October 7, 1994
Caldwell County
DEM Project # 94926
APPROVAL of 401 Water Quality Certification
Mr. Roger Cates
NC DOT
P.O. Box 1460
Boone, N.C. 28607
6
FILE Cr
Dear Mr. Cates:
You have our approval to place fill material in 0.01 acres of wetlands or waters for the purpose
of road improvement at SR 1791, Brandy Place, as you described in your application dated
27 September 1994. After reviewing your application, we have decided that this fill is covered by
General Water Quality Certification Number 2735. This certification allows you to use General Permit
Number 031 when it is issued by the Corps of Engineers.
This approval is only valid for the purpose and design that you described in your application. If
you change your project, you must notify us and you may be required to send us a new application.
For this approval to be valid, you must follow the conditions listed in the attached certification. In
addition, you should get any other federal, state or local permits before you go ahead with your
project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory
hearing. You must act within 30 days of the date that you receive this letter. To ask for a hearing,
send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the
Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and
its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Environmental Management under Section 401
of the Clean Water Act. If you have any questions, please telephone John Domey at 919-733-1786.
Sincerely,
ston Ho , Jr. P.
Attachment
cc: Wilmington District Corps of Engineers
Corps of Engineers Asheville Field Office
Asheville DEM Regional Office
Mr. John Domey
Central Files
94926.1tr
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper
Q ?A?d qqqVim'
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JAMES B. HUNT, JR. DIVISION OF HIGHWAYS
GOVERNOR P.O. Box 1460
Boone, N.C. 28607
September 27, 1994
Mr. Steve Chapin ??? ??SV
U.S. Army Corps of Engineers E®
Room 75, Grove Arcade Building
37 Battery Park Avenue
Asheville, N.C. 28801
Dear Mr. Chapin:
4 1994
R. SAMUEL HUNT I I I
SECRETARY
The Department of Transportation has begun a project to
grade, drain, base, and pave SR 1791 Brandy Place in Caldwell
County. As part of this project we are proposing to extend a
pipe carrying an unnamed tributary to Middle Little River,
DEM classification C. Therefore, we are requesting a 404
Nationwide Permit for this project.
I am sending a joint application form, a straight line
sketch with the proposed erosion control, notes on pipe
installation, and a marked map.
By copy of this letter, I am requesting Ms. Stephanie
Goudreau, Mt. Region Coordinator, to comment directly to you
concerning the 404 Nationwide Permit request.
Also, by copy of this letter, I am requesting
authorization to proceed under Section 401 of the Clean Water
Act from the Division of Environmental Management.
We would like to extend this pipe as soon as possible.
If further information is required, please let me know. Your
early review and consideration will be greatly appreciated.
You ruly,
Roger Cates, P.E.
District Engineer
0
Page 2
Mr. Steve Chapin, U.S. Army Corps of Engineers
SR 1791 Brandy Place
September 27, 1994
RC:JMB
Enclosures
cc: Ms. Stephanie Goudreau, Mt. Region Coordinator, NCWRC
Mr. Eric Galamb, Water Quality Certification Unit, DEM
Mr. Richard Phillips, P.E., Regional Engineer, DEHNR
Mr. W.E. Hoke, P.E., Division 11 Engineer
Mr. Neil Trivette, Area Roadside Environmental Engineer
Mr. Kelly Winkler, County Maintenance Engineer
DEM ID: 9 L` 9 ?_(' ACTION ID:
NATIONWIDE PERMIT APPLIED FOR (PROVIDE NATIONWIDE PERMIT #): 3 [
JOINT APPLICATION FORD[ FOR
NATIONWIDE PERMITS THAT REQUIRE NOTIFICATION TO CORPS OF ENGINEERS
NATIONWIDE PERMITS THAT REQUIRE SECTION 401 CERTIFICATION CONCURRENCE
NATIONWIDE PERMITS THAT REQUIRE INDIVIDUAL SECTION 401 CERTIFICATION
WILMINGTON DISTRICT ENGINEER
CORPS OF ENGINEERS
DEPARTMENT OF THE ARMY
P.O. BOX 1890
WILMINGTON, NC 28402-1890
ATTN: CESAW-CO-E
Telephone (919) 251-4511
WATER QUALITY PLANNING
DIVISION OF ENVIRONMENTAL MANAGEMENT
NC DEPARTMENT OF ENVIRONMENT ky -
?_l?'
