Loading...
HomeMy WebLinkAbout19970616_Penalty Assessment SS 96-002 Response_19970205 DIVISION OF WATER QUALITY Winston-Salem Regional Office February 5, 1997 MEMORANDUM To: Linda Forehand Compliance Group From: Mike Mickey Subject: DOT/HWY421 - Fast Track (SS) Watauga County This is in response to your inquiry about the SS assessment for DOT. In regards to the rainfall issue, please note the following timeline: May 11, 1996 - DOT claims 2" rain in 30 minutes (See 6/21/96 DOT response ltr). May 12, 1996 - Battle Ridge Companies (BRC) claims 2" rain fell in one hour (See 6/28/96 BRC response letter). Same rain event as above. May 20, 1996 - BRC says they were substantially complete with repairs and improvements to sediment structures (See 6/28/96 BRC letter). May 30, 1996 - Turbidity samples collected by DWQ. June 4, 1996 - Turbidity samples collected by DWQ. Please note that the alleged 50 year storm occurred 18 days prior to DWQ's sampling. In our opinion, the rainfall amount issue is irrelevant due to the time elapsed. Your next question involved BRC's claim that the high turbidity values were due to instream work. This excuse is also irrelevant. The high turbidity values were due to the failure of DOTBRC to comply with the Sediment Pollution Control Act (SPCA). The Division of Land Resources (DLR) found the waste pit/borrow site to be in violation of the SPCA during their 5/29/96 inspection. The NOV issued 5/30/96 required DOT to submit revised plans, install and maintain adequate measures, reestablish the old channel and 25' trout stream buffer or stabilize an appropriately designed and approved new channel (DOT relocated 800 LF of trout stream without 404/401 permit approval). The waste pit/borrow site did not come into compliance with the SPCA until sometime after 8/2/96. Please be aware that DLR is attempting to get DOT to remove sediment from Stony Fork Creek. The last meeting was held 1/29/97 in Raleigh. Harlan can check with Charles Gardner for an update. cc: WSRO DIVISION OF WATER QUALITY Winston-Salem Regional Office MEMORANDUM TO: Steve Tedder THROUGH: Larry Coble -5-?4'? Steve Mauney FROM: Ron Linville Mike Mickey SUBJECT: Civil Penalty Assessment NCDOT (SS 96-002) US 421 Project Watauga County DATE: 970430 ??? ®6 LSO •, ql ?F„a+ Please be advised that the WSRO does not support the Department of Transportation request for remission of the civil penalty of $1,752.52. Primarily, the "facts" provided in the letter from Mr. J. D. Goins do not adequately describe the severity of the conditions found at this construction site. It does not indicate that DOT ordered the contractor to halt road construction on the project for approximately one week to bring the sediment controls up to standard. Additionally, there is no mention that DOT relocated 800 linear feet of trout stream without a COE 404 Permit or a 401 DWQ Certification. Further, it is our understanding that the Division of Land Quality and DOT are negotiating silt removal from the stream. However, DOT wants to perform the work with a backhoe instead of the customary suction dredge. The WSRO does not concur that many of the problems associated with this project were "unforeseen" due to the mountainous terrain. DOT should have taken due diligence and precautionary measures because of the terrain. The letter does not mention possible preventive administrative measures that DOT will take to insure that similar situations do not occur in the future. Nor does the letter indicate that DOT will avoid allowing a contractor to cause severe environmental problems through tacit approval of field modifications to construction plans which constitutes avoidance of environmental laws and regulations. The fine assessed was minimal considering a DWQ macroinvertibrate study conducted 7/23/96 found "... a small but measurable, decline in habitat and water quality in Stony Fork Creek." Also, it should be noted that DWQ's turbidity samples (only 2) were collected 18 days after the alleged 50 year storm (See 2/5/97 memo attached) and that DOT was noncompliant with the S.P.C.A. for over 66 consecutive days. cc: Linda Forehand John Dorney i From: "James Ronald (Ron) Linville" <niew331Owsro.ehnr.atate.nc.us> Organization: WSRO DEMM To: nlew507Odem.ehnr.atate.nc.us Date sent: Fri, 16 May 1997 11:47:54 +0000 Subject: Re: 421 Priority: normal Reference DWQ 960725, wilkes County Hwy 421. It just doesn't make sense environmentally to me that DOT will run 4 more additional lanes through this area and not utilize the existing roadway for the project. This will end up having 6 lanes of traffic. I think that DOT could relocate some homes within the same area, finish 1 new road section and then divert traffic to it and then upgrade the old raod, then open up both when complete. This cumulative roadbuilding is insane! r*********r*********r*r*************rW**r***************r****« Ron Linville @ WSRO 910/771-4608 x 265 "One of the penalties of an ecological education is that one lives alone in a world of wounds. Much of the damage inflicted on land is quite invisible to laymen. An ecologist must either harden his shell and make believe that the consequences of science are none of his business, or he must be the doctor who sees the marks of death in a community that believes itself well and does not want to be told otherwise." from Round River by Aldo Leopold ii FHWA-NC-EIS-92-08-F Federal Highway Administration Region 4 US 421 WATAUGA COUNTY NORTH CAROLINA AND FINAL SECTION 4(f) STATEMENTS Federal Aid Project No. FR-86-1(6) State Project No. 8.1750601, R-529BA & BB ADMINISTRATIVE ACTION FINAL ENVIRONMENTAL IMPACT STATEMENT Submitted Pursuant to the National Environmental Policy Act 42 U.S.C. 4332(2)(c) and 49 U.S.C. 303 By the U.S. Department of Transportation Federal Highway Administration and U North Carolina Department of Transportation Cooperating Agencies Department of the Interior, National Park Service Department of the A of En i rs 2 D to of Approval H. Franklin Vic , P.E., NCDOT /Z ,/9/y Date of App roval F- Manager of Planning & Environmental Branch Leon N. Larson, FHWA Regional Administrator The following persons may be contacted for additional information: Nicholas L. Graf, P.E. Division Administrator Federal Highway Administration 310 New Bern Avenue, Suite 410 Raleigh, NC 27601 (919) 856-4346 H. Franklin Vick, P.E. Manager, Planning & Environmental Branch N.C. Department of Transportation Post Office Box 25201 Raleigh, NC 27611 (919) 733-3141 This statement documents the need for transportation improvements for US 421 from just ' west of the South Fork New River to just east of the Blue Ridge Parkway. n J US 421 FROM JUST WEST OF THE SOUTH FORK NEW RIVER TO JUST EAST OF THE BLUE RIDGE PARKWAY WATAUGA COUNTY, NORTH CAROLINA FEDERAL AID PROJECT FR-86-1(6) STATE PROJECT 8.1750601 TIP R-529BA & BB ADMINISTRATIVE ACTION FINAL ENVIRONMENTAL IMPACT STATEMENT AND FINAL SECTION 4(F) STATEMENTS DOCUMENTATION PREPARED BY PIEDMONT OLSEN HENSLEY: even L. Thomas, P.E. roject Manager - Transportation FOR NORTH CAROLINA DEPARTMENT OF TRANSPORTATION: L. Grime , P.E., Unit Head Cons tant En ' eering Unit E. Michelle Wagone Fishburne, P.E. Project Planning Engineer PREFACE This document is the Final Environmental Impact Statement (FEIS) and Final Section 4(f) Statements for the proposed transportation improvements to US 421 from just west of the South Fork New River to just east of the Blue Ridge Parkway (T.I.P. Project R-529BA & BB). See Exhibit 1. The remaining section of US 421 covered in the Draft Environmental Impact Statement (DEIS), from just east of the Blue Ridge Parkway to SR 1361 (R-529BC), is addressed in the Federal Highway Administration (FHWA) Finding of No Significant Impact (FONSI). The FEIS was prepared in accordance with Federal Highway Administration Technical Advisory T6640.8A, Section VI-C, as an abbreviated FEIS. Accordingly, only those sections of the DEIS that required modification or clarification are presented in the FEIS; hence, the DEIS is incorporated into the FEIS by reference. The abbreviated FEIS is divided into eight sections and six appendices. Commitments for mitigation of impacts associated with the Preferred Alternative are addressed in the first section of the FEIS. These mitigation measures are compiled from Sections IV, V, VI, and VII of the DEIS and from agency correspondence received throughout the study process. The second section includes errata sheets for those portions of the DEIS that were revised or expanded. References to the specific portions of the DEIS being modified are provided to assist the reader. Entire paragraphs from the DEIS are included in this report. The new or revised information within the paragraphs and tables is highlighted for clarity. Material may have been omitted from the DEIS text and will not appear in the FEIS paragraph. The third section of the FEIS identifies the Preferred Alternative for the proposed project. This section includes justification for the selection of the Preferred Alternative. The fourth and fifth sections of the FEIS are the Final Section 4(f) Statements for the Blue Ridge Parkway and W. S. Moretz House, respectively. The Draft Section 4(f) Evaluations were circulated with the Draft Environmental Impact Statement, approved on June 10, 1992. ' The sections revised from the Draft Section 4(f) Evaluations are highlighted in the final statements. These revisions reflect updated information and responses to comments on the draft evaluations. i Sections VI and VII of the FEIS detail the wetlands and floodplain findings for the ' Preferred Alternative, respectively. Public and agency comments concerning the DEIS are addressed in Section VIII of the FEIS. Information concerning the Corridor Location Public Hearing is presented along with summaries of verbal and written comments. In addition, each of the comments made by various review agencies concerning the DEIS are addressed with specific responses. The agency letters are included in the Appendix of this document. The final section of the FEIS includes six appendices. Appendix A contains the entire corrected tables from the DEIS that required revision due to updated information or revised policies. Appendix B contains exhibits from the DEIS that were revised or added as necessary. Appendix C contains appendices from the DEIS that were revised. Appendix D contains the correspondence received from federal and state agencies and local officials concerning the DEIS. Appendix E contains additional Agency correspondence concerning the Preferred Alternative at Deep Gap. Appendix F contains the Memorandum of ' Agreement between the State Historic Preservation Officer (SHPO) and FHWA for the mitigation of effects to the Section 106 properties. 1 1 ii I E'er! ow NN D D ?'?'T? ? ) W ?'T1 ? r = c) D D o ? l , Z O m° .u 7C' m M ? Z D Cl u %• •-?..• VI i 00 c < 112 2 x % r u •• A u N r mm .D cr- 1, ?Z ?m 0 a m <o 0 G7 ? u / I ' Q o < r m / Db N ?. 4 ? I ? C ? r uDi ' w ° m LTI _ o . v • 0 o N .0 u w m W a ? I Mr m "o, ° ) o4 ° f w r 3>0 m O 0 r ?. 1 r f -? N t? -n N .D / u / N TO H. JEFFERSON--- O / -,,. N D Z; r w m N A 0 y ?O ?O z 0 C) D o -q C: : D- z C- D cn M D= ° O C a > N ! z Q O o tr x t t t 1 1 1 TABLE OF CONTENTS Page Preface i Environmental Commitments I Errata Sheets II Preferred Alternative III Final Section 4(f) Statement - Blue Ridge Parkway IV Final Section 4(f) Statement - W. S. Moretz House V Wetlands Finding VI Floodplain Finding VII Public and Agency Comments VIII Appendices A. Revised and Additional Tables B. Revised and Additional Exhibits C. Revised Appendices D. Agency Comments on DEIS E. Agency Comments on Preferred Alternative at Deep Gap F. Memorandum of Agreement Section I L? 1 t Environmental Commitments 1 1 t ENVIRONMENTAL COMMITMENTS The following summarizes the commitments for mitigation measures offered by the North Carolina Department of Transportation (NCDOT) for the Preferred Alternative. 1. NCDOT will reevaluate the need for and feasibility of noise barriers during the final design phase of the project based on final alignment and grades as well as cut and fill locations. 2. NCDOT will minimize long-term water quality impacts through implementation of NCDOT Best Management Practices for Protection of Surface Waters as practicable. 3. NCDOT will minimize wetlands impacts through the judicious development of the roadway alignment during the final design phase of the project. 4. NCDOT will coordinate with the U.S. Fish and Wildlife Service on the relocation of a tributary to Gap Creek. 5. The Federal Highway Administration (FHWA) and the NCDOT will coordinate with the State Historic Preservation Office (SHPO) and Department of the Interior - National Park Service (NPS) to continue assessment of archaeological site 31Wt301 (Stoneman's Fort). The fort, constructed of earth and materials from a dismantled house during the closing days of the Civil War, was impacted by the construction of the Blue Ridge Parkway (BRP). Current plans indicate between one to 20 feet of land will be used in the area where remnants of the fort may remain. Should these fort remnants be impacted, a qualified archaeologist will assess the National Register eligibility of the site, prior to right-of-way acquisition, by several methods which may include archival research, site mapping, and site testing. Since the integrity of the fort was compromised, preservation in place is not anticipated at 31Wt301. The FHWA and NCDOT will transmit the results of this work to the SHPO and NPS for review. Should additional archaeological work be required to mitigate impacts to 31Wt301, a mitigation plan will be developed in consultation with the SHPO and the NPS prior to construction. I-1 6. NCDOT will implement an erosion control program in accordance with the NCDOT Division of Highways Sediment and Erosion Control Policy to minimize erosion and sedimentation during construction. 7. The use of sheet piling or other potential bog protective measures, if required, will be evaluated during design and coordinated with the United States Army Corps of Engineers (COE), NPS, USFWS, and NCWRC. 8. NCDOT will minimize the loss of forested areas through limiting clearing and grubbing within the construction limits 10 feet beyond slope limits and by using 2:1 or steeper side slopes, where allowable. 9. NCDOT and the Federal Highway Administration (FHWA) will ensure all the stipulations in the Memorandum of Agreement between NCDOT, FHWA Eastern Federal Lands Highway Division, and NPS will be fulfilled. 10. If any of the underground storage tank (UST) sites are impacted by the Preferred Alternative, a complete investigation of the UST site will be undertaken to determine appropriate disposal procedures prior to right of way acquisition. 11. To facilitate the South Fork New River as a possible Wild and Scenic River, a canoe access and parking area at the US 421 crossing of the South Fork New River will be studied prior to right-of-way acquisition. 12. Prior to right-of-way acquisition, the salvage yard located on Old NC 60 in the community of Rutherwood will be investigated to determine appropriate disposal procedures. r 13. The final wetland mitigation plan will be developed in coordination with the appropriate regulatory and resource agencies during permit application. , 14. A research project for the Deep Gap Southern Appalachian Bog will be performed by the National Park Service and funded by FHWA and NCDOT. An agreement to perform this research will be completed prior to the Record of Decision (ROD). The research project will monitor the hydrology and function of the bog located on r I-2 r BRP property prior to construction and continue through and following construction for a minimum of five years. 1 15. The Federal Highway Administration (Eastern Federal Lands Highway Division) shall develop design plans and administer the construction contract for the bridge and related construction where US 421 crosses the Blue Ridge Parkway (BRP). 16. A dual-arch bridge as depicted in Exhibit IV-6 of the DEIS will be constructed to replace the existing BRP single-arch bridge. Final bridge and roadway design plans will be submitted to the North Carolina SHPO and NPS for review and comment. FHWA shall coordinate with the NPS throughout the design and construction of the ' project as stipulated in the MOA among FHWA, NCDOT, and the NPS. 17. The rock face of the existing BRP bridge over US 421 will be salvaged by the contractor. The salvaged rock will become the property of the NPS and will be stacked at a location designated by NPS and approved by NCDOT. 18. NCDOT shall document the existing bridge in accordance with the Historic ' Structure and Landscape Recordation Plan included in the MOA prior to and during construction. 19. In consultation with North Carolina SHPO and NP S, NCDOT shall develop and ' implement a landscape plan for the land within the NPS boundaries at the crossing of US 421 and the BRP. This landscape plan will specify plants indigenous to the Blue Ridge Mountains and compatible with the historic landscape plan for the BRP. The plans will be submitted to the North Carolina SHPO and the NPS for review and comment prior to construction. r 20. NCDOT may erect directional signs pertaining to the BRP in the vicinity of the ' US 421/BRP interchange. Any signs that NCDOT and FHWA consider to be essential for reasons of safety will conform to NPS standards and will be submitted ' to the North Carolina SHPO and NPS for review and comment. 21. NCDOT shall acquire adequate protective buffer lands on both sides of US 421 to rote t th i h d f h BRP d p c e v ews e o t e an to prevent non-conforming development in the vicinity of the US 421/Blue Ridge Parkway interchange. Areas NCDOT proposes r I-3 r to acquire for buffer lands will be reviewed and approved by the FHWA and NPS prior to purchase. 1 22. NCDOT shall deed additional right-of-way acquired for construction of the ramp in the northwest quadrant of the US 421/BRP interchange to the NPS in fee simple. This land will not be considered compensation/mitigation for the NPS property required for roadway construction. 23. NCDOT shall develop and implement a landscape plan to landscape US 421 along its border with the W. S. Moretz Farm. This landscape plan will plant material indigenous to the area and be submitted to the North Carolina SHPO for review and comment prior to construction. ' 24. NCDOT shall document W. S. Moretz Farm prior to construction in accordance with the Historic Structure and Landscape Recordation Plan included in the MOA. 25. During construction and following completion of the project, access to the W. S. Moretz Farm from US 421 will be maintained along the existing driveway. r 26. Utility lines relocated by the construction of the US 421 improvements will not be routed through the Deep Gap Southern Appalachian Mountain Bog. 27. Design plans for the construction of the retaining wall in the vicinity of the US 421/ BRP Interchange will be submitted to the NPS and North Carolina SHPO for review and comment. 28. The traffic control plans in the vicinity of the US 421/BRP Interchange will be submitted to the NPS and North Carolina SHPO for review and comment. 29. Attempts will be made to avoid any spring seeps encountered during the design ' phase with alignment shifts. Seep areas that cannot be avoided will be incorporated into runoff ditches. ' 30. Should the Preferred Alternative impact Site 31Wt289, site testing will be conducted to determine the eligibility of the site for the National Register. Preservation in place is not anticipated for this site. r I-4 r 31. The NCDOT Geotechnical Unit will conduct subsurface investigations prior to right- of-way acquisition to determine the location and type of rock to be removed prior to construction. Should acid-bearing shale be encountered, a plan to minimize acid runoff from uncovered shale would be developed and implemented. However, it is not anticipated shales will be encountered at this location. 1 P I-5 Ij ? 