Loading...
HomeMy WebLinkAbout20011084 Ver 1_Complete File_20010711o"'O? W A r?RQG r o ? Michael F.-Easley Governor William G. Ross, Jr., Secretary Department of Environment and Natural Resources Kerr T. Stevens Division of Water Quality July 25, 2001 DWQ# 01-1084 Beaufort County Jay Johnson North Carolina Department of Transportation, Division 2 P.O. Box 1587 Greenville, NC, 27835 APPROVAL of 401 Water Quality Certification Dear Mr. Johnson: You have our approval, in accordance with the attached conditions, to excavate, fill and disturb 0.043 acre of shallow bottom habitat and wetlands in order to replace Bridge #127 on SR 1722 with three aluminum pipe arches in Beaufort County, as described in your application received by the Division of Water Quality on July 11, 2001. After reviewing your application, we have determined that this fill is covered by General Water Quality Certification Number 3274 which can be downloaded from our web site at http://h2o.enr.state.nc.us/ncwetlands . This Certification allows you to use your CAMA Permit when it is issued by the NC Division of Coastal Management. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. Also this approval will expire when the accompanying CAMA Permit expires unless otherwise specified in the General Certification. This approval is only valid for the;purpose and design that you described in your application. If you change your,. project, you must notify us in writing and you maybe required to send us anew application for a. new.certification....lf the..:,; property is sold, the new owner must be given.a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory -mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition conforming to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611- 7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Tom Steffens in DWQ's Washington Regional Office at 252-946-6481 or Mr. John Dorney in Raleigh at 919-733-9646. Attachment incerely, t ens cc: Corps of Engineers Washington Regulatory Field Office Washington DWQ Regional Office Central Files File Copy Doug Huggett 011084 North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), httpJ/h2o.enr.state.nc.us/ncwetiands/ MEMORANDUM TO: John Dorney Regional Contact: tom steffens Non-Discharge Branch WO Supervisor: Bager Thorpe Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name NCDOT - Bridge 127 on SR 1722 County Beaufort Project Number 01 1084 County2 Recvd From DCM Region Washington Received Date 7/11/01 Recvd By Region Project Type bridge Certificates Stream Permit Wetland Wetland Wetland Stream Class Acres Feet Type Type Impact Score Index Prim. Supp. Basin Req. Req. CAMA Waters PT -@N ? 30,307. ? ?- HQ\a F- 29-29 S_AF ? - ` Mitigation ...MitigationType _Type Acres Feet _ ..._ ...., t ?, . n. w n . f z a ,. ?:;r.+r. lr..M :.sav •A.wcYnM+wJ PJ!....r.t }kw.'.a t,5wa+e+}f.sKa'.«.TY'wni is Wetland Rating Sheet Attached? _. ._ ...._...r._._ _ 0 Y Q N Did you request more i. nfo? Y. ON ' ; Have Project Changes/Conditions Been Discussed With Applicant? 0 Y 0 N Is Mitigation required? 0 Y 0 N Recommendation: 0. Issue 0 Issue/Cond 0 Deny Provided` by Region: Latitude (ddmmss) Longitude (ddmmss) Comments: Site visit 17 July 01, Recommend Issue w/o conditions cc: Regional Office Central Office Page Number 1 Facility Name NCDOT - Bridge 127 on SR 1722 County Beaufort Project Number 01 1084 Regional Contact: tom steffens Date: Comments (continued from page 1): cc: Regional Office Central Office Page Number 2 North Carolina Department of Environment and Natural Resources 1 •; Division of Coastal Management Michael F. Easley, Governor NCDENR William G. Ross Jr., Secretary Donna D. Moffitt, Director ®1108 July 2, 2001 OeA MEMORANDUM: UL F 2001 T. Steven TO: MfVe s, Director DIV. OF WATER QUALITY Df Water Quality DIRECTOR'S OFFICE FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: N.C. Department of Transportation Project Location: On SR 1722 in Ransomville at the crossing of North Creek, a tributary to Pamlico River. Proposed Project: Proposes to replace the degraded timber bridge (Br. #127) with 3 corrugated aluminum structural plate pipe arches with head walls and wing walls. This will allow 8 foot shoulders that comply with State Highway standards for secondary roads. Please indicate below your agency's position or viewpoint on the proposed project and return this form by July 22, 2001. If you have any questions regarding the proposed project, please contact Bill Arrington at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE ore ea 1 Is nct 51-B Hwy. , estron aza II Morehead City, North Carolina 28557 ?