Loading...
HomeMy WebLinkAbout19960325 Ver 1_Complete File_19960501State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director -Awl [D FE F1 May 10, 1996 Onslow County DEM Project # 960325 APPROVAL of 401 Water Quality Certification Ms. Alice Gordon Planning and Environmental Branch N.C. DOT P.O. Box 25201 Raleigh, NC 27611 Dear Ms. Gordon: You have our approval to place fill material in 0.06 acres of wetlands or waters for the purpose of replacing Bridge #49 on SR 1225, as you described in your application dated 26 March 1996. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3025. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. For this approval to be valid, you must follow the conditions listed in the attached certification. In addition, you should get any other federal, state or local permits before you go ahead with your project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Environmental Management under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733- 1786. Attachment Sinc rely, ton How Jr. P.E. cc: Wilmington District Corps of Engineers Corps of Engineers Wilmington Field Office Wilmington DEM Regional Office Mr. John Dorney Central Files Doug Huggett; DCM 960325.1tr Environmental Sciences Branch, 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer • 50% recycled/100% post consumer paper To: John Dorney Planning Branch DIVISION OF ENVIRONMENTAL MANAGEMENT CAMA MAJOR PERMIT APPLICATION REVIEW REGIONAL OFFICE STAFF REPORT AND RECOMMENDATIONS REVIEWER: GREGSON WQ SUPERVISOR: ADKINS DATE: April 26, 1996 WETLAND INFORMATION FOR CENTRAL OFFICE TRACKING PERMIT YR: % PERMIT NO.: 960325 COUNTY: Onslow PROJECT NAME: NC DOT Bridge #49 PROJECT TYPE: Bridge PERMIT TYPE: CAMA 4110 `FO COE #: N/A DOT#: N/A RCD FROM CDA: DCM DATE FROM CDA: March 26, 1996 F??R t! > REG OFFICE: WiRO RIVER AND SUB BASIN#: 030502 '044iF1996° *STREAM OR ADJACENT WATER BODY: New River CLASS: C NSW STREAM INDEX #: 19-(1) *OPEN OR CLOSED: N/A WL IMPACT: Yes WL TYPE: OTH WL REQUESTED: 0.06 WL ACR EST: Yes WL SCORE: N/A MITIGATION: N/A MITIGATION TYPE: N/A MITIGATION SIZE: N/A RATING SHEET ATTACHED?: N/A RECOMMENDATION: ISSUE STORMWATER PLAN REQ'D: IF YES, DATE APPROVED: PROJECT DESCRIPTION: NC DOT proposes to replace the existing bridge #49 on NCSR 1225. WATER QUALITY CERT. (401) CERT. REQ'D: Yes IF YES, TYPE: General Certification #3025 SEWAGE DISPOSAL TYPE OF DISPOSAL PROPOSED: N/A TO BE PERMITTED BY: N/A IF BY DEM, IS SITE AVAILABLE AND PERMIT ISSUANCE PROBABLE: N/A WATER/WETLAND FILL AREA OF FILL - WATER: N/A WETLAND: 2808 sq. ft. IS FILL ELIMINATING A SIGNIFICANT USE? No RECOMMENDED CONDITIONS OR PERMIT RESTRICTIONS: That the project be done in such a manner so as to not cause turbidity outside the immediate construction area to exceed 25 NTU. cc: Central Files Wilmington Regional Office Files DCM-Janet Russell John Parker X DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: North Carolina Department Of Transportation PROJECT NAME: BRIDGE #49 2. LOCATION OF PROJECT SITE: State Route 1225, Richlands, Onslow County Photo Index - No Photos Available State Plane Coordinates - X: 2 430 200 Y: 416 800 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - January 25, 1996 Was Applicant Present - Yes 5. PROCESSING PROCEDURE: Application Received - cc: February 21, 1996 Office - Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Onslow County Land Classification From LUP - Municipalities (B) AEC(s) Involved: PT (C) Water Dependent: Yes (D) Intended Use: Bridge Replacement (E) Wastewater Treatment: Existing - N/A Planned - N/A (F) Type of Structures: Existing - 20' Wide Bridge Planned - 30' Wide Birdge (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands 404 2808 sq ft (B) Non-Vegetated Wetlands (C) Other 2760 sq ft Coverage of Public Trust Waters 30' x 92 High Ground Disturbance 39,200 sq ft (D) Total Area Disturbed: Approximately 1 Acre (E) Primary Nursery Area: No (F) Water Classification: C NSW Open: No 8. PROJECT SUMMARY: The Department of Transportation plans to replace an existing bridge over a tributary to the New River. In addition, they plan to widen the roadway and shoulder approaches to the proposed bridge. Department