands downstream from the property. NIA XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes [] No Is this an after-the-fact permit application? Yes F? No XIS. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e. 'g., draw-down schedules for lakes, Cates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). W ` ? Nc VG.. r? _1.?? Z c d ( Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 ItL -. jail 4v VI BENT BENT 'RIVER EDG 7 3 BENT + + - - BENT DEEP RIVER + + - - - - + + + + SR. 50 BR. 51 + + t + + + + + + + + + + + + .. - - BENT + + + + + + + + + t vs z + + + + + + + + + + + + + + + + + + t t + .- + + + + + + + + + t + +++++ DRIFT + + + + + + + + + + + + + + + +++++++++++ +++++++++++ + + + + + + + + t + - - - - BENT + + + + + + + + PROPOSED TEMP. ++++++++++ RIP RAP CAUSWAY + ++ - - - - BENT TO DRIFT PILE 0 r +I = . BENT ARMOR N RIP RAP RIVER 000000000000°0000 000000000 a PROPOSED NEW RIP o00000o0o°0° °0000000 RAP ARMOR LIMITS. 20' o 0 0000 0 0000 6c . BENT A 1 A NOTES: RIP RAP CAUSWAY TD CONSIST OF CLASS I & B RIP RAP. 100' CAUSWAY TO BE REMOVED AND PLACED ON BANK ABOVE PLAN NORMAL WATER SURFACE ELEVATION AND WILL EXTEND CURRENT ARMOR LIMITS BY ±20'. NORMAL AVERAGE WATER DEPTH: 12' DRIFT TO BE REMOVED FROM RIVER AND PLACED ON RIGHT OF WAY FOR FUTURE DISPOSAL. METHOD OF REMOVAL WILL BE BY TRACKED EXCAVATOR. NO SCALE DRAWN BYE RN PROJECTi SHEET DATE/ 7/31/01 DRIFT REMOVAL PLAN CHATHAM SR. NO 50 OVER DEEP RIVER CHATHAM COUNTY NORTH CAROLINA