HomeMy WebLinkAbout20011739 Ver 1_Complete File_20011128
'1 ISSUED
FILE COPY 01 1739
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY P. O. Box 25201, Raleigh, NC 27611-5202 LYNDO TIPPETT
GOVERNOR PHONE: 919-733-2520 SECRETARY
Mrs. Jean Manuele
U. S. Army Corps of Engineers
Raleigh Regulatory Field Office
6508 Falls of Neuse Road, Suite 120
Raleigh, NC 27615
November 20, 2001
Subject: Nationwide Permit #14 & #33
Bridge # 261 on SR 1737
Caldwell County, North Carolina
Project Number: 5.7552
Dear Mrs. Manuele:
The NC Department of Transportation is scheduled to replace the existing substandard Bridge
#261 on SR 1737 in Caldwell County with two lines of 60'x 117"x 79" CSPA with a concrete
headwall. Both lines of pipe will be laid at least one (1) foot below streambed grade. An artificial
floodplain will be established on the inlet and outlet ends of pipe #2 to isolate this barrel for
stormwater flow only (see attached diagram).
Miscellaneous rip-rap impacts will total 40 linear feet or less. New stream impacts =1001n. feet.
Construction of this project will necessitate impacts to waters of the United States in the Catawba
River Basin. Bridge #261 crosses a second order perennial unnamed tributary to the Upper Little
River (Class: WS-IV). The Division 11 Environmental Officer reviewed this project for the
presence of threatened and endangered species on November 19, 2001. The subject project has
been determined to have no effect on any listed threatened or endangered plant or animal species.
Historic compliance work will be scheduled and concurrence with the State Historic Preservation
Office will be obtained if required.
The replacement of Bridge #261 with arched pipes will require temporary dewatering. An
impervious sandbag dike will be constructed upstream of the existing bridge to create a small
pool. Clean water will temporarily be pumped around the construction area and will be
discharged into a buffer area. Any dirty water located inside the construction area will be pumped
into a silt bag. The dewatered area will total approximately 500 square feet or 0.01 acres. Once
P. O. Box 250, N. WILKESBORO, NC 28659 PAYMENT
PHONE (336)667-9111 FAx (336)667-4549
RF71F 11_n
Mrs. Jean Manuele
Bridge #261 on SR 1737
Page 2
November 20, 2001
the new structure is in place, the impervious dike will be removed and the stream will flow freely
through the new pipe crossing.
The minor modifications proposed in this application should not remove or degrade existing water
quality uses. By utilizing the erosion control measures outlined in the attachments to this
application, downstream water quality standards will be protected.
Attached is a Preconstruction Notification Form, plan sheets with proposed erosion control
measures, a marked county map, a marked topography map and photographs.
By copy of this letter, it is requested that Mr. Ron Linville, Mountain Region Coordinator, with
the North Carolina Wildlife Resources Commission comment directly to you concerning the 404
Nationwide Permit application with a copy sent to me.
By copy of this letter, I am forwarding seven (7) copies of this application package to Cynthia
Van Der Wiele, NCDENR, Division of Water Quality, 401/Wetland Unit, for her review. A
$200.00 check is enclosed for the 401 certification processing fee. It is requested that any
comments related to the 401 certification be forwarded directly to the Corps with a copy sent to
me.
We would like to begin construction as soon as possible. If further information is required, please
let me know. Your early review and consideration will be greatly appreciated.
Sincerely,
7
Heath Slaughter
Division Environmental Officer
Enclosures
cc: Jean Manuele, US Army Corps of Engineers (1 additional copy)
Ron Linville, Western Piedmont Region Coordinator, NCWRC
Cynthia Van Der Wiele, Division of Water Quality (7 copies)
R. C. McCann, PE, Division Engineer
Heath Slaughter, Division Environmental Officer
Neil Trivette, Roadside Environmental Field Operations Engineer
Dennis Bennett, Bridge Maintenance Engineer
Office Use Only: 0117 Version April 2001
3 ?"'
USACE Action ID No. DWQ No.
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit
? Section 10 Permit
® 401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: NW #14 & NW #33
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
H. Applicant Information
1. Owner/Applicant Information
Name: North Carolina Department of Transportation
Mailing Address: P O Box 250, North Wilkesboro NC 28659
Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239
E-mail Address: hslau hterndot.state.nc.us
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Heath Slausihter. Division Environmental Officer
Company Affiliation: North Carolina Department of Transportation
Mailing Address: P O Box 250, North Wilkesboro NC 28659
Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239
E-mail Address: hslau titer o,dot.state.nc.us
Page 3 of 12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Bridge #261 on SR 1737
2. T.I.P. Project Number or State Project Number (NCDOT Only): 5.7552
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Caldwell Nearest Town: Lenoir
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): From Lenoir, travel east on NC
90fUS 64. Turn right onto SR 1734. Turn left onto SR 1738. Turn Right onto SR 1737.