AND NATURAL RESOURCES
P.O. BOX 29535
RALEIGH, NC 27626-0535 l r,r _ 4 1994
ATTN: MR. JOHN DORNEY
M
Telephone (919) 733-5083
WETLANDS GROUP
MIATFP (1 IAI ITY SECi
ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SENT TO THE CO
ENGINEERS. SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DIVISION OF
ENVIRONMENTAL MANAGEMENT. PLEASE PRINT.
1. OWNERS NAME : N.C. Pef'AR71n6VT Or- 7RANSP02TAT /0 A)
2. OWNERS ADDRESS: P.O. AQr, 1-1&6
AOQNE. , A)G 2S66'7
3. OWNERS PHONE NUMBER (HOME): (WORK): 7 i- 24S- S30 6
4. IF APPLICABLE: AGENT'S NAME OR RESPONSIBLE CORPORATE OFFICIAL, ADDRESS,
PHONE NUMBER: ROGS/L CATES
106 60% /-460
R60NG NC. 7 S6ol
704- 2t. 5- 6-3S0
5. LOCATION OF PLANNED WORK (ATTACH MAP). COUNTY: CA Lt7G(JELI.
NEAREST TOWN OR CITY: LEA)OI
SPECIFIC LOCATION (INCLUDE ROAD NUMBERS, LANDMARKS, ETC.): 2EZ /7IZ
.S f,4AWV aA C C-
6. NAME OF CLOSEST STREAM/RIVER: TR18 70 m/QpLE 41M.6 A111619--
7. RIVER BASIN: CATAIVAA -
8. IS THIS PROJECT LOCATED IN A WATERSHED CLASSIFIED AS TROUT, SA, HQW, ORW,
WS I, OR WS II? YES [ ] NO ['x]
9. HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS
PROPERTY? YES [ ] NO (?(]
IF Y?S, EXPLAIN.
10. ESTIMATED TOTAL NUMBER OF ACRES OF WATERS OF THE U.S., INCLUDING
WETLANDS, LOCATED ON PROJECT SITE: L 0.01 /fCRE
3/30/92
-2-
11. NUMBER OF ACRES OF WATERS OF THE U.S., INCLUDING WETLANDS, IMPACTED BY
THE PROPOSED PROJECT:
FILLED:
DRAINED:
FLOODED:
EXCAVATED : O, O ( A c/Z C-
TOTAL IMPACTED : -Z O. D / Act c-
12. DESCRIPTION OF PROPOSED WORK (ATTACH PLANS) : EXTEND Ant EX/.Tr
3Co INO e/PE B.N 20 Freer n1U w ter A--,A/O-
13. PURPOSE OF PROPOSED WORK: TN?S iX?plr / ,oq OC Q SRO TO
aAADE, ORAlIV . AA-SG. AND p4UF 52 1-7171 "ANOV P dC6_
14. STATE REASONS WHY THE APPLICANT BELIEVES THAT THIS ACTIVITY MUST BE
CARRIED OUT IN WETLANDS. ALSO, NOTE MEASURES TAKEN TO MINIMIZE WETLAND
IMPACTS. _ROADUAY fteOS_ To CSC- wio _wl?i, ?.GPT 4,V AccceTLlaLr.
BDADIIJAy SECT/DA1 P/OE u?iGG A/E?/? 72 SSE E5o777wZn0? 70 a CO/s1eDf}TE
/d/t7 QDAD[(/r43? L?CTE'/y0/NG T!i X/S7-1NC &?& A1VI7 /.USING &Oc/d CopaedL
/1')643UR6S AS SA(OWov S'1i4FN[.O m1/v/w)1'z.6 paTLANp fln,0 crs.
