Loading...
HomeMy WebLinkAbout19980955 Ver 1_Complete File_19980922 STATE of NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. P.O. BOX 25201. RALEIGH, N.C. 27611-5201 E. NORRIS TOLSON GOVERNOR SECRETARY September 4, 1998 US Army Corps of Engineers Raleigh Field Office 6508 Falls of the Neuse Road, Suite 120 Raleigh, North Carolina 27615 ATTN: Mr. Eric Alsmever NCDOT Coordinator Dear Sir: SUBJECT: NATIONWIDE PERMIT 33 APPLICATION FOR BRIDGE NO. 80 OVER DEEP CREEK, PERSON COUNTY. TIP B-3015. ACTION II) 199602012. On May 22, 1998 the U.S. Army Corps of Engineers issued a renewal of Nationwide Permit No. 23 (Action ID. 199602012) for the subject project. It was subsequently requested by the Contractor during a pre-construction meeting with NCDOT, that they be allowed to place a temporary causeway across Deep Creek to facilitate equipment crossing. Otherwise, the Contractor would have an approximately 4.5 mile long detour requiring overweight bridge crossing permits. The causeway would be in place for approximately two weeks between late September and early October. The causeway will consist of an 72 inch pipe back filled with approximately 85 tons of either Class B rip-rap and/or clean broken-up concrete that will fill approximately 300 ft' (0.01 acre) of the creek. A geotextile fabric will be placed over the rip-rap and approximately six inches of ABC stone will cover the fabric. The 72 inch pipe is designed to carry the creek water even in the event of an unusually hard rain. If the creek were to exceed this capacity, the water will run over the top of the causeway. When equipment crossing is completed, the ABC stone, fabric, and pipe will be removed in their entirety. The rip-rap/broken concrete will also be removed, except for an approximate 12-inch layer. Removal of this layer would cause greater disturbance and harm to the creek than leaving it in place. No wetlands will be impacted. Details of the project are depicted in the attached drawings. e, 2 NCDOT has already designed and installed erosion control features for this project. No additional devices are proposed. Please review this permit application for approval under a Section 404 Nationwide Permit 33. By copy of this letter, it is also requested that the appropriate General Water Quality Certification be issued by the North Carolina Division of Water Quality. If you have any questions or need any additional information, please contact Mr. Michael Wood at (919) 733-7844 extension 306. Sincerely, William D. Gilmore, PE, Managcr Planning and Environmental Branch cc: Mr. David Franklin, ACOE Mr. John Dorney, Division of Water Quality Mr. William J. Rogers, P.E., Structure Design Mr. Tom Shearin, P.E., Roadway Design Mr. Whit Webb, P.E., Program Development Mr. R. L. Hill, P.E., Highway Design Mr. A. L. Hankins, P.E., Hydraulics Mr. D. A. Allsbrook, P.E., Division 5 Engineer Ms. Michele James, Planning & Environmental 'f0?/O1/9F. save llELLIlYGER-ffiOYROE BOOS GARRISON CO WE TUE 09:59 FAX 919 772 4580 CREEK CROSSING SUBM MAL PERSON COUNTY BRIDGE PROJECT 99.2380501 September 1, 1998 1. DURATION: Only 3,750 cubic Yards of dirt must be moved across the creek. it should take no more d= two weeks to perform the work. 2. TDAE OF YEAR: The work will be performed In late September or early October. 3. MATMUALS: We will install a 72 inch conduit in the existing creek to cary the water flow. This pipe will be bank 01od with Class "13" rip rap of clean broken up concrete which will am allow some water flow between voids. A running surface of ABC will bo spread over the top of the rip rap. The ABC will be separated from the rip rat) with a layer of votextile fabric. This will serve to keep tb. fines of the ABC from dropping into the voids of the rip rap. The 72" conduit should be large enough m carry the creek water even in the event of a unusually hard rain. In the event however, that the Week should well obovv aarmal !units, the waver will run over tho cop orate crossing taus prVivalting any backup of water. The crossing will be approximately 12 feet wide and we anticipate the following gttaiuities. A. 72" Conduit 24 if D. pip Rap SS tool c, onotadie Fabric b5 square yard D. ABC Stone 25 ton: 4. DISTURBANCE: Since tic dirt will be introduced to the creek, we feel very little erosion or disturbance will be involved in the temporary crossing. Layinm the pipe and placing the initial lay n rip rap in the creel? may cause suale silt to be stirred un Nola the creek bnttorrt but this should be minor. Hauling over the creek crossius should not cause any orosion at all. Removal of the pipe and rip rap should cause the same king of minor clouding as installation. The Department of T ranspoatatacm has alroady designed adequate erosion features to oortumol the arosion on the project. Since this crossing will cause no additional erosion, we no not think- additional measums will be required. c, pipe and most of the 7p ?.ESTORATTON: Once the dirt is hauled across the creek the ABC, fabri -ap will be removes from the creek. In order to keep from disturbing the cleet, bottom, we may 1Ctve a 12" layer of rip rap in the bottom. This layer will starve to both armor for the creek bottom and hop reduce the disturbanvo that will be crralod during installation ou the new bridge. PnOPOSED CHECK CROSSING - DOT PROJ. M2390501 T, :h x1e?