`\ o Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: http://dcm2.enr.state.nc.us 1 ^ `? AN EQUAL OPPORTUNITY \ AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED / 10% POST CONSUMER PAPER -U, Development Type FEE DCM % DWQ % (143001601435100093 1625 6253 243001602 435100095 2341 1. Private, non-commercial development that does not involve $250 100%($250) 0%($0) the filling or excavation of any wetlands or open water areas: _ II. Public or commercial development that does not involve the filling or $400 100%($400) 0% ($O) excavation of any wetlands or open water areas: III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below applies: III(A). For Private, non-commercial development, If General water Quality $250 100%($250) 0% (SO) Certification No.3301 (see attached) can be applied: III(8): For public or commercial development, if General water Quality $400 100%($400) 0% (SO) Certification No.3301 (see attached) can be applied: III(C). If General Water Quality Certification No. 3301 (see attached) could be applied, but DCM staff determined that additional review and $400 60%($240) 40%(S160) written DWQ concurrence is needed because of concerns related to water quality or aquatic life: III(D). If General Water Quality Certification No. 3301 ee attached) $400 60%($240) 40%(S160) can not be applied: IV. For development that involves the filling and/or excavation of more than one acre of wetlands and/or $475 60%($285) 40%(S190) open water areas: DIVISION. OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: North Carolina Department of Transportation- SR 1722 Beaufort Co. 2. LOCATION OF PROJECT SITE: Replace bridge 127 on SR 1722, in Ransomville, with 3 culverts at the crossing of North Creek, a tributary of the Pamlico River. Photo Index -2000: Flight Line 106 / #1304 B:16 State Plane Coordinates x: 2,689,600 y: 628,000 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit -6/25/2001 & 6/28/2001 Was Applicant Present - No, (Jay Johnson, DEO) 5. PROCESSING PROCEDURE: Application Received - 6/8/2001 Office - Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan -Beaufort County Land Classification From LUP - Rural with Services - CONSERVATION (B) AEC(s) Involved: PT, EW and CS (C) Water Dependent: Yes (D) Intended Use: Public (E) Wastewater Treatment: Existing - None Planned - None (F) Type of Structures: Existing - Roadway, Bridge Planned - Replacement of bridge with culverts (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA] Excavated Filled Other (A) Coastal Wetlands- Cladium 0 jamaicense, Scirpus spp., S. c nosuroides Shallow Bottom 1750 sf ( same 1750 sf) (C) Other Wetlands 124 sf High Ground excavation at culverts High Ground disturbance (in road R/W) 96 sf 7. (Continued) (D) Total CAMA AEC Disturbed: 0.040 acres (E) Total area disturbed by project 0.045 acres (F) Primary Nursery Area: YES (G) Water Classification: C Sw NSW (above the bridge) SA HQW NSW (below the bridge) Open for Shellfishing: NO Form DCM-MP-1 A(To be completed by all applicants) 1. APPLICANT a. Landowner: Name N. C. Department of Transportation Address P.O. Box 1587 City Greenville, State N.C. Zip 27835 Day Phone (252) 830-3490 Fax (252) 830-3352 b. Authorized Agent: Name. Jay Johnson, -NCDOT Div. 2 Address P.O. Box 1587 City Greenville, State N.C. Zip 27835 Day Phone (252) 830-3490 Fax _(252) 830-3352 c. Project name (if any) Bridge #127 Beaufort Co. NOTE: Permit will be issued in name of landowner(s), andor project name. 2. LOCATION OF PROPOSED PROJECT a. County Beaufort 636 j b. City, town, community or ?airdmark_ Ransomville c. Street address or secondary road number SR 1722 d. Is proposed work within city limits or planning jurisdiction? Yes X No e. Name of body of water nearest project (e.g: river. creek, sound, bay) North Creek 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Replace Bridge #127 on SR 1722 with 3 Aluminum Arch pipes and backfill/repave over the culverts. b. Is the prof bsed activity maintenance of an existing project, new work, or both? New work c. Will the project be for public, private or commercial use? _Public Transportation d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. Purpose: To upgrade existing Bridge to improve the safety of traffic movement and to comply with State safety standards for secondary road culvert crossings. METHODS OF CONSTRUCTION: Standard roadw,- and culvert construction methods: DAILY OPERATIONS: Conveyance of vehicular traffic Revised 03/95 Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract N/A b. Size of individual lot(s) N/A c. Approximate elevation of tract above MHW or NWL 27 d. Soil type(s) and texture(s) of tract Currituck Muck e. Vegetation on tract Juncus Roemeranus, Baccaris Hamilifolia, Tvhna Spp. Cladium iamaicense, Phragmites australis, Spartina patens f. Man-made features now on tract Existing paved road and timber bridle. g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan) Conservation X Transitional Developed Community Rural Other Undeveloped h. How is the tract zoned by local government? N/A i. Is the proposed project consistent with the applicable zoning? Yes No N/A (4ttach zoning compliance certificate, i(applicable) j. Has a professional archaeological assessment been done for the tract? Yes X No If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X No 1. Are there wetlands on the site? X Yes _ No Coastal (marsh) X Other X If yes, has a delineation been conducted? No (Attach documentation, ifavailable) m. Describe existing wastewater treatment facilities. N/A it =z 200i n. Describe location andtype of discharges to waters of the state. (For example,-surface-;-runoff, sanitary wastewater, in(justrial/commercial=':effluent;-- "wash down" and residential discharges.) Surface Runoff o. Describe existing drinking water supply source. N/A 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: • A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. • An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by I V white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use.of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include highway or secondary road (SR) numbers, landmarks, and the like. •A Stormwater Certification, if one is necessary. •A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Form DCM-MP-1 Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Harriet Ross Address 1206 Hubs Rec Rd. Belhaven, NC 27810 Name Jean S. Woolard Address 3467 Davenport Fork Rd. Creswell, NC 27928 Name Maggie Lee Clayton Address 230 S. Savannah Rd. Belhaven, N.C. 27810 Name Address • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, pennittee, and issuing dates. N/A • A check for $400 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any pen-nit issued in response to this application will allow only the development described in r ? 'Ir the application. dl4 ' pi-ojecii Ull be subject to condition: and restrictions contained in the permit. I certify tha t -to4he Best of my.-knowledge, the proposec activity complies with the State of North Carolina': approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands, ir. connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the 6th day of June. , 2001 . Print Name Jay Johnson Signature Land er i Au rired Agent Please indicate attachments pertaining to your proposed project. X DCM MP-2 Excavation and Fill Information X DCM MP-3 Upland Development DCM MP-4 Structures Information X DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. Revised 03/95 Form DCM-MP-2 EXCAVATION AND FILL (Except bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. N/A Describe below the purpose of proposed excavation or fill activities. All values to be given in feet. Average Final Existing Project Length Width Depth Depth Access channel (MLW) or (NWL) Canal Boat basin Boat ramp Rock groin Rock breakwater Other (Excluding shoreline stabilization) 1. EXCAVATION a. Amount of material to be excavated from below MHW or NWL in cubic yards b. Type of material to be excavated c. Does the area to be excavated include coastal wetlands (marsh), submerged aquatic vegetation (SAVs) or other wetlands? Yes No d. High ground excavation in cubic yards 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area b. Dimensions,ef disposal area c. Do you claim title to disposal area? Yes _ No If no, attach a letter granting permission from the owner. d. Will a disposal area be available for future maintenance? _ Yes -.No If yes, where? Revised 03/95 Form DCM-M -2 e. Does the disposal area include any coastal wetlands (marsh), SAVs or other wetlands? Yes No f. Does the disposal include any area in the water? Yes . No 3. SHORELINE STABILIZATION N/A a. Type of shoreline stabilization Bulkhead Riprap b. Length c. Average distance waterward of MHW or NWL d. Maximum distance waterward of MHW or NWL e. Shoreline erosion during preceding,12 months (Source of information) f. Type of bulkhead or riprap material g. Amount of fill in cubic yards to be placed below water level (1) Riprap (2) Bulkhead backfill h. Type of fill material i. Source of fill material 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) a. Will fill material be brought to site? Yes No If yes, J;. 