1 1 Section II Errata Sheets 1 ERRATA SHEETS I Summary, Subsection C, Pages S-5 and S-6. Revise to read: BRP Crossing Alternative 1 involves widening existing US 421 from two lanes to five ' lanes. The existing stone facade arch bridge would be replaced with a similar stone facade arch bridge. Access between US 421 and the Parkwav would be maintained. ..................... BRP Crossing Alternative 2 involves construction of a two-lane roadway parallel to and north of existing US 421 to carry westbound traffic while existing US 421 would carry eastbound traffic. The existing stone facade arch bridge would remain intact, and an approximately 900-foot long tunnel would be constructed to pass westbound US 421 traffic under the Parkway. No access would be provided between US 421 ' and the Parkway at Deep Gap. '':Sf#1 ?,c t fic?t t?1SCt1ttrjEilt b, BRP Crossing Alternative 3 involves construction of a two-lane roadway parallel to and north of existing US 421 and would pass under the Parkway. East of the Blue Ridge Parkway, a center left-turn lane would be added. Existing US 421 would carry eastbound traffic while the new roadway would carry westbound traffic. The existing stone facade arch bridge would be maintained and a new structure would be built just north of the existing bridge. Access between US 421 and the Parkway would be provided T a st mat0 total Mst f0. + 0' 3T coon Svc ul?l b pt`t? t tely ;4 XXX -X :..:. . MI I'n BRP Crossing Alternative 4 involves construction of four new lanes to carry US 421 under the Parkway, two for eastbound US 421 traffic and two for westbound US 421 traffic. East of the Blue Ridge Parkway, a center left-turn lane would be added. The existing stone facade arch bridge would be removed and replaced with two similar stone facade arch bridges. Access between US 421 and the Parkway would be provided. :. sued.. t0 cost ..nstxttct?n? BRP Crossing Alternative 5 involves the construction of a two-lane roadway parallel to and south of existing US 421 and would pass under the Parkway. East of the Blue Ridge Parkway, a center left-turn lane would be added. Existing US 421 would carry westbound traffic and the new roadway would carry eastbound traffic. The existing stone facade arch bridge would be maintained and a new structure would be built just south of the existing bridge. Access between US 421 and the Parkway would be provided ii X ela W: ted tat1 mgt £ctxtarro 'vt?p ro?ia tey .iD M: 0 alit II-1 BRP Crossing Alternative 6 involves construction of a two-lane roadway parallel to and south of existing US 421 and would pass under the Parkway. This alternative is similar to BRP Crossing Alternative 5, but with different horizontal and vertical alignments and no access between US 421 and the Parkway. Existing US 421 would carry westbound traffic and the new roadway would carry eastbound traffic. Section I, Subsection C, Page I-3, second paragraph. I c P rar a t ny the year lulu, the ADT volumes a US 421 are projected to range from 10,900 to 24,600 vehicles per day. Section II, Subsection B.2.1, Page II-7, first paragraph. \?YA;; W GN7 V ?jt existing Table II-2 lists the eight segments eliminated and the reasons for their elimination. X.: ix ..... x... ....r.... x ''?.:: ....,...... The l? Section II, Subsection B.2.3, Page II-10, first paragraph. Build Alternatives A, B, and C share a common corridor in the area of the crossing of the Blue Ridge Parkway over US 421 at Deep Gap. Because of the uniqueness of this area, seven preliminary improvement alternatives, Blue Ridge Parkway (BRP) Crossing Alternatives 1, 2, 3, 4, 5, 6, and 6A were developed independent of Build Alternatives A, B, and C. .:...VMS l~...??.::th+? II-2 1 remaining segments were aggregated into three alternatives referred to as the "reasonable and feasible" corridors. These alternatives are designated as Build J 1 rotxanu ttI tie eX3stm 04Sei ettt areetrzent. The final selection of the Preferred Alternative will include a reasonable and feasible BRP Crossing Alternative. Included in Section V of this report are exhibits showing a plan view of each of the BRP Crossing alternatives. Each alternative is described as follows: Blue Ridge Parkway Crossing Alternative 1 BRP Crossing Alternative 1 involves widening existing US 421 from two lanes to five lanes. The existing stone facade arch bridge would be replaced with a similar stone facade arch bridge. Access between US 421 and the Parkway would be maintained. Blue Ridge Parkway Crossing Alternative 2 BRP Crossing Alternative 2 involves construction of a two-lane roadway parallel to and north of existing US 421 to carry westbound traffic while existing US 421 would carry eastbound traffic. The existing stone facade arch bridge would remain intact, and an approximately 900-foot-long tunnel would be constructed to pass westbound US 421 traffic under the Parkway. No access would be provided between US 421 and ;.::::: ;:.;:;;.:::.:;.;: the Parkway at Deep. Gap. .:.... ? post fCtt ?otx?te?o? 'VV?tLt?d ?e ppxximty mil4. Blue Ridge Parkway Crossing Alternative 3 BRP Crossing Alternative 3 involves construction of a two-lane roadway parallel to and north of existing US 421 and would pass under the Parkway. East of the Blue Ridge Parkway, a center left-turn lane would be added. Existing US 421 would carry eastbound traffic while the new two-lane roadway would carry westbound traffic. The existing stone facade arch bridge would be maintained, and a new structure would be built just north of the existing bridge. Access between US 421 and the Parkway would be provided. SImalVe It e for e?rtGr+puld b`'a?mtey ............... . Blue Ridge Parkway Crossing Alternative 4 ' BRP Crossing Alternative 4 involves construction of four new lanes to carry US 421 under the Parkway, two for eastbound US 421 traffic and two for westbound US 421 ' traffic. East of the Blue Ridge Parkway, a center left-turn lane would be added. The existing stone facade arch bridge will be removed and replaced with two similar stone facade arch bridges. Access between US 421 and the Parkway would be provided. Fill L Blue Ridge Parkway Crossing Alternative 5 BRP Crossing Alternative 5 involves the construction of a two-lane roadway parallel to and south of existing US 421 and would pass under the Parkway. East of the Blue Ridge Parkway, a center left-turn lane would be added. Existing US 421 would carry westbound traffic and the new roadway would carry eastbound traffic. The existing stone facade arch bridge would be maintained with a new structure built just south of the existing bridge. Access between US 421 and the Parkway would be vrovided. II-3 Blue Ridge Parkway Crossing Alternative 6 BRP Crossing Alternative 6 involves the construction of a two-lane roadway parallel to and south of existing US 421 and would pass under the Parkway. This alternative is similar to BRP Crossing Alternative 5, but with different horizontal and vertical alignments and no access between US 421 and the Parkway. Existing US 421 would carry westbound traffic and the new roadway would carry eastbound traffic. ii:•i:•i:•:i:•::::::L;J:{•:i{.y:;•;.:{vvvt<::•:6::??:::::: :.:::.v: :.::::::::::::::::::: u:.: ?:. ?:: ::::::::::•..:...::...:::: ............................................................................. ........... Blue Ridge Parkway Crossing Alternative 6A BRP Crossing Alternative 6A is similar to BRP Crossing Alternative 6, but with a different horizontal and vertical alignment. i,lq# #ct#1t XXXX ??!, Section III, Subsection F.1.2c, Page III-31, second paragraph. The general methodology employed in the investigations for protected species for this project included a thorough analysis of pertinent literature and an extensive field M. It should be noted that care was taken that no protected or disturbed during the field study. Section III, Subsection 17.12c, Page III-45, second paragraph. This species habitat requirements include high elevationi" '<`pn 0M. X the moss-sedge-grass mantle that carpets moist to wettish, black humified find sand over outcrops of granitic rock; steep slopes and bluff ledges; or the rocky detritus around outcrops. The Roan Mountain bluet is presently known only from the North Carolina side of Roan Mountain. Section III, Subsection G, Page III-59. UST 3: Three-Way Grocery and Exxon US 221 (in Deep Gap) Owner: Jack Wellborn Facility No.: 0-023388 Three 10,000-gallon gasoline tanks, installed 1985 One 10,000-gallon diesel tank, installed 1985 One 4,000-gallon tank, installed 1985 II-4 [l I 11 J All Tanks: Material:'` a#C Interior Protection: Interior lined Exterior Protection: seceiast .6 P Section IV, Subsection F, Page IV-17, second paragraph. Build Alternative B would incur the most displacements of the build alternatives. It would involve the displacement of 57 residents, 10 businesses, and two non-profit organizations for a total of 69 relocations. Build Alternative A would incur the fewest displacements of the build alternatives. It would involve the displacement of 37 residents, 14 businesses, and two non-profit organizations, for a total of 53 relocations. i .. or iv ct?rnri urt?[tips> ?c rill:>I <tl ?s .1 MY:1i? Frefer.r.0- A: U*"M?i?We Section IV, Subsection H.2, Page IV-29. Add the following. Section IV, Subsection I, Pages IV-29 - IV-32. The project area is located in the Eastern Mountain Air Quality Control Region, Region I for the state. `i8b t>a>tttar>tn3e ....................... tom..:..: Traffic input parameters included peak hour volumes, speeds, vehicle types, and roadway conditions. Meteorological inputs included conservative values for wind speed (1 meter/second), wind direction (worst direction for each receptor), and atmospheric stability (Pasquill Class F). The one-hour CO background level was assumed to be 1.9 parts per million (ppm) and the eight-hour CO background level 1.2 ppm. Additional details of the modeling may be found in the Air Quality Technical Memorandum - May 1990, available from the Department of Transportation II-5 1 Potential "worst case" location sites for the build alternatives and for the No-Build Alternative were selected for analysis. Selections were made on the basis of anticipated traffic volumes, operating conditions, and proximity of sensitive receptors to the proposed roadway. The potential "worst case" location for the build alternatives was adjacent to the right-of-way boundary at the western terminus of the study area where the alternatives share a common corridor. Two receptors were placed, one at each side of the right-of-way, 50 feet from the centerline of the roadway. In order to evaluate the air quality effects of the proposed project, design year CO projections were calculated for both the Build and the No-Build Alternatives and compared to the National Ambient Air Quality Standards (NAAQS). This comparison revealed the projected CO concentration levels, presented in Table IV-9, would not be expected to violate the one-hour or the eight-hour standard, 35 ppm and 9 ppm, respectively. The one-hour CO concentration would not be expected to exceedri (including background contribution) and the eight-hour CO concentration would not be expected to exceed. In summary, no violations of either the one-hour or eight-hour NAAQS for CO would be expected under either the Build or No-Build Alternatives. The temporary air quality impacts from construction are not expected to be substantial. During construction, all materials resulting from clearing and grubbing, demolition or other operations would be removed from the project, burned, or otherwise disposed of by the contractor. Any burning would be done in accordance with applicable local, state, and federal laws and ordinances and regulations of the SIP for air quality in compliance with 15 NCAQ 2D.0520. Care would be taken to insure burning would be done at the greatest distance practicable from dwellings and in such a manner as to prevent a hazard to the public. Burning would be performed under constant surveillance. Measures would also be taken in allaying the dust generated by construction when the control of dust would be necessary for the protection and comfort of motorists or area residents. This evaluation completes the requirements of the 1990 Clean Air Act Amendments, and no additional reports are required. Section IV, Subsection J.4, Page IV-51, first paragraph. 4. Noise Impact - The activity category most affected by noise in the design year was residences. Each receptor was identified by activity and was compared to the noise abatement criteria established for that activity category. By the design year, under a No- Build scenario, approximately 141 receptors would experience noise levels in excess of the noise abatement criteria. #}aXtriAltvttfuI!>h €tiatt<trital II-6 I'' n Section IV, Subsection J.S, Page IV-52, third paragraph. The reasonableness of barrier installation, as defined by the Department of Transportation, should show that common sense and good judgment were used in arriving at a decision. In determining the reasonableness of noise barrier installation, the following criteria are considered: • The cost effectiveness of the abatement measure. Cost effectiveness is defined as $25,000 per effectively protected (four dBA or more reduction) residence. ' The exposed height of the wall does not exceed a maximum of 25 feet. • Unless special conditions exist, it is not considered reasonable to provide ' noise abatement for impacted businesses or isolated receptors. • Based on NCDOT post project experience, it is considered unreasonable to ' provide abatement for isolated residences, due to the cost of abatement versus the benefits provided. Section IV, Subsection L.2.1, Page IV-80, fourth paragraph: The height of the terrain within the proposed area is 400 feet with the base line at 3,100 feet above mean sea level. No balds exist in the proposed project area, and corresponding "high" elevation steep rock faces or ledges are also nonexistent. Therefore, it is highly unlikely that the proposed action will result in any impacts to this species. 1 Section IV Subsection L.2.1 Page IV-81. Add the following: L L I I L II-7 1 Section IV, Subsection L.2.2, Page IV-82, second paragraph. Bog turtles have been reported in approximately 14 counties of the piedmont and mountain provinces of North Carolina. Although no specimens were sighted during , field investigations, four areas of potential habitat were located. Only cursory attempts were made to locate the bog turtle, such as quiet observation time (approximately two hours) of suitable habitat. Potential habitat areas identified , include the Pine Run Branch crossing of Alternatives A and C (Site 8) and the 3.3- acre mountain bog site at the tributary to Wildcat Branch where the BRP Crossing Alternatives cross (Site 10, Table III-8). There are also potential habitats at Sites 3A and 6C (Table III-B, Exhibit III-4). Section IV, Subsection M, Page IV-85, first paragraph. II-8 1 CJ Section IV, Subsection N, Page IV-86. >:,:.,um. .:::::.>::< t! Thi ' f;? tt tbe. ultd atlThis evaluation is based on the results of the 1988 Federal Emergency Management Agency (FEMA) detailed flood ' insurance study of the incorporated area of Boone and the FEMA Federal Insurance Rate mapping for the unincorporated portions of the study area. The mapping indicates the only major stream and corresponding flood plain involvement would be the South Fork New River, with a drainage area of approximately 34.8 square miles above the existing US 421 crossing, and Gap Creek with a drainage area of approximately three square miles. Section IV, Subsection N.2, Page IV-88, second paragraph. ' As indicated on Exhibits IV-3 and IV-4, all the build alternatives would cross the 'St<Q of the 100-year flood lain of Gap Creek and the South Fork New River. The f lo' od plain boundaries are classified as Zones for Gap Creek and the South Fork New River, respectively, in the Flood Insurance Rate maps. ? indicate the boundaries are where the 100-year base flood ' elevations have not been determined by FEMA. Under all the build alternatives, bridge crossing for the main channels of the South Fork New River and Gap Creek would require the placement of piers in the floodway. Reaches of the South Fork New River and Gap Creek will be crossed with culverts and pipes. All hydrologic structures will be designed so any increase in backwater elevation will not result in a significant increase in 100-year flood elevation. r Section IV Subsection S Page IV-95. Add the following to the end of the first paragraph. r? J II-9 1 1 Section IV, Subsection T, Page IV-96, first paragraph. Water quality impacts resulting from erosion and sedimentation would be controlled ' in accordance with the NCDOT Standard Specifications, Provisions for Highway Construction, and NCDOT Best Management Practices forProtection of Surface Waters. .......... .............. :.::... .....................:.:......... :. A Section IV, Subsection T, Page IV-96. Add the following paragraphs at end of section. II-10 J 11 f Section III I 7-7 I' L? r-J, Preferred Alternative FJ PREFERRED ALTERNATIVE Three build alternatives and the No-Build Alternative were evaluated in detail in the DEIS. ' The No-Build Alternative is described and discussed in Section II.B.1 of the DEIS. Based on the results of this evaluation, the No-Build Alternative was eliminated from consideration ' because it did not adequately meet the purpose of and need for the project. Of the three build alternatives evaluated in the DEIS, Build Alternative A was selected as the Preferred Alternative. Build Alternative A is shown in Exhibit II-2 of the DEIS and in Exhibit 2 on the following page. Of the seven Blue Ridge Parkway (BRP) Crossing alternatives evaluated, BRP Crossing Alternative 4 was selected as the Preferred Alternative. BRP Crossing Alternative 4 is shown in Exhibit V-5 of the DEIS and in Exhibit IV-5 of the FEIS. Consequently, the Preferred Alternative for this project includes Build Alternative A and ' BRP Crossing Alternative 4. ' The Preferred Alternative begins just west of the South Fork New River bridge as a five- lane curb and gutter section and proceeds easterly approximately 1,500 feet along existing US 421. The alternative then diverges from existing US 421 and transitions to a four-lane ' divided facility with a 46-foot grassed median. Turning south, the Preferred Alternative continues in an easterly direction for approximately three miles. The alternative then turns ' north, crosses existing US 421, and continues in an easterly direction, passing north of Rutherwood and Laxon and through the eastern portions of the community of Deep Gap. The alternative converges with the existing US 421 corridor approximately 0.5 miles west of the US 421/US 221 intersection in Deep Gap. The Preferred Alternative then continues along the existing US 421 corridor for approximately one mile, terminating just east of the Blue Ridge Parkway. The Preferred Alternative is approximately nine miles in length. The bridge over the South Fork New River will either be widened to five lanes, or another two-lane bridge will be constructed parallel to the existing bridge. At-grade intersections for the Preferred Alternative will be provided at SR 1514, existing US 421 (three locations), SR 1355, SR 1357, SR 1359, and US 221. A grade separated interchange providing access for all movements will be provided at the Blue Ridge Parkway crossing. III-1 Build Alternative A and BRP Crossing Alternative 4 were selected as the Preferred Alternative based on being the environmentally preferred alternative. Table S-1 in Appendix A of the FEIS summarizes the impacts of the Build and BRP Crossing Alternatives. The advantages of the Preferred Alternative are as follows: • fewer residential relocatees -- 38 (14 less than Build Alternative B and four less than Alternative C); • lower cost -- approximately $9.2 million less than Build Alternative B and $9.8 million less than Build Alternative C; • fewer noise impacts -- 14 (nine less sites than Build Alternative B and nine less than Build Alternative C); • fewer wetland impacts -- (0.65 acres less than Build Alternative B and 2.55 acres less than Build Alternative C; • lesser impacts to the W. S. Moretz property (eligible for inclusion on the National Register of Historic Places) than Build Alternative C; • no impact to a tributary to Gap Creek (tailwater of the mountain bog); • least impact to Blue Ridge Parkway; • provides safety and capacity to meet future traffic demand; • improves eastbound and westbound travel lanes of US 421 at Blue Ridge Parkway crossing; and • BRP Crossing Alternative 4 preferred by Department of the Interior - National Park Service. The estimated construction cost of the Preferred Alternative is $37.7 million. Estimated right-of-way cost is $8.9 million, for an estimated total project cost of $46.6 million. III-2 mm m m mm m m 0 m m mm r r r N N . -J ?m . mm Y: CC, r = 9p N ... a0 o ?