15. YOU ARE REQUIRED TO CONTACT THE U.S. FISH AND WILDLIFE SERVICE
(USFWS) AND/OR NATIONAL MARINE FISHERIES SERVICE (NMFS) REGARDING THE PRESENCE
OR ANY FEDERALLY LISTED OR PROPOSED FOR LISTING ENDANGERED OR THREATENED
SPECIES OR CRITICAL HABITAT IN THE PERMIT AREA THAT MAY BE AFFECTED BY THE
PROPOSED PROJECT. HAVE YOU DONE SO? YES [ ] NO ()r)
RESPONSES FROM THE USFWS AND/OR NMFS SHOULD BE FORWARDED TO CORPS.
16. YOU ARE REQUIRED TO CONTACT THE STATE HISTORIC PRESERVATION OFFICER
(SHPO) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA WHICH
MAY BE AFFECTED BY THE PROPOSED PROJECT?
HAVE YOU DONE SO? YES ( J NO [k]
RESPONSE FROM THE SHPO SHOULD BE FORWARDED TO CORPS.
17. ADDITIONAL INFORMATION REQUIRED BY DEM:
A. WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS, AND LAKES ON
- THE PROPERTY.
B. IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY
PROJECT.
C. IF DELINEATION WAS PERFORMED BY A CONSULTANT, INCLUDE ALL DATA SHEETS
RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE.
D. IF A STORMWATER MANAGEMENT PLAN IS REQUIRED FOR THIS PROJECT, ATTACH
COPY.
E. WHAT IS LAND USE OF SURROUNDING PROPERTY? /2£5/DEAIT/AL 4 A61 cturmxgL-
F. IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL?
/NI A-
2 e
O 'S SIGNATURE DA(TE
,: tto[iTtl CN?4?cIN14_!)Et'!1[tTt1INr OE 1R11N$ppgTAT1CV
EROSION AM SEDIMFirrATIM C'ON'IZZOL PLAN
PR")Cr ROAD COUNTY
?f•L1L•???
PREPARED 13Y DATF
APPROVED by " / - ZZ-?J y
Courrty M? nterrance F..rtg neec
G'-?= z
District Erig nPe
Roadside Frw ron. rmq hiQPr
Std. # D s .rlQtinn Symbol
245.03 Temporary Silt Ditch *_ ------------------
245.05 Temporary Diversion ....... --------- "
893.01 Temporary Silt Fence
890.05 Temporary Slope Drain with Earth Berm ..........
Silt Basin Type A
--------
.02 Silt Basin Type B
------------------------------------------- Temporary Rock Silt Check Type-A ______f
895.10 Temporary Rock Silt Check Type-B .......... ------------
892.01 Temporary Rock Sediment Dam Type-A
892.02 Temporary Rock Sediment Dam Type-8
897.01 Rock Pipe Inlet Protection
894.01 Rock Silt Screen ... .--------------------------------- - •% -?•; ---
245.04 Stilling Basin .............................................
-------- -----
Rock Inlet Protection:
896.01 Type A ............................... A •- OR -• A
896.02 Type 8 ............................... B Q-- OR •- B -----
896.03
Type C ............................... C 13-- OR •• C? ----
Pipe Outlet Energy Dissipator.............
.:'.
Inlet or Outlet Protection ................ a
!'l
GENERAL NOTES ON EROSION CONTROL
Silt Basin Type B's will be constructed to the dimension of
six feet by three feet by three feet unless otherwise noted
on the plans.
Generally, the order of installation of the erosion control
measures will be as follows:
Temporary S,i_lt Basins shall be installed before
clearing and grubbing begins
Silt. Fences a,nd Temporary SC?i,tches shall be
installed as soon as ditchline is established.
1 f
Temporary_ Stone Ditch Checks shall be installed as
soon as ditchline is established.
Pipe Outlet and Inlet Protection will be done as soon
as pipe is installed.
Seeding and Other_ Permanent Erasion Control Measures
are to be implemented as soon as practical.