20Q1 (1) Amount of material to_-be -placed"in the water (2) Dimensions of fill area (3) Purpose of fill b. Will fill material be placed in coastal wetlands (marsh), SAVs or other wetlands? Yes No If yes, (1) Dimensions of fill area (2) Purpose of fill 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? b. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? c. Will wetlands be crossed in transporting equipment to project site'? - Yes No If yes, explain steps that will be taken to lessen environmental impacts. NCDOT Beaufort # 127 Applicant or Projgct Nanle Siglure/ Date Revised 03/95 . Form DCM-MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Has a site development plan been submitted to the Division of Environmental Management for review? Yes X No If yes, date submitted a. Type and number of buildings, facilities, units or structures proposed Replace Bridge # 127 with 3 Aluminum Arch pipes, Backfill and repave over the culverts b. Number of lots or parcels N/A Density (give the number of residential units and the units per acre) N/A d. Size of area to be graded, filled or disturbed including roads, ditches, etc. 36' x 50'= 1800 sg: ft. e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? Yes X No If yes, date submitted f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for paved surfaces. Marl and Asphalt g. Give the percentage of the tract within 75 feet of MHW or NWL, or within 575 feet in the case of an Outstanding Resource Water, to be covered by impervious and/or built-upon surfaces, such as pavement, buildings, rooftops, or to be used for vehicular driveways or parking. < 10% h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. i. Describe proposed method of sewage disposal. N/A j. Have the facilities described in Item i. above received state or local approval? N/A (Attach appropriate documentation) k. Describe location and type of proposed discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges). Surface runoff from roadway; stormwater capture and retention from upland ditches , diffuse flow into-wetlands Describe proposed drinking water supply source (e.g. well, community, public system, etc.) N/A m. Will water be impounded? If yes, how many acres? _ _ Yes X No n. If the project is a oceanfront development, when was the lot(s) platted and recorded? N/A NCDOT Beaufort #127 Applicant or Project Na e Signature Date Revised 03/95 Form DCM-M -5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-I. Be sure to complete all other sections of the Joint Application that relate to this proposed project. 1. BRIDGES a. Public Private b. Type of bridge (construction material) c. Water body to be crossed by bridge d. Water depth at the proposed crossing at MLW or NWL e. Will proposed bridge replace an existing bridge? _ _Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) f. Will proposed bridge replace an existing culvert(s)? Yes No if yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW orNWL (4) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge, h. Width of proposed bridge i. Height of proposed bridge above wetlands j. Will the proposed bridge affect existing water flow? _ _Yes No If yes, explain k. Navigation clearance underneath proposed bridge 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? Yes _ No If yes, explain m. Will the proposed bridge cross wetlands containing no navigable waters? Yes No If yes, explain n. Have you contacted the U.S. Coast Guard concerning their approval? Yes No If yes, please provide record of their action. 2. CULVERTS a. Water body in which culvert is to be placed North Creek b. Number of culverts proposed 3 c. Type of culvert (construction material, style) Cormated Aluminum Structural Plate Arch Pine d. Will proposed culvert replace an existing bridge? X Yes --No If Yes, (1) Length of existing bridge 35' (2) Width of existing bridge 29.7 (3) Navigation clearance underneath existing bridge 2' (4) Will all, or a part of, the existing bridge be removed? (Explain) Entire bridle will be removed and replaced. Existing bulkheads Revised 03/95 Form DCM-MP-S i ZCG1 will be left and " the pipes will be placed c. Will the placement of the proposed bridge or culvert between them. require any highground excavation?' . =:: X Yes