of Transportation Page 2 9. PROTECT DESCRIPTION The North Carolina Department of Transportation has made application to replace an existing bridge on State Route 1225 near Richlands in Onslow County. The bridge structure spans a tributary to the New River. The D.O.T. is proposing to replace the existing 20' wide by 52' long timber bridge with a new concrete bridge 30' wide by 92' long. The new bridge will be in the same alignment as the existing bridge. The navigation clearance over the water level in the New River would increase slightly from 10.2' below the existing bridge to 10.5' under the proposed bridge. Navigation potential should also be increased by reduction in the number of bents. The Department of Transportation reports that the water depth in this tributary is approximately 1.3 feet at mean low tide. Approximately 2808 square feet (.06 acres) of federal wetlands will be impacted by the proposed widening of the SR 1225 road shoulders, the approaches to the bridge and relocation of the side ditches. D.O.T. determines this to be necessary to accommodate grade adjustments for the proposed longer bridge. These wetlands are low quality wetlands most likely created by road maintenance of State Route 1225 in years past. The wetlands are indicated on the drawings submitted for review. Also, 550 cubic yards of high ground would be excavated as part of the proposed project. Just under 1 acre will be disturbed by the total project. Excess spoil material will be removed from the site by the contractor. Approximately 2,760 square feet of public trust will be shaded by the proposed bridge. No coastal wetlands are present at the site. No disturbance is slated to occur below mean high water. The waters of the New River are classified as C, Nutrient Sensitive by the Division of Environmental Management. This portion of the New River is not a designated Primary Nursery Area nor is it open for the harvesting of shellfish as determined by the Division of Marine Fisheries. 10. ANTICIPATED DvIPACTS The proposed project would result in the loss of .06 acres of federally protected wetlands. Also, the proposed bridge would cause the shading of .06 acres of public trust waters. Stormwater runoff to the New River would be increased due to the increase in surface area of the bridge. FORM DCM-MP-1 APPLICATION (To be completed by all applicants) b. City, town, community or landmark 1. APPLICANT Richlands a. Landowner: Name N.C. Dept. of Transportation Address P. O. Box 25201 City Raleigh State NC Zip 27611 Day Phone (919) 733-3141 Fax _(919) 733-9794 b.. Authorized Agent: Name Address City State Zip Day Phone Fax C. Project name (if any) B-2157, Replace Bridge No. 49 on SR 1225 Note: Permit will be issued in name of landowner(s), and or project name. 2. LOCATION OF PROPOSED PROJECT C. Street address or secondary road number SR 1225 d. Is proposed work within city limits or planning jurisdiction? Yes X No e. Name of body of water nearest project (e.g. river, creek sound, bay) Branch of New River 3. DESCRIPTION & PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Replacement of Bridge No. 49, widening _ approaches and filling of adjacent wetlands to accommodate relocation of roadside ditches b. Is the proposed activity maintenance or an existing project, new work, or both? Both C. Will the project be for public, private or commercial use? Public Transportation d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. Standard bridge and roadway construction equipment. See cover letter for description. L 77, a. County Onslow Fri % .. J f Revised 03195 Jr 00AS-L, ,,.iyi!AGEMENT FORM DCM-MP-1 D 1_ '? C v L m. ,.Describe existing wastewater treatment facilities 4. LAND AND WATER r r " 1 ?996 N/A CHARACTERISTICS r 'N OF Kat-imS DEMENT a. b. C. d. e. f.. Size of entire tract N/A Size of individual lot(s) N/A n. Approximate elevation of tract above MHW or NWL 5.5 Soil type(s) and texture(s) of tract Muckalee Loam Vegetation on tract roadside grasses, and shrubs Man-made features now on tract Bridge g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan) Conservation Transitional Developed Community Rural x Other h. How is the tract zoned by local