Temporary Rock Silt Checks (Type B) will be spaced as
required by percent of grade as described on page VI-16 in
the.Erosion and Sedimentation Control Guidelines.
t
No. 5 Stone, or equivalent, will be used in conjunction with
Temporary Rock Silt Check Type-B in location where water is
leaving the project or entering pipe.
ii .
i
i
,
,R .
PA.
'ItUl?l?V,Ihy ??w
'% g'Y'?lri' I tl n
i
1
i
J
eze
Pv.i ILU11fIY?/` -
I IS
EXTEND 2D P:cc--r ?X15rl N
ON INLEZ END -? All,
y
r '
i
may. co
:,.
10,
e-I
5 e ??,
L 4,;a
`i'• 1
1 '
a
?t?on>>whY -???,, s-rFl-r ? dr
1
? I J
I ,
y
t
1 ?
CJ .
H.
J as
' ?fi
PIPE INSTALLATION
1. Install erosion control devices. In streams, where
necessary, rock silt screens will be used and installed
prior to pipe replacement or any work being done to
channel.
2. Remove material and existing pipe while limiting, as much
as possible, material and sediment from entering a stream
and/or escaping from project.
3. Prepare pipe foundation while again taking care to limit,
as much as possible, material and sediment from entering
a stream and/or escaping from project. Where possible,
new grade will be below existing stream bed. If needed,
bedding material will be clean stone.
4. Place the new pipe and compact backfill.
5. Install slope protection on outlet and inlet ends of
pipe. Also complete installation of erosion control
measures and perform maintenance as needed on existing
measures.
6. Establish permanent vegetation as soon as possible.
7. Remove rock silt screens as soon as possible after
vegetation is established. Prior to removal of rock silt
screens any accumulated silt must be removed.
153 _®e/
151 1 p Yadkin Valley g',' BUTTE MTN. ! •?? 18
1569 \ 157 - 1354 FA
New Hope
• Ch. 1559 '2 - 1.5
'1700'\
't_' • 3 f; ^ ti Hollow
Springs
Ch.
1511 1551 1597
?a 170 / .
Y Ch. 1550
J f \
KNOB
,330f
17052
?" /•" 1 HICKORY
KNOB
\ COX KNOB
1
?t? ?'"/ IFaS ELEV.2430 1
? 12 1 Z
1772 j
? cf v 1
I o 1
1730 ?• 1731
117213 S I O??S ?fc0o " 1729
. 1 O
1
1733
1730 (•
FAS
l o S 7 2 1730 .8 17 , &Mvvy .60.1-AGE
1799 1851 1
RITEN MTN, j r \. 7?
:V, 2,265 _ i i t8t t 2 I Qv FAS .9 f. { (:Coat C?4h l ® 2 FA51 O
oak HO RIVER
I
r' 1 OC
as - 17.34 1
Cedar Valley
p : W
1773
1 1735 4791 1
/ 1739
Hecn?
/- --j? ----- --- F- - .5 i '8 1c?, p
J ------ 1 1737 SI 4P
1749 , 7 aS 1
1 1734 6 F 1
17
1740 1824
1749
'l \ • 6 3 • 5 1794.11
` 1002 ' 1741 - 1741 I1
\ ?1 l 1.0 Q
I_ ` l f P N 1742
1746 'J \ N 1823, x
out L - 1743 /
r 1845 17 Lu
IifYKp1M1/ 1744 ( 1
J 321l 1.1 1745 a I 1 .J
1755 ( 1
1AlLlS ?? l_•' -'U .1
4,103 s ? ? \
i ?. cap 1843 1 5
1751:\174x' 1756
f
321 \ n _ 1757
--• ?? ? 756
FAS',?
