HomeMy WebLinkAboutNCS000575_MONITORING INFO_20190414STORMWATER DIVISION CODING SHEET
NCS PERMITS
PERMIT NO.
fvL J o
DOC TYPE
❑FINAL PERMIT
�} MONITORING REPORTS
❑ APPLICATION
❑ COMPLIANCE
❑ OTHER
DOC DATE
❑ Doi � U
YYYYMMDD
DUKE
ENERGY®
PROGRESS
April 8, 2019
Certified Mail: 7016 2140 0001 0231 1838
File Pt.: 12520-R
NCDEQ
Division of Water Resources
Attention: Central Files
1617 Mail Service Center
Raleigh, NC 27699-1617
Garry A. Whisnant
Plant General Manager
Asheville Steam Electric Plant
Duke Energy Progress
ASVL PLT1200 CP&L Dr
Arden, NC 28704
o: 828-687.5211
F 828.687.5204
garry.whisnant@duke-energy.com
RECEIVE r-,
RE: Duke Energy Progress, LLC.
NPDES SDOMR Year 3 Period 2 1 st Quarter
Monthly Tier I Reporting
Asheville Steam Electric Plant- NCS000575 — Buncombe County
Dear Sir or Madam:
APR 14 2019
GENI]RAL FILE
0%P-] R St1EGT10N
In accordance with Part III, Section E: l and E.2. of the above referenced stormwater permit, Duke
Energy Progress, LLC respectfully submits, in original and one copy of Year 3- Period 2 — Is( Quarter
SDOMR for the facility stormwater outfalls. No actual discharge occurred at the facility stormwater
outfalls SW001 and SWO03 during normal operating hours of Year 3- Period 2 — Ist Quarter. Therefore,
no stormwater analytical samples were collected during the March Monthly Tier I monitoring period.
Please note, SW-7 and SW-8 have not been constructed and are not included in this submittal.
Should you have any Questions regarding this Submittal or require additional information, please
contact Teresa Williams at 828-687-5240 or Matthew Fields at 828-687-5230.
"1 certify, under penalty of law, that this document crud all attachments were prepared under rnv
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gatherand evaluate the information submitted. Based on my inquiry of the person or
persons who mintage the systent, or those persons directly responsible for gathering the
information, the information submitted is, to the best of inv knowledge and belief, true. accurate, and
complete. 1 an aware that there are significant penalties for submitting false information, including
the possibility of fines and imprisonment for knowing violations. "
Sincerely,
,Z-v A Azlo'
Garry A. Whisnant
Asheville Plant Manager
enclosure
www.duke-energy.com
Permit Number NCS000575
FACILITY NAME Asheville Steam Electric Plant
PERSONCOLLECTING SAMPLE(S) _ rVa
LABORATORY(S) Na
Na
Part A: Specific Mo itoring Requirements
STOR,MWATER DISCHARGE OUTFALL (SDO)
MONITORING REPORT
SAMPLES COLLECTED DURING CALENDAR YEAR: 2019 Year 3 Period 2 1st Qtr
(This monitoring report shall be received by the Division no later than 30 days from
the date the facility receives the sampling results from the laboratory.)
COUNTI' Buncombe
PHONE NO. (_828____) 687-521 l
n/a
Lab # n/a
SIGNATURE OF PERMITTEE OR DESIGNEE
SIGNATURE
ON LAST PAGE.
Outfall
No.
Date
Sample
Collected
No
Flow
Y/N
50050
Total
Flow (if a
Total
Rainfall
mo/dd/ r
NIG
inches
SW001
n/a
Yes
X
NO FLOW AT THIS OUTFALL DURING THE YEAR 3 PERIOD 2
NO FLOW AT THIS OUTFALL DURING THIS RAIN EVENT LISTED.
n/a
SWO03
n/a
Yes
nNO
❑
FLOW AT THIS OUTFALL DURING THE YEAR 3 PERIOD 2
,NO FLOW AT THIS OUTFALL DURING THIS RAIN EVENT LISTED.NO FLOW AT THIS OUTFALL
n/a
Outfall
No.
Date
Sample
Collected
00400
00530
01097
01002
01012
01022
01027
01034
01042
01051
01067
01147
01092
01077
01059
171900
pH
Solids, Total
Suspended
Concentration
Antimony,
Total (as
Sb)
Arsenic,
Total as
(As)
Beryllium,
Total (as .
Be)
Boron,
Total
(as B)
Cadmium,
Total (as
Cd)
Chromium,
Total (as
Cr)
Copper,
Total
(as Cu)
Lead.