government? No zoning Is the proposed project consistent with the applicable zoning? x Yes No (Attach zoning compliance certificate, if applicable.) Has a professional archaeological assessment been done for the tract? Yes x No If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes x No 1. Are there wetlands on the site? x Yes -No Coastal(marsh) Other x If yes, has a delineation been conducted? Yes (Attach documentation, ifavailable) o. Describe location and type of discharges to waters of the state. (For example, surface runoff sanitary wastewater, industrial/commercial effluent, "wash down", and residential discharges.) Surface Runoff Describe existing drinking water supply source. N/A 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: * A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. * An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 710203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U. S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the Revised 03/95 FORM DCM-MP-1 site. Include highway or secondary road (SR) number, landmarks, and the like. * A Stormwater Certification, if one is necessary. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name See Attached Sheet Address Phone Name Address Phone Name Address Phone A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. COE Nationwide Permit No. 23 issued 4/17/95 COE Action ID No. 199502094; DEM Cert. #2735 A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. * A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement of compliance with the N. C. Environmental Policy Act (N.C.G.S. 113A-1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the day of . , 19 Print Name H. Franklin Vic R.E. Signature Landowner or Authorized Agent Please indicate attachments pertaining to your proposed project. DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development DCM MP-4 Structures Information X DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development COASTAL tUIENT NOTE: _,J .P1 date each attachment in the C v''?e at the bottom of each form. [? r-??Jt 1 I r' FEB N 1 t •JV Riparian Landowners Mrs. A. B. Humphrey Box 236 Richlands N.C. 28574 N. S. Day, Heirs C/O Jay Day P.O. Box 99 Trenton N.C. 28585 William S. Dail 227 Turtle Shell Rd. Richlands N.C. 28574 Astrakel International , LTD. 2630 Mirrow Lake Dr. Fayetteville N.C. 28305 FEB DIVISIO"' ?_.. COASTAL MAN;-? ' ?vENT D ? Form DCM-MP-S BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major (4) Will all, or a part of, the existing culvert be Permit, Form DCM-MP-1. Be sure to complete all removed? (Explain) other sections of the Joint Application that relate to this proposed project. g. Length of proposed bridge 28.05 m (92') 1. BRIDGES h. Width of proposed bridge 9.2 m (30') a. Public X Private i. Height of proposed bridge above wetlands b. Type of bridge (construction material) N/A Prestressed Girders j. Will the proposed bridge affect existing water flow? Yes X No C. Water body to be crossed by bridge If yes, explain Branch of the New River d. Water depth at the proposed crossing at MLW or NWL 0.4 meter (1.3 feet) k. Navigation clearance underneath proposed bridge e. Will proposed bridge replace an existing bridge? 3.2 m 00.5') X Yes No If yes, 1. Will the proposed bridge affect navigation by (1) Length of existing bridge 15.88 m (52') reducing or increasing the existing navigable (2) Width of existing bridge 6.0 m (201 opening? X Yes No (3) Navigation clearance underneath existing If yes, explain Increase opening by one less bent bridge 3.1 m (10.2') in creek and bridge is 3.5" higher in elevation. (4) Will all, or a part of, the existing bridge be removed? (Explain) Existing bridge will be removed M. Will the proposed bridge cross wetlands containing no navigable waters? Yes X No f. Will proposed bridge replace an existing culvert(s)? If yes, explain Yes X No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above n. Have you contacted the U. S. Coast Guard the M1-1W or NWL concerning their approval? Yes X No D -- - -If yes'please provide record of their action. Revised 03/95 i F :.. Df. Form DCM-MP-5 2. CULVERTS N/A a. Water body in which culvert is to be placed b. C. Number of culverts proposed Type of culvert (construction material, style) d. Will proposed culvert replace an existing bridge? Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge j. Will the proposed culvert affect existing navigation potential? Yes No If yes, explain 3. EXCAVATION AND FILL a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? Yes X No If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Depth of area to be excavated (4) Amount of material to be excavated in cubic yards (4) Will all, or a part of, the existing bridge be b. Will the placement of the proposed bridge or culvert removed? (Explain) require any excavation within: N/A Coastal Wetlands _ SAVs _ Other Wetlands If yes, (1) Length of area to be excavated e. Will proposed culvert replace an existing culvert? (2) Width of area to be excavated Yes No (3) Amount of material to be excavated in cubic If yes, yards (1) Length of existing culvert (2) Width of existing culvert c. Will the placement of the proposed bridge of culvert (3) Height of the top of the existing culvert above require any highground excavation? the MHW or NWL X Yes No (4) Will all, or a part of, the existing culvert be If yes, removed? (Explain) (1) Length of area to be excavated 133m(436') (2) Width of area to be excavated 5 in (16') (3) Amount of material to be excavated in cubic yards 550 cubic yards f. Length of proposed culvert d. If the placement of the bridge or culvert involves g. Width of proposed culvert any excavation, please complete the following: (1) Location of the spoil disposal area h. Height of the top of the proposed culvert above the On high around off site MHW or NWL (2) Dimensions of spoil disposal area To be determined by contractor i. Will the proposed culvert affect existing water flow? (3) Do you claim title to the disposal area? Yes No Yes X No If yes, explain If no, atta ting permission from ?C D, FEB Revised 03/95 f '? -OAS Form DCM-MP-5 (4) Will the disposal area be available for future maintenance? Yes X No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X No If yes, give dimensions if different from (2) above. (6) Does the disposal area include any area below the MHW or NWL? Yes X No If yes, give dimension if different from No. 2 above. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below MHW or NWL? Yes X No If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: _ Coastal Wetlands _ SAVs x Other Wetlands If yes, (1) Length of area to be filled 95 m (312') (2) Width of area to be filled 2.7 m (9') (3) Purpose of fill Roadway approaches g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X Yes No If yes, (1) Length of area to be filled 217 m (712') (2) Width of area to be filled 18 m (59') (3) Purpose of fill Shoulder and roadway widening 4. GENERAL a. Will the proposed project involve any mitigation? Yes X No If yes, explain in detail Revised 03/95 b. Will the proposed project require the relocation of any existing utility lines? X Yes No If yes, explain in detail Overhead electrical lines c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes X No If yes, complete Form DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? DOT's best management practices for the protection of surface water f. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Standard bridge and roadway construction equipment. g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes X No If yes, explain in detail NCDOT Replace Bridge No. 49 (B-2157) Applicant or Project Name Signature MD Date J...;? :- '. LU) 96 119 .,IvISION OF ?TAI_ MANAGEMENT r? r / JO a o ..Op .0 ..Ot Se '35 t die 9 ti0 1 ... o9cM--"HVTE FEB 21 1996 DIVISION OF COASTAL MANAGEMENT N. C. DEPT. OF TRANSPORTATION DIVISION OV 11101.1 W A YS ONSLOW COUNTY PROJECT: 8.2260501 82157 OS y0 ?V05 ?-Qae ? r SHEET I OF 5 a 0 O G 1 3 1 ID 3NI? Hold r r u r c F 0 / Ljj I , / " D W / _CLX h / ?- 00 Q0 Q? LU Ln C 0- m (D 0 M Q ? 41 w m I ? Q FEB DIVISION ,:_.?;TAL z r? ? Z ® A x x ? z ? z 9 U a ® ® ? o 0 H 0 a W 0 ® a w U A ?. ? W \ o ? \ ? W c? c a a i z v VI S y o0 W ° I I ? v I 99999. IX Lw I I I I ? ? ~ Q IX I Looo_ E . --- I c) I ? ? I y Zl£' Q / \C) 0 0 d O 1-? X-- V) Ln -X 2L". W z 0 Q 44 Lu? Q M.8? OZ Z/S ILL rn 966 F% I 100 I J I I s ?