• I w ? p CD m /. o ?. p i? m C .. U C;a / •• OD tl ,. U N ? v m -' N • / a. c a :, ii • sX yy • •• Q 9 : a • *-J" xo m? {± cm 9-6 m W ?. A j t r .ay a o co N TO m C, N i m m 0 A Z O = O m • N o ., a7 N ? I II ¦ I fD' X X O NI O r m m ? N a MM Z i - I X r- m zm D -A z 0 z 0 r CO ? D° "n < m c w o z m cn mM o o ., m C3 D m J7 o m ^r Ji z O r- ? L Section IV Final Section 4(f) Statement - Blue Ridge Parkway 1-1 11 0 FINAL SECTION 4(f) STATEMENT FOR BLUE RIDGE PARKWAY A. PROPOSED ACTION ' The North Carolina Department of Transportation (NCDOT) proposes to improve US 421, partially along new alignment, from just west of the South Fork New River to`iast east a£ exu Ridgy'rky'' T' :xa?et S?A33. The project extends in an west- ' east direction for approximately 0e miles. US 421 serves as the primary transportation route linking Watauga County to eastern North Carolina and is part of the proposed North Carolina Intrastate System. ' A portion of the proposed project lies within the property boundaries of the Blue Ridge Parkway, a national park currently the subject of a historic structures survey to determine ' its eligibility for inclusion in the National Register of Historic Places. For the purposes of this project, the Federal Highway Administration (FHWA) and the North Carolina Department of Transportation (NCDOT) will consider the Blue Ridge Parkway eligible for ' the National Register. Because the proposed improvements to US 421 will be constructed with Federal-Aid funds and because the construction will require the use of publicly owned ' lands from a park, a recreation area, and a historic site; this project will comply with the requirements of Section 4(f) of the United States Department of Transportation Act. B. SECTION 4(f) PROPERTY The Blue Ridge Parkway is a 469-mile elongated park within the southern Appalachian ' Mountains that connects the Shenandoah National Park in Virginia with the Great Smoky Mountains National Park in North Carolina (Exhibit IV-1). Owned and administered by the ' United States Department of the Interior, National Park Service, the primary purpose of the Blue Ridge Parkway is recreational driving and sightseeing. It also abounds with places to camp, fish, hike, and picnic. Visitor centers, naturalist talks and walks, self-guided nature trails, and numerous roadside exhibits provide the park visitor with information on the history, geography, and plant and animal life of the area. 1 IV-1 There are more than 300 scenic overlooks along the Parkway. Near the project area are Thompkins Knob, which includes a trail to historic buildings, Elk Mountain, Stoney Fork Valley, Osborne Mountain View, Carroll Gap, and Grandview. Further north on the Parkway, a short hike affords visitors an overlook of the Roanoke River Gorge. The route also crosses Daniel Boone's famous Wilderness Road less than 10 miles south of the project area. The Blue Ridge Parkway provides access to adjacent state parks along the way and to the Cherokee Indian Reservation at its southern extremity. It is the most visited unit of the national park system in the United States, with 25 million visitors per year in 1990 and over 600 points of access. Its breathtaking scenic beauty and unique historic sites make it the showpiece parkway of the National Park Service, but the Blue Ridge Parkway is also notable as a remarkable civil engineering achievement. The roadway winds between and across ridges and summits and through the gaps and hollows of the mountains. More than 50 years in the making, the Parkway was completed in 1987 with the construction of a 7.5-mile section that traverses the rugged and winding terrain of Grandfather Mountain, less than 25 miles south of the project area. Within this section is the Linn Cove Viaduct. An engineering and construction achievement costing almost $10 million, the viaduct is 1,243 feet long and contains 153 segments weighing 50 tons each. It was built from the top down using pre-cast sections to minimize the impact to one of the world's oldest mountains. The states of North Carolina and Virginia acquired the rights-of-way for construction of the Blue Ridge Parkway. Title for the portion of the parkway within the project area was conveyed to the United States on November 10, 1943, fee simple. "l"ie<x;` `>CI ...................... '. ':::: :". i:ii :.:: • •>::: .., •: • :; ' ; ..:. ... : .....:.::::a....>r...........:. n:..; r` s:>:.:'.;:::i:.:::::.,:.::..:: :::::.,,.: y:::: •:::: ?.;' :;:..;•::::::::: :::.; . ?..u± Fakra:>..rcv b...ascis mint. The easement provides for a 26-foot wide crossing of the Parkway and extends 1,100 feet to the northwest and 750 feet to the southeast. The provisions of the deed-reserved easement will be modified through a supplemental agreement between the Secretary of the Interior and the State Highway Administrator of the NCDOT to provide access for the improvement of US 421 through the Blue Ridge Parkway. US 421 intersects the Parkway property at Milepost 276.4 through a natural mountain pass known as Deep Gap. The Parkway at Deep Gap is located along the Eastern Continental IV-2 1 urnsville 22 4z 194 194 Z 0 Oaks Micaville Newland 1.11 141, MOAN p O one (wl^ ?.Galan inville ve' •RRIa 721 Sparta C? ?? • l9! MFM oSEPARK Glendale Laurel Springs ,? ? .? Clossllore Springs $Q Spruce 19! . 71 ? rl oNF M ? Rn Deep 770 750 jg 18 19E HlowinR Rock r n e. .ll ? 89 mows Little ?'t? Plneola 1f '` • c.,h,,? ? SwitZerlaf?l Mi- -j, . A. RlJ r' W 'I j!AHK oli Ul •11'n11+K I)e 71? ' ` v l . , IN VILLL K???,1? -1? .,,,. ?:?.dl< Kuti 8 ??? ? jb llp 16 ? ?N? UM II- NO ?` ) i 1` 171 I Lake 13 Tahom 71) 1Huanny Gap ??L 7,?I?ir It,,, 89 _. -_, ?? Lit' la•nl (M ?? 1 ?i (71 Bottom 0 204,00 bar a o a I e (feet) 11 // 1 I' /! s ''`? II _BLUE RIDGE II I, j PARKWAY 4100? LEGEND STONEMAN.S FORT BOG \ ? ? \ \ ?? \\ / - - EXISTING ROADWAY /)/` ?? \•___ BLUE RIDGE PARKWAY PROPERTY LINE J / \\ ARCHTBRIDGEONE RESIDENCE BLUE R I DGE / US HIGHWAY 421 PARKWAY BOUNDARY \ WATAUGA COUNTY, NC BLUE RIDGE PARKWAY STUDY AREA EXHIBIT IV-1 r t 1 1 1 1 t Divide and is one of the area's few east-west crossings. The gap is formed by an inclining escarpment to the north and a declining escarpment to the south. The Blue Ridge Parkway/US 421 interchange at Deep Gap is surrounded by a mature, mixed hardwood and hemlock forest. The forest has not been logged for many years and the only disturbances in the forested area are two dirt roads cut through the tract to provide access to private homes. As a consequence, the stand contains many large, mature hardwood trees; indeed, this forest is one of the best examples of mature forests in the study area. Although the Parkway provides no recreational or parking facilities within the project area, it does contain the following historically and biologically important features: • Stoneman's Fort. One of the major events of the Civil War in Watauga County was Stoneman's Raid, which took place near the end of the war. In 1865, Federal cavalry under Major General George H. Stoneman, based in Tennessee, moved eastward through western North Carolina and Virginia with the assignment to destroy Confederate rail traffic. The advance guard attacked the town of Boone on March 28, 1865. After General Stoneman and the First Brigade moved on to Wilkesboro through Deep Gap, General George Kirk and the Second and Third North Carolina Mounted Infantry replaced him in Boone. Kirk's task was to hold the county and fortify the roads and passes in the area against counterattacks by Confederate cavalry. Under Federal Brigadier General Tillson, the Second North Carolina Mounted Infantry built fortifications at Deep Gap. According to local tradition, the main fortification was a stockade, an encircling trench enclosing about one acre and breastworks to the east along the road through the gap. This entrenchment was largely destroyed by the construction of the Blue Ridge Parkway around 1959. (VanNoppen, Ina W., 1961, Stoneman's Last Raid. North Carolina College Print Shop, Raleigh, North Carolina.) As currently planned, little if any of the reported archaeological sites (Stoneman's Fort) will be impacted by the proposed project. The FHWA and NCDOT will coordinate with the SHPO and the Blue Ridge Parkway/National Park Service to continue assessment of the archaeological site. Should the site be impacted, additional archaeological work will be conducted which may include archival IV-3 research, mapping any existing earthworks, and site testing to determine the eligibility of remnants of Stoneman's Fort (31Wt301) to the National Register of Historic Places. Since the integrity of this resource has been compromised by construction of the Blue Ridge Parkway, preservation in place is not anticipated for this archaeological site. • Mountain bog. This uncommon topographic phenomenon is located in the southwest quadrant of the Blue Ridge Parkway/US 421 intersection. The word "bog" refers to the wet spongy ground that mainly consists of decayed mosses and other vegetation. In this water-logged and oxygen-deprived environment, decomposition slows down. Leaves, branches, and other partially decayed organic matter build up over time, resulting in accumulated layers of peat. Sphagnum moss, the glue which holds the bog together, provides a physical base on which other plants grow and maintains the wet environment by absorbing tremendous amounts of water. €xxierviceis idatet tieatthernppalachiait iii: ;ainr?untattg ?r pre ex,t aye; of the am. habitat types to artt? Cart3S?na wYtb state. Scientists are just beginning to study mountain bogs, which are as different from one another as they are from the surrounding terrain, and each is important to the understanding of the bog environment. Valued for the unique habitat they provide, mountain bogs are often home to numerous rare and endangered plant and animal species. Likely bog inhabitants include Gray's lily and the bog turtle. The bog turtle is North Carolina's smallest turtle. Many naturalists consider it to be the United States' rarest turtle species. The bog turtle prefers very muddy habitats where springheads send cool water trickling through the bog in slow moving rivulets. A biological survey conducted for this project did not detect the elusive bog turtle, but specimens of Gray's lily were found in the bog, and the habitat there was judged to be conducive to turtle population. • Parkway bridge. Built in 1963 of concrete with a native Grandfather Mountain granite veneer, the existing bridge was designed by Region 15 of the Bureau of Public Roads (now FHWA). The monolithic, rigid arch, frame bridge, whose construction is typical of Parkway bridges, spans approximately 65 feet with a minimum vertical clearance of 14 ft.- 6 in., and took nearly a year to complete. IV-4 1 1 1 1 1? Massive footings were necessary to support the structure under existing soil conditions. Including the footings, the bridge extends almost 200 feet along the Parkway. 1. BRP Crossing Alternative 1 (Exhibit IV-2) Existing US 421 will be widened symmetrically from two lanes to five lanes while maintaining its current design speed of 45 miles per hour (mph). The existing stone facade arch bridge will be replaced by a new structure with a span of approximately 110 feet xnd t izxtmum'vertzcal ciearanee l" 6` t 6 in. Temporary detour routes will be constructed for both Parkway and US 421 traffic during demolition and removal of the existing bridge and construction of the new bridge. The design speed for the detours will be 20 mph. It is estimated the temporary detours will be required for approximately six months. Approximately 9.1 acres of Parkway property will be cleared for construction, most above the Parkway elevation; thus, the visibility of US 421 from the Parkway will be substantially increased. However, the total visual intrusion of US 421 will remain less than one-quarter mile. The existing access between the Parkway and US 421 will be maintained. IV-5 BRP Crossing Alternative 1 will result in improved air quality due to a more efficient, less congested highway and will produce no increase in noise levels. Additional disturbance of the Stoneman's Fort archaeological site will be minimal and approximately 0.2 acre of the mountain bog will be negatively impacted. The estimated construction cost of BRP Crossing Alternative 1 is approximately $3.1 million. Because of the safety hazards which would be introduced by the detour period `(? ...:.,..,. use ? ..t ... .+ c to t? t t itx b BRP Crossing Alternative 1 is not 14 considered a reasonable and prudent alternative. 2. BRP Crossing Alternative 2 (Exhibit IV-3) Existing US 421 will be maintained for eastbound traffic and two additional lanes will be constructed to the north for westbound traffic. The 45-mph design speed of existing US 421 will remain unchanged, while the new lanes will have a design speed of 60 p The existing stone facade arch bridge car will remain above the eastbound lanes and an approximately 900-foot-long tunnel will be constructed to pass westbound US 421 traffic under the Blue Ridge Parkway. A temporary detour route will be required for Parkway traffic. The existing access between the Parkway and eastbound US 421 will not be maintained. Approximately 5.8 acres of Parkway property will be cleared for construction. This alternative will avoid disturbance of the mountain bog; however, the outer fringes of the Stoneman's Fort archaeological site could be impacted. The estimated construction cost of BRP Crossing Alternative 2 is approximately $31.6 million. I The geology of the site, which consists of rock extensively intruded upon by granite dikes and sills, renders construction of a 900-foot shallow tunnel impractical from an engineering standpoint. Due to area rock formation, the extensive use of retaining walls to fortify the slopes would be required, thereby increasing the cost of construction. For these reasons, BRP Crossing Alternative 2 is not considered a reasonable and prudent alternative. I IV-6 1 1 I 11 1 0 300 600 SCALE (FEET) i I l l i •l II ? ? II ,? FI l BLUE RIDGE ?\?? / I \\ LEGEND PARKWAY BOUNDARY / , I \ 11 f ?,j II 'I 11 A STONEMAN.S FORT j I II 11 4 ,•l•';•4 BOG i II I' _ = EXISTING ROADWAY BLUE RIDGE PARKWAY II -? PROPERTY SLINE II _ ARCHTBRIDGEONE II E=7 RESIDENCE / I) PROPOSED ROADWAY \ I _ PROPOSED SINGLE i ARCH BRIDGE III N US HIGHWAY 421 WATAUGA COUNTY, NC SECTION 4(f) BLUE RIDGE PARKWAY CROSSING ALTERNATIVE 1 EXHIBI 1 1 a M r 1 r 1 1 11 0 300 600 II / II ? SCALE (FEET) n cv QP? j 1i II j - IV -----PC 1??i? II? % ?I LEGEND BLUE RIDGE D / J \? 11 PARKWAY BOUNDARY / ,`co°?? I \ 11 A STONEMAN. S FORT -f / I I I I 11 Rts;:?. BOG EXISTING ROADWAY BLUE RIDGE PARKWAY II PROPERTY LINE II _ ARCHT GEONE RESIDENCE II PROPOSED ROADWAY ? I lz? PROPOSED TUNNEL N US HIGHWAY 421 WATAUGA COUNTY, NC SECTION 4(f) BLUE RIDGE PARKWAY CROSSING ALTERNATIVE 2 EXHIBIT IV-3 r t LJ t 1 e 1 A 1 0 300 600 SCALE (FEET) 400? BLUE RIDGE PARKWAY BOUNDAR' I , I I ? I I Py I11 ? QP?? I I J? -x II ?? II ,? A II LEGEND ?/ I 11 11 / A STONEMAN,S FORT ?? / II 11 BOG II I' _ = EXISTING ROADWAY I BLUE RIDGE PARKWAY II PROPERTY LINE II I = ARCHTBRIDGEONE II p--l RESIDENCE II PROPOSED ROADWAY \ I PROPOSED SINGLE ARCH BRIDGE I N `US HIGHWAY 421 I WATAUGA COUNTY, NC SECTION 4(f) 1 BLUE RIDGE PARKWAY CROSSING ALTERNATIVE 3 A 1 r e r [l 1 1e t 1 0 300 600 SCALE (FEET) Zooll" BLUE RIDGE PARKWAY BOUNDAR' i I Py Il 1 P QP?% I e? i I ?I? ? ? ?:.}?::}• `: iii J //' A I LEGEND 11 A STONEMAN.S FORT 11 II ;.•': f:;?. BOG I' _ = I EXISTING ROADWAY {- BLUE RIDGE PARKWAY OPE RT Y L INE P R _ I GG I I g TT XX ARCHTBRIDGEONE RESIDENCE PROPOSED ROADWAY _ PROPOSED DOUBLE ARCH BRIDGE US HIGHWAY 421 WATAUGA COUNTY, NC I I SECTION 4(f) 1 BLUE RlbGE PARKWAY CROSSING ALTERNATIVE 4 (PREFERRED) EXHIBITIV-5 N t w LI t 3. BRP Crossing Alternative 3 (Exhibit IV-4) Existing US 421 will be maintained for eastbound traffic and two additional lanes will be constructed to the north to pass westbound traffic under the Blue Ridge Parkway. East of the Blue Ridge Parkway, a center left turn lane will be added. The 45-mph design speed on existing US 421 will remain unchanged, while the new lanes will have a design speed of 50 mph. The existing stone facade arch bridge i : ::::;:;::::A ..........:.....:::::::. S''f will remain above the eastbound Ian es. A new stone facade arch bridge will be constructed to span the proposed westbound lanes. Approximately ten acres of parkway property will be cleared for construction. This alternative will avoid disturbance of the mountain bog but could impact Stoneman's Fort archaeological site. BRP Crossing Alternative 3 will result in improved air quality due to a more efficient, less congested highway and will produce no increase in noise levels. The estimated construction cost of BRP Crossing Alternative 3 is approximately $2.4 million. Because this alternative does not improve the deficient vertical clearance for the eastbound lanes of US 421, this alternative is not considered a reasonable and prudent alternative. 4. BRP Crossing Alternative 4 - Preferred Alternative (Exhibit IV-5) Existing US 421 through the Blue Ridge Parkway property will be removed. Four new travel lanes, with a design speed of 50 mph, will be constructed to pass US 421 under the Blue Ridge Parkway. East of the Parkway, a center left-turn lane will be added. The new lanes for eastbound traffic will be constructed along the alignment of existing US 421; the new westbound lanes will be located to the north. The existing stone facade arch bridge will be removed and replaced with dual stone facade arch bridges. > :: IV-7 5. BRP Crossing Alternative 5 (Exhibit IV-7) Existing US 421 will be maintained for westbound traffic and two additional lanes will be constructed to the south to pass eastbound traffic under the Blue Ridge Parkway. East of the Parkway, a center left-turn lane will be added. The 45-mph design speed of existing US 421 will remain unchanged, while the new lanes will have a design speed of 50 mph. The existing stone facade arch bridge ?W Z.ttk`t:15:;X will remain intact above the westbound lanes. A new stone facade arch bridge ?mxnzmuctt ?exYa?trace will be constructed to pass the proposed eastbound lanes under the Blue Ridge Parkway. Fj LI IV-8 t 1 t t a r e t f ?M I I 1 i rl+ ?r ter, . _ ^ t,'' U U 9 .rrttY ? it ? ? ? w v ,? bA U cn u 4 1 h s ,11', ? • r?'? MIpsyyLV US HIGHWAY 421 UT i WATAUGA COUNTY, NC ARTIST'S RENDERING OF BLUE RIDGE PARKWAY BRIDGE r ?EXHIBIT W-6 f 1 1 t 1 IF] ?J 1 0 300 600 SCALE (FEET) 400? BLUE RIDGE PARKWAY BOUNDAR' ni i FIB" :6 :6 :6 ;6 r A / IV II/ / ID2 LEGEND ? I ??i 11 II 11 11 / A STONEMAN.S FORT II 11 •:"s;:`i?:`' BOG II I' _ = EXISTING ROADWAY II '? I {___ BLUE RIDGE PARKWAY II PRIOPEIRTGGY LITINE II _ ARCHTBRIDGEONE II ?? RESIDENCE II PROPOSED ROADWAY PROPOSED SINGLE ARCH BRIDGE US HIGHWAY 421 I WATAUGA COUNTY, NC SECTION 4(f) BLUE RIDGE PARKWAY CROSSING ALTERNATIVE 5 EXHIBIT IV -7 ? Py Q Phi i III i ?J? ti II ?? Approximately six acres of Parkway property will be cleared for construction. This alternative will negatively impact approximately 0.3 acres of the mountain bog and could impact Stoneman's Fort archaeological site. BRP Crossing Alternative 5 will result in improved air quality due to a more efficient, less congested highway and will produce no increase in noise levels. The estimated construction cost of BRP Crossing Alternative 5 is approximately $4.0 million. B 8n '`t` <#?'' #c?#xrt#nbsternnv+s n? ?cox?5idr a ree5oxbSendixuideittt 6. BRP Crossing Alternative 6 (Exhibit IV-8) Existing US 421 will be maintained for westbound traffic and two additional lanes will be constructed to the south to pass eastbound traffic under the Parkway. East of the Parkway, a center left-turn lane will be added. The 45-mph design speed of existing US 421 will remain unchanged, while the new lanes will have a design speed of 60 mph. The existing stone arch bridge tyitf? x''14 f't; it#.?rtleal clran; will remain intact above the westbound lanes. Anew structure with atfu#?at t,#tun#satim exticax ate"rat#s ?f 6 i't - t*: will be built to pass eastbound US 421 traffic under the Blue Ridge Parkway. A temporary detour route will be required for Parkway traffic. The existing access between the Parkway and US 421 will be eliminated due to physical and geometric constraints. Approximately 6.7 acres of Parkway property will be cleared for construction, most below the Parkway elevation. BRP Crossing Alternative 6 will result in improved air quality and no increase in noise levels. This alternative could impact the Stoneman's Fort archaeological site; eastbound lanes will traverse the area where the original site of the fort is thought to have existed. Approximately 1.6 acres of the mountain bog will be negatively impacted. The estimated construction cost of BRP Crossing Alternative 6 is approximately $3.8 million. Because of the substantial impact to the mountain bo BRP Crossing Alternative 6 is not considered a reasonable and prudent alternative. 1 IV-9 11 7. BRP Crossing Alternative 6A (Exhibit IV-9) i, BRP Crossing Alternative 6A is identical to BRP Crossing Alternative 6 with the following exceptions: I • The two proposed eastbound lanes will have a design speed of 50 mph. • Approximately 5.2 acres of Parkway property will be cleared for construction. • Approximately 0.6 acres of the mountain bog will be negatively impacted. • The estimated construction cost of BRP Crossing Alternative 6A is approximately $3.4 million. Because of the impact to the mountain bog and Stoneman's Fort archaeological site, BRP Crossing Alternative 6A is not considered a reasonable and prudent alternative. D. AVOIDANCE ALTERNATIVES I The No-Build Alternative would not impact Parkway property, Stoneman's Fort or the mountain bog, nor would it require capital expenditure for new construction. However, as discussed in Section I of the Draft Environmental Impact Statement, 1988 traffic volumes on US 421, estimated at approximately 5,000 vehicles per day (vpd), exceed the acceptable capacity for this section of US 421. Between 1988 and Year 2015, traffic volumes are projected to grow approximately 3.5 percent annually. This annual growth translates into projected design year traffic volumes of approximately 9,100 vpd. The current accident rate, which is greater than the national average, is likely to increase as traffic volumes increase. In addition, tourism and economic development in the county would be discouraged because of inadequate transportation facilities. The Transportation Systems Management (TSM) Alternative consists of limited construction activities designed to maximize the use and energy efficiency of existing US 421. These activities include widening shoulders, providing additional warning signs and turning lanes, improving intersections, and reducing the speed limit. However, implementation of TSM measures will not adequately address the needs of the project; in particular, reducing congestion, lowering the accident rate, and improving the restrictive roadway geometrics of US 421. IV-10 I 11 11 1 r I 1 1 0 300 600 SCALE (FEET) Zooll" BLUE RIDGE PARKWAY BOUNDAR' i / i LEGEND X II 11 11 A STONEMAN.S FORT I I?s•..s; BOG EXISTING ROADWAY I BLUE RIDGE PARKWAY ?- PROPERTY LINE = ARCHTBRIDGEONE I II E? RESIDENCE II PROPOSED ROADWAY PROPOSED SINGLE ARCH BRIDGE N US HIGHWAY 421 WATAUGA COUNTY, NC II SECTION 4(f) BLUE RIDGE PARKWAY CROSSING ALTERNATIVE 6 EXHIBIT IV4 t J I t 11 1 0 300 600 SCALE (FEET) y? BLUE RIDGE PARKWAY BOUNDAR I / I ? Py 111 a QP?? I 0? i I ' ? I I III / LEGEND II 11 11 A STONEMAN,S FORT I Il I I •:?s;:` ?:" BOG II II = = EXISTING ROADWAY BLUE RIDGE PARKWAY PROPERTY LINE _ IHTBRIDGEONE I I ?