5. Site coordinates, if available (UTM or Lat/Long): UTM: 17 467015E 3969954N
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
Residential/Farm
7. Property size (acres): A2proximately 0.03 acres.
8. Nearest body of water (stream/river/sound/ocean/lake): UT of Upper Little River (Class:
WS-M.
9. River Basin: Catawba
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
Page 4 of 12
10. Describe the purpose of the proposed work: Upgrade existing stream crossing.
11. List the type of equipment to be used to construct the project: Trackhoe/backhoe and dump
12. Describe the land use in the vicinity of this project: Residential/Farm
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
V. Future Project Plans
Are any additional permit requests anticipated for this project in the future? If so, describe the
anticipated work, and provide justification for the exclusion of this work from the current
application: N/A
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
Page 5 of 12
1. Wetland Impacts
Wetland Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres Located within
100-year Floodplain**
es/no Distance to
Nearest Stream
linear feet
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online athttT)://www.fema-go v.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property: 0 acres
Total area of wetland impact proposed: 0 acres
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact Length of Average
Width of Perennial or
Site Number Type of Impact* Impact Stream Name**
Stream Before Intermittent?
(indicate on map) (linear feet)
Impact (please specify)
Replacing
Bridge #261 Bridge with 60'
"
" 60 feet UT of Upper Little River 6 feet Perennial
of 117
x 79
CSPA
80 linear
Bridge 9261 Temporary feet or 500 UT of Upper Little River 6 feet Perennial
Dewatering square feet
Miscellaneous
Bridge #261 rip-rap
placement for 40 feet or
less UT of Upper Little River 6 feet Perennial
stabilization
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.uses.sov. Several Internet sites also allow direct download and printing of USGS maps (e.g., www.tovozone.com,
www.mMuest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 1001n. ft. of new permanent impacts.
Page 6 of 12
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U.S.
Open Water Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres Name of W aterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: nit, excavation, dredging,
flooding, drainage, bulkheads, etc.
4. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The existing bridge must be replaced due to its condition. By utilizing the erosion control
measures as shown in the attached drawings adverse impacts to streams in the area will be
minimized The existing bridge is being replaced with pipe as a cost saving measure.
Page 7 of 12
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetlands/strrnaide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
Page 8 of 12
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at bn://h2o.enr.state.nc.us/wro/index.htm. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet): N/A
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
IX. Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ? No ® If you answered "yes", provide the following information:
Page 9 of 12
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or. 0260.
N/A
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
All appropriate best management practices for sediment and erosion control will be
implemented during construction.
XH. Sewage Disposal (DWQ Only)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
N/A
XM. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (I 5A NCAC 2H .0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
Page 10 of 12
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Applicant/Agent's Signaturd" Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
US Army Corps Of Engineers Field Offices and County Coverage
Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell
US Army Corps of Engineers Avery Clay Jackson Polk
151 Patton Avenue Buncombe Cleveland Lincoln Rowan
Room 208 Burke Gaston Macon Rutherford
Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley
Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain
Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania
Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham
US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes
6508 Falls of the Neuse Road Ashe Franklin Nash Surry
Suite 120 Caswell Forsyth Northampton Vance
Raleigh, NC 27615 Chatham Granville Orange Wake
Telephone: (919) 876-8441 Davidson Guilford Person Warren
Fax: (919) 876-5283 Davie Halifax Randolph Wilkes
Washington Regulatory Field Office Beaufort Currituck Jones
US Army Corps Of Engineers Bertie Dare Lenoir
Post Office Box 1000 Camden Gates Martin
Washington, NC 27889-1000 Carteret* Green Pamlico
Telephone: (252) 975-1616 Chowan Hertford Pasquotank
Fax: (252) 975-1399 Craven Hyde Perquimans
Wilmington Regulatory Field Office Anson Duplin Onslow
US Army Corps Of Engineers Bladen Harnett Pender
Post Office Box 1890 Brunswick Hoke Richmond
Wilmington, NC 28402-1890 Carteret Montgomery Robeson
Telephone: (910) 251-4511 Columbus Moore Sampson
Pitt
Tyrrell
Washington
Wayne
Union
Watauga
Yancey
Wilson
Yadkin
*Croatan National Forest Only
Page 11 of 12
48 s
2-
349
Buffalo c
e 1]02 Co.. .b \
.6 .Q 1S68 •????
76°05' /
-154 2 "1.8 bL, 4010
154 C,
64
-153 10
P376 x68
16 3 J GILL KNOB
1504 0 I o to G
\ , PAS
xo
343 s 44 ?-un
1507 V 1$10
1594 5 /
M0?7?
