Loading...
HomeMy WebLinkAboutNCS000575_MONITORING INFO_20190414STORMWATER DIVISION CODING SHEET NCS PERMITS PERMIT NO. fvL J o DOC TYPE ❑FINAL PERMIT �} MONITORING REPORTS ❑ APPLICATION ❑ COMPLIANCE ❑ OTHER DOC DATE ❑ Doi � U YYYYMMDD DUKE ENERGY® PROGRESS April 8, 2019 Certified Mail: 7016 2140 0001 0231 1838 File Pt.: 12520-R NCDEQ Division of Water Resources Attention: Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Garry A. Whisnant Plant General Manager Asheville Steam Electric Plant Duke Energy Progress ASVL PLT1200 CP&L Dr Arden, NC 28704 o: 828-687.5211 F 828.687.5204 garry.whisnant@duke-energy.com RECEIVE r-, RE: Duke Energy Progress, LLC. NPDES SDOMR Year 3 Period 2 1 st Quarter Monthly Tier I Reporting Asheville Steam Electric Plant- NCS000575 — Buncombe County Dear Sir or Madam: APR 14 2019 GENI]RAL FILE 0%P-] R St1EGT10N In accordance with Part III, Section E: l and E.2. of the above referenced stormwater permit, Duke Energy Progress, LLC respectfully submits, in original and one copy of Year 3- Period 2 — Is( Quarter SDOMR for the facility stormwater outfalls. No actual discharge occurred at the facility stormwater outfalls SW001 and SWO03 during normal operating hours of Year 3- Period 2 — Ist Quarter. Therefore, no stormwater analytical samples were collected during the March Monthly Tier I monitoring period. Please note, SW-7 and SW-8 have not been constructed and are not included in this submittal. Should you have any Questions regarding this Submittal or require additional information, please contact Teresa Williams at 828-687-5240 or Matthew Fields at 828-687-5230. "1 certify, under penalty of law, that this document crud all attachments were prepared under rnv direction or supervision in accordance with a system designed to assure that qualified personnel properly gatherand evaluate the information submitted. Based on my inquiry of the person or persons who mintage the systent, or those persons directly responsible for gathering the information, the information submitted is, to the best of inv knowledge and belief, true. accurate, and complete. 1 an aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. " Sincerely, ,Z-v A Azlo' Garry A. Whisnant Asheville Plant Manager enclosure www.duke-energy.com Permit Number NCS000575 FACILITY NAME Asheville Steam Electric Plant PERSONCOLLECTING SAMPLE(S) _ rVa LABORATORY(S) Na Na Part A: Specific Mo itoring Requirements STOR,MWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT SAMPLES COLLECTED DURING CALENDAR YEAR: 2019 Year 3 Period 2 1st Qtr (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTI' Buncombe PHONE NO. (_828____) 687-521 l n/a Lab # n/a SIGNATURE OF PERMITTEE OR DESIGNEE SIGNATURE ON LAST PAGE. Outfall No. Date Sample Collected No Flow Y/N 50050 Total Flow (if a Total Rainfall mo/dd/ r NIG inches SW001 n/a Yes X NO FLOW AT THIS OUTFALL DURING THE YEAR 3 PERIOD 2 NO FLOW AT THIS OUTFALL DURING THIS RAIN EVENT LISTED. n/a SWO03 n/a Yes nNO ❑ FLOW AT THIS OUTFALL DURING THE YEAR 3 PERIOD 2 ,NO FLOW AT THIS OUTFALL DURING THIS RAIN EVENT LISTED.NO FLOW AT THIS OUTFALL n/a Outfall No. Date Sample Collected 00400 00530 01097 01002 01012 01022 01027 01034 01042 01051 01067 01147 01092 01077 01059 171900 pH Solids, Total Suspended Concentration Antimony, Total (as Sb) Arsenic, Total as (As) Beryllium, Total (as . Be) Boron, Total (as B) Cadmium, Total (as Cd) Chromium, Total (as Cr) Copper, Total (as Cu) Lead. Total (as Ph) Nickel, Total (as Ni) Selenium, Total (as Se) Zinc, Total (as Zn) Silver, Total (as Ag) thallium, Total (as TI) Mercury, Total, Method 1631E mo/dd/vr SU m L m /L m /L m /L m /L m /L m /L m IL m /L m L m L to L m /L m /L n L SNi1001 nIa SWO03 n/a Outfall No. Date Sample Collected 00400 00530 01097 01002 01012 01022 01027 01034 01042 01051 01067 01147 01092 01077 01059 71900 pH Solids,'1'otal Suspended Concentration Antimony, Total (as Sb) Arsenic, Total as (AS) Beryllium, Total (as Be) Boron, 'Total (as B_) Cadmium, Total (as Cd) Chromium, Total (as Cr) Copper, Total (as Co) Lead, Total (as Ph) Nickel, Total (as Ni) Selenium, Total (as Se) Zinc, Total (as Zo) Silver, Total (as Ag) Thallium, Total (as TI) Mercury, 'Total, Method 1631E mo/dd/ r SU m L mg /L m L m L m L m /L m /L m /L m /L m L m IL m /L m /L m L n /L S W 001 n1a S1V003 n/a Based on Form S W U-247 Page 1 of 2 Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _yes X no (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall No. Date Sample Collected 50050 00556 00530 00400 Total Flow (if applicable) Total Rainfall Oil & Grease (if appl.) Non -polar O&G/FPH (Method 1664 SGT-HEM), if appl. Total Suspended Solids pH New Motor Oil Usage mo/dd/ r MG inches m II m I unit al/mo STORM EVENT CHARACTERISTICS: Date ri'a Total Event Precipitation (inches): Event Duration (hours): n/a (only if applicable — see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature Permittee) 04/08/19 (Date) Form S W U-247, Iasi revised 1212012 Page 2 of 2 DUKE ENERGY® PROGRESS March 12, 2019 Certified Mail: 7016 2140 0001 0231 1791 File Pt.: 12520-R NCDEQ Division of Water Resources Attention: Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 RECEIVED MAR 2 5 Z019 CL-N i rtAL FILES D%AJR SECTION RE: Duke Energy Progress, LLC. NPDES SDOMR Year 3 Period 2 1 st Quarter Monthly Tier I Reporting Asheville Steam Electric Plant- NCSO(X)575 — Buncombe County Dear Sir or Madam: Garry A. Whisnant Plant General Manager Asheville Stearn Electric Plant Duke Energy Progress ASVL PLT 1200 CP&L ar Arden. NC28704 o: 828.687-5211 f 828.687.5204 garfy,whisnant@duke-eneTgy.com In accordance with Part III, Section E:1 and E.2. of the above referenced stormwater permit, Duke Energy Progress, LLC respectfully submits, an original and one copy of Year 3- Period 2 — Ist Quarter SDOMR for the facility stormwater outfalls. No actual discharge occurred at the facility stormwater outfalls SWOOI and SWO03 during normal operating hours of Year 3- Period 2 — 1 st Quarter. Therefore, no stormwater analytical samples were collected during the February Monthly Tier 1 monitoring period. Please note, SW-7 and SW-8 have not been constructed and are not included in this submittal. Should you have any questions regarding this submittal or require additional information, please contact Teresa Williams at 828-687-5240 or Tina Woodward at 704-382-4585. "1 certib% raider penalty of' law, that this document and all attachments ►Pere prepared under my direction or supervision in accordance with a systent designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the .9wenn, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 ant ativare that there Lire significant penalties for submitting false rnj()rmatlon, including the possibility of fines and imprisonment,f r knowing violations. " Sincerely, Garry A. Whisnant Asheville Plant Manager enclosure www.duke-energy.com Permit Number NCS000575 FACILITY NAME Asheville Steam Electric Plant PERSON COLLECTING SAMPLES) _ n!a LABORATORY(S) n!a Na Part A: Specific Monitoring Requirements STOR,MWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Na Lab # nla SAMPLES COLLECTED DURING CALENDAR YEAR: 2019 Year 3 Period 2 1st Qtr (This monitoring report shall be received by the Division no later than 30 days front the date the facility receives the sampling results from the laboratory.) COUNTY Buncombe PHONE NO. (_828_) 687-521 l SIGNATURE OF PERMIT -FEE OR DESIGNEE REQUIRED ON LAST PAGE. Outfall No. Date Sample Collected No Flow YIN 50050 Total Flow if a Total Rainfall mo/dd/ r MG inches SW001 nla Yes X NO FLOW AT THIS OUTFALL DURING THE YEAR 3 PERIOD 2 NO FLOW AT THIS OUTFALL DURING THIS RAIN EVENT LISTED. nla SWO03 nIa Yes NaNO FLOW AT THIS OUTFALL DURING THE YEAR 3 PERIOD 2 NO FLOW AT THIS OUTFALL DURING THIS RAIN EVENT LISTEMNO FLOW AT THIS OUTFALLtn/a Outfall Date 00400 00530 01097 01002 01012 01022 01027 01034 " 01042 01051 01067 01147 01092 01077 01059 71900 No. Sample Collected pH Solids, Total - Suspended Concentration Antimony. Total (as Sb) Arsenic, Total as (As) Bervllium. Total (as Be) Boron, Total (as B) Cadmium, Total (as Cd) Chromium, 'Total (as Cr) Copper, Total (as Cu) Lead, Total (as Ph) Nickel, Total (as Ni) Selenium, Total (as Se) Zinc, Total (as Zn) Silver, Total (as Ag) Thallium, Total (as TI) Mercury, Total, Method 1631 E mo/ddl r SU m m /L m L m L to L m IL m IL m /L m g/L m L m L m L m /L m L n L Wool l nla SWO03 Na Outfall No. Date Sample Collected 00400 00530 01097 '01002 01012 01022 01027 01034 01042 01051 '01067 01147 01092 01077 01059 71900 pH Solids, Total Suspended Concentration Antimony, Total (as Sb). Arsenic, Total as (As) Beryllium, Total (as Be) Boron, Total (as B) Cadmium, Total (as Cd) Chromium, Total (as Cr) Copper, Total (as Cu) Lead, 'Total (as Pb) Nickel, Total (as Ni) Selenium, 'Total (as Se) Zinc, Total (as 7.n) Silver, Total (as Ag) Thallium, 'rota) (as TI) Mercury, Total, Method 1631E mo/dd/vr SU m L m L m L m L m L m /L m IL m /L m /L m L m /L m /L m IL m /L n L SW001 nla SWO03 n!a Based on Form SWU-247 Page I of 2 t• Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _yes X no (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall No. Date Sample Collected 50050 00556 00530 00400 Total Flow (if applicable) Total' Rainfall Oil & Grease (if appl.) Non -polar O&G/TPH (Method 1664 SGT-HEM), if appl. Total Suspended Solids pH New Motor Oil Usage moldd/yr MG inches mg/1 m h unit allmo STORM EVENT CHARACTERISTICS: Date r"a Total Event Precipitation (inches): Event Duration (hours): ^ra (only ifapplicable — see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) ,Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." A0 /� e (Signature of Permi e) 03/12/19 (Date) Form SWU-247; last revised 21212012 Page 2 of 2