-1 RESIDENCE PROPOSED ROADWAY PROPOSED 31NGU ARCH BRIDGE N US HIGHWAY 421 WATAUGA COUNTY, NC I I SECTION 4(f) BLUE RIDGE PARKWAY CROSSING ALTERNATIVE 6A EXHIBIT IV -9 There is no feasible alternative in cost or engineering practicality for a new alignment of US 421 that will not cross the Parkway. The Parkway crosses all east-west transportation facilities in western North Carolina. I E. MEASURES TO MINIMIZE HARM 1 `i••:<;?ii:L;i: ':i' 'iy: y :':y' +' :i' Sy:::::; ":+'( :::: :<j:: i': :i: •i;•i}:. Y li <vy .... . .. Y..:' i.: :.' ;::... iiii:'t4FS: L: "•Ilt.iii'•i::: .. .. ............................................................................. 1....' H:::' ':', 'i:i:i .'+'! '.. ' '•: at ry:'?.1 ;y'?Yp??v4p' t'Y li:i+i??' :,,..; ;:%:::: ;:::•::•:;;;;;;;;;;,;;;;,;;;;;•:: ':ay:.?:.;?•:+?:?:; ??,:y:::.:.y:.::::':.:f;{..;::':.+:::y;:{:,:>••.::,:f:;:':}::':y::::<.::::::y.:::.y:::;':::: ..;: ;::.....:;••:::.::::::;:;::::;..,:;fi:; ::::::::<::c:;•:;:::;<:?;;.:::::.:.:.?:;: ..:..:.....::.:•': .::: • '?:54,:??R??'...,??', 17 ::.. ;i: ? ?41:i??'Lk:iii?k?ki.?i? ?F.iY?i?:::?i?:`A'k??i::F'.4i4??''. '' :: :i:; . ' : : ' ?.: i : .'?yyi .::::. ' ; : . ' : ' ' :pi,,:,,??vv: r :??.++it?;. ?'•? :¢i ..:'. ?`. }:;:i,,:...::,Y:;:;:;:;:::2ti!fx:.:i:f4?iF.:i:i:i:i .qq• .....::i:i: , :????{{ . ::.;:11LI . ..: .??yy??:yy ; . '. ;:?'Q b `..??yy' ?ir4/M!??;:;: ? •.?V.i:;;?;:?:fi!.,V',..,??ff?R;lti; F. COORDINATION This project was coordinated with the Department of the Interior, National Park Service and the U.S. Army Corps of Engineers (COE), both of which are designated cooperating agencies for the US 421 Environmental Impact Statement. Meetings were held with representatives of these agencies throughout the study process. It was agreed by all parties that no avoidance alternatives were possible. Each alternative's impacts to Section 4(f) property were presented to the National Park Service and the Corps of Engineers, and their recommendations for measures to minimize harm were Vol <t r . IV-13 ?l H. PREFERRED ALTERNATIVE I The Preferred Alternative (Blue Ridge Parkway Crossing Alternative 4) is the feasible and prudent alternative with the least harm to the Blue Ridge Parkway. Of the seven Blue Ridge Parkway (BRP) Crossing Alternatives studied, BRP Crossing Alternatives 1, 5, 6, and 6A would impact the unique Southern Appalachian Mountain Bog located in the southwest quadrant of the interchange. According to the U.S. Fish and Wildlife Service, fewer than 500 acres of mountain bog habitat remain in North Carolina. BRP Crossing Alternative 2 involves construction of a 900-foot-long tunnel to pass westbound traffic under the Blue Ridge Parkway. Because the rock in this area is extensively intruded by granite dikes and sills, construction of a tunnel is considered impractical. I BRP Crossing Alternative 3 would retain the existing stone facade arch bridge to pass eastbound traffic under the Blue Ridge Parkway. A new stone facade arch bridge would be constructed to the north to pass westbound traffic under the Parkway. The 45 mph design speed for US 421 and the substandard vertical clearance at the bridge would remain r unchanged for the eastbound traffic. Although the new bridge would be similar in design to the existing bridge, the appearance of the bridges would be very different due to weathered condition of the stone facade. In addition, the difference in ages of the bridges would result in the bridges being replaced due to deterioration at different times. I IV-14 BRP Crossing Alternative 4 will not encroach upon the Southern Appalachian Mountain Bog. The existing stone arch facade bridge will be removed and four new travel lanes, with a design speed of 50 mph, will be constructed to pass US 421 under the Blue Ridge Parkway. The existing bridge will be replaced with dual stone arch facade bridges with a minimum 16 ft. - 6 in. vertical clearance. The stone facade of the existing bridge will be salvaged by the contractor and become the property of the National Park Service (NPS) for use at future construction sites. Retaining walls will be constructed along US 421 between the highway and Blue Ridge Parkway property to reduce the impacts of highway construction on the Section 4(f) property. For the reasons listed above, Blue Ridge Parkway Crossing Alternative 4 is the Preferred Alternative. The National Park Service, Blue Ridge Parkway and the State Historic Preservation Officer have concurred in this selection. I. DEPARTMENT OF THE INTERIOR COORDINATION Comments were solicited and received for the Draft Environmental Impact Statement and for the Draft Section 4(f) Evaluation from the Director of the Office of Environmental Affairs, U.S. DOI. J. COMMENTS RECEIVED ON THE SECTION 4(f) PROPERTY The following comments were received from the circulation of the Draft Section 4(f) Evaluation. United States Department of the Interior, Office of the Secretary ' Comment #1: We object to Alternative 4 because there is no need to connect the existing parkway ramp to U.S. 421 with a T-intersection. Since the ramp will only serve eastbound traffic, the existing Y-intersection with acceleration and deceleration lanes added would serve much better. Response: The Parkway ramp for eastbound US 421 is maintained as a "Y" intersection to minimize harm to the adjacent bog. Acceleration and deceleration lanes will not be constructed since it would require the I IV-15 construction limits to extend into the bog. The median will be I extended to prevent left turns. Comment #2: It should be noted that the artist's rendering depicting this alternative does t not show a design element offensive to the Parkway's aesthetic quality, that being, the construction of steel W-beam guardrail at not only the medium pier of this structure, but also at the abutment walls. Although the state is obligated by standards to construct guardrails when adequate clear zones do not exist, we recommend that liberal design criteria, such as a longer bridge, be used to create the necessary clear zones. The same problem exists for Alternative 3. R esponse: NCDOT has requested assistance from the Federal Highway Adminis- tration Eastern Federal Lands Highway Division (EFLHD) for designing and administering the construction contract for the US 421 improvements in the area of the interchange with the BRP. The Memorandum of Agreement between NCDOT, FHWA EFLHD, and NPS states, "The NPS shall be a cooperating agency in the project development, and shall (1) approve the final design standards for the Blue Ridge Parkway, ..." Comment #3: We note that the National Park Service (NPS) is a cooperating agency as it manages the Blue Ridge Parkway and has legal jurisdiction in the area where construction alternatives cross the Parkway. While there has been some coordination with NPS, we are concerned that the NPS preferred crossing, Alternative 3 (as stated in Superintendent Everhardt's letter dated May 31, 1990, page E-5.1) has not been adequately addressed. Alternative 4, preferred by the highway agencies, does not adequately mitigate adverse impacts to the Parkway, will use more parkway land, and will cost $1 2 million more . . Response: BRP Crossing Alternative 4 was developed in cooperation with the NPS. The NPS-BRP has concurred with the selection of BRP Crossing Alternative 4 as the Preferred Alternative. Comment #4: The NPS prefers the design and mitigation features of Alternative 3, except for the design feature calling for maintaining the existing two lane bridge structure. It appears infeasible from an engineering point of view to preserve this structure. We note that this bridge structure, which was built in 1960, would not appear to meet the criteria of eligibility to the National Register of Historic Places. Replacing this bridge with a double stone arch bridge would appear to be acceptable. Additional design of the bridge needs to be developed to assure consistency with the historic character of the Parkway. IV-16 r_1 L a FJ 1 1 Ll s 11 C 1 Response: The Preferred Alternative, BRP Crossing Alternative 4, does replace the existing single stone facade arch bridge with a double stone facade arch bridge. The design and construction of the bridge will be coordinated with NPS to insure its compatibility with the historic character of the BRP. United States Department of the Army, Corps of Engineers Comment: In the EIS, your agency states that a sheet pile wall may be installed between the new road and the bog in order to prevent siltation and other damaging runoff from reaching the bog. We commend your agency for this idea. We would like to see this decided upon and have detailed plans provided for the structure in the final EIS. Response: Detailed plans for a sheet pile wall, if implemented, will be developed during final design. The wall will be designed based on information obtained from the Bog Research project to be performed by the NPS and funded by NCDOT and FHWA. See Section IV, Subsection E, Page IV-11. K. CONCLUSION Based on the above considerations, there is no feasible and prudent alternative to the use of land from the Blue Ridge Parkway, and the proposed action includes all possible planning to minimize harm to the Blue Ridge Parkway resulting from such use. IV-17 1 a LI Section V 1 Final Section 4(t) Statement - W. S. Moretz House I t I] jl L1 1 s FINAL SECTION 4(f) STATEMENT FOR W. S. MORETZ HOUSE A. PROPOSED ACTION The North Carolina Department of Transportation (NCDOT) proposes to improve US 421, partially along new alignment, from just west of the South Fork New River to just fast o e Hued Paxkwa? ctZ The project runs in a west-east direction for approximately nine miles. US 421 serves as the primary transportation route linking Watauga County to eastern North Carolina and is part of the proposed North Carolina Intrastate System. A portion of Build Alterrattves ) and C fall within the property boundaries of the W. S. ...................... Moretz House located near the US 421/US 221 intersection. This property, shown on Exhibit V-1, is listed as Structure Identification No. 21 in the Historical Architectural Resources Survey Technical Memorandum available from the NCDOT, and is eligible for listing in the National Register of Historic Places. Since the proposed improvement will be constructed with Federal-Aid funds and will involve a taking of Historic Property lands for highway use, this project will comply with the requirements of Section 4(f) of the United States Department of Transportation Act. B. SECTION 4(f) PROPERTY 1 1. Name: L 2. Size: 3. Location: 4. Ownership: W. S. Moretz House The eligible property consists of a 19.3-acre tract. Located at the intersection of US 421 and US 221 in the town of Deep Gap, along the north side of US 421 and west side of US 221. The W. S. Moretz House and surrounding 19.3 acres is owned by Joyce Ann Bowman and Jimmy Dean Moretz. The property is V-1 designated as Watauga County parcel number 352 and is found on Watauga County Deed Book number 230. 5. Summary of Physical Description: This site is a farm complex located at the northwest corner of the US 421/US 221 intersection. The house is a one-and-a-half-story frame dwelling with steeply pitched hip roof with dormers on three sides. There is a small shed-roofed addition on the right toward the front, and a wing and additions on the rear. The porch retains its original chamfered porch posts and its original board ceiling. A large, frame bank barn with shallow-pitched gambrel roof is located on the property to the east of the house. It is built into a hillside that slopes downward from east to west. There are several other outbuildings of more recent construction. Date of Construction: Both the house and barn were constructed circa 1915. Style: World War I period cottage. Setting and Landscaping: Exhibit V-1 shows the physical plan view location of the W. S. Moretz house and property. The setting is rural. The house and barn are approximately 450 feet and 200 feet, respectively, from US 221 and both are approximately 600 feet from US 421. The house is sited at the end of a long path that leads northward into the site from US 421. A low hill rises behind the house. As the path passes the house it turns northeasterly, goes past an outbuilding, curves northward around the hill, and becomes the earth ramp into the barn located at the end of the path. A painted, horizontal-board fence separates the parking area in front of the house from the front yard. The rise from the fence to the house is terraced about halfway the distance from the fence to the house. Mature boxwoods are located around the front of the V-2 1 1 s fl 0 200 SCALE (FEET) US 221 GAP CREEK / 'HISTORIC STRUCTURE n\ \ // / NO. 212 4-1 // . 1 U. S. POST \ / OFF I CE HISTORIC AREA BOUNDARY LEGEND W -- EXISTING R/W cc •I EXISTING ROADWAY a C.D RESIDENCE III ' [ J,C 1 I 0 ° Z M US HIGHWAY 421 WATAUGA COUNTY, NC HISTORIC STRUCTURE NO. 21 EXHIBIT V-1 l7 porch. There is a high evergreen hedge row to the left (west) of the house separating the house from the pasture land, and there are mature shrubs to the right (east) of the house. The house and yard are shaded by mature trees. Gap Creek runs along the eastern end of the property. The entire property is used for cattle grazing and thus is mostly open field. Integrity: The site and the buildings retain their integrity. Historical Background: The house was built around World War I by Grover Cleveland Moretz. His brother, W. S. Moretz, went west but returned to Deep Gap. Then Grover Cleveland went to Dallas, Texas, and W. S. acquired the house. They were both sons of Alfred Jacob Moretz, who moved to Deep Gap in 1888 and built the oldest house still standing in the Deep Gap area. W. S. was the Deep Gap postmaster from the 1920's to the 1960's. Evaluation: The house and site are significant according to Criterion C as they embody the distinctive characteristics of a type or period of construction, and they represent a significant and distinguishable entity. The house is the only World War I period house of its style in the study area, and the large barn is the only large, frame bank barn of its period and style in the study area. The house and site possess integrity of location, design, setting, materials, workmanship, feeling, and association. v-3 C. IMPACTS ON THE SECTION 4(f) PROPERTY 1 1 V-4 I d L 0 200 SCALE (FEET) ' US 221 GAP CREEK .. H I STOR I C STRUCTURE NO. 212 % ? U. POST OFF I CE HISTORIC AREA BOUNDARY C I R1 pRop LEGEND "r F Fo ??/ / _PROPOSED R/W w EXISTING R/W ' - - EXISTING ROADWAY ?-1 RESIDENCE III [ j,C 1 o Z m US HIGHWAY 421 WATAUGA COUNTY, NC BUILD ALTERNATIVE A EXHIBIT 1 TABLE V-1 BUILD ALTERNATIVES SUMMARY OF POTENTIAL IMPACTS DEEP GAP AREA A B C Length (feet) 9,560 9,450 9,610 Total Cost $7,448,200 $7,617,000 $7,440,200 Construction Cost $3,920,000 $3,550,000 $3,950,000 Right-of-Way Cost $3,528,200 $4,067,000 $3,490,200 Relocatees Business (Minority) 15(0)1 6(0) 7(0) Residential (Minority) 9(0) 10(0) 9(0) Cemeteries (Estimated number of graves) 0 0 0 Underground Storage Tanks 1 1 1 Wetlands (Impacted Acres) 0.1 0.9 0.1 Historic Properties Impacted (acres) 1.8 0 5.7 Archaeological Sites 0 1 0 Channel Relocations (feet) 1,900 1,900 0 Original Channel Length (feet) 2,0502 2,000j31 0 11) Includes Deep Gap Post Office. (2) Original channel Is degraded perennial drainage ditch located in pasture. (3) Original channel is tailwater for bog and is classified as a trout stream by DEM. V-5 D. AVOIDANCE ALTERNATIVES I Three alternatives that avoided use of the Section 4(f) property were evaluated. These alternatives are discussed below: Build Alternative B i 0 2 0 0 SCALE (FEET) US 221 GAP CREEK / /. _ i 'HISTORIC STRUCTURE NO. 212 U. S. POST OFFICE :77?lJ ['J HISTORIC AREA Jy? // . BOUNDARY PR 1 LEGEND wqr -_ PROPOSED R/W Lu - -EXISTING R/W EXISTING ROADWAY E-7 RESIDENCE -ij ° I I[J Cl - ? o / Z / m US HIGHWAY 421 WATAUGA COUNTY, NC BUILD ALTERNATIVE C EXHIBIT V-3. f' 'J J C 0 200 SCALE (FEET) US 221 GAP CREEK /. 'HISTORIC STRUCTURE ` NO. 212 n U. S. POST OFF I CE H I AREA BOUNDARY L l LEGEND C/ _PROPOSED R/W / T w -EXISTING R/W EXISTING ROADWAY IR??yRopo Q E:?l RESIDENCE 0) k?q i i I? CI S HIGHWAY 421 \ WATAUGA COUNTY, NC BUILD ALTERNATIVE B EXHIBIT V-4 i Z xs the. o xzuans of the [7nited States Depar#merxt of the Inferior (DOI), F'ash' az aexv c f SFWS); the North;Carolin. Department a£??nvix. C0. , lea tks d Natural Res umes, 17xvisicrn of Et?virdnr>?cental Maria exuen# la'F the tpx't arx%?a Wdli(etesurcQtnlsigWR! ar?d th'e Sops of ' n sneers X that :ii the xelt?catiori ?f dap Creek dawt tream ?f the bad av X.: cs > j resu givers hydrological ehate to this rare, unique artd "£rt4rly understcd" ecosystem. l~urthexmore? the Dlltrf has stand (see. Appendix xhibtti) that:a recornrxtendatlon a£ denial for the .'pVa'tertiatity Certificariori for dap reef would be zad0.:1 £ 13 iid Alternative B U chosen. For these reasons, Build Alternative 1 w. h d i S 4 " ' ect avar att s lit ...O X ?f pro ert , got Ganstd ered px<adext sand feasible artern$zve Five-Lane Shoulder Section Alternative ' .................................. :;.*r"`::.::, .:..:.:.::: is alternative involves wid?ri?rs the ex#sting two lane roadway to a five bane roadway, fa it travel, Zanes'with center ttirri lane '!with stan acrd sh0Wd?rs With nc rnediari tct sepaxt tkae opposz Imes af.<trayel, vesicle safety; i$ drarnt£eaiiy d e d t ` n " r r ued `a ie no xe w clea c? axr?r grant otcorrung vhz?s tocavx, uvl?ich caulk resultn a greater fxegtxency cif head antallisions in 'YearIl 1.i ..pxaj ctcd t carry an average dally traffic YQ MM pf 1 ,30Q e cl s per dad _.: . at speedy ctf m?Ies per 'hoUr, .. 77 °fiveilane shottlder;sect??ort would not e consistent with°the tie of,roadwsy desired £o ill 42 corridor...,15,1...in Watauga County is principal ruxal arterialn the Nati'oal <ihway System and the North Carolina Intrastate Systerxt.vr these xeasons tkxs aXtexnatxve i5 not cans dered a prtxet and feaxble altxnazve. North Alternative i is altrx€afiiv involves ;the cons rutian ca£ a fqur an divdedrecvay,.. ex±ssln X X. 115::rtorth tsf the Stititi ?#(rQperfy: s alternative vtrulC rttri altar?g the ' irthern roc boiznda of the Section property; f ropertJ`' , hovirevr,o takes ih t eGttori property would be required geometric cons trixtts axtd cuts for lh R: A ' roadwa in excess f 150 feet require this alternative to un#dereut the :Zue.l dge 'arlrvvay, est Deep Gap, for a ppz?ztiatelyp feet W_ ' l ci addtttax a * ........pprQxxxate are cf... 'ax!y pxQperty" ?wauid tie 'w<txi tl?e''` costrtttia s........ T- ft x X: l t h l f l a terna ive wau re±Iutre t e use Q c an undesirable honzontal ,reverse curve and the V-7 i iaatxa of access t t e ue icge .,,arl?vvay, 'ar these reasons,, aXterna ive s nint a?rasxdered a `pxuden nc feas.1 alteraat v E. MEASURES TO MINIMIZE HARM •shall;docurner,r't. S Moretx;'arnaprztaro cc?strurrn accarciance+vrt pr?da Ais4zactruture ac..asapctecarcation Phan; • LltiriQT?IruCtin fl?v?ring Gmpetion t p?jecCss t M z .a m rQm,tT 4 1 w iY be marnta ned alpn 'thy ex stln c riverv ' ........ ..... ...... Y: 1v#rnprr?durif Arrant} fir?gtrtgn adverse imparts of the pjr, s pxeaxe buveen the Mate istric'reservat an ?i'cerd tie Pderal:: thwy : < ............::...... ctrnunstrtn, ands iz?cXuced theT, Ap?edi F. COORDINATION V-8 1 1 I? u ?j A, ' OR CONCI °C.l'SION Or N?'W' IBLE ANII)TR'C RN'' L.T. , ' 0"T HE USE Ol''SEG SECTION $? LAN H. PREFERRED ALTERNATIVE The Preferred Alternative (Build Alternative A) is the feasible and prudent alternative with the least harm to the W. S. Moretz property while not impacting the tailwater of the mountain bog. Build Alternative B would avoid the W. S. Moretz property; however, approximately 1,900 feet of the tailwater to the mountain bog would require rechannelization. The Department of the Interior, U.S. Fish and Wildlife Service, DEM, North Carolina Wildlife Resources, and COE have stated their opposition to this alternative due to this rechannelization of the stream and its possible impacts on the mountain bog. ' Build Alternative C would require an additional 3.9 acres of the W. S. Moretz property to be converted to highway use as compared to the Preferred Alternative. Because of the close proximity of the proposed roadway under Build Alternative C and the amount of required conversion of Section 4(f) property to highway use, this alternative is considered imprudent. The Five-Lane Shoulder Section Alternative would involve the construction of a five-lane , shoulder section along the W. S. Moretz property. This alternative will not adequately provide the proposed safety and increased capacity objectives for an improved US 421. ' The North Alternative would run along the northern property boundary of the W. S. Moretz property; however, no takes of the property would be required. This alternative would result in impacts to approximately 600 feet of the Blue Ridge Parkway and extensive clearing of Parkway property (11 acres). This alternative would require the use of an undesirable horizontal reverse curve and the elimination of access of US 421 to the Blue Ridge Parkway. For the reasons listed above, Build Alternative A is the Preferred Alternative. I 1. DEPARTMENT OF THE INTERIOR COORDINATION I Comments were solicited and received for the Draft Environmental Impact Statement and , for the Draft Section 4(f) Evaluation from the Director of the Office of Environmental Affairs, US DOI. ' J. COMMENTS RECEIVED ON THE SECTION 4(f) PROPERTY The following comments were received on the Section 4(f) property. ' United States Department of the Interior, Office of the Secretary ' Comment: We concur that there are no feasible and prudent alternatives to avoid the Moretz House, which is eligible for the National Register of Historic Places. We concur that all means to minimize harm have been considered contingent upon approval ' of the mitigation plan by the North Carolina Historic Preservation Officer. This plan and its approval should be included in the final Section 4(f) statement. , Response: A copy of the MOA between the State Historic Preservation Officer and the Federal Highway Administration is presented in Appendix F. "-10 21MOWWW'. 