.2? - !e rle 42 ..' y
^? 139 .1 Crtlk Grandin `,? •-'•` /.i
IV - 1117 I]]7
,sos
b PO
A 2231, t? . 40 ?issv ?yE'?O/
:.. ? 2 9
1111 \ rOPI?
ISO- ` Yadkin Valley k ?zt BUTTE MTN.
OJ?`a .m 2 Y-1'6v IV,. t7 18
" 342
SNP Panenal `? IS69 4'1 1 ve '
We Sd New Hop. 31!' L S n
334 a. „]a 1,
noa a\ .
Iseo , le0ed 268 \ ,}1 1.1 Hdlo.+
3)v -_ '? fA 1111 43 I I 35 E 1 1? SPnngs\m
_ J J I J , ? I5P7
1117 }? .1
15,
atfeiwn i6o1 y 1 1?1. ?a0 Yadkin Valley OL v Is]o .5 / 16°00'
J
1 MOSES KNOB ?ez..
ELEV. 2.770• J
Q? yy Kings HICKORY
;. 1 Geek I KNOB
x' 130 y 34 ;
d?? I
? COX KNOB
r \ Cl` n
27 INDIAN GRAVE~P I
a GAP OJ t? ..
81Y. 2,130
Warrior I E?.,r / n1
32 ?o
G,?l?'`? 333
M o '-
7J \ \ 1710 171,
90
X719 ate.. Al
.K Im
Dr-
56
1710
. /
! ! I 189 J ,7 u
7.2 1730
'` all 'v qev 73 57 J 75°SS'
.18 MEN MTN
o f 88' a? ,` ELEV.226S FA .J <x 64
S fA ?J 90
J BYP. N / ? ° Cyrior ?l Y: 9 VI 77'x.
? ? Oak Hill v 47 RIVER
r \1 M la -"f / G
?FAP SIB 7x Gw•
6.
LEN
As d.
11\\ `? Valle 'O•o' '?JS
?? I '? 1791 W
L ne
:;i?;•:::9.; r' `. 9e Mt. Hertnan
59
`q f FAS ^ T
_ _ _ _ _ e 1 Q
170726{
A .7
34
1.x.3: - L\\ y ,761 17114 , 256 Q
ht0 MAIT•?:' ?OO? I.o
POP. 2.10 rAS 17iR
EST. 1PBx ?!` FAS F. st 'ZS n.::... 9 C' •J '- 1713 7 x
^? .1
HUDSON d> k 1
PO P. x.888 °;:; '% I7lp f .
l '`• ` •" .:;\ ,. 17.3 4 35*50' _1
tTi .1:^.':'.`. 4.PAS•O ••P 1:7 t al W .6
FAB
If, / „]] '
?? 3 .1 1141 _ n Q
,SAWMILLS _
POP. 4750 ch-?
l t? ? ... ?? 6 9 9
l
Baton i1E.' *..; ?l _ •a• s1 i `?4 17
1813
0
0
n
0
.J
N
v
II
w
rn
w
c?
II
ON
J
0
K.A
N
cA
0
N
O
lJl f,J. ; .r 'L?
} N?
,"5 r
(D
r-r
3
r
V
rn
V
0
Ln
m
w
to
orn
ko
?o
ui
-A
Z
m
r -
r
m
Z
v
a
r
m
a
c
0)
a
;O
c
I?
o
u
0
0
0
CAD
0
?Q
r"t
n
ro
ac
(9
O
N
CULVERT CONSTRUCTION SEQUENCE
LPLACE PROPER EROSION CONTROL DEVICES
(SILT BASINS, TEMP. DIVERSION, SILT FENCE ECT.)
2. REMOVE EXISTING STRUCTURE
3.CONSTRUCT IMPERVIOUS DIKE UP STREAM TO
CREATE SMALL POOL (DO NOT DIG A HOLE) SO
WATER CAN BE PUMPED AROUND CONSTRUCTION
AREA DOWN STREAM. (THIS WILL BE CLEAN WATER)
ANY UNCLEAN WATER FROM INSIDE CONSTRUCTION
AREA WILL BE PUMPED INTO A SILT BAG.
4.CONSTRUCT BOTH LINES OF PIPE
5.REMOVE IMPERVIOUS DIKE
6.COMPLETE ROADWAY (THIS INCLUDES SEEDING
AND MULCHING)
Fo -,o
? o
0 -'
z cn
cn D D
_o
v ? +
w
s cc
@ O
I @ 0 co
z
----yid----? r
Z zlise co 3 @
.D I
3 x'
O z a I m l
m•
O L- o
r'
i Ix
i
W
/ z (!7
co / x D D
O D< r
@ D
+ L
-I
a` o C
N m
? D
@
D
Ul
C
m
N
(0-) 70
m
? n
X 0
m
? z
V?