Total
(as Ph)
Nickel,
Total
(as Ni)
Selenium,
Total (as
Se)
Zinc,
Total
(as Zn)
Silver,
Total (as
Ag)
thallium,
Total (as
TI)
Mercury,
Total,
Method
1631E
mo/dd/vr
SU
m L
m /L
m /L
m /L
m /L
m /L
m /L
m IL
m /L
m L
m L
to L
m /L
m /L
n L
SNi1001
nIa
SWO03
n/a
Outfall
No.
Date
Sample
Collected
00400
00530
01097
01002
01012
01022
01027
01034
01042
01051
01067
01147
01092
01077
01059
71900
pH
Solids,'1'otal
Suspended
Concentration
Antimony,
Total (as
Sb)
Arsenic,
Total as
(AS)
Beryllium,
Total (as
Be)
Boron,
'Total
(as B_)
Cadmium,
Total (as
Cd)
Chromium,
Total (as
Cr)
Copper,
Total
(as Co)
Lead,
Total
(as Ph)
Nickel,
Total
(as Ni)
Selenium,
Total (as
Se)
Zinc,
Total
(as Zo)
Silver,
Total (as
Ag)
Thallium,
Total (as
TI)
Mercury,
'Total,
Method
1631E
mo/dd/ r
SU
m L
mg /L
m L
m L
m L
m /L
m /L
m /L
m /L
m L
m IL
m /L
m /L
m L
n /L
S W 001
n1a
S1V003
n/a
Based on Form S W U-247 Page 1 of 2
Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _yes X no
(if yes, complete Part B)
Part B: Vehicle Maintenance Activity Monitoring Requirements
Outfall
No.
Date
Sample
Collected
50050
00556
00530
00400
Total Flow
(if applicable)
Total
Rainfall
Oil & Grease
(if appl.)
Non -polar
O&G/FPH
(Method 1664
SGT-HEM), if
appl.
Total
Suspended
Solids
pH
New Motor
Oil Usage
mo/dd/ r
MG
inches
m II
m I
unit
al/mo
STORM EVENT CHARACTERISTICS:
Date ri'a
Total Event Precipitation (inches):
Event Duration (hours): n/a (only if applicable — see permit.)
(if more than one storm event was sampled)
Date
Total Event Precipitation (inches):
Event Duration (hours): (only if applicable — see permit.)
Mail Original and one copy to:
Division of Water Quality
Attn: Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of
my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including
the possibility of fines and imprisonment for knowing violations."
(Signature Permittee)
04/08/19
(Date)
Form S W U-247, Iasi revised 1212012
Page 2 of 2
DUKE
ENERGY®
PROGRESS
March 12, 2019
Certified Mail: 7016 2140 0001 0231 1791
File Pt.: 12520-R
NCDEQ
Division of Water Resources
Attention: Central Files
1617 Mail Service Center
Raleigh, NC 27699-1617
RECEIVED
MAR 2 5 Z019
CL-N i rtAL FILES
D%AJR SECTION
RE: Duke Energy Progress, LLC.
NPDES SDOMR Year 3 Period 2 1 st Quarter
Monthly Tier I Reporting
Asheville Steam Electric Plant- NCSO(X)575 — Buncombe County
Dear Sir or Madam:
Garry A. Whisnant
Plant General Manager
Asheville Stearn Electric Plant
Duke Energy Progress
ASVL PLT 1200 CP&L ar
Arden. NC28704
o: 828.687-5211
f 828.687.5204
garfy,whisnant@duke-eneTgy.com
In accordance with Part III, Section E:1 and E.2. of the above referenced stormwater permit, Duke
Energy Progress, LLC respectfully submits, an original and one copy of Year 3- Period 2 — Ist Quarter
SDOMR for the facility stormwater outfalls. No actual discharge occurred at the facility stormwater
outfalls SWOOI and SWO03 during normal operating hours of Year 3- Period 2 — 1 st Quarter. Therefore,
no stormwater analytical samples were collected during the February Monthly Tier 1 monitoring period.
Please note, SW-7 and SW-8 have not been constructed and are not included in this submittal.
Should you have any questions regarding this submittal or require additional information, please
contact Teresa Williams at 828-687-5240 or Tina Woodward at 704-382-4585.