1 '7 State of North Carolina Department of Environment, Health, and Natural Resources, Division of Environmental Management Comment: DEM still believes that DOT should avoid the section of Gap Creek and an unnamed tributary on the west side of US 421 in Deep Gap. Both streams are classified as C-Trout and are high quality resources except for the degraded section on the Moretz property. Gap Creek on the Moretz property has been channelized and impacted by grazing. DEM believes that the alternative through the Moretz property is a practicable alternative which would not require relocation of 1,900 feet of Gap Creek and the unnamed tributary. Therefore, a recommendation to the Director of DEM for 401 Water Quality Certification denial would be likely made if an alternative is chosen which does not minimize stream and wetland impacts. Response n Build Alternative A, the Preferred Alternative, avoids the section of Gap Creek and an unnamed tributary on the west side of US 421 in Deep Gap. North Carolina Wildlife Resources Commission Comment: Construction Alternatives 1. Mitigation - Highway construction on the south side of US 421 (under the "avoidance" alternative), Build Alternative B, would require restoration of the stream channels to natural gradient, width, depth, sinuosity, and habitat structure. While the segment of Gap Creek involved could conceivably be restored to its original function, it is likely that this area will be permanently culverted. Restoration of the present value of fishery habitat would then be impossible. Relocation of the unnamed tributary would require extensive monitoring to ensure that the mountain bog wetland would not be affected. This monitoring would include long-term measurement and modeling, before and after construction impact, of surface, sub-surface, and groundwater dynamics within the bog watershed. Such monitoring, while possible, would likely be prohibitive in terms of time and monetary expenditure required for the NCDOT to provide sufficient information to resource agencies. If hydrologic impacts on the bog were detected, remediation of these impacts would be problematic due to the limited V-11 understanding of bog ecosystems. Successful mitigation could not be assured, and it is the opinion of the NCWRC that mitigation is not a prudent and feasible alternative to construction on Build Alternative B. 2 Minimization - Impacts on stream and bog habitat could conceivably be minimized by complete bridging of the area containing both stream channels. Length of such a structure would likely exceed 2, 000 feet, and the NCWRC anticipates that such expense would be considered prohibitive by the NCDOT. Minimization of impact by bridging is therefore not considered a prudent and feasible alternative to the 'preferred" (Build Alternative B) alignment by the NCWRC. 3. Avoidance - The original 'preferred" corridor (Build Alternative A), developed in the environmental document, would avoid channel alteration of Gap Creek and the unnamed tributary, virtually eliminating the likelihood of hydrologic alteration of the mountain bog wetlands. Crossing of Gap Creek would still be necessary, but the angle of this crossing would be nearly perpendicular, the optimal condition in such situations. Attending natural resource impacts, including loss of riparian wildlife habitat, would also be minimized under this alternative. The NCWRC considers the original 'preferred" corridor (Build Alternative A), which involves marginal taking of the Moretz property, to be the only prudent and feasible construction alternative. Response: None required. K. CONCLUSION Based on the above considerations, there is no feasible and prudent alternative to the use of land for the W. S. Moretz House and the proposed action includes all possible planning to minimize harm to the W. S. Moretz House resulting from such use. V-12 Ij t i u Section VI Wetlands Findings u I I FJ WETLAND FINDINGS The proposed build alternatives were evaluated for impacts to wetlands using the 1987 Corps of Engineers (COE) Wetland Evaluation Manual, Technical Report Y-87-1. The manual was designed to assist in making jurisdictional determinations using a multi- parameter approach. This approach requires the positive evidence of hydrophytic vegetation, hydric soils, and wetland hydrology to determine that an area is a wetland. Soils information was obtained through the use of U.S. Department of Agriculture Soil Conservation Service (SCS) soils maps for Watauga County, North Carolina, and field investigation. The soils hydric status was determined through both the SCS list of hydric soils for Watauga County, North Carolina, and the Munsel Color Chart. The hydrophytic vegetation status was determined using the National List of Plant Species That Occur in Wetlands, Southeast Region (2), (Reed 1988). Hydrology was determined through field investigation and observations. During the field investigation, the wetlands areas were visually assessed to determine value and function. The wetland function refers to the biological, chemical, and physical characteristics of a wetland, while the value refers to those characteristics which are beneficial to society. The functional value of a wetland lies in its ability to perform the various functions. Based on the field investigation and the visual analysis of the functions and values, the wetlands were divided into two categories: Riverine and Palustrian. The categories Riverine and Palustrian are derived by the U.S. Fish and Wildlife Service's Classification of Wetland and Deep Water Habitat of the United States (Cowardin). Cowardin describes the Riverine system as "all wetlands and deep water habitats contained within a channel..." These Riverine systems are "bounded on the landward side by upland, by the channel bank (including natural and man-made levees), or by wetlands." The Palustrian system "includes all non-tidal wetlands dominated by trees, shrubs, persistent emergents...". Table IV-15 of the DEIS lists the eighteen wetland sites identified in the study area and describes the function of each site. Table IV-16 of the DEIS lists the approximate acreage of wetland impacts at each site. Both tables were updated and are included in Appendix A of the FEIS. VI-1 Among the build alternatives, Alternative A, the Preferred Alternative, impacts 2.4 acres of wetlands; Alternative B impacts 3.05 acres; and Alternative C impacts 4.95 acres. Among the BRP Crossing Alternatives, only BRP Crossing Alternatives 1, 5, 6, and 6A impact wetland acreages. The wetland impacted by each of these alternatives is at Site No. 10, the Southern Appalachian Mountain Bog. Along the Preferred Alternative, 11 wetland sites were identified. The Riverine sites are 1, 2B, 3C, 5B, 61), and 9B. These Riverine systems are located on the South Fork New River, Rocky Branch, Brown Branch, an unnamed tributary to Pine Run, an unnamed tributary to Laxon Creek, and Gap Creek. All are generally characterized by wide stream channels -- between 16 and 25 feet -- and have an unconsolidated bottom of rock, cobble, and sand. The streambeds are incised deeply with the water surface four to eight feet below the bank. These Riparian wetlands have been impacted by urbanization and farming, particularly the area around Gap Creek. The Palustrian sites occur at 313, 6A, 7, 8, and 10. These Palustrian systems are associated with Brown Branch, Laxon Creek, Gap Creek, Pine Run, and the mountain bog. All occur in riparian banks of varying width adjacent to the respective streams. While little mature vegetation exists at the various sites, wetland hydrology, hydric soils, and hydrophytic vegetation on the heilaceous layer are present. The mountain bog is also classified as a Palustrian system. The word bog refers to the wet spongy ground that mainly consists of decayed mosses and other vegetation. In this water- logged and oxygen-deprived environment, decomposition slows down. Leaves, branches, and other partially decayed organic matter build up over time, resulting in accumulated layers of peat. Sphagnum moss, the glue which holds the bog together, provides a physical base on which other plants grow and maintain the wet environment by absorbing tremendous amounts of water. No impact to the bog is anticipated by the Preferred Alternative. In accordance with Executive Order 11990, "Protection of Wetlands", impacts to wetlands are to be avoided where practicable. If avoidance is not possible, then impacts should be minimized and, finally, mitigated. For the build alternatives, the wetland areas were avoided whenever possible; and impacts were minimized to the fullest extent practicable when avoidance was not possible. Based on the above considerations, it is determined that there are no practicable alternatives to the proposed construction in wetlands and that the I 77 L 1 VI-2 I Preferred Alternative includes all practical measures to minimize harm which may result from such use. In accordance with the February 6, 1990, Memorandum of Agreement between the Corps of Engineers and the Environmental Protection Agency, unavoidable wetland losses will be mitigated. Mitigation may include: maintenance of historic hydrologic flows, wetland replacement, and enhancement of degraded wetlands. Compensation by creation or restoration of in-kind wetlands or out-of-kind wetland of equal or better value in accordance with the U.S. Fish and Wildlife Service Mitigation Policy is also an option. A preliminary review of possible mitigation sites was conducted. The criteria used to select candidate sites are as follows: ' • Characteristic wetland topography • Proximity to impacted wetlands • Suitable for enhancement, restoration, or natural creation efforts 0 Undeveloped in nature The results of the preliminary search for mitigation sites is shown in Table VI-1. ' The final wetland mitigation plan will be developed in coordination with the appropriate regulatory and resource agencies during permit application. IJ I1 r VI-3 TABLE VI-1 SUMMARY OF WETLAND CREATION/ENHANCEMENT POTENTIAL (Sheet 1 of 2) Alternative Site No.' River/Branch Name Traversed Creation of Wetlands 1 South Fork New River A, B, and C Little opportunity exists to create wetlands in this area. 2A Rocky Branch C Some opportunity exists to lower elevation uphill of stream to allow hydrology to reach these areas. Areas in pasture should be allowed to return to undisturbed status. 2B Rocky Branch A and B Minimal due to soil make- up. 3A Brown Branch C Areas of pasture could be allowed to revert to wetlands. Some plantings will facilitate the creation. 3B Brown Branch A and C None 4 Pine Run B None 5A Pine Run B Little opportunity exists. 5B Tributary to A and C Little opportunity exists. Pine Run 6A Laxon Creek A, B, and C Opportunity exists to re- vegetate the wetlands. 6B Laxon Creek B Areas adjacent to creek could be lowered to allow greater and longer period of flooding. Revegetation could also be done. (1) Refer to Exhibit III-3 in DEIS for site location. VI-4 1 1 TABLE VI-1 SUMMARY Or WETLAND CREATION/ENIIANCEMENT POTENTIAL (Sheet 2 of 2) Alternative Site No. River/Branch Name Traversed Creation of Wetlands 6C Laxon Creek B Areas that are disturbed could be allowed to revert to natural conditions. 6D Tributary to A and C Area could be allowed to Laxon Creek revert to natural con- ditions. 7 Gap Creek A and C Wetlands vegetation could be reverted and enhanced. 8 Pine Run A and C Wetlands area could be enhanced and expanded through creating larger flat areas. 9A Gap Creek C Little opportunity exists. 9B Gap Creek A Minimal opportunity exists. 9B Gap Creek B Minimal opportunity exists. 10 Tributary to BRP 1, 5, 6, Due to the unique nature of Wildcat Branch and 6A this wetland, little opportunity exists to create a bog-type wetland. However, the area down- stream (a riparian wetland) may be enhanced and expanded. (1) Refer to Exhibit III-3 in DEIS for site location. VI-5 Section VII E Floodplain Findings t FLOODPLAIN FINDING A floodplain evaluation was conducted in accordance with Executive Order 11988 "Floodplain Management," to determine if encroachment would occur with implementation of any of the build alternatives. This evaluation is based on the results of the Federal Emergency Management Agency's (FEMA) 1988 detailed flood insurance study of the incorporated area of the Town of Boone, North Carolina, as well as FEMA's Federal Insurance Rate Mapping for the unincorporated portions of the study area. The mapping indicates that the study area's only major streams and corresponding floodplain involvement ' would be the South Fork New River, with a drainage area of approximately 34.8 square miles above the existing US 421 crossing, and Gap Creek with a drainage area of approximately three square miles. Floodplain Encroachments and Risk As noted in FEMA's detailed flood study, encroachment on floodplains by structures and fill can reduce flood-carrying capacity, increase flood height and velocities, and increase flood hazards beyond the encroachment itself. As part of the National Flood Insurance Program, FEMA has determined floodway boundaries as a tool for floodplain management. Based on the FEMA definition, the 100-year floodplain is divided into a floodway and a floodway fringe. The floodway is the channel of a stream plus any adjacent floodplain areas that need to be kept free of encroachment so the 100-year flood can be carried without substantial increases in flood heights. Minimum standards limit such increases to one foot, provided that hazardous velocities are not produced. The area between the floodway and the 100-year floodplain boundaries is termed the floodway fringe. The floodway fringe encompasses the portion of the floodplain that could be completely obstructed without ' increasing the water surface elevation above FEMA's published floodway elevation. As indicated on Exhibits IV-3 and IV-4 of the DEIS, the Preferred Alternative would cross the 100-year floodplains of Gap Creek and the South Fork New River. The floodplain boundaries are classified as Zones A6 and A4 for the South Fork New River and Gap Creek, respectively, in the Flood Insurance Rate Maps (FIRM). Zones A4 and A6 indicate the boundaries shown are where the 100-year base flood elevations have not been determined by FEMA. The Preferred Alternative also has planned crossings of reaches of the South Fork New River and Gap Creek which were mapped by approximate methods and VII-1 are all classified Zone A. Zone A designates areas of 100-year flood of which base flood elevations and flood hazard factors have not been determined. For the Preferred Alternative, bridges crossing the South Fork New River and Gap Creek would require the placement of piers in the floodway. All stream crossing structures would be designed to assure that there would be a minimal increase in the water surface elevation during the base flood. These structures of the Preferred Alternative would be designed such that any increase in the backwater elevation would not exceed the allowable increase as published in the FEMA detailed flood study for the area. The Preferred Alternative provides a horizontal roadway alignment which is nearly normal (90 degree skew) to the South Fork New River and Gap Creek. The bridge length required for the crossing of the South Fork New River would be approximately the same as the existing bridge crossing, 52 feet. To span the floodway of Gap Creek, the Preferred Alternative would require a bridge length of approximately 60 feet. Exact bridge lengths will be determined during the design phase of the project. Additional hydraulic analyses would be performed during the design phase to accurately locate the river channel, top of bank, and other topographic features. Little or no increased flood risk would be associated with the proposed project due to the bridge pier encroachment in the floodway and the potential for loss of property or human life would remain unchanged. Floodplain Values I Construction of the Preferred Alternative will increase the amount of impervious surface areas within the study area, thereby increasing storm water runoff. The area impacted by this increased runoff would be minor in comparison to the remaining pervious surface areas. The increased amount of road surface draining into the area would be very small in relation to overall drainage areas. t No increases in backwater elevations or velocities at floodplain encroachments are anticipated. Limits within which construction activity could take place would be restricted to those necessary for the conduct of work and would be defined during the design. Under the conditions described herein, any impacts to natural and beneficial floodplain values associated with the project would be negligible. VII-2 I Floodplain Development Due to the surrounding terrain, existing land use patterns, and the partial control of access for this project no additional pressures for incompatible floodplain development would be anticipated in conjunction with the project. Mitigation The location and preliminary design of alternatives at floodplain involvements were carefully addressed to successfully negate increases in flooding risk and mitigate environmental impacts. Potential impacts to the floodplain as a result of erosion will be mitigated by strict adherence to NCDOT Best Management Practices for Protection of Surface Waters. 1 1 1 LI 1 1 1 VII-3 I 1 1 1 Section VIII t F1 1 1 Public and Agency Comments PUBLIC AND AGENCY COMMENTS A Corridor Public Hearing for the project was held July 30, 1992, at the Parkway Elementary School located between Rutherwood and Laxon. Approximately 88 people attended. Comments were received from the Watauga County Board of Commissioners, the Town of Boone, the Boone Area Chamber of Commerce, Appalachian State University, and the Northwest North Carolina Forum supporting the widening of existing US 421 to four lanes. Other comments addressed project impact on property values within the area. A number of homeowners from the Birdseye View Subdivision near Deep Gap submitted a signed statement expressing the concern they be allowed to directly enter and exit US 421 in both directions from SR 1612 during construction. Following the Public Hearing, 22 written comments were received. The majority of comments came from individuals in the Boone area. Most expressed a preference for either Alternative A or a combination of Alternatives A and C. Two suggested extending Alternatives A and C further north to make use of an existing portion of Old NC 60. Comments received from the individuals in Deep Gap expressed concern about the disruptive effect the project will have on the lives of the local residents. Another concern expressed by several citizens was the dangerous driving conditions resulting from the fog that develops along US 421 where Alternate B follows the Blue Ridge Parkway. Written review comments concerning the Draft Environmental Impact Statement for this project were received from the following federal and state agencies and officials: United States Department of the Interior, Office of the Secretary, Office of Environmental Affairs U.S. Department of the Interior, National Park Service United States Environmental Protection Agency Department of the Army, Wilmington District, Corps of Engineers VIII-1 r North Carolina Department of Cultural Resources I State of North Carolina, Department of Environment, Health, and Natural Resources Division of Environmental Management Division of Parks and Recreation Division of Land Resources Division of Forest Resources North Carolina Wildlife Resources Commission I Specific comments received from the reviewing agencies concerning the Draft Environmental Impact Statement and responses are presented below. Correspondence from the agencies is included in Appendix D of this report. Department of the Army Wilmington District Corps of Engineers Comment #1: Line 3, paragraph 1, page IV-88, should be corrected to read "Zones A4 and A6 for Gap Creek and South Fork New River, respectively. " "Zone A4 indicates... " should be changed to read "Zones A4 and A6 indicate... " on Line 4, same paragraph and page. Response: Paragraph revised. See Section II, page II-9, paragraph 4, of the FEIS. Comment #2: The Draft EIS indicates that several segments of the project qualify for nationwide permit authorization. Nationwide permits are not applicable for those normally qualified segments since their function or usefulness is dependent upon the remainder of the project which requires individual permit authorization. All portions of the proposed project must be evaluated as part of the individual permit. Response: See Section II, page II-8, paragraphs 4, 5, and 6 and page II-9, paragraphs 1 and 2 of the FEIS. Comment #3: The Final EIS should indicate a conceptual mitigation plan to offset the impacts for the Preferred Alternative, the proposed ratios of compensatory mitigation, and the acreage of mitigation proposed according to wetland