- 0'-- s?Xoo?/2 x! ISM `I I II + a c`< z 0-) NMI 90? II? z + G= cD W = C? o I I Z I -F- a ?" I s Q w ti z a = v I I ` `c l 7 p J1 00 vi r? s 1 I I " a to Z m W E(D !- - _lull 0 ? z L+. z o cv ?1 °o `-s o U)Lu -JcD cj- I BRANCH OF NEW RIVER 451E 36.839 S06°45'- MZ??? ?I I I g.2?6 T 0+55.006 i 0+55,5b -g.N1o3g S?nW ?4 g91 I I I _ - - - - - - - I T3 C3 CD NEW!" BRANCH OF _ _ - I I I a I SOIL LL L I I I= I w to ?II ;. I I I ? FEB 21 1996 I? I -. I I l,n L-Li qpjjsjnN F AAAInrGNA F:NT oI 00 tij Jl I 1 J I O cc) £ O CO 06 J w 7-1 0 V W -(o 4 ti Cr T oT CJ z 0 F -? 0 3 H ? w ? x ° 0 U ll? ' 0 -- 3 o w O O O V , w 0 0 0 A > :? -. U a a m 7 - O N d' -, 00 _O _ N cr. O z a z C4 A W U CA .44 r? L) H ? O U N N O p 11+40 V 8.43 ,A- S-27M-`J ? ?? tl J t ` ` Fig 1 Age, pl 1 M?N-?c ;op's -Ta 9. Ex 2 sT?CN cT I - V.I. S. Z/Z??IS 5,3r?1 1 I+(vo 5M i f ? oo y ? ELEV. `1.ISw, z 5 YR. Elsa ? $, 3Z M N.C. DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ONSLOW COUNTY PROJECT 8.2260501 8-2157 5 ,z, F 5 ,,Ty „' STA1E u H d ?y? STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. DIVISION OF HIGHWAYS GOVERNOR P.O. BOX 25201. RALEIGH. N.C. 27611-5201 February 9, 1996 Mr. Bob Stroud Division of Coastal Management Department of Environment, Health and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Dear Mr. Stroud; GARLAND B. GARRETT JR. SECRETARY To? .? v `,."L iVli ?I Subject: Onslow County, Replacement of Bridge No. 49 on SR 1225 over Branch of the New River. State Project No. 5-265 1, T.I.P. No.-B-2157 The North Carolina Department of Transportation proposes to replace Bridge No 49 over a branch of the New River on SR 1225 near Richlands in Onslow County. The proposed action will involve replacing the existing two-lane, timber bridge 15.88 meters (52 feet) long and 6 meters (20 feet) wide with a two-lane, concrete bridge 28.05 meters (92 feet) long and 9.2 meters ( 30 feet) wide. This bridge replacement will take place on existing alignment and local traffic will be detoured along existing roadways. The new structure is longer than the existing bridge. To facilitate the longer structure, grade adjustments will be made on the approaches to accommodate an increased superstructure depth. Approximately 137 meters (450 feet) and 76.2 meters (200 feet) of roadway work will be required on the south and north approaches, respectively to provide a two lane travelway. This work, which will include the relocation of roadside ditches, will require the excavation of approximately 550 Cubic Yards from high ground. There will be no excavation below NWL or in wetlands. The roadway approaches will be stabilized with 0.06 acres of fill in wetlands. The elevation of the new structure will be slightly higher ( 0.3 ft.) than the existing bridge. The proposed bridge will increase the existing navigation potential by decreasing the number of bents. ro-? w r 2 The North Carolina Department of Transportation is requesting that the proposed work be authorized under the appropriate Coastal Area Management Act (LAMA) permit. Enclosed is a permit application for a CAMA Major Development Permit including permit drawings and a copy of the fee application check for $250.00. The discharge of dredge and fill materials into waters of the United States was authorized by the Corps of Engineers on April 17, 1995 (Corps of Engineers Action ID No. 199502094) under Nationwide Permit 23 in compliance with Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act (33 U.S.C. 1344). If you have any questions or need additional information please call Ms Alice N. Gordon at (919) 733-7844 Ext. 314. Sincerely, H. Franklin Vick, P.E., Manager Planning and Environmental Branch HFV/plr cc: w/attachment Mr. Jeff Richter, COE Wilmington Field Office Mr. John Dorney, NCDEHNR, Department of Environmental Management Mr. John Parker, NCDEHNR, Division of Coastal Management Mr. Kelly Barger, P.E. Program Development Branch Mr. Don Morton, P.E., Highway Design Branch Mr. A. L. Hankins, P.E., Hydraulics Unit Mr. John L. Smith, Jr., P.E., Structure Design Unit Mr. Tom Shearin, P.E., Roadway Design Unit Mr. D. J. Bowers, P.E., Division 3 Engineer Mr. Jimmy Lee, P.E. Bridge Maintenance i