_ a
G*Ak?JITMF F:-
DEM ID:
NATIONWIDE PERMIT APPLIED FOR
ACTION ID:
(PROVIDE NATIONWIDE PERMIT #): 3
JOINT APPLICATION FORM FOR
NATIONWIDE PERMITS THAT REQUIRE NOTIFICATION TO CORPS OF ENGINEERS
NATIONWIDE PERMITS THAT REQUIRE SECTION 401 CERTIFICATION CONCURRENCE
NATIONWIDE PERMITS THAT REQUIRE INDIVIDUAL SECTION 401 CERTIFICATION
WILMINGTON DISTRICT ENGWE ;????®
CORPS OF ENGINEERS v01
DEPARTMENT OF THE ARMY
P.O. BOX 1890
WILMINGTON, NC 28402-1890
ATTN: CESAW-CO-E
Telephone (919) 251-4511
WATER QUALITY PLANNING
DIVISION OF ENVIRONMENTAL
NC DEPARTMENT OF ENVIRONM
AND NATURAL RESOURCES
P.O. BOX 29535
RALEIGH, NC 27626-0535
ATTN: MR. JOHN DORNEY
Telephone (919) 733-5083
r`
ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SENT TO THE CORPS OF
ENGINEERS. SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DIVISION OF
ENVIRONMENTAL MANAGEMENT. PLEASE PRINT.
G y 12
1. OWNERS NAME: N .C. PCPAtUA60T 6r- TRA ysPo2TpT/oA)
2. OWNERS ADDRESS: P.O, AQr, /- & 6
AQ0 Al E . Ai c 2 966-7
3. OWNERS PHONE NUMBER (HOME):
(WORK) : 7,0: - 265-- 5-3,9 6
4. IF APPLICABLE: AGENT'S NAME OR RESPONSIBLE CORPORATE OFFICIAL, ADDRESS,
PHONE NUMBER: XXP62 CArGS
P6 gox 1.460
A60?V6 me h60-1
:Z,0.4- 24,5-- 6'3 6 0
5. LOCATION OF PLANNED WORK (ATTACH MAP). COUNTY: GA LC7WEL L
NEAREST TOWN OR CITY: LCNOI
SPECIFIC LOCATION (INCLUDE ROAD NUMBERS, LANDMARKS, ETC.): 5-9 /711
,8RAA1VV -RL6 C &
6. NAME OF CLOSEST STREAM/RIVER: ?'R18 TD /1?/OQGE L./% TLE ?Q/UE?2
7. RIVER BASIN: A TA WA A
8. IS THIS PROJECT LOCATED IN A WATERSHED CLASSIFIED AS TROUT, SA, HQW, ORW,
WS I, OR WS II? YES [ ] NO [xJ
9. HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS
PROPERTY? YES [ ] NO [?(J
IF Y?S, EXPLAIN.
10. ESTIMATED TOTAL NUMBER OF ACRES OF WATERS OF THE U.S., INCLUDING
WETLANDS, LOCATED ON PROJECT SITE: < O . D 1 /f C1119
3/30/92
-2-
11. NUMBER OF ACRES OF WATERS OF THE U.S., INCLUDING WETLANDS, IMPACTED BY
THE PROPOSED PROJECT:
FILLED:
DRAINED:
FLOODED:
EXCAVATED : 67, 0 ( fq C12 C-
TOTAL IMPACTED : •e 0. D / ACR C-
12. DESCRIPTION OF PROPOSED WORK (ATTACH PLANS) : EXTEND Aw E X /ST/N6
3Cv f AX A 4.06 60 20 FEET ON / l/_F_T c nib
13. PURPOSE OF PROPOSED WORK: ZY3 U )Wk /% P.4,?r OG' A P0CO.1ECT TO
aAAD6, DRAI V1 AA-SG AND pe4VE -<7?- 1-711--- B/ANO PLdife
14. STATE REASONS WHY THE APPLICANT BELIEVES THAT THIS ACTIVITY MUST BE
CARRIED OUT IN WETLANDS. ALSO, NOTE MEASURES TAKEN TO MINIMIZE WETLAND
IMPACTS. IFDAD0,41 ftC-OS To AC- All-9i JET Td 6fT 4Ai ACCre;r4d4a
RDA,0W4Y .SECT/QAl p/OE WILL &/ -* 72 dE )o T5 ,0 70 A COIA,00*TE
fbuDER aoAONAL 4rTEN0I10(: Toe _xis7-iN6 ,,o/PE Anra aSI116 aLev.) CboL
A Obtf(R6S AS SNOWAO .Sf/OGIGa MINIM ILL pC.,rlq ?o 107,040-S.