types. Response: The final mitigation plan will be developed during the permit process. The plan will be based on actual construction limits and filling acreage required by the project. The conceptual mitigation plan is included in Wetlands Finding, Section VI of this document. VIII-2 t United States Environmental Protection Agency general guidelines for mitigation ratios are: a. Restoration of degraded wetland - 2:1 b. Enhancement - 4:1 c. Creation - 3:1 d. Preservation of existing wetlands - 10:1 These are guidelines and are evaluated on a project by project basis. Final ratios will be determined during development of the mitigation plan. Plan development will be coordinated with the Corps of Engineers, U.S. Fish and Wildlife, and the Wildlife Resource Commission. United States Environmental Protection Agency Comment #1: The discussion of potential impacts related to construction activities should be improved to provide more detail regarding the length of streams potentially exposed to runoff from the construction zones for each alternative, as well as relative amounts of cutting and filling activity associated with the various alternatives. Response: Best Management Practices for Protection of Surface Waters and NCDOT Sediment and Erosion Control Program will be implemented to protect surface waters from runoff during construction. The amounts of cutting and filling will be determined during final design. Comment #2: The use of an independent erosion control contractor should be considered to review proposed erosion control plans as well as to constantly monitor the effectiveness of erosion control measures during construction. Response: NCDOT will develop, implement, and administer a sediment and erosion control program as stipulated in the NCDOT Sediment and Erosion Control Program document approved by the Sedimentation Control Commission in March 1991. Comment #3: The discussion should be expanded so that the overall impacts from spoil disposal associated with the various alternatives can be compared. The discussion should also include impacts from temporary haul roads that would have to be constructed to potential disposal areas. Response: Earthwork will be balanced during final design to minimize waste or borrow. Disposal of waste and debris will be done in accordance with Section 802 of the NCDOT Standard Specifications for Roads and Structures. VIII-3 r As outlined in Section 802, all waste and debris will be disposed of in r areas outside the right-of-way unless otherwise permitted by NCDOT. Disposal sites are provided by the Contractor. Rock waste, earth waste, and construction debris will be disposed of according to the detailed requirements of the Section, and seeding and mulching will take place over all waste areas. Disposal of waste and debris will not be allowed in any area under the COE's regulatory jurisdiction until the contractor has obtained a permit for such disposal from the COE District Engineer and has furnished a copy of the permit to the NCDOT Resident Engineer. Comment #4: The DEIS should have discussed the possibility of the presence of acid- bearing shales and potential impacts associated with them. Methods that will be used to search for the shales and potential mitigation techniques, if the shales are discovered in the various corridors, should be discussed. Response: The NCDOT Geotechnical Unit will conduct subsurface investigations prior to right-of-way acquisition to determine the location and type of rock to be removed prior to construction. Should acid-bearing shale be encountered, a plan to minimize acid runoff from uncovered shale would be developed and implemented. However, it is not anticipated shales will be encountered at this location. Comment #5: A discussion of the number of spring seep areas potentially impacted by each alternative would also be helpful in comparing the alternatives. Discussion of methods to be used to protect these areas is also needed. Response: See Section II, page II-10, paragraph 2 of the FEIS for discussion of Preferred Alternative. Comment #6: Stream water quality should be monitored by NCDOT or the Federal Highway Administration. Response: NCDOT Best Management Practices for Protection of Surface Waters will be implemented, as applicable, during construction to ensure water quality. Chapter IV, Section 1.2, Part 2.2 of the DEIS (page IV-63) addresses the water quality measures included in the BMPs. Comment #7: Every effort should be made to minimize the loss of forested areas by reducing the footprint of the highway corridor as much as possible. Response: See Section I, page I-2, Environmental Commitment No. 8, of the FEIS. VIII-4 State of North Carolina Department of Environment, Health, and Natural Resources Division of Environmental Management Comment #1: DOT should require that the contractor not impact additional wetland areas due to the disposal of excavated spoil material, as a source of borrow material, or other construction related activities. Prior to the approval of any borrow source, the contractor shall obtain a 401 Certification from DEM. Response: Disposal of waste and debris will be done in accordance with Section 802 of the NCDOT Standard Specifications for Roads and Structures. The Section contains requirements for the handling of all waste and debris materials encountered on a project. The specifications require NCDOT approval of the disposal areas. They also do not allow disposal in any areas under the regulatory jurisdiction of the COE until a permit is obtained from the COE. Comment #2: The document states on page IV-64, 'In the event of a hazardous materials spil4 special design considerations, such as providing for the drainage of structures into off-site detention basins and not directly into surface waters, would minimize the severity of impact to receiving waters. " DOT may wish to consider these detention basins for major stream crossings in this project. Response: The NCDOT will consider detention basins for major stream crossings in accordance with NCDOT Best Management Practices for Protection of Surface Waters, as applicable. Comment #3: Bog turtles are difficult to locate. Please discuss the methodology used to locate, and the intensity of the search for bog turtles and Gray's lily. A certification for absence by a qualified herpetologist would avoid the above discussion for the bog turtles. In addition, a certification for absence by a qualified botanist would avoid the above discussion for Gray's lily. Response: See Section II, page 11-8, third paragraph, of the FEIS for methodology used for the bog turtle. The search for the Gray's lily consisted of field surveys of areas identified as suitable habitat. These areas were traversed at 50-foot intervals on east-west lines. Comment #4: To minimize the effect on a bog by construction, DOT proposes to install sheet pilings. A bog may be impacted if the groundwater is stabilized by the sheet pilings. DOT may wish to consult with a qualified herpetologist to determine if the methods proposed to minimize harm to a bog will not alter the bog that DOT is trying to save. VIII-5 r Response: See Section IV, page IV-11 and Environmental Commitment #7, Section I, page I-2 of FEIS. 1 Comment #5: The COE's September 14, 1990, letter to Hensley-Schmidt, Inc. states that there are two wetland areas separated by a dirt road DOT has acknowledged that the 3.34 acre wetland (bog) may be impacted However, will the 0.718 acre bog be avoided or impacted? R esponse: The 0.718 acre riparian wetland will be avoided by the Preferred Alternative, and thus no impacts are anticipated to this wetland. Division of Parks and Recreation C omment: The list of animals expected to occur within the project area (Table III-11) contains many species that do not occur in this region of the mountains. Indeed if the green salamander, Junaluska salamander, or zig-zag salamander were actually thought to be potentially present, why weren't they considered along with the other state-listed or federal candidate species? The document should be amended to correct these mistakes. Response: Table III-11 was revised. See Appendix A of the FEIS. Division of Land Resources Comment #1: This project will impact 14 geodetic survey markers. N. C. Geodetic Survey should be contacted prior to construction at P.O. Box 27687, Raleigh, N. C. 27611 (919) 733-3836 Intentional destruction of a geodetic monument is a violation of N. C. General Statute 102-4. Response: See Section II, page II-10 of the FEIS. Comment #2: If any portion of the project is located within a High Quality Water Zone (HQ99, as classified by the Division of Environmental Management, increased design standards for sediment and erosion control will apply. Response: None of the project study limits are included in an HQW zone. Comment #3: The erosion and sedimentation control plan required for this project should be prepared by the Department of Transportation under the erosion control program delegation to the Division of Highways from the North Carolina Sedimentation Control Commission. VIII-6 r Response: The erosion control plan will be prepared under the erosion control program delegated to the Division of Highways by the North Carolina Sedimentation Control Commission. North Carolina Department of Cultural Resources (September 9, 1992, letter) Comment: We feel that both Alternatives A and B are prudent and feasible alternatives that will not adversely affect or use the historic property. By law, the protection of historic resources is of special importance. Thus, these resources must be given a value above community dislocation and mere cost of a project. We understand that several of the structures which Alternative A would take are abandoned. Also, the additional cost of $433, 000 for Alternative A is small considering the total project cost is nearly $60 million. In addition, Alternative A can be built and serve transportation needs safely. Thus, we recommend that Alternative A or B be selected so that an intact and important historic property may be preserved Response: Build Alternative A was selected as the Preferred Alternative. 1 t t 1 11 1 North Carolina Department of Cultural Resources (November 5, 1993, letter) Comment: Having applied the criteria of effect X36 CRF 800.9(a), (b)J, we believe Alternatives WSM-1 (Section of Build Alternative C) and WSM-2 (Section of Build Alternative A) would have an adverse effect upon the Moretz House. If either of these alternatives are chosen, we recommend that the Federal Highway Administration (FHWA) initiate consultation with us to develop ways to reduce the effects on the historic property. Also, FHWA should notify the Advisory Council on Historic Preservation of the adverse effect determination. The project would also be subject to Section 4(f) of the U.S. Department of Transportation Act since land from a historic property would be used On the other hand, Alternative WSM-3 (Section of Build Alternative B) bypasses the historic property. If FHWA chooses WSM-3 as the preferred alternative, we believe the adverse effect upon the property, as well as the use under Section 4(f), can be avoided Response: In consultation with SHPO, the FHWA executed an MOA to mitigate the adverse effect of the Preferred Alternative (Build Alternative A) on the Moretz property. VIII-7 North Carolina Wildlife Resources Commission I Comment #1: The NCDOT makes the following statement on page S-11: 'Due to the Response: Build Alternative A was selected as the Preferred Alternative. overall advantages, Build Alternative A, from the western terminus of the project limits to approximately one mile west of US 221, and Build Alternative C, from one mile west of US 221 to the eastern terminus of the project limits, is recommended as the preferred alignment at this time. " The NCWRC is confused by this statement because the DEIS did not assess environmental impacts resulting from a combination of Alternatives A and C; therefore, we are unsure as to how the NCDOT selected this combination as the preferred alternative. If indeed the NCDOT wants resource agencies such as the NCWRC to review the feasibility of a combined alternative, the Final EIS (FEIS) should contain information on this alternative (as Alternative D?) in the same manner as presented for Alternatives A, B, and C by giving acreages of various fish and wildlife habitat types potentially affected by this alternative. Comment #2: The NCWRC agrees with the comment on page IV-76 that enhancement of disturbed wetland areas is more desirable as mitigation for unavoidable losses of wetlands than attempting to create new wetlands, as the latter is often unsuccessful. The NCDOT has listed potential wetland areas that could be enhanced for mitigation in Table IV-17, and we concur that possibilities do exist. The FEIS should state that wetland mitigation will be coordinated with the U.S. Army Corps of Engineers, North Carolina Division of Environmental i Management, the NCWRC, and the U.S. Fish and Wildlife Service. Response: In Section VI of the FEIS, wetland findings and mitigations are discussed. The wetland mitigation plan will be developed in coordination with the appropriate regulatory and resource agencies during permit application. 1 VIII-8 fJ f 1 1 Li 1 t 1 Appendix A Revised and Additional Tables 1 1 1 1 1 1 1 1 1 1 1 1 1 i 1 1 REVISED AND ADDITIONAL TABLES Table S-1 Summary of Potential Impacts Table II-2 Preliminary Alternative Segments Eliminated Table II-2.2 Preliminary Alternative Segments Retained Table III-11 Amphibians and Reptiles Expected to Occur in the Project Area Table IV-6 Relocation Impacts for Build Alternatives Table IV-9 Maximum Predicted Carbon Monoxide Concentration (ppm) Table IV-11 Traffic Noise Exposures Table IV-15 Potential Wetlands (Sheet 3 of 3) Table IV-16 Vegetated Wetlands Table IV-17 Summary of Wetland Creation/Enhancement Potential (Sheet 2 of 2) 1 1 1 1 1 1 1 1 1 1 1 t 1 1 1 1 1 1 1 `O o o r; r; o o o o r; o 0 0 --• 49 44 09 09 v D 0 o o .? o o ? o - o -- 404 4 P., tn c; O O qt O 'Tt 0 0 .? O O [? oo O M O O r. 44 414 `? et O O ?O M ?O M O O O O M ? O O O O -? ti a .?° 4A 403, r olg a1 U ? M C O CV N O O -• 0 0 0 0 0 -? Nl O O M M O O --? O O ? O O O --? .--? ? 409). ..w O O M4A ?M O O ? O O X 0 0 0 .-r .--? p,, ? O ? --? M ? N O? N d? O? 4.0 U MV M O N N O O ? .- M F o ? '.s 49 4 , w y 00 00 vy en ?D O N 8 Q 00 l? N N ?A N M O N t? N O? M 00 O M ?D M 44 ? 4n m ?O ? O I? O? M •? ? ? d ? ? N M ? p M et t? 1 ? ? N N p et ? O N ? ? N 49 49 49 --i 42 10 1= Ire- 04 "1 0 ai o z as x z U i v x z° w 3 a x' z N Oq 0 U a ou b a 0 w v rl) a a 0 z O U N Oq A ? U o w y ? a a •? S¢ --? N TABLE II-2 PRELIMINARY ALTERNATIVE SEGMENTS ELIMINATED Corridor Segment Reasons for Elimination I Requires significant relocations and disruption to the community of Rutherwood. Difficult to maintain traffic on existing US 421 during construction of Segment I. L Severe topographical constraints. M Severe topographical constraints. Crosses Dogwood Knoll residential community causing significant relocations and disruptions to the community. S Crosses Historic Site No. 23'. Requires significant relocations and causes disruptions to the community of Laxon. T Requires significant relocations and causes disruptions to the community of Laxon. Requires relocation of Laurel Springs Baptist Church. Longitudinal encroachment on Laxon Creek. U Crosses Historic Site No. 20'. Requires significant relocations and causes disruptions to the community of Laxon. X Severe topographical constraints. Longitudinal encroachment on Gap Creek. Elimination of connective segments S, T, and U. FF Crosses Historic Site No. 24. (1) Historical Architectural Resources Survey Technical Memorandum, Margaret Stephenson, September, 1989. 1 1 1 1 1 TABLE H-2.2 Sheet 1 of 2 Preliminary Alternative Segments Retained Corridor Segment Reasons for Retainage A Favorable topography. Utilizes long segment of existing US 421 roadway. B Favorable topography. Positive public input. C Favorable topography. Tie-in for Segments A and H. Favorable at-grade intersection tie with existing US 421. D Favorable topography. E Favorable topography. Few relocatees. G Favorable topography. Tie-in for Segments D and H. Favorable at-grade intersection tie with existing US 421. H Favorable topography. J Favorable topography. K Favorable topography. Favorable at-grade intersection tie with existing US 421. N Favorable topography. O Favorable topography. P Favorable topography. Tie-in for Segments N and W. (1) Historical Architectural Resources Survey Technical Memorandum, Margaret Stephenson, September, 1989. TABLE II-2.2 Sheet 2 of 2 Preliminary Alternative Segments Retained Corridor Segment Reasons for Retainage Q Favorable topography R Favorable topography V Tie-in for Segments Q and Y. W Favorable topography. Favorable at-grade intersection tie with SR 1359. Y Favorable topography. AA Favorable topography. Only location for crossing Blue Ridge Parkway. BB Favorable topography. Utilizes long segment of existing US 421 roadway. CC Tie-in for Segments H and N. DD Favorable topography. Favorable horizontal alignment. EE Favorable topography. No impact to Historic Site No. 21. (1) Historical Architectural Resources Survey Technical Memorandum, Margaret Stephenson, September, 1989. 1 1 TABLE III-11 Sheet 1 of 3 AMPHIBIANS AND REPTILES EXPECTED TO OCCUR IN THE PROJECT AREA SALIEAWA MICROHYLIDAE Genus Species Common Name Gastrophryne carolinensis Eastern narrow-mouthed toad BUFONIDAE Bufo americanus American toad Bufo woodhousei Common or Woodhouse's toad HYLIDAE Acris crepitans Northern cricket frog Hyla chrysocelis Lesser gray treefrog Hyla crucifer Peeper treefrog Pseudacris triseriata Northern chorus frog RANIDAE Rana catesbeiana Bullfrog Rana clamitans Green frog Rana palustris Pickeral frog Rana sphenocephala Southern leopard frog Rana sylvatica Wood frog CAUDATA NEC7VRIDAE Necturus maculosus Mudpuppy CRYPTOBRANCHIDAE Cryptobranchus alleganiensis Hellbender AMBYSTOMA77DAE Ambystoma maculatum Spotted salamander Ambystoma opacum Marbled salamander PLE7HODON77DAE Desmognathus fuscus Northern dusky salamander Desmognathus imitator Imitator salamander Desmognathus monticola Seal salamander Desmognathus ochrophaeus Mountain salamander Desmognathus quadramaculatus Black-bellied salamander Desmognathus santeetlah Santeetlah salamander Desmognathus wrighti Pigmy salamander TABLE III-11 Sheet 2 of 3 AMPHIBIANS AND REPTILES EXPECTED TO OCCUR IN THE PROJECT AREA CAUDATA PLE7HODON77DAE Genus Species Common Name Gyrinophilus porphyriticus Spring salamander Eurycea bislineata Two-lined salamander Eurycea guttolineata Three-lined salamander Eurycea longicauda Long-tailed salamander Hemidactylium scutatum Four-toed salamander Leurognathus marmoratus Shovel-nosed salamander Plethodon cinereus Red-backed salamander Plethodon glutinosus Slimy salamander Plethodon jordani Jordan's salamander Pseudotriton montanus Mud salamander Pseudotriton Tuber Black-chinned red salamander SALAMANDRIDAE Notophthalmus viridescens Eastern newt REP77LIA KIN0S7ERNIDAE Sternotherus minor Loggerhead musk turtle 71?IONYCHIDAE Trionyx spiniferus Spiny softshell CHELYDRIDAE Chelydra serpentina Common snapping turtle EMYDIDAE Chrysemys pitta Painted turtle Graptemys geographica Map turtle Terrapene caroling Eastern box turtle SQUAMATA SCINCIDAE Eumeces fasciatus Five-lined skink Eumeces inexpectatus Southeastern five-lined skink Eumeces laticeps Broadhead skink Scincella lateralis Ground skink 1 1 i 1 1 1 TABLE III-11 Sheet 3 of 3 AMPMBIANS AND REPTILES EXPECTED TO OCCUR IN THE PROJECT AREA SQUAMATA ANGUIDAE Genus Ophisaurus Species Common Name attenuatus Slender glass lizard TEIIDAE Cnemidophorus sexlineatus Six-lined racerunner IGUANIDAE Anolis Sceloporus COLUBRIDAE Carphophis Cemophora Coluber Diadophis Elaphe Elaphe Heterodon Lampropeltis Lampropeltis Lampropeltis Nerodia Opheodrys Pituophis Regina Storeria Storeria Tantilla Thamnophis Virginia carolinensis Green anole undulatus Eastern fence lizard amoenus Worm snake coccinea Scarlet snake constrictor Racer punctatus Ringneck snake guttata Corn snake obsoleta Rat snake platyrhinos Eastern hognose snake calligaster Prairie kingsnake getulus Common kingsnake triangulum Milk snake sipedon Northern water snake aestivus Rough green snake melanoleucus Bullsnake septemvittata Queen snake dekayi Brown snake occipitomaculata Redbelly snake coronata Southeastern crowned snake sirtalis Common garter snake valeriae Smooth earth snake VIPERIDAE Agkistrodon Crotalus contortrix Copperhead horridus Timber rattlesnake 1 1 1 1 i TABLE IV-6 RELOCATION IMPACTS FOR BUILD ALTERNATIVES Build Alternative Type of Displacee Individuals Families Farms Businesses Non-Profit Organizations Total A B C 0 0 0 38 52 42 0 0 0 21 7 7 3 2 1 62 61 50 TABLE IV-9 MAXMIUM PREDICTED CARBON MONOXI DE CONCENTRATION (PPM) No-Build Alternative Build Alternative 1-Hour 8-Hour 1-Hour 8-Hour Receptor (ppm) (ppm) (ppm) (ppm) At Right-of-Way 7.3 5.0 3.8 2.5 NAAQS Standards for CO: 1-Hour 35 ppm 8-Hour 9 ppm Source: North Carolina Department of Transportation, Technical Memorandum -Air Quality, May , 1990 (as amended by Technical Letter Report - October 1, 1993). v y ^?o N ?D ,D M ,D oO oo et -- - O O ; N V) [? ,C G O ? Q b V) ,D ,O M M ?o et T M ?+ T N M b 0 ? M 00 tn ? ?t y z ,O ?D M M er er M 7 N M e0 E'd C y d V en w o v ? ? W) Q W a C? > to) ^ tn + ? + + N + to ?o ?o ,O ,D \O \O 1n r` N -It 0 z ?o c + + + + + + + + + + + + i W O ~ O Z y r N ?