No-- e. Will proposed culvert replace an existing culvert? If yes, Removal of bridge Yes X No (1) Length of area to be excavated 36' If yes, (2) Width of area to be excavated 30' (1) Length of existing culvert (3) Amount of material to be excavated in cubic (2) Width of existing culvert yards 80 cu. Yds. (3) Height of the top of the existing culvert above the MHW or NWL d. If the placement of the bridge or culvert involves any (4) Will all, or a part of, the existing culvert be excavation, please complete the following: removed? (Explain) (1) Location of the spoil disposal area Temporary spoil area is existing road bed f. Length of proposed culvert 49'6" (2) Dimensions of spoil disposal area g. Width of proposed culvert 3(a. 9' 7"x 6'6" with 20' x 20' headwalls (3) Do you claim title to the disposal area? X Yes No h. Height of the top of the proposed culvert above the If no, attach a letter granting permission from MHW or NWL 2' the owner. (4) Will the disposal area be available for future i. Will the proposed culvert affect existing water flow? maintenance? X Yes No Yes X No (5) Does the disposal area include any coastal if yes, explain wetlands (marsh), SAVs, or other wetlands? Yes X No If yes, give dimensions if different from (2) j. Will the proposed culvert affect existing navigation above. potential? Yes X No (6) Does the disposal area include any area below If yes, explain the MHW or NWL? Yes X No If yes, give dimension if different from No. 2 above. 3. EXCAVATION AND FILL e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material a. Will the placement of the proposed bridge or culvert described in Item d. above) to be placed below MHW require any excavation below the MHW or NWL? or NWL? X Yes _ _No X _Yes No If yes, Backfill over pipes and between If yes, (1) Length of area to be filled 33' (1) Length of area to be excavated 33' (2) Width of area to be filled 50' (2) Width of area to be excavated 50' (3) Purpose of fill Backfill over new pipes and (3) Depth of area to be excavated 2' between (4) Amount of material to be excavated in cubic yards 122 cu. yds. f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material b. Will the placement of the proposed bridge or culvert described in Item d. above) to be placed within: require any excavation within: Coastal Wetlands - SAVs Other Wetlands Coastal Wetlands - SAVs - Other Wetlands If yes, No If yes, Open Water (1) Length of area to be filled (1) Length of area to be excavated 33' (2) Width of area to be filled (2) Width of area to be excavated 50' (3) Purpose of fill (3) Amount of material to be excavated in cubic yards 122 cu. yds. Revised 03/95 Form DCM-MR5 will be left and the pipes will be placed between them. e. Will proposed culvert replace an existing culvert? Yes X No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) f. Length of proposed culvert 49'6" g. Width of proposed culvert 30'-b 9' 7"x 6'6" with headwalls h. Height of the top of the proposed culvert above the MHW or NWL 2' Will the proposed culvert affect existing water flow? Yes X No If yes, explain j. Will the proposed culvert affect existing navigation potential? Yes X No If yes, explain 3. EXCAVATION AND FILL a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? X _Yes No If yes, (1) Length of area to be excavated 33' (2) Width of area to be excavated 50' (3) Depth of area to be excavated 2' (4) Amount of material to be excavated in cubic yards 122 cu. vds. b. Will the placement of the proposed bridge or culvert require any excavation within: Coastal Wetlands - SAVs _ Other Wetlands If yes, Open Water (1) Length of area to be excavated 33' (2) Width of area to be excavated 50' (3) Amount of material to be excavated in cubic yards 122 cu. vds. LGG1 c. Will the placement of the proposed bridge or culver require any highground excavation?:.. ` :_: z: ,= X Yes If yes, Removal of bridge (1) Length of area to be excavated 36' (2) Width of area to be excavated 30' (3) Amount of material to be excavated in cubic yards 80 cu. Yds. d. If the placement of the bridge or culvert involves am excavation, please complete the following: (1) Location of the spoil disposal area Temporary spoil area is existing road bed (2) Dimensions of spoil disposal area 20' x 20' (3) Do you claim title to the disposal area? X Yes No If no, attach a letter granting permission from the owner. (4) Will the disposal area be available for future maintenance? X Yes No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below the MHW or NWL? Yes X No If yes, give dimension if different from No. 2 above. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below MHW or NWL? X Yes _ No If yes, Backfill over pipes and between (1) Length of area to be filled 33' (2) Width of area to be filled 50' (3) Purpose of fill Backfill over new pipes and between Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: Coastal Wetlands - SAVs Other Wetlands If yes, No (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill Revised 03/95 Form DCM-MP-S g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? Yes X No If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill 4. GENERAL a. Will the proposed project involve any mitigation? Yes X No If yes, explain in detail b. Will the proposed project require the relocation of any existing utility lines? Yes X No If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes X No If yes, complete For n DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? Silt fence f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Typical Bridle construction equipment g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? _ _Yes X No If yes, explain in detail V yf r1 `V,J NCDOT-Beaufort # 127 ` J v Applicant or PL*ectt N ame' Signature Date Revised 03/95 r + ,O[ ? r A J/N_c-o ?r h (E ? Y g S1 .3 r ra C. J orth a ? t • • 4 N?? h 'l ?uj 9X Q? y,. r cc) cm h p cV , i .s 0, M N \ r- L N M a LL 7 - VVV ?•'• f.!, Zool s v v i c f 7, 7 4 1 n A t1 ? Y I 10 ?? ?N G{ tit rn ? ? o o O t.S? T C1 ; • r? G G ? b ? r• Ln ?l crrl 3. J P1 O A n m n N d C r o n r o t' ? f 2 ?iy S 40 - n Sow Z I / / Y ? ntD OY c z p -? 70 i Tj ? b -p 7 r- ?l 00 N I N?u n o L4: (Tj 40 /I R, I :• K 70 y T 10 I 04 tyl (l c \ p N ? r J 1 m 1 1 ? -\ ` ? N b ' s Z ?m -0 C C `i f rn p?-' ? ??mo f:. cU G -Ii A 6` _v ?? -DU vll 1 ?r S bATE JUNE 05.2001 1 ROAD .UFORT 127 EXISTING WIDTH: 29' 7' EXISTING LENGTH: 35' SUPERSTRUCTURE: RC FLOOR/ TIMBER JOIST SUBSTRUCTURE: TIMBER CAPS ON TIMBER PILES HEIGHT CROWN TO BED: 8' WATER DEPTH.-4' SKEW: 108 DEGREES q* CUD EXISTING HEAD WALL PTOPOSED . 3@ 9'-7?? x 6'-6" X 49'-6" CAA S R UCTURE. STR. PLATE PIPE ARCH WITH HEAD WALLS SR 1722 v NL 1 9/ RIP RAP 9 PROPOSED WIDTH: 30 9' 7' x 6' 6' x 49' 6' NWL CORRUGATED ALUMINIUM STRUCTURAL PLATE PIPE ARCH WITH HEAD WALLS E)OSTNG HEAD WALL PROPOSED LENGTH: 49' 6' HEIGHT CROWN TO BED: 8' 12' MINIMUM BEDDING 3 0 9'7* x 6'6- CAA STR. PLATE PIPE ARCH WATER DEPTH:4' SKEW: 105 DEGREES 9' WING WALL XCAVATION ABOVE NWL: TOP vIEw I L 51 x 3O'W x 2 D= 80 CUBIC YARDS ' I EXCAVATION BELOW NWL JYL x SOW x 2'D = 122 CUBIC YARDS 30 9'7- x 616' CAA STR, PLATE PIPE ARC I CREEK 35, s d l ?d 8' DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS Washington Regulatory Field ffice P.O. Box 1000 IN REPLY REFER TO Washington, North Carolina 27889-1000 July 31, 2001 Regulatory Division Action ID No. 200110959 T. GROUP ??''SECT6tp? = ?' Mr. John Dorney Division of Environmental Management North Carolina Department of Environment and Natural Resources 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Dear Mr. Dorney: Please reference the application of the NC Department of Transportation for Department of the Army (DA) authorization and a State Water Quality Certification to replace an existing bridge with culverts, identified as Bridge 127, located off State Road 1722, adjacent to North Creek, in Ransomville, Beaufort County, North Carolina. Your receipt of this letter verifies your acceptance of a valid request for certification in accordance with Section 325.2(b)(ii) of our administrative regulations. We are considering authorizing the proposed activity pursuant to Section 404 of the Clean Water Act, and we have determined that a water quality certification is required under the provisions of Section 401 of the same law. A Department of the Army permit will not be granted until the certification has been obtained or waived. In accordance with our administrative regulations, in most cases, 60 days after receipt of a request for certification is a reasonable time for State action. Therefore, if you have not acted on the request, or asked for an extension of time, by October 1, 2001, the District Engineer will deem that waiver has occurred. -2- Questions or comments may be addressed to Mr. Raleigh Bland, Washington Regulatory Field Office, Regulatory Division, telephone (252) 975-1616, extension 23. Sincerely, P4" " Raleigh Bland, P.W.S. Regulatory Project Manager Copies Furnished: Mr. Doug Huggett Division of Coastal Management North Carolina Department of Environment and Natural Resources 1638 Mail Service Center Raleigh, North Carolina 27699-1638 z FIELD INVESTIGATION REPORT NC DOT - SR 1722, Beaufort Co. June 29, 2001 PAGE 2 8. PROJECT SUMMARY: The applicant is the N.C. Department of Transportation. The proposal is to replace the degraded timber bridge with 3 corrugated aluminum structural plate pipe arches with head walls and wing walls. This will allow 8 foot shoulders that comply with State Highway standards for secondary roads. 