"1 certib% raider penalty of' law, that this document and all attachments ►Pere prepared under my
direction or supervision in accordance with a systent designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the .9wenn, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. 1 ant ativare that there Lire significant penalties for submitting false rnj()rmatlon, including
the possibility of fines and imprisonment,f r knowing violations. "
Sincerely,
Garry A. Whisnant
Asheville Plant Manager
enclosure
www.duke-energy.com
Permit Number NCS000575
FACILITY NAME Asheville Steam Electric Plant
PERSON COLLECTING SAMPLES) _ n!a
LABORATORY(S) n!a
Na
Part A: Specific Monitoring Requirements
STOR,MWATER DISCHARGE OUTFALL (SDO)
MONITORING REPORT
Na
Lab # nla
SAMPLES COLLECTED DURING CALENDAR YEAR: 2019 Year 3 Period 2 1st Qtr
(This monitoring report shall be received by the Division no later than 30 days front
the date the facility receives the sampling results from the laboratory.)
COUNTY Buncombe
PHONE NO. (_828_) 687-521 l
SIGNATURE OF PERMIT -FEE OR DESIGNEE
REQUIRED ON LAST PAGE.
Outfall
No.
Date
Sample
Collected
No
Flow
YIN
50050
Total
Flow if a
Total
Rainfall
mo/dd/ r
MG
inches
SW001
nla
Yes
X NO FLOW AT THIS OUTFALL DURING THE YEAR 3 PERIOD 2
NO FLOW AT THIS OUTFALL DURING THIS RAIN EVENT LISTED.
nla
SWO03
nIa
Yes
NaNO
FLOW AT THIS OUTFALL DURING THE YEAR 3 PERIOD 2
NO FLOW AT THIS OUTFALL DURING THIS RAIN EVENT LISTEMNO FLOW AT THIS OUTFALLtn/a
Outfall
Date
00400
00530
01097
01002
01012
01022
01027
01034 "
01042
01051
01067
01147
01092
01077
01059
71900
No.
Sample
Collected
pH
Solids, Total -
Suspended
Concentration
Antimony.
Total (as
Sb)
Arsenic,
Total as
(As)
Bervllium.
Total (as
Be)
Boron,
Total
(as B)
Cadmium,
Total (as
Cd)
Chromium,
'Total (as
Cr)
Copper,
Total
(as Cu)
Lead,
Total
(as Ph)
Nickel,
Total
(as Ni)
Selenium,
Total (as
Se)
Zinc,
Total
(as Zn)
Silver,
Total (as
Ag)
Thallium,
Total (as
TI)
Mercury,
Total,
Method
1631 E
mo/ddl r
SU
m
m /L
m L
m L
to L
m IL
m IL
m /L
m g/L
m L
m L
m L
m /L
m L
n L
Wool l
nla
SWO03
Na
Outfall
No.
Date
Sample
Collected
00400
00530
01097
'01002
01012
01022
01027
01034
01042
01051
'01067
01147
01092
01077
01059
71900
pH
Solids, Total
Suspended
Concentration
Antimony,
Total (as
Sb).
Arsenic,
Total as
(As)
Beryllium,
Total (as
Be)
Boron,
Total
(as B)
Cadmium,
Total (as
Cd)
Chromium,
Total (as
Cr)
Copper,
Total
(as Cu)
Lead,
'Total
(as Pb)
Nickel,
Total
(as Ni)
Selenium,
'Total (as
Se)
Zinc,
Total
(as 7.n)
Silver,
Total (as
Ag)
Thallium,
'rota) (as
TI)
Mercury,
Total,
Method
1631E
mo/dd/vr
SU
m L
m L
m L
m L
m L
m /L
m IL
m /L
m /L
m L
m /L
m /L
m IL
m /L
n L
SW001
nla
SWO03
n!a
Based on Form SWU-247 Page I of 2
t•
Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _yes X no
(if yes, complete Part B)
Part B: Vehicle Maintenance Activity Monitoring Requirements
Outfall
No.
Date
Sample
Collected
50050
00556
00530
00400
Total Flow
(if applicable)
Total'
Rainfall
Oil & Grease
(if appl.)
Non -polar
O&G/TPH
(Method 1664
SGT-HEM), if
appl.
Total
Suspended
Solids
pH
New Motor
Oil Usage
moldd/yr
MG
inches
mg/1
m h
unit
allmo
STORM EVENT CHARACTERISTICS:
Date r"a
Total Event Precipitation (inches):
Event Duration (hours): ^ra (only ifapplicable — see permit.)
(if more than one storm event was sampled)
Date
Total Event Precipitation (inches):
Event Duration (hours): (only if applicable — see permit.)
,Mail Original and one copy to:
Division of Water Quality
Attn: Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
"1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of
my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including
the possibility of fines and imprisonment for knowing violations."
A0 /�
e
(Signature of Permi e)
03/12/19
(Date)
Form SWU-247; last revised 21212012
Page 2 of 2