+ ?IlI ?? ?hlI i??Q Btoken up Contaele STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. P.O. Box 25201, RALEIGH, N.C. 27611-5201 E. NORRIS TOLSON GOVERNOR SECRETARY September 4, 1998 T 7R US Army Corps of Engineers Raleigh Field Office p 6508 Falls of the Neuse Road, Suite 120 SE Raleigh. North Carolina 27615 WEtLAri?`_,c;t,,, , y1NTER UpLlii ,::_ `? ATTN: Mr. Eric Alsmeyer NCDOT Coordinator Dear Sir: SUBJECT: NATIONWIDE PERMIT 33 APPLICATION FOR BRIDGE NO. 80 OVER DEF,P CREEK, PERSON COUNTY. TIP B-3015. ACTION ID 199602012. On May 22, 1998 the U.S. Army Corps of Engineers issued a renewal of Nationwide Permit No. 23 (Action ID. 199602012) for the subject project. It was subsequently requested by the Contractor during a pre-construction meeting with NCDOT, that they be allowed to place a temporary causeway across Deep Creek to facilitate equipment crossing. Otherwise, the Contractor would have an approximately 4.5 mile long detour requiring overweight bridge crossing permits. The causeway would be in place for approximately two weeks between late September and early October. The causeway will consist of an 72 inch pipe back filled with approximately 85 tons of either Class B rip-rap and/or clean broken-up concrete that , 00 will fill approximately 1 fr (0.01 acre) of the creek. A geotextile fabric will be placed over the rip-rap and approximately six inches of ABC stone will cover the fabric. The 72 inch pipe is designed to carry the creek water even in the event of an unusually hard rain. If the creek were to exceed this capacity, the water will run over the top of the causeway. When equipment crossing is completed, the ABC stone, fabric, and pipe will be removed in their entirety. The rip-rap/broken concrete will also be removed, except for an approximate 12-inch layer. Removal of this layer would cause greater disturbance and harm to the creek than leaving it in place. No wetlands will be impacted. Details of the project are depicted in the attached drawings. 2 NCDOT has already designed and installed erosion control features for this project. No additional devices are proposed. Please review this permit application for approval under a Section 404 Nationwide Permit 33. By copy of this letter, it is also requested that the appropriate General Water Quality Certification be issued by the North Carolina Division of Water Quality. If you have any questions or need any additional information, please contact Mr. Michael Wood at (919) 733-7844 extension 306. Sincerely, n _ William D. Gilmore, PE, Manager Planning and Environmental Branch cc: Mr. David Franklin, ACOE Mr. John Dorney, Division of Water Quality Mr. William J. Rogers, P.E., Structure Design Mr. Tom Shearin, P.E., Roadway Design Mr. Whit Webb, P.E., Program Development Mr. R. L. Hill, P.E., Highway Design Mr. A. L. Hankins, P.E., Hydraulics Mr. D. A. Allsbrook, P.E., Division 5 Engineer Ms. Michele James, Planning & Environmental of/O1/8F TUE 09:58 FAX Pig 772 4860 WE GARRISON CO a DELL INGER-NO_YiWE @003 CREEK CROSSING SUBMITTAL PERSON COUNTY BRIDGE PROJECT #8.2380501 September 1, 1998 1. IDURAT10N: Only 3,750 cubic yards of dirt must be moved across the creek. It stiould take no more Man two weeks to perform the work. 2. TDAE OF YEAR- The work will tm performed in late September or early October. S, MATERIALS: We will install a 72 inch conduit in the existing creek to carry the water flow. This pipe will be back f Llod with Class "B" rip rap or clean broken up concrete which will also allow some water flow between voids- A cunning surface of ABC will bo spread ovor the top of the rip rap. 11te ABC well be separated from the rip rap with a laver of geotextile fabric. This will serve to keep th! fines of the ABC from dropping into the voids of the rip rap. The 72" conduit should be large enough to carry the creek water even in the event of a unusually hard rain. In the event however, that the or"k rtsould swell above normal !units, ctia wacoc will run vvea the sop of tLO crossing taus prpVEfltias any backup of water. The crossing will be appmximately 12 feet wide and we anticipate the following Vantltie.. A. 72" Conduit 24 If g, Rip Rwp SS tons C. Gootextlle faabric 65 square yarn: D. ABC Stone 25 tots 4. DISTURBANCE: Since no dirt will be introduced to the creek, we feel very little erosion or disturbance will be involved in the tempormy crossing. Layinm the pipe and placing the inkW layer rip r-ap in the cttvk may .sins suare silt to be stirred uo rrom the creels button but this should be minor. Hauling over the creek crossing should not cause any orosion at all. Removal oftho pipe and rip rap should cause the same klnu of minor clouding as installation. The Department of Transportation has nlw2dy designed adequatc erosion features to rorttrol the erosion on the project. Since this crossing will cause no additional erosion, we ao not think- additional measures will be required. 2XSTORATION: Once the dirt is hauled across the creek the ABC, fabric, pipe and most of the:yip rap will be removea from the creek. In order to keep from distzluiming the creel: bottom, we may leave a 12" layer of rip rap in the bottom. This layer will sage to both armor for tho creek bottom and htlp reduce the disturbance that will be crcutod during installation on the new bridge. PROPOSED CROCK CROSSING - DOT PROJ, M238=1 T.- . C` T c•,, 7 I; 8FS7: xe j D!,11 '_39PJI i?3a 11 Beoken up Gorowtft