9. PROJECT DESCRIPTION: The site of this proposal is State Road 1722, at the crossing of North Creek, in the community of Ransomville, Beaufort County, NC. The road is approximately 3 feet above NWL. The general purpose of the project is to replace the deteriorating timber bridge with culverts, to allow for a 22 foot pavement width and 8 foot shoulder width. The bridged crossing at North Creek is flanked with wooded Pine/Gum swamp wetlands, coastal wetlands, pasture and residential land. This area is primarily residential, agricultural and undeveloped wooded swamp and forest. The site consists of a 20' wide creek downstream of the crossing. The creek widens adjacent to the bridge to 25' at the south side and 31' at the north side. At the north side of the bridge (upstream), the.zreek branches to the main stream (15'), a smaller steam (8') and a ditch. The coastal wetland consists of Spartina cynosuroides, Scirpus spp. and Cladium jamaicense. The adjacent uplands are pastuelands, agricultural fields, residential land and forested, and are vegetated primarily with various elm, pines, cedar, gum, grasses and wheat. North Creek is Joint waters at the project site, and is classified SA HQW NSW between the Pamlico River and SR 1722 and classified:CSwv NSW between SR 1722 and its headwaters by the Division of Water Quality and subject to the Tar-Pamlico River Buffer Rules. The area is closed to shellfishing, and is designated as primary nursery area by the North Carolina Division of Marine Fisheries. The Beaufort County Land Use Plan designates the project area as Rural with Services , with all areas lying within CAMA Areas of Environmental Concern, designated as Conservation. The proposal is to replace the existing 30 feet wide by 35 feet long timber bridge with three 97" wide x 6'6" tall x 49'6" long corrugated aluminum structural plate pipe arch's (culverts) on the existing alignment. The addition20 foot width will allow for 8 foot road shoulders as required for State Highway standards. The ends of the culverts will be stabilized with headwalls and wingwalls to eliminate the need for slopes extending into coastal shoreline, esturine waters, public trust waters, 404 type wetlands and coastal wetlands. The approaching roadway will be unchanged. Best Management Practices will be used to minimize erosion and sedimentation. MCENED JUL 1 1 2001 DWQ STAFF SERVICES s FIELD INVESTIGATION REPORT NC DOT - SR 1722, Beaufort Co. June 29, 2001 PAGE 3 10. ANTICIPATED IMPACTS: As proposed, the replacement of the existing bridge with three culverts will result in the following impacts: Approximately 124 square feet of 404 type wetlands will be filled by road shoulder, and 1750 square feet of shallow bottom will be filled by culverts and fill surrounding the culverts. Approximately 96 square feet of high ground will be graded, filled or excavated for the roadway and paving. There is a high probability of turbidity to be expected during the replacement of the culverts. Stringent sedimentation/erosion control measures can minimize this. The NC DOT has reduced their original proposal to install 70 foot culverts with sloped road shoulders to the shorter 49'6" culverts with head and wing walls in order to avoid the impact of an additional 800 sqare feet of impacts to shallow bottom, esturine waters , 404 type wetlands and coastal shoreline. Principally local residents use state Road 1722. The replacement of the bridge with culverts and 8 foot road shoulders will upgrade the crossing to improve safety of traffic movement and have the comply with State safety standards for secondary roads. North Creek is a Primary Nursery Area and may be impacted by this project. The collective disturbance area for the project is 0.045 acres. Bill Arrington June 29, 2001 Morehead City EG) M1? U) ll) i 4Y" t? CD CD o 0' H 0 in z? ?CD CD C, CD = z p on O? C r' p v ? CD O `r n (D W K= Z O ( n ? O p Q ? N Q. Q O -}/? Q Q = 0 •'G 0 Z / Q OD 81S Q_ t? K v Q A ? O 3 m F1 RS7 CLASS n 00I? 7i c7; N tYJ ? . ,,?hU C'S I?` i R: f ... U V +C