15. YOU ARE REQUIRED TO CONTACT THE U.S. FISH AND WILDLIFE SERVICE
(USFWS) AND/OR NATIONAL MARINE FISHERIES SERVICE (NMFS) REGARDING THE PRESENCE
OR ANY FEDERALLY LISTED OR PROPOSED FOR LISTING ENDANGERED OR THREATENED
SPECIES OR CRITICAL HABITAT IN THE PERMIT AREA THAT MAY BE AFFECTED BY THE
PROPOSED PROJECT. HAVE YOU DONE SO? YES [ ] NO [x]
RESPONSES FROM THE USFWS AND/OR NMFS SHOULD BE FORWARDED TO CORPS.
16. YOU ARE REQUIRED TO CONTACT THE STATE HISTORIC PRESERVATION OFFICER
(SHPO) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA WHICH
MAY BE AFFECTED BY THE PROPOSED PROJECT?
HAVE YOU DONE SO? YES ( ] NO [k]
RESPONSE FROM THE SHPO SHOULD BE FORWARDED TO CORPS.
17. ADDITIONAL INFORMATION REQUIRED BY DEM:
A. WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS, AND LAKES ON
- THE PROPERTY.
B. IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY
PROJECT.
C. IF DELINEATION WAS PERFORMED BY A CONSULTANT, INCLUDE ALL DATA SHEETS
RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE.
D. IF A STORMWATER MANAGEMENT PLAN IS REQUIRED FOR THIS PROJECT, ATTACH
COPY.
E. WHAT IS LAND USE OF SURROUNDING PROPERTY? ,QE.S/DENT/AL 4 Arpecti lIRiL-
F. IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL?
/VI b-
2 v
O 'S SIGNATURE TE
- r±?ir?, ?}uic,n?.c?n_._t?crnnTrtaYr oi, 7?nrtS?'o?'nTlac?
EROS ION AND SED I MRrrATIC N C'O TMOL ELAN
PRw-ROAD ?l? I til
PREPARED PY 2 DATE 1
V,j, If 11
APpRpVED gX - /-Z7-z7 y
County Mn rntenance F..Jfg veer
G7?%? 1Z
1)14trict Dig nAe
Roadside Env ron. EJ1gtnPPC
Std. # oesui Lion
.. -Sy[I].1241
245.03 Temporary Silt Ditch
245.05 Temporary Diversion
893.01 Temporary Silt Fence
890.05 Temporary Slope Drain with Earth Berm E- ?--_
245.01 Silt Basin Type A
245.02 Silt Basin Type B -•------•------------------------- ------------
--------------•-----.....__..... ---
892.04 Temporary Rock Silt Check Type-A
895.10 Temporary Rock Silt Check Type-B
892.01 Temporary Rock Sediment Dam Type-A
892.02. Temporary Rock Sediment Dam Type-B .__
897.01 Rock Pipe inlet Protection :1) :1 ;;
894.01 Rock Silt Screen ----------------------------------------- - ---
24?.04 Stilling Basin. ........................ ---------------------•----- -----
Rock Inlet Protection:
896.01 Type A .....--•--------------• .. A ?? -- OR
-- A?
?? ..
T e B ..............
896.02 yp ................. B OR ..
` 896.03
13
Pipe Outlet Energy Dissipator ............ .:'.
Inlet or Outlet Protection ................ h
i
t
GENERAL NOTES ON EROSION CONTROL
Silt Basin Type B's will be constructed to the dimension of
six feet by three feet by three feet unless otherwise noted
on the plans.
Generally, the order of installation of the erosion control
measures will be as follows:
Temporary ,.i_l.t_ Basins st?a1.1 be installed before
.clearing and grubbing begins
Silt- Fences a.nd, Temporary S_i.l_t C?i,tches shall be
installed as soon as ditchline is established.
J f
Temporary-- Stone L?itc.h Checks shall be installed as
soon as ditchline is established.
p1pG Outlet and Inlet Protection will be done as soon
as pipe is installed.
