Loading...
HomeMy WebLinkAboutNCS000575_MONITORING INFO_20191126STORMWATER DIVISION CODING SHEET NCS PERMITS PERMIT NO. lvc DOC TYPE PERMIT k❑FINAL YJ' MONITORING REPORTS ❑ APPLICATION ❑ COMPLIANCE ❑ OTHER DOC DATE ❑ YYYYMMDD T � (� DUKE ENERGY® PROGRESS November 22, 2019 Certified Mail: 7014 1820 0001 7891 3442 Nile Pt.: 12520-R NCDEQ Division of Water Resources Attention: Central Fiies 1617 Mail Service Center Raleigh, NC 27699-1617 NOV 2 6 2019 CENTRAL FILES D R SECTION RE: Duke Energy Progress, LLC. NPDES SDOMR Year 4 Period 12nd Quarter Asheville Steam Electric Plant- NCS000575 — Buncombe County Dear Sir or Madam: Garry A. Whisnant Plant General Manager Asheville Steam Electric Planl Duke Energy Progress ASVL PLT/ 200 CP&1 Dr Arden, NC 28704 a 828-687-5211 f. 828-687.5204 garry. whtsnanti�duke-enetgy.com In accordance with Part III, Section E: I and E.2. of the above referenced stormwater permit, Duke Energy Progress, LLC respectfully submits, an original and one copy of Year 4- Period 1 -- 2nd Quarter SDOMR for the facility stormwater outfalls. Please note, SW-7 and SW-8 have not been constructed and are not included in this submittal. Should you have any questions regarding this Submittal or require additional information, piease contact Teresa Williams at 828-687-5240 or Matthew Fields at 828-687-5230. "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a systent designee! to assure that qualified personnel proptrt-v Father and evaluate the information submitted. Based on my inquiry of the person or persons who manage the S.vsteni, or those persons directly responsible ,for- gathering the infortmation, the information suhrnittetl is, to the hest of my knowledge anti belief; true, accurate, and complete. 1 ain aware that there are significant penalties for submitting false info"nation, including the possibiliiv of fines and inrprisonnient for knowing violations. " Sincerely, Jeff McKee Asheville Maintenance Superintendent enclosure www.duke-energy.com STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Number NCS000575 SAMPLES COLLECTED DURING CALENDAR YEAR: 2019 Year4 Period 1 2nd Qtr (This monitoring report shall be received by the Division no later than 30 days from the dale the facility receives the sampling results from the laboratory.) FACILITY NAME Asheville Steam Electric Plant COUNTY Buncombe PERSON COLLECTING SAMPLE(S) _ Malt Fields PHONE NO. (_828_) 687-5211 LABORATORY(S) Asheville Steam EleCIPC Plant 5055 Duke Energy Analytical Lat)aratory Lab 9 248 SIGNATURE OF PERM lT-I'EE OR DESIGNEE REQUIRED ON LAST PAGE. Part A: Specific Monitoring Requirements Outfall No. Date Sample Collected No Flow YIN 50050 Total Flow if a Total Rainfall molddl r MG inches SW001 nla Yes NO FLOW AT T IHS OUTFALL DURING THE YEAR 4 PERIOD 1 X NO FLOW ATTHIS OUTFALL DURING THIS RAIN EVENT' LISTED. Na SNN'003 10/30/19 NO NO FLO\V AT THIS OUTFALL DURING THE YEAR 4 PERIOD 1 NO FLOW AT THIS OUTFALL DURING `THIS RAIN EVENT' LISTED.NO FLOW AT THIS OUTFALL 1.52 Outfall No. Date Sample Collected 00400 00530 01097 01002 01012 01022 01027 01034 01042 01051 01067 01147 01092 01077 01059 171900 pH Solids, Total Suspended Concentration Antimony, Total (as Sh) Arsenic, Total as (As) Beryllium, 'total (as Be) Boron, Total (as B) Cadmium, Total (as Cd) Chromium, Total (as Cr) Copper, Total (as Cu) lead, Total (as Ph) Nickel, Total (as Ni) Selenium, Total (as Se) Zinc, Total (as Zn) Silver. Total (as Ag) 'Thallium, Total (as TI) Mercury, Total, Method 1631 E mo/dd/vr SU m L mgjL m IL m L In L m /L m /L m /L m /L m L m l m L m /L m /L n L SNV001 n1a SNi'003 10130119 6.81 9 <0.001 0.00125 <0.001 <0.05 <0.001 <0.001 000306 <0.001 0,00110 <0.001 0.020 <0.0002 <0.0002 8.08 Outfall No. Date Sample Collected 00400 00530 01097 01002 01012 01022 01027 01034 01042 01051 01067 01147 01092 01077 01059 71900 pH Solids,'I`otal Suspended Concentration Antimony, Total (as Sb) Arsenic, Total as (As) Beryllium, Total (as Be) Boron, Total (aS B) Cadmium, Total (as Cd) Chromium, 'Total (as Cr) Copper, Total (as Cu) Lead, Total (as I'h) Nickel, Total (as Ni) Selenium, 'Total (as Se) Zinc, Total (as Zn) Silver, Total (as Ag) Thallium, 'Total (as TI) Mercury, Total, tilethod 1631E mo/dd/vr SU m IL m L m /L m L mg /L m /L m /L m IL m /L m L m L m L m /L m /L i n gtL S%V001 n1a SNV003 n1a Based on Form SIVU-247 Page 1 of 2 Does this facility perform Vehicle Maintenance Activities using more than » gallons of new motor oil per month? T yes X no (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall No. Date Sample Collected 50050 00556 00530 00400 Total Flow (if applicable) Total Rainfall Oil & Grease (if appl.) Non -polar O&G/TPH (Method 1664 SGT-HEM), if appl. Total Suspended Solids pH New Motor Oil Usage moldd/ r MG inches m I m I unit al/mo STORM EVENT CHARACTERISTICS: Date 10/30119 Total Event Precipitation (inches): 1.52 Event Duration (hours), Wa (only if applicable — see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh. North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquire of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 11 /22/19 (Signature of Permittee) (Date) Form SWU-247, last revised 2/211012 Page 2 of 2 DUKE ENERGY® PROGRESS November 22. 2019 Certified Mail: 7014 1820 0001 7891 3442 File Pt.: 12520-R NCDEQ Division of Water Resources Attention: Central Files 1617 Mail Service Center Ralei.-h. NC 27699-1617 RE: Duke E ner;_ry Pro�oress. LLC. NPDES SDOMR Year Period 12nd Quarter Asheville Steam Electric Plant- NCS000575 — Buncombe County Dear Sir or Madam: Garry A. Whisnant Plant General Manager Asheville Steam Electric Plant Duke Energy Progress ASVL PLTi200 CP&L Dt Arden, NC 28704 o: 828-687-5211 f 828-687.5204 gamy. whisnantgduke-energy.com In accordance with Part 111, Section E: I and E.2. of the above referenced stormwater permit. Duke Energy Progress. LLC respectfully suhmits, an Original and one copy of Year 4- Period I — 2nd Quarter SDO,NIR for the facility stormwater outfalls. Please note. SW-7 and SW-8 have not heen constructed and are not included in this submittal. Should YOU have any questions regarding this submittal or require additional information, please contact Teresa Williams at 828-687-5240 or Matthew Fields at 828-687-5230. "I certify rurder petrctltY of lain, that this docitniew caul all attachnretrts were prepared rider my (fit-echon or supervision in accordance with a system designed to assure that dualijied personnel properly gather and evelluctte the inj6rtnation sOnnitted. Bused on nrY inquiry of the person or Persons who nianage the s_vsterrr, or those persons directh responsible for- gathering tlrc bilornrcttiolt, the hifnrnrcrtirur subnritted is, to the best of niv knowledge and belief: trite, accurate, and complete. I can aware that there are sipitjicartt penalties for- srtbrnitting jii1se injOrrnation, including [lie possibility of fines and imprisoninent,for knowing violations. " Sincerely. Jeff ,NIcFee Ashcyille ,Ylaintcnance Superintendent enclosure www.duke-energy.com Permit Number NCS000575 FACILITY NAME Asheville Steam