?m
D
m ?
D m
f
a
h
o
w
14
0
Ul
O
O
T
r
N ?
O T,
D
C7
m
? Z
N
rn -
D
O
n
Cl)
m I
0
ww ?,
rn o
oS ?
?m
?U)
m
D 7- C7
n (D
CD Z
cl) n
M.- 70
o U, m
m
S
m
D
D
b
a
by y
a
a
Z
z
y0a
ti
O
W
IN
O
W
co
W
U1
,-,
O
m
m
r
r-
0
m
m
N
N z
oo
m
xm
QO c)
?m
mo
O?
m
z
0
m
0
V)
c
n
C
m
D
m
n
r
D
V)
V)
-71
D
O
Z
m
n
CD
m
0
D
-I
rm
C
m
D
C)
m
m
z
F-
m
r?
0
m
x
V)
z
G7
CO
CD
0
S C-)
D m
Z
0
D
r
Top Left: Bridge #261 on SR 1737, Caldwell County.
Top Right: Side view of Bridge #261 on SR 1737, Caldwell County.
Bottom Left: Downstream view taken from bridge. There is a fair amount of livestock (goats)
damage to the riparian zone on this end of the structure.
Bottom Right: Upstream view taken from bridge. This area is relatively undisturbed.
011739
o?0F w A rF9QG Michael F- Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
co Gregory J. Thorpe, Ph.D.
> y Acting Director
p -? Division of Water Quality
November 30, 2001
Caldwell County
DWQ Project No. 011739
Bridge No. 261 on SR 1737
APPROVAL of 401 Water Quality Certification with Additional Conditions
Mr. Heath Slaughter, Division Environmental Officer
NCDOT Division 11
P.O. Box 250
North Wilkesboro, NC 28659
Dear Mr. Slaughter:
You have our approval, in accordance with the attached conditions and those listed below, to impact
100 linear feet of an unnamed tributary to Upper Little River for the purpose of replacing Bridge No.
261 on SR 1737 in Caldwell County. The project must be constructed in accordance with your
application dated 20 November 2001 (received 28 November 2001). After reviewing your
application, we have decided that this fill is covered by General Water Quality Certification No.
3289, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Number 14. In
addition, you must acquire any other federal, state or local permits before you proceed with your
project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water
Supply Watershed regulations. This approval will expire with the accompanying 404 permit unless
otherwise specified in the Water Quality Certification.
This approval is valid solely for the purpose and design described in your application (unless
modified below). Should your project change, you must notify the DWQ in writing and submit a new
application. If the property is sold, the new owner must be given a copy of this Certification and
approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills
for this project (now or in the future) exceed one acre, or if total impacts to streams (now or in the
future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC
211.0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the
attached certification and any additional conditions listed below.
1. NCDOT shall follow Best Management for the Protection of Surface Waters (March 1997) and
comply with the requirements for WS-IV waters as specified in 15A NCAC 2B .0216.
2. Stormwater must be directed to buffer areas or retention basins and must not be routed directly
into streams. Mowing of existing vegetated buffers is strongly discouraged, so that they may be
utilized for storm water sheet flow.
3. Temporary or permanent herbaceous vegetation must be planted on all bare soil within 15 days of
ground-disturbing activities to provide long term erosion control.
4. The pipe shall be designed and installed in such a manner that the original stream and floodplain
dimensions are not altered. Existing stream dimensions (widths and depths) are to be maintained
above and below locations of culvert extensions to provide sediment transport and passage of
aquatic life. Pipes shall be buried one foot into the substrate. Use of rip-rap shall be minimized
and shall not impede the ability of aquatic life to move during low flow conditions.
5. All work shall be performed during low flow conditions.
North Carcima Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
919-733-1766 (phone), 919-733-6293 (fax), h,-to:ffh2o.enr.state.nc.us/ncwetlands/
6. Disturbance of the stream channel must be limited to only what is necessary to perform the
culvert installation. Heavy equipment must be operated from the banks rather than in the stream
channel in order to minimize sedimentation and reduce the likelihood of introducing other
pollutants into the stream.
Upon completion of the project, the NCDOT shall complete and return the enclosed
"Certificate of Completion" form to notify NCDWQ when all work included in the §401
Certification has been completed. The responsible party shall complete the attached form
and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon
completion of the project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory
hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing,
send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the
Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This
certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean
Water Act. If you have any questions, please telephone Ms. Cynthia Van Der Wiele at 919.733.5715
or Mr. Mike Parker of the Asheville Regional Office at 828.251.6208 ext. 256.
Sincerely,
Thorpe, Ph.D.
Attachment
cc: Wilmington District Corps of Engineers
Corps of Engineers Asheville Field Office
NCDWQ Asheville Regional Office
Central Files
File Copy