Seedino an!; Other- permanent Erosion Control Measures
are to be implemented as soon as practical.
Temporary Rock Silt Checks (Type B) will be spaced as
required by percent of grade as described on page VI-lb in
the.Erosion and Sedimentation Control Guidelines.
No. S Stone, or equivalent, will be used in conjunction with
Temporary Rock Silt Check Type -B in location where water is
leaving the project or entering pipe.
}
PAL i
1
•i•? I
1 • ?
1
,
1
.',i• I f tj?l '?
.fit ,Q
sTA-r ti
EX rEND ZD A: cc-t 15
ON INLET Ewt2
1 ! ,
i
?? 1 r
-rG)q)
?J5'. / ` • ' ' 211.1' .
1 I,
oll
,J
0
AY• f /,
Dui. 4•
1
t.r I
,
`i
?'?;??' ? •? 1. •. , •
1. I
,
1?U/11)V{/"y
-to
I J
1
`f-0
i
r
-r-0
1-4. V
as it
i.
PIPE INSTALLATION
1. Install erosion control devices. In streams, where
necessary, rock silt screens will be used and installed
prior to pipe replacement or any work being done to
channel.
2. Remove material and existing pipe while limiting, as much
as possible, material and sediment from entering a stream
and/or escaping from project.
3. Prepare pipe foundation while again taking care to limit,
as much as possible, material and sediment from entering
a stream and/or escaping from project. Where possible,
new grade will be below existing stream bed. If needed.,
bedding material will be clean stone.
4. Place the new pipe and compact backfill.
5. Install slope protection on outlet and inlet ends of
pipe. Also complete installation of erosion control
measures and perform maintenance as needed on existing
measures.
6. Establish permanent vegetation as soon as possible.
7. Remove rock silt screens as soon as possible after
.,vegetation is established. Prior to removal of rock silt
screens any accumulated silt must be removed.
4P 0 /
_ 1511 , 11= \ 1010
a Yodtln VdMy \.•? ?T BUTTE MTN, ••? 18 Q
Ic
\ - 1554 .`
' C a, 1569 New Hope
• Ch. 1558 •2 1.5
M-_. 1•, 1700'
Hollow`.
1551 ? •Springs
1511 \s 1? ,1 b 170 / Ch.
Y Ch. i /
KNOB 1550 :.3301'
/•Ot 1702 :£ ?.?•
HICKORY
04 KNOB
\ COX KNOB
\ / ? 1 H
i? IF>5 ELEV. 2430 1
1772 1
/ G1 G1 qot O
? I
1 4f
/ 1730 1• 1731•
-" i
•? i 9??Say 1728 % z 0,1729
omco /. ! Q
,?S ?; l _ t• ??JSa i
I
1 173
1 U
_w\ '? `•-? _ ?F. 1730 N 1
1 .5 i
7 1 7
O
2 1730 1789 ttff1851 .9 1
21TEN MTN. s r \.7 N n ^ IV'?
',V. 2.265 1811.2 y I /<40 (-? y P/,qcc-
.4 .3 90
Cador Cry _ ®
2 F4S'
2
C, oar< ?R
RIVER
I 1 ?' ?? 1
a? 1734 1
codw vam" r
1773 W
,
738
1735 1 - 4 1791
r 1 hv. H-rnwn _ ' _ ' •:
_ 1002-
173761 ?.4P
4
1749 •7
1 1734 0 1 N
w) N 1
1749 1760 1824
,I 5 9 •5 1711 4
43
x'1741 •741
G 1002
.4
Q.
o
I__ ` I i> 91a; / N 1742
1746 J N
1743 1
Qnnvdr- r 18.t5
- is
17 W
4a ?( 1
321 1zl r.1 1745 a I 1 ..?
IIUS 7- 1
' U _.5 1 Q
4,103 1 5
n .? '• I ??
a \ ;j r 1843
Ghopol \% -- n
9 - 1751 ; 1710 • 1756
` .r
..c
1 ` ` 341``1 -- T57
FAS
GRANITE FALLS ' J 1 I C ' /