Electric Plant PERSON COLLECTING SAtY1PLE(S) MatlF3elds LABORAT011 Asnevdle Steam Electnc Plant S'TORIIWATER DISCIIARGE OUITALL (SDO) MONITORING REPORT 5055 Duke Energy Analytical Laooramy La h # 248 Part A: Specific ,Monitoring Requirements SAMPLESCOLLECTED DURING CALENDAR YEAR: 2019 Year 4 Period 1 2nd Qtr (This monitoring, report shall he received by the Division un later than 31) days from the date the facility receives the sampling results from the lahoil COUNTY Buncombe PHONE NO. (_828_) 687-5211 SIGNATURE OF PERMITYLE OR DESIGNLL•' REOU€RED ON LAST PAGE. Outfall Date No 50050 No. Sample Flory "Total 'Total Collected Y/N Flow (if a Rainfall moldd/vr MG inches SN111101 n/a Yes LINO FLOW AT "TIIIS (WITALL DURING TIIF, YEAR 4 PERIOD 1 "TIIIS C1�21 FLOC►' AT Tills OUI'FALL DURING RAIN EVENT LISTED. MV003 10/30/19 No R NO FLOW AT I'llIS OU"TFALL DURING TILE YEAR 4 PERIOD 1 1.52 NO FLOW AT TIIIS OUTFALL DURING THIS RAIN EVENT LISTED \O FLONV AT TIIIS OUYFALL Outfall No. Date Sample Collected 00400 00530 01097 01002 1,01012 01022 01027 01034 01042 01051 01067 01147 01092 01077 -01059 71900 pH .S,olids,'T'otal Suspended Concentration Antimony, Total (as Sh) Arsenic, "ratai as (As) Bercllill Total (as Be) Boron, Total (ati B) Cadmium, Total pis Cd) Chromium, rotal (as Crl Copper, Total (as Cu) bead, Total (as Pb) Nickel, 'Total (as Ni) Selenium, 'I otal (as Se) Zinc, 'I'ntal tas'/,n) Silver, Total (a, A);) 'Thallium, Total (as 111) mercury, T ota1, Method 1631 I; mo/dd/vr SU m L m /l, m /L m /L m /L m /L m /L m /L m /L m /L m L m /L m /L m /L n L SW1101 nia SNN1003 10130l19 6.8t 9 <0001 0.00125 10.001 <0.05 <0 001 <0.001 0.00306 <0.001 0,00710 <0 001 0 020 <0.0002 <0.0002 8.08 Outfall .No. Date Sample Collected 00400 00530 01097 01002 01012 01022 01027 01034 01042 01051 01067 01147 01092 01077 01059 1 7-1900 pH Solids, -Total Suspended Concentration Antimony, Total W. Sh) Arsenic, 'Total as (As) Bervilill Total (as Be) Boron, Total (as B) Cadmium, Total (as Cd) Chromium, 'fatal (as Cr) Copper, -Total (as Cu) I-ead, 'Total (as Pb) Nickell, Total (as Ni) Selenium. Total (as tie) Zinc, 'Total (as/,n) Silver, '1,018 (a, AM) 'Thallium, 1'otai (as 1'1) Mercury, 'T otal, Method 1631 F. mo/dd/vr SU rn /L m L m /L m L mg /L m /L m /L m /L nl /L m i, m L m /L m /L m /L n /L S%illlI rya S W 0113 n!a l3p►Seci on Form SNVU-247 Paue I of- Does this facility perform Vehicle Nlaintenance Activities usin" more than >> gallons of new motor oil per month? _ yes X no (ifyes, complete fart 13) Part B: Vehicle ,Maintenance Activity Monitoring Requirements Outfall No. Date Sample Collected 50050 00556 00530 00400 Total Flow (if applicable) Total Rainfall Oil & Crease (if appl.) Non -polar O&G/TPH (Method 1664 SGT-HEM), if a f. Total Suspended Solids fill New Motor Oil Usage mo/dd/vr MG inches m /l m /l unit gal/mo STORM EVENTCHARACTERISTICS: Da(e IG/30119 Total Event Precipitation (inches): 1.52 Event Duration (hours): n/a (only if applicahlc — see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only it -applicable — see permit.) Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 iMail Service Center Raleigh, North Carolina 27099-1617 "1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed 14) assure that qualified personnel properly gather .and evaluate the information submitted. Based on my inquire of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the hest of my, knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) 11 /22/19 (Date) Form SNVU-2-47. luel revisecl'%2/20/2 I'a�e2of'2