} d N 04 w d y O O 0 0 Q E- Q BU 8U eU V U C? a .o > C1 "o tn kn \D \'D IC ?o % ?o \D N V Q o ? a x a a x a x a a .? a x a x 04 ? " .o g o g o vo) g to 0 0 0 0 0 0 0 0$ C C14 C4) en a? dQ? 'o ? o g g g g g g g g g g g g g g g g a? •• •- + + + + + + + + + + + + + + + + CL cO C O N 't O, O - V) •'-' O N V) N O M N M V) M M M V) d' V) '?t 1- O et In - •. '--,w?1D x U x x U U U x x U x x x a Ux u? d u o E V) t \,O t r- w 00 t 0, w-) ? %o o o to r- 00 Q, O if 0.rx z * x 7 r-a H U + b a + + + + 0 ) _ ? _ ?O Qp W) 00 00 00 00 w O Q b O -+ V1 w m )n O M 00 N N N N N N C v ? Q ¢' AM, " O ?-1 Vt ?i W) \O Q? tn 00 1n c tf) a V') S O, In [? In ?D to N to N 1n N v) N N N Wn wl ? ?o O . O -- )n 00 M et In O M 00 N N N N N N O d \C ON V7 00 )n ?O )n Cr) )n ?D ON V'1 I t- )n ?O )n N V•) N )n N )n N N N V1 W) W) y y y .. Q O Q O O_ I?t ON 00 t- IC ,-• t` N ?t ct ct efi d d Z + + + + + + + + + + + + + + + + g W 4t ztt tit ?O O M O O ?O 00 V7 00 V) 00 W) 00 w 00 W) V) W) 00 U V) $ > 0 U y a d ? ? a z o o o ? ? ? ??? U Q A w14 ? x x a a x a a x ? x a x x xax u® S S tf) N N W) o qtt p O S N W S W S C CY) en W) dA? ?a?go S S S S S S S S S S S S S SSS ? ° tr) tr ) o o ? ? r- ? r-00 r- u ? aC p4 a4 a rx a rx n; rx as rx a a: A4 ?: w ? v d j , a?•y ? a w °v .? --? N M q?t tr) \,o r 00 a , 0 . ¢ m U A W U a tx H rl .-» t, ,? 00 . , 00 ,? 00 00 00 00 00 * x 1 V ? N O O O O O O O O O O N N M M C?! + + w0 d 00 r-- 'At to 't to d to ? to ? to Itt to "I to Nt to W) tn O • M Q O Q C? O N N M O\ O r. O .? cM .-, 00 00 ? M - [- N m m (V v? """"CCCC LIU + + + . + co b d C'4 N r zo. ee ?? *k ray N N h --+ 00 pp pp ?n q? ?O ?O ?O ?D ?D ?D ?G to ?D ?O O '? z O r a J N N M •--+ ON + O .--r O .--i Cl?) .--? 00 + 00 + r-+ M .--? I- + N cn (•M N i i i ° O p ed a N Cc ?? + + + + + + ?j d. In tr) qD \4, 'o o >1 o ° ai p j + + O + 0 0 0 0 0 0 0 0 a ? i ++++ W p O 0 . o 00 to 00 V') R W) to to v to to "t W) Rt to Rt to v W) "t to "t to 00 ?o r t? r` 0 0 UC'n ?w > C".. ,q O O v y N ep w ?. A Q ? Q o?b4 tr b 8 ° 8 § $ 8 8 8 ° ° 8 °88° M 00 00 00 dA? o as ? 0 8 8 8 8 8 8 8 8 8 8 8 8 8888 + + + + + + + + + + + + + + + + [? --+ M N M M -,t M t/') M 00 M N M ?O 't I? to ?O ?O N l? ??pp to 00 00 ?C \C ?? a x a x rx x x x x x x x xxxx ?? d j ?, 0 ? a o a. a Cr W) E- N M ?t to a °? 00 00 00 00 00 0° 00 00 00 00 00 00 00 00 00 0. PG 94 z *a V ? O G G G G G G G G ?O G G \O w O a ., b V N N N N cV N N N N N N N N N N N GEC v ? a . b r M cM M M N N N N CV N N N N .r U ? a Vj y? ? 0 G 0 00 + 00 + 00 + 00 + 00 + 00 + C? + 00 + 00 + 00 + 00 + .t M -?t M + + + + + z w S z ~ W O ° N I- N t- N l- N l- l-- M l- M P M P M r- G? 00 O? 00 p? Fp ? ?O ?G RO 0 O F" VV) _ . 0 ? q Z U Q S o o ? 04 04 04 04 04 04 04 U @) yc ? C p t, O W) O M O tn O W) O tn O W) O W) O W) O V) O C O C O O O O O O MNO O . N M M N ?L1c? g g g g g S g g g g g ggggg m? + + + + + + + + + + + +++++ ? C-4 00 Q, It ID r- r- \,O oo t- 00 O r-' O O O N N M O) O?\ Q) O?, g)4 a P4 04 V fyi U A: A4 fs: fx L1; f? (> V 0 Q OG U ¢ q .? .c 00 00 00 00 00 00 00 00 00 00 rn 00 O ON O ? G O C- c? A w w C7 x O O O O O M a ._., rl ? -4 \ O \ O) 09 z * * a 1 1 1 1 1 1 U ? d d ' ?/ ' O O ?c ?D Q, N N N O Q o t, 4 4 U 0 a N N M N "t d IC ?c -+ N N d 'qt ?? d' M M N \D .--a - - p p M N N Wry to Vn M b0 O z N N M C-4 -,t d \c ?p --+ ?O O, N N N O 0 0 v v v v Q Oq N d ?o ?o ?c to \o \c ?c ? \o ? \C ? ? ? a ' °a > . O .-. C M + + 00 + N + \c + ?o + ?o + O O \C + Ict \1O \40 \O \1O \c ++++++ C e ^ ?J V V l/O?1 V \/??? ?J V V \/Q?? V 00 ON M 10 tn V Q ?D V V V p VI) W) tr) Cf) to ?O I- I- [- I- d k o o 0 0 ?.1 U V) in to et V1 to V-) '? rn ` a E? z b ?o ?o ?c ?n ?o ?o \o kn .n .n rn r wn W, \c \.o ?c \c v a o o? •w? x 94 04 04 x x x a aa.aaxx u?4k o p [ g o N 0 o \C g g g o o g Q g o 0 0 0 w) tor) w) M d i •O O 8 0 0 0 S S S S S S S S S wl t S y'cc + + + + + + + + + + ++++++ QN CN C N O m O W) O W) .-, tr) O p O M N N4 N N N F+y W V W W W W W 04 W W K/ U 04 W V u c rn rn M 00 U a a ' ? .? .? M M rn rn o\ rn 1-4 , ? ( a rn o? °` , ??/ 09 z . U as + 0 O O O O O O O O OOOOOO00 r. ?C w O U U ? U t? V @ t-- V t- V V t- N 0O Q ? b co 't d' 't d 't et R' 't -+ O O GQ X4-21 M M M M N M M M M M M M M M ?f' >g z u 0 0 0 0 0 0 0 0 0 OoOOOO00 aa? j ?i V V @ @ @ V7 N t e0 m T .? Q •-? O \,o + \c + ?o + ?o + \O + \c + ?o + ?o + \D .o \o \,o ?o O O + + + + + + Z > W O O o Z M M M M M M M M cM M M M M M V) ? 4, b N E-? U g w > O O ' Q p Coq Z ¦p r ?o r ?o r ?o r ?o r r t` t` ?o r r t- r t- W) d ?o ?o %D 10 `o \,o kf) o a U Q o cc ..a ? .-? P4 94 04 04 04 04 04 04 04 04 .-? U ®ac ? g o 0 0 o g o g o oooogg • dAr'? oa??o g g g g g g ° g g Sgggggg O ± Q a W O M N M tn M O `ci M M N M to M 00 M O 00 O, o c) O, \,D tt "t 't V'1 W) cM M r -4 .1 rl --r d .-J 04 U 04 04 U w 04 04 04 U 04 04 04 04 04 P4 U ? u d ?j 0 .? 0 U ? y d 00 a4 00 U 00 A 00 w 00 w 00 C7 00 x 00 00 00 00 00 00 °?az?g a a4 a O? O? p? O? O? O? O? ON M ON N * x U Q 00 V t r- ?C N N N N N N (V M M M ?O ?C + + + 0 V 00 --? O? M M M M M n --+ ?? pp pp pp w U V? ? ?O ?O ?D o V7 W) .? O co 'b ?d V i V O O ?O W) + O O O O ?+ -- et -1 0 0 + + O b GC ? ,? ? Gq 4j d F?.(I ? V) V) d' V7 O) W) O) V'1 v i V 1 tr) N N N I- M (n y to . z 'g ?0 r r V V V d + I? + ?O + - N N N (V N N N M M en \O ',O U th Q c o o + + + + + + ++++++++ o .? o o O O Z d v1 "Rt W) ',O 110 V) In N l- N l- N l- N r- ON O? U r- r- r- ?• ?} \O \1O \O \O \O Ic ?O ?O ?. Sy aKi o O 4 H U .? . g . 0 .r '? z° •o ?n v? ?O ?1 V 1 try ?o ?! 1 ?o M M M M M M M M ?O ?O ?O ?O O Gp'. U U a oo °?' o Nv ?w? a a a a a a a a - x?aaaa U® . as Q g o o o o o o oogogooo WI) - tAr) d N '" ? N d A '? •o a?,[ o S S g g g g g g g°gggggg E + + + + + + + + ++++++++ d I- M ?O r- it N ? 00 ? t- ? 00 W') - \o M N l/y h ? -+ V1 r 1?0 ? 00 00 ON rn o =?° a a ?- ? a a a a aaaaaaaa ? ? d cc , 00 ,0 o M In ¢ CQ U "o? ? r- C) ¢ Ua 4 N N O N C'4 0 0 0 0 O 0 N o O N 0 CD C-4 0 .a a z C4 C14 C14 C14 C14 r14 * iF i F Q!i U Q as a + + , O? + •? --+ N 00 00 %.o rn ? + + i i cc + + + O a! 00 r+ [? QN ON O --+ to 00 to V ?1 to V? ?D ? i i to to ? ?D ?D ?O ?O i ?1 to •? w O Q V O 00 + O O O O .- 0 d ? to I? ?+ r O O to I? + o y ? o ?I M ?D N ?O d to 'tt V1 W) 00 W) N ?O M t 00 00 t} O? 00 In in ?o to in to to to to to y . z ... to to l? i i O\ •-i •--? N_ 00 00 ?o O\ i O U 00 to Q) to ? ? ? to to to 00 to to ?D ?D ?D \D ?D ? to to 60 a? • Q N _ . Q a a V 'D a d O \D + O O O to + [? + -- r-+ -+ --+ O O O h ++++ ++ Z $ 00 z kQ a 0 p Z m 110 Q s ? qt ?h In et to M In to to O? V` O O -t ?t ? (T M It to l- l- t!1 W) W) \D \C ?, b a?i O a F _ > O 0 o a p al Z "O M ? to to ? to -?t to 00 ? 00 ?t 00 00 O1 (7., qt - N N It v ?,o ?o to to to ?D ?o , ci R u Q S 0 o cc a a a a a a a aaxaaaaaa U@ ? ° ° 8 ° F 8 8 8 8°88888° . a? o ?,g o 8 5 5 8 5 8 8 888888588 , a?? + + + + + + + +++++++++ t? a\ O N --+ N N N T N to --+ 00 . to t- ?,0 00 N M to to to to to ?f •-+ N N N (V N N N N N N N N N N C-4 x x x x x x x xa* xxxx* ?U 10- ..?., t3> Q? v O •--r N ` M " ?t to --4 ?Dt-000C,? O -- NM .-r --1 -4 00 . N N N N U 0-. CMG N N N N N N N N N N N N N N N N a z 1 -j I U w d ON 00 \C O O - O O 00 00 00 N M M M .. + + + + + + q:h .? -. .-? O O I Q' 00 t O 00 ?t ? V) et ? I- (- I- N •-? r v ?D ?D kn wn V) W) W) W) Wn Wn v) v) V') V'1 tf) 0 b N_ V') --? N 'O V') t- O? + tf) Ir) 'It 't N N N + + + + + + + + + + + + + + + + ?Q Oq en Cf) W) C) CIN tn \D \O \O t- t- ?10 V7 ?D t z ' s' et ON 00 ?O O O - O O 00 00 00 N M M M 0 ?Cc + E Zkk u? 5?' 'If 1 ?--I V'1 ?O ?O Wn kn to V) v) tf) V) tn V) tf) tn Vn V1 y Q N 0 M M V7 ?O -.I- M ?D 00 V) Vn V7 M qt ?t 't G q a p + + + + + + ++++++++++ g W G O ~i 0 ?+ ? ? 0o 00 t-o NOOOr000 ?? ?b aki Q Z ?D V) ? ? ?D kn tr) ?D t- r r tr) ?O 110 ?D O 0 0 H U? a? d 6zs? ? 4 00 W) W) NSItt W) W) VI) 1^ V It I Ua.? d o Nv ?4 04 04 C4 u a .5 g g g o g g gogSooggoo .o as ? o g g g g g g gggggggggg `° %n M o o - \pr-o+o?N000000V W! n t- 00 00 00 00 00 Q,, 00 0,\ rn O o O o O N N N N N N N N N N N M M rn M M V ' qF, ... 0 q O N 6 6 w 79 .'.mow t W) ?,O t` 00 O\ O r-r Q N ¢ M .t Q eC N N N N N N NNMNMMNNMM UP.f? a z N N N N N at * 04 r? Q? E-? U ? M M rn O O (7? r "o ? o., 00 00 -+ --+ M O V7 V7 en '4t r- r- r- t- V)VIW) W) W) W) W) tr) W) w w O b N N 00 --+ + --i 00 00 00 N O O O O O N O Q '? Qa W) WI) W) 00 00 O ?o Wn tr) tn "o bo O y 'g z Cp M M Ch O C) (ON r- "O r- ON 00 00 C N V') V7 V7 V7 tr) V7 V7 V7 WI) V7 V7 V7 V') W) q VVWW?? `? y , °? a q `" ^ a i O p b q W '? C tt + Ict + V7 + 11, + It + `ct ?t m 1* In l? M M MW) + + + + + + + + + + + Z O 4 ?` V ?@ @ @ O 0,4 ? K Z ?! 00 00 V') V7 V7 W) N Rt 00 N N -4 N CN w -0 a? 0 O .r a) U ? w, ? '? ? 0 0 .. d o@ o a m 1n 1n 0000 C? 1^ v V1V) {? 0 ua4A l O °w; o Nv ? a a a a 04 04 u@ . a ° ° tn 8 8 -4 gogoooW) W) . a - 1-4 C4) Cl?) C14 o v? o ' g g g g g ggggggggggS a? , + + + + + +++++++++++ ? p" 'k W 1-+ 4 ^ a to "o OC) c) ) ? b C') to to O N N N M" m m M't M M M M M M M M M M M N M M cM M U U U x x xUxxxxxxaxa ?U O d m .? "t M 00 m < C) C'4 U 4 s: In N I) - N N N M M M M CN 4 O -,t NNNNNNNNNNN f C? Z C 4 i ?F t 1 r-. w H V ? a¢o M O O ^+ OO ; IO + + r- + w o a? ?} ?} Q p p p Q U O a ?. oa b N + + + -? + N N N N N N N?IRt N_ I?t + + + + + + + + + 00 0 + + + tr 3 00 00 m ryry?,, ,? m O? M b dp O en C) C) U ca 4 o ^ 'fl ??? 1n + + + + 00 V') W) v') v) V') N 00 00 N N + + + + + + + + + + + + . o o O CCCC w i..i g N w w? o 04 z V V ?a.? b Z M ? ?D \D ?D l\ [\ ?O ?. N U JZ o O z?? C-4 C'4 o? W) tp t" Say d ?. w? a4 a a a4 arx04C4 0404 04 x w u® x bn o o g g oogogogoo g g N N i$ d ? W ? •? ? , r" ? p O p O p O p O p p p p p p p p p p p O O O O O O O O O O O p O ? ? ? " `^ ?Tj M M tn M 00 M ? p4 ? ? W) O \,O ? W C\ Z? - - 00 M M M M M M M M M M M M Cl?) ? C •? v O4 V fx 04 U fy 04 04 0i P4 0i cx 04 04 04 y ? U o .p o ? ' N M W) 00 -a U a v N N -,t N t? o0 00 N N C-4 N N N N N N N a, a z N C,4 * i * C)4 U \10 M i O? O) C) (ON ONO.% OOOOOMt*M + + + + d M 00 @ 00 00 00 00 00 .- -+ tn ? i ?D ?O ^ ?O ?O ID ?D ,V ?c ?D \D ?D d ? N N N N \,D "t .w + + + + + + + + + + + + + + E r.+ z ?d V) O\ OO\m O\OOOO V)OO + + + + + + + + U C? UUC?C? d M 00 00 00 00 00 00 r.• .? r...? p p N Wo ?? H U v? + + + + + +++++++++++ ???? 2 2 2 2 cf) Q z? ?II U@@@@ ,tt -t w) w) th wntnwntnrrrrr o? • 8 0 0 0 O O O O O O O O O g Q f?+ C O W) in W) W) A V N N V dA4 I o a? ?,o g g g g S ggggggggggg Ow 1 z r r r O N ct W)± 00 M ?D o-, 00 00 N± 0. 1 (on - N ?,D r r r r 00 00 r I'D \D r 00 00 00 M M cM M CI) M cM M M M M M cM M cM cM ?? ? V ?x P+ Pi V P+ ri g Ci ?x Ci 0i Cr P4 dV a? ,.?,? N M Q m u w"..W,QpQUA?d a? kr) W) te) 'tt It 1* It W) if) kr) W) tn Z N N N N N N N N N N N N N N N N a as b w O V O a b w b w ou o o °a cc rA ato z o o? oo? ,? 0 0 va.5 0 U @ ac a? 8 U o CO) at ? P4 ' U Q as 'a + + + + } ^i + 1 +++++ w ? of ?G V'1 V'1 In V) kf) W) V't V•1 ?O r-+ W) l- ?o IO tn tr) W) 't tr) W) V•) ?O W) U'1 tr) O ?.cd + + ++++++ C, tf) 000 -? + + + ++++++++++++ b? U N d ?D ?D ?O ?O ?O ?O I? ?O ?F V c 00 y 7?' + N O q + + + . W) N ---. .-. ++-4 .... +++++ z W 40" 04 O g C o0 M z <4 ' a z tn ? "C 1,0 U oar-tr) ? oo [-U ry) w > ? ? v .rJ O O ?Z?^p ?n to v) to W) tr) W) tn W-) rn tnW)?c V)Z ?rW., o av UQ? o O ? Ix w? a a a a aaa?aaaaaaa?a ?®? g g o 0 ooW-)tr) o . N N N N o?.?o g g g g gggggggggggg 1 L" + + 00 + + + + + + + + + + + + + + + NMO - WntnNt V) rp W \O 00 00 O? ) O?rnONrnONrnrnO-, O OOO w M M M M M M M M M M M M M ?t ?° a a a aaUaaaaaaaaa v g 0 00 00 00 00Np M?MA ? o aai ?aP4 + N N 00 N 00 N 00 ?D\c (V N N N N N r O? O N C N N a z N N * * f? ? fps ?D M M M M M V'1 to 1n .M•. M-I M t. O ? (? + + + ? E + + O < tr) W) tf) W) c D W 00 00 - to tn t? I, U " , to kn Wn wn to I In VI) V) to Wn 1.0 to Wn Wn W) " ? MM M u I I I I I I I I I I I I 1 M t- I I I I I I I I I O a ?° ? I I I I I I I I I I I I ICh CN ~ten N I , I I I I I ????? I I M 0 ? . a? O ? c, 'd' + I I M + M + I I I I 1 ?t ? M t? l? I I I I I I I + + + + + I I O •? Q 4?., O O Q --a 'D .-+ r^+ ch + M + M + M + M M I'D 110 ?D 't It M r` r` M M + + + + + + + + + + + + Z w W Q bq 0 N G G H U 0 0 Z 00 00 00 00 00 -? ,- in V-) 00 00 In to to ?o \'O ?D ? et ?n et -t Z Z o a " U Q . o . w? x a a rx xxxaxl?aaxxax U@) o o g g gogoo888 W) o ? c g g g g gggggggggggg ,?, : ? N O N 0N •^+? NVn'Dcnarn00in 000000 1-4 " .4 4 4 1 1 1 1 00 1 - - -. -0 C 4 C 4 C 4 m C 4 2 04 C4 C4 04 C4 04 C4 04 C4 C4 C4 V C4 04 04 P4 U ? d V " U ° o a? ¢ ° N U a v v- N N `D N S N `p ?0 O?t ?i ? \NDNNNNNNNNNNN a. a t * ?. ? f U ? b w' + + + +++ o \?D •n i to O ^ CQ M + 00 + 00 M to "t to m 00 V-) i + + + + + + + + + + o tc I/????i A to to 00 V) 00 r , 00 00 00 %n en v) ?c kn ?O \1O v) ?O e+o O w i M + 00 + 00 M i "O \D to -,t •n M 00 N + + + + + + + + + + O O @?@ a ? ? W V1 00 ? 00 r- 00 00 (-- 00 In cn ?O N V1 ?O i ?G ?O ?D to ?D ?O ? v1 ? i y Q a > Q? ^ "d M M Wn v) 1n M ?c In ?o In t In M "t 00 In \,p 0 Z iC G p + + + + + + + + + + + + . + + + + ' ? ? r @ ) O ? b z ?D U 1 to to to 000 in 00 In M ?D IC N 0 0 to ?o \C ?O V'1 \O ?D ?O 1n ?O ?D a i w 0 O U > o z O O O ?\D ??? 0 0???? u Q S O co? rx x as xxxax u@ . ? o Q goooCD 8 W)te 8 aa?• ) 0 .o ?° 8 8 8 8 8888888888888 , ± ++ + rn a, + O a8 ° N N M W) M 0 0 oenM N0 M M M M In In In 0oo ? et ? ?t ? et ? ?t d ? et ? 'ct ? rt ? ?t a ? 04 U 04 x xUU uuP494UUxxx U V 0 t? .4 ?0 b M ¢ ln?O?00Q,O- NM? Vy t N N N N 00 00 00 00 00 N N N N N N N N N N N N N a 174 9 z **? W a H U w w + + + cn N N i++ , + w O 4J w. O b a', + cn + i+ V l'! _ 0 +.+ V + O\ + N + M N i N i i + + c0 q ? + q G N co y h a N A 0 p? 'C in + Ih + ? + V')?t?0\O? M d ? d' ? V'? N +++++++ o Z ? S ++++++ + I O O ??`` ??a\\ ?` o ? z M v? ?o ON N r- O? N O? 00 a 0 ?o ?\ r ?o r \ o 1 0111 00 U rA - 1 % ? g w > y U .c? O O rQ .?, O ?' ? V V ? V ? f1r c4 00 t? M N?r?M ocn °,81 ° MI cn ua.5 0 .?w? a a a xxxxaxaaaxxarxa pe g o tn 0 W) otnW)W) ogoooog W) W) tn N -+ N N A r? • O O?O S S S S S S S S S S S S S S S S S + + + ++++++++ + +++++ Z a6 W) 00 W) 00 ' -? ON ? } M I?.?00 in ?cO\ -NO8,-r 8 ON V , 00 ON CN ON 0 0 O N M w d It 'It ?t rF IT lZr h v') W) V? N v 1 ?° rx x x xxxxxxxrxxaaxxx ? ? V , ? 0 " 0 O N N 00 N rno-?Nc??W) r-00aN p O O N N N N N N N N N N N M 9 z *? 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ' w > 30 F R G 0t r o? 3 3 0 a e ? 04 a ? aG$ ? a a Z O , 00 , OQ 18> h ri d g y n y ? g y ? o0 >?-a...3'.. J a A 3•x•5 ?? > w O T 3?? wa.8 3 3 ? ? U... 8 1 s N O O N O w ? o .? y U h yO s y y o " l0 ?y ?o 0 0 ?o 3 ? 3•? H H 3•? 3?; cc C13 cc to b U ? %0 < a Q v a as pq ?"" ,5 oa y v ?o oc ? u v s. v• a ?.. q. ice 0 ..? ?...a? 0 ?'q Cleo r- co m o ?z Q 0 8 w O .b 0 .y a>i 0 x 0 to s .s 3 a .? ?s o >, a? z TABLE IV-16 VEGETATED WETLANDS Approximate Acreage of Wetlands Site No. River/Branch Name Within Alternative 1 South Fork New River A, B, and C <0.1 2A Rocky Branch C 0.3 2B Rocky Branch A and B <0.1 3A Brown Branch C 2.3 3B Brown Branch A and C 0.2 3C Brown Branch A and C <0.1 4 Pine Run B 0.7 5A Pine Run B <0.1 5B Tributary to A and C <0.1 Pine Run 6A Laxon Creek A, B, and C 0.9 6B Laxon Creek B <0.1 6C Laxon Creek B 0.3 61) Tributary to A and C <0.1 Laxon Creek 7 Gap Creek A and C 0.9 8 Pine Run A and C 0.1 9A Gap Creek C <0.1 9B Gap Creek A <0.1 9B Gap Creek B 0.9 10 Tributary to BRP 1 0.2 Wildcat Branch 10 Tributary to BRP 5 0.3 Wildcat Branch 10 Tributary to BRP 6 1.6 Wildcat Branch 10 Tributary to BRP 6A 0.6 Wildcat Branch i TABLE IV-17 SUMMARY OF WETLAND CREATION/ENIWVCEAENT POTENTIAL (Sheet 1 of 2) Alternative Site No.' River/Branch Name Traversed Creation of Wetlands 1 South Fork New River A, B, and C Little opportunity exists to create wetlands in this area. 2A Rocky Branch C Some opportunity exists to lower elevation uphill of stream to allow hydrology to reach these areas. Areas in pasture should be allowed to return to undisturbed status. 2B Rocky Branch A and B Minimal due to soil make- up. 3A Brown Branch C Areas of pasture could be allowed to revert to wetlands. Some plantings will facilitate the creation. 3B Brown Branch A and C None 4 Pine Run B None 5A Pine Run B Little opportunity exists. 5B Tributary to A and C Little opportunity exists. Pine Run 6A Laxon Creek A, B, and C Opportunity exists to re- vegetate the wetlands. 6B Laxon Creek B Areas adjacent to creek could be lowered to allow greater and longer period of flooding. Revegetation could also be done. (1) Refer to Exhibit III-3 for site location. TABLE IV-17 SUMMARY OF WETLAND CREATION/ENiIANCEMENT POTENTIAL (Sheet 2 of 2) Alternative Site No. River/Branch Name Traversed Creation or Wetlands 6C Laxon Creek B Areas that are disturbed could be allowed to revert to natural conditions. 6D Tributary to A and C Area could be allowed to Laxon Creek revert to natural con-ditions. 7 Gap Creek A and C Wetlands vegetation could be reverted and enhanced. 8 Pine Run A and C Wetlands area could be enhanced and expanded through creating larger flat areas. 9A Gap Creek C Little opportunity exists. 9B Gap Creek A and B Minimal opportunity exists. 10 Tributary to BRP 1, 5, 6, Due to the unique nature of Wildcat Branch and 6A this wetland, little opportunity exists to create a bog-type wetland. However, the area down- stream (a riparian wetland of approximately 0.7 acres) may be enhanced and expanded. (1) Refer to Exhibit III-3 for site location. I Appendix B Revised and Additional Exhibits u f` ., N N N r ? r ?Ar H SHFEr z ?~ ? ? SyFFr nl, 'Ov r t \ ao \l '•? 7Z C /`SAT ?ATey 3tiyF?T S ' ? SET 4 / c . .9 `y m a co UGgEs NT y co F • en cn `l ca N CA '. IA,3 L101 '• ?1`5 y Z ?,33HS / ?. J / C3 m9 r a Al r w •' C?7 i w ?IH N D /D >DA m z vi M D S Z ay A ?? •D _•l Ao c D C C M -n T /A> ? ? t7 r m :J L?A L L J L C N -IN _ jf• ` 1 m J a: j- N ?. N (n .. n m O .. Z mm ? N r 0 A ESP N w (C N N TO !Y?'?F'??RR?QN j [ 33 " r X X O -q 0 m r -4 m ., I F.• 0 C Z M D Z 7 G m -I - 'm m D ? Z 0 z 0 r D in < m C cn o Z m -i N mM o .4.6 10 ., DQ .m ? ..m Q ,Fl ae? 0 D n J Appendix C Revised Appendices 0 R E L O C A T I O N X E.I.S. _ CORRIDOR PROJECT= 8.1750601 I.D. NO.: R-529B R E :p OR T North Carolina Department of Transportation _ DESIGN RELOCATION ASSISTANCE COLNTY Watauga Alternate 1 of. 4 Alternate F.A. PROJECT: FR-86-1(6) Section DESCRIPTION OF PROJECT LS 421, South Fork River to Deep Gap ESTIMATED DISPLACEES INCOME LEVEL ype of ?Displacee Owners Tenants Individuals 0 0 M i nor- 'Total ities -0 0 --- -p---- ---_.___... 0-1SM 15-25M 2S-35M - 35-50M 50 LP - o -------0 0 - ? --.0 0 amilies 26 8 34 0 2 12 11 6 3 ' usinesses 4 4 8 0 VALLE OF DWELLING DSS DWELLINGS AVAILABLE arms 0 0 0 0 Owners Tenants For Sale For Rent Non-Profit 2 CEMS 0 2 0 0-20M 1 $ 0-150 1 0-20M 2 $ 0-150 3 ANSWER ALL QUESTIONS 20-40M 5 150-250 5 20-40M 16 150-250 8 S NO EXPLAIN ALL "YES" ANSWERS -- .------•--- 40-70M 12 250-400 - 2 40-70M 22 250-400 5 _ - x -- - x - - 1. Will special relocation : services be necessary 2. Will schools or churches be affected b y displacement 70-100 6 400-600 0 70-100. 32 400-600 4 ---._-.._ ...._._---. _..,._.__--- --•--.-- -__. __.____-- --._.___._..-_-_- ..___.._..__..... 100 UP 2 600 UP 0 100 LP 18 600 UP 4 ...... ..... -...-.- x -- x ?- 3..Will business services still be a v a i l a b l e after project 4. Will any business be dis- TOTAL 26 8 90 24 -- -- -..?........ .. - ?..... _- --?-- - 1--- .- --_?....... ---......... ._ REMARKS (Respond by Number) placed. If so, indicate size type, estimated number of 2. Two private cemeteries - employees, minorities, etc. --9 x - 5. Will relocation cause a housing shortage 3. Will not be disrupted due to project. x - -- --? x 6. Source for available hous- NI ing (list) q 7. Will additional housing programs be needed 4. a. 1SF Building, Smith's Store, 1,400 SF, general dry goods, 1 employee b. Fenced in 1/2 acre area used for auto storage, 1 employee x - ? x 8. Should Last Resort Housing be considered 9. Are there large, disabled, C. One-story metal building, 900 SF, Wendy's Maintenance Shop, 1 employee d. One-story metal building, 2,100 SF, Pennell's L elderly, etc. femilies Auto Repair, 4 employees - ANSWER THESE ALSO FOR DESIGN e. One-story metal building, 3,000 SF, - 10. Will public housing be needed for project 11. Is public housing avail- able 12. Is it felt there will be ad- Upholstering Company, 4 employees f. Two one-story metal buildings, 4,200 SF, Steel- master Building Sales, 2 employees g. Two-story block and frame business, 3,700 SF, Phoenix Auto Sales, Junk Yard, 2 employees - -?- equate DDS housing available, - u during relocation period Q H. One-story Metal Building, 120' x 275' 33,000 SF Cretcher Brothers Produce, 16 employees ID. wiii there be a problem of housing within financial '.._..... means X14. Are suitable business sites - available (list source) 1S. Number months estimated to c;img-IX- te_.2ELOCATION No minorities on the above businesses. 6. a. Ronald T. Fannon, Broker with Boone Realty, Inc. b. The Mountain Times Newspaper 8. As necessary in accordance with State Law R'eIocation AgeWt m 15.4 Revised 5/90 -3- /-3.-- ,_ _,I, 4 to 2- Date Original & 1 Copy: State Relocation Agent '? 2 Copy: Area Relocation File - R [=L-OCA-F I Gf`J P EP OR -T North Carol ime Department ,. ?f Transportati X__ E.I.S. CORKIDOS; --- DESIGN RELOCATION ASSIS IN _......y PROJECT: 7?C6E,1 ........... _ COUNTY: wetau=a Alternate A ___....._..__._._.._.o f 1 A l t e a .._...._ .: - I.D. NO.: R -S23R _ F.A. PROJECT: FP-66-l (?) '-rcr Approx. SE 470 to S= DESCRIPTION OF PROJECT: _y __._..__ , ._._.ut P _ c5::; to Jee Ge,a ........ ........................ - ................................. ---- ..................................... ESTIMATED DISPLAC S INCO('`= ... --.--................................................... 11 Ype of IL ....... .... 'Minor-' ?i N T ....- II -15M IL. .15-_25M .................... D l s p l a c e e !iOwners.I ... LEVEL - ............ 1 .... .,,.... ITenants Tot=I 1tiPs I 0 ? 7 ri 25-35M ... 35-50M 50 Ur I? ! J I dUa s r i! I ........ .. ..................... ... ..N ............... _........... _............. ...... nd 1 n L r ! 'I I ... I' ....... n . ....... u - h n. mI 2 V B u s -I e s s e s .... .. ! ........... VALUE „ OF DWELLING .............. _ y ... DSS DWELLINGS AVA I LA..... ........... Fa ................ u 4 .................... ....................... Owners Tenants For.....Sa.l_e .... .N ..For Rent... ;rms ............................ .. . O.Non-Prof I t 0 C r_20r .......p.... N.?.... 0_1501........C?...._ ?C_20^1 ? h.......... ........ ...„ ................ ........ . ....... h ......... .................................................. N .. y. 6 0_15 C i ANSWER ALL QUESTIONS ^r_'n y ° 20-40Mh 16 X150-250 q... uM?5? -?5?Y.......... .n..... p nYES!NO" EXPLAIN ALL "YES" ANSWERS Lu---DM' ........................ 150-400 LC-7pM? X25...... np "' . - ...... 7--1 LIE" ? ?tp- IC -1 CD d 400 -' 3C " - - p ?Cu UP ...... .._.JC.....U ..... ... ...................... .... .......,......., I ^ c t 4 e+-p - - ,..L UP _2c! L3 c ? I --?e?- - _ 1. py 1928 . .................. . T , X ! 3. WI 1 1 '.'DUE- I ness ,AI ce GV_'. able a -_e_ ect t...... ; X „ 4 ......._.. _.ny US! ne=_ ce c s- REMARKS (-Respond by Number) Placed. If so, _ype, Pmt mates moe 2. _ Cl,urc , 1,800 Sr, No nam em, 1D : n E?r-vICes w ! 1 1 sti 1 1 be avai table after prcjy- r - Wo?sing short -- Y 6 Source for r G t,.cched I i st . 4 X 7. W I I I add I t I Cast ! .7ZL-z- ? [? . (a) Ronald Fannon„ broker with Boone Real oC G y, programs oe _ ( b ) Multiple X B. Si,ould Lest Resort (c) The Mountain Times Newspaper be considered X ?! 9. Are there Iarg2 s ?. ? necessary in accor-:a.nce with State law, elderly, etc. I-.m. yes h °- --ti ANSWER THESE ALSO FOR DESIGN; 11. North Western Regione! Housing Authorit , X 110. Will public CUSir9 be y'' c' ?= 1 r-iCw2r, Director, (70-/) X64-6683. needed for ploje-- I?. I .X T i 11 . _ s pub I I c ,sus r: a; a, ? 2 . S22 DSS dwe I I i ! ab ngs av- ? e . ................ ..::......__. able X 'I 712. Is it felt -her u;,,i ad-' y f c E? equate DDS ,ous ng cVaila:ble I I,-- .r during relocation :)er;od I XX 13. WiII there be e prcbiem _ ;I housing within -!nancia! .......... .............^ means X 1 114. Are suitable 'CUSiaesS 5 ;,Los i, i._ l............l1 eve i I ab I L. ( I i St source ) y 115. Number months estimated ±c l co plete RELOCATION 12 mc_ ......... :................... .... ..... ...... ......... .......................... .... .... .......... ............... ............................................... .......... ................ 22 ocat I on Agen* .y_/....... _.....- pr -- - - - Form 15.4 Revised 5/90 A ro?sc Date Original $ 1 [spy: State Relocation Agen? Area Relocation File " O C A T I O N R E P O R T North Carolina Department of Transportation E.I.S. _ CORRIDOR _ DESIGN RELOCATION AEGISTANCE JJECT- 8.1750601 COUNTY= -._ Watauga Alternate 4 of 4 Alternate D. NO., R-5298 F.A. PROJECT: _ FR-86-1(8) - DESCRIPTION OF PROJECT, LS 421) South Fork River to Deec Gap i l n 11 e a 10n gent orm 15.4 Revised 5/90 c0,? c2cF _.._ ESTIMATED DISPLACEES INCCY`E LEVEL DTs l O T l T s 0 ISM 351 p acee enants wners l ota ties - 15-25M 2S- 1 35-SOM 50 LF Indlviduals see emarks - Faml lies -? - V Businesses VALLE OF OWEL.L I NG DSS D WELLINGS AVAILABLE I Farms -- -^ _,- _ Owners Tenant _ _ s For Sa le For Rent Non -Profit -? - 0-2011 - -^- g 0-15C? -- 0-2dM g 0-150 - - - - ^ AKSWER ALL OLESTIONS 20-40M 1501-250 .2!J-40 11 ISO-' SO YES NO EXPLAIN ALL "YES" ANSWERS 40-7011 250-400 . 40-70M z=o-aoa 1. Will special relocation i b 70-100 1400-600 70-100 400-600 t 2. serv ces e necessary Will schools or churches be 100 LIP 600 LF 100 L4" bpd L?' - --- affected by displacement _..--__-- 3. Will business services still TOTAL 1 be available after proJect ._.•.......... __. 4. Will any business be dis- REMARKS (Respcnd by Number) Placed, If so, indicate size type, estimated number of employees, minorities, etc. No Relocation on this Alternate Section #4 5. Will relocation cause a housing shortage 6. Source for available hous- -- ins (list) 7. Will additional housing programs be needed 8. ? Should Last Resort Housing --__ be considered 9. Are there large, disabled, elderly, etc. families r M99R THESE ALSO FOR DESIGN 10. Will public housing be -- needed for proJect 11. Is public housing avail- - able 12. Is It felt there will be ad- equate DDS housing available during relocation period 13. Will there be a problem of housing within financial means 14. Are suitable business sites available (list source) 15. Number months estimated to complete RELOCATION ate Approved Date - Original & 1 Copy, State Relocation Agent 2 Copy, Area Relocation File _T ?n nut LT-!?):' W 1 LI, 1 IF I Appendix D Agency Comments on DEIS 1 1 1 A 1 1 1 1 1 A 1 1 1 t A 1 AGENCY COMMENTS ON THE DEIS Exhibit 1 United States Department of the Interior Office of the Secretary Exhibit 2 United States Environmental Protection Agency Exhibit 3 Department of the Army, Wilmington District Corps of Engineers Exhibit 4 North Carolina Department of Cultural Resources Exhibit 5 State of North Carolina Department of Environment, Health, and Natural Resources Division of Environmental Management Division of Parks and Recreation Division of Forest Resources Division of Land Resources Division of Environmental Management Exhibit 6 North Carolina Wildlife Resources Commission Exhibit 7 United States Department of the Interior Fish and Wildlife Service Exhibit 8 North Carolina Department of Cultural Resources Note: WSM-1 is a section of Build Alternative C. WSM-2 is a section of Build Alternative A. WSM-3 is a section of Build Alternative B. 4 L76(FNP-774) ER-92/0712 'United States Department of the Interi OFFICE OF THE SECRETARY WASHINGTON, D.C. 20240 OCT N 6 1992 Mr. Nicholas L. Graf Division Administrator Federal Highway Administration Department of Transportation P.O. Box 26806 Raleigh, North Carolina 27611 C 1 ' I CT ,8 1992 Dear Mr. Graf: This responds to the request for the Department of the Interior's comments on the draft environmental/Section 4(f) statement for U.S. 421, Watauga County, North Carolina. SECTION 4(f) STATEMENT COMMENTS Blue Ridge Parkway Because of the length of the Parkway, we concur that there is no feasible and prudent build alternative that would avoid use of the Section 4(f) resource. We have the following comments regarding each of the proposed crossings of the Parkway. We concur that Alternative 1 is imprudent because it requires a new bridge with a span of 110 feet. This length would preclude a stone arch bridge. In addition, there will be substantial impacts to the Parkway from closing U.S. 421 during construction. We object to Alternative 1. We object to Alternative 2 because it lacks an access connection to U.S. 421. We do not object to Alternative 3. However, we are concerned about the design details of the proposed new ramp in the northwest quadrant (such as percent of grade, curvature,sight distance at the Parkway, amount of cut and fill, etc.). We recommend that a grassed median (suitable for shrub planting) on U.S. 421 be extended through the intersection with this ram to 421 to the Parkway and to enhance the park entrance andecomplement tthesstone arch bridge and other parkway aesthetics. We also recommend that the Blue Ridge Parkway be given, as mitigation, adequate land at the ramp in fee simple for scenic control as well as for entrance and traffic control signing. Exhibit 1, Page 1 2 We object to Alternative 4 because there is no need to connect the existing #1. parkway ramp to U.S. 421 with a T-intersection. Since the ramp will only serve IV-15 eastbound traffic, the existing Y- intersection with acceleration and deceleration lanes added would serve much better. It should be noted that the artist's rendering depicting this alternative does not show a design element offensive to the Parkway's aesthetic quality, that being, the construction of steel W-beam guardrail at not only the medium pier of #2 IV-16 this structure, but also at the abutment walls. Although the state is obligated by standards to construct guadrails when adequate clear zones do not exist, we recommend that liberal design criteria, such as a longer bridge, be used to create the necessary clear zones. The same problem exists for Alternative 3. Alternative 5 is unacceptable because of the impacts it may have on threatened and endangered species associated with the bog. In addition, a new parkway bridge over U.S. 421 to the south of the existing bridge would reduce sight distance at the intersection of the existing ramp and the parkway as well as affect the design geometrics of the ramp by shortening its length. We concur that the impacts on the sensitive mountain bog makes Alternatives 6 and 6A unacceptable. We have the following comments concerning the second provision of Section 4(f), planning to minimize harm. We note that the National Park Service (NPS) is a cooperating agency as it manages the Blue Ridge Parkway and has legal jurisdiction in the area where 113 construction alternatives cross the Parkway. While there has been some IV-16 coordination with NPS, we are concerned that the NPS preferred crossing, Alternative 3 (as stated in Superintendent Everhardt's letter dated May 31 1990 , , page E-5.1) has not been adequately addressed. Alternative 4, preferred by the highway agencies, does not adequately mitigate adverse impacts to the Parkway, will use more parkway land, and will cost $1.2 million more. The NPS prefers the design and mitigation features of Alternative 3, except for the design feature calling for maintaining the existing two lane bridge structure. It appears infeasible from an engineering point of view to preserve #4 this structure. We note that this bridge structure, which was built in 1960, IV-16-IV-17 would not appear to meet the criteria of eligibility to the National Register of Historic Places. Replacing this bridge with a double stone arch bridge would appear to be acceptable. Additional design of the bridge needs to be developed to assure consistency with the historic character of the Parkway. Alternative 3 will have impacts which can be mitigated on the mountain bog as well as on endangered and threatened species associated with the bog. However, the document does not adequately address mitigation. In this regard, the U. S. Fish and Wildlife Service (FWS) indicates a preference for the "no build" alternative, but also indicates that impacts to the bog from Alternatives 2, 3 and 4 are acceptable with mitigation. Mitigation of secondary impacts to the bog due to adjacent construction activities (i.e., increased sedimentation) and the potential secondary impacts to the bog from possible future activities associated with the highway improvement, such as the need for right-of-way for transmission, gas and/or water lines, needs to be addressed in the statement. Exhibit 1, Page 2 t A J f t r 3 These secondary impacts also need to be addressed to assure protection of the Bog Turtle and Gray's Lily which are threatened federal candidate species as well as state threatened species. The NPS Management Policies stipulate that: "Consistent with the purposes of the Endangered Species Act (16 USC 1531 et seq.), the NPS will identify and promote the conservation of all federally listed threatened, endangered, or candidate species within park boundaries and their critical habitats. Active management programs will be conducted as necessary to perpetuate the natural distribution and abundance of threatened or endangered species and the ecosystems on which they depend." Moretz House We concur that there are no feasible and prudent alternatives to avoid the Moretz House, which is eligible for the National Register of Historic Places. We concur that all means to minimize harm have been considered contingent upon approval of V-10 the mitigation plan by the North Carolina State Historic Preservation Officer. This plan and its approval should be included in the final Section 4(f) statement. SUMMARY COMMENTS We recommend reconsideration of Alternative 3 which is preferred by the National Park Service. We also recommend working with the National Park Service to reach an agreement concerning measures to minimize harm to the Blue Ridge Parkway. The Department of the Interior would have no objection to Section 4(f) approval of this project by the Department of Transportation if a satisfactory agreement can be reached with the National Park Service concerning the most feasible and prudent alternative and mitigation measures. Since the Department of the Interior has a continuing interest in this project, we are willing to cooperate and provide technical assistance on this project. For technical assistance please contact the Regional Director, National Park Service, Southeast Region, 75 Spring Street, Atlanta, Georgia, 30303, (404) 331- 5835. We appreciate the opportunity to provide these comments. Sincerely, rnathan Deason nvironmental Affairs i cc: Mr. L. J. Ward Planning and Environmental Branch North Carolina Division of Highways P. 0. Box 25201 Raleigh, North Carolina 27611 Exhibit 1, Page 3 ?fb St4 A ?r UNITED STATES ENVIRONMENTAL PROTECTION AGENCY 1,1'4' a,0110 REGION IV C40 345 COURTLAND STREET. N.E. ATLANTA, GEORGIA 30365 September 15, 1992 Mr. L.J. Ward, P.E., Manager Planning & Environmental Branch NC Dept. of Transportation P.O. Box 25201 Raleigh, NC 27611 Subject: Draft Environmental Impact Statement (DEIS) US 421 From West of the South Fork of the New River to SR 1361 Watauga County, NC; Federal Aid Project No. FR-86-1(6); ERP No. D-FHW-E40325-NC Dear Mr. Ward: Pursuant to Section 309 of the Clean Air Act and Section 102(2)(C) of the National Environmental Policy Act (NEPA), the U.S. Environmental Protection Agency (EPA) Region IV has reviewed the subject Draft Environmental Impact Statement (DEIS). We have identified some areas of concern with the project that need to be addressed during preparation of the Final Environmental Impact Statement and considered during the decision making process. Water Quality Impacts One area of major concern is potential impact to area water quality. There are several high quality streams within the project area that could potentially be adversely impacted by construction of this project. The impacts could originate from several sources; however, due to the mountainous terrain in the project area, one of the most likely sources is construction related impacts. Since the highway corridor will traverse areas with very steep slopes, construction may require deep cuts and extensive fill areas. Earth disturbance of this magnitude creates the potential for extreme soil erosion and the possibility of serious siltation of area streams if erosion is not carefully controlled. These impacts could be relatively long term if large amounts of erodible material reach the streams. The discussion of potential impacts related to construction activities s ou e Im rove to o iv more etai' regarding the length- o streams #1 -tenUai 111LT --- IPMe ?re urom a uc oones or each VIII-3 alternat ve as ative amounts o cu Ing an ling act v ty associate with the various erna Ives. Development of a com rehen8ive erosion control p1jan and strict adherence to Best Management Practices are essential for successful protection of area streams. Due to the steepness of the terrain, the use of an independent erosion control contractor should be considered #2 to review pro osed erosion control plans as we as to constantly VIII-3 monitor the effectiveness oz erosion control measures urine uunszructiion. Exhibit 2, Page 1 1 Printed on Recycled Paper 1 r -2- An additional potential impact to water quality is related to potential spoil disposal areas. Information regarding possible spoil disposal needs should be discussed. Potential for adverse water quality and wetland impacts from disposal areas can be very serious ?3 and the discussion should be expanded so that the overall impacts from spoil disposal associated with the various alternatives can be VIII-3 - compared. The discussion should also include .un acts from tem ors VIII-4 haul roads that would have o e constructed to potential isposa areas. - Another area of concern is related to potential excavation of and construction through areas of acid bearing shales. If exposed and allowed to contact water, these shales can produce acid runoff that is very detrimental to aquatic life. Since the potential exists for these shales to occur in the project area, the DEIS should have #4 discussed the possibility of the presence o t ese s ales and VIII-4 potential impacts associated with them. Methods that will be used to _ search for the sh a1es an potential mitigation tec ni rule , if the hales are discovered in the various corridors should be discussed. Th s information would be helpful in determining the adequacy of information available for alternative selection. No discussion of water quality impacts to spring seeps is included in the document. These seep areas often occur in mountainous regions and provide important habitat to a variety of unique plant and animal species. These extreme headwater areas are very important to downstream water quality and potential impacts should be discussed in the text. A discussion of the number of these areas potentially #5 i pa _t _d hy?anl,1 alternative would alan bQ helpful in comparin the VIII4 alternatives. Discussion of methods to be used to protect these areas is also nee e - The project will impact from 2.2 to 5.0 acres of wetlands. Wetland losses must be avoided, if possible, however, if unavoidable then they must be reduced as much as possible and the losses must be mitigated. we favor the protection of the mountain bog that is located in the project area by selection of an alternative that completely avoids the bog area. An additional concern is input of non-point source pollutants to area waters from the highway after project completion. The document discusses the potential for highway runoff to degrade water quality and we support the use of design features that capture runoff and provide a level of protection from non-point source pollutants. Add t onall we encoura a NCDOT to use alignment shifts to locate the highway as far away from stream corridors as po Exhibit 2, Page 2 1 1 -3- Federal Highway Administration i.e. the agencies responsible for project, throughout the construction period and for some period following construction in order to detect problems that may occur area streams due to project activities. If problems (e.g., acid drainage or siltation) are detected then corrective actions can be initiated immediately. Terrestrial Impacts the] in The proposed project will impact from 142.3 to 110.5 acres of forest lands. Our interest in this matter is a function of the fact that EPA has identified the loss of habitat and the associated decline of plant and animal diversity as a major ecological problem in the Southeast. Forested areas, especially hardwood forests such as are located in the project areas, provide diverse habitat for a variety of organisms. In addition, the loss of forest lands also contributes to the greenhouse effect, the alteration of the earth's climate by human activities. Eve effort should be made to minimize the loss of forested areas by reducing the footprint of the highway corridor as much as possible. Mitigation of loss by planting trees in right-of-way or other suitable areas should be considered. Another consideration is the fragmentation of forest habitat by the construction of the project. Habitat fragmentation is particularly critical for species that require large areas of undivided land. One such species is the black bear. Project design should include features that mitigate this type of habitat fragmentation. On the basis of our evaluation of the document, a rating of EC-2 has been assigned._,.This_rating.means that...our._review of the project has identified environmental impacts that should be avoided to fully protect the environment. Additional information is needed to adequately assess some impacts or mitigation plans. we appreciate the opportunity to comment on this document. If you have any questions please contact David Melgaard, of my staff, at (404) 347-3776. Sincerely I ??, ?x ?., &-)? Heinz J. Mueller, Chief Environmental Policy Section Federal Activities Branch cc: N.L. Graf, Federal Highway Administration Exhibit 2, Page 3 #6 V111- #7 VIII-4 L n L, DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 IN REPLY REFER TO Planning Division September 22, 1992 ? o SEP 231992 k DIVISION OF U HIGHWAYS AESEA? ? Mr. L. J. Ward, P.E., Manager Planning and Environmental Branch Division of Highways North Carolina Department of Transportation Post Office Box 25201 Raleigh, North Carolina 27611-5201 Dear Mr. Ward: This is in response to your letter dated July 13, 1992, requesting comments concerning the "Federal Draft Environmental Impact Statement for US 421, from just West of the South Fork New River to SR 1361 East of Deep Gap, State Project No. 8.1750601 (R-529B), Federal Aid No. FR-86-1(6), Watauga County." The project consists primarily of constructing a 4-lane highway with median transitioning into a 4- or 5-lane highway on the east and west terminal points, respectively. The project includes a crossing of the Blue Ridge Parkway near the eastern end. The present preferred alternative is Alternative A, with Alternative C substituted for a 1-mile section and Blue Ridge Parkway Crossing Alternative 4 (BRP 4). ' The presented Alternatives A, B, and C do not cross any U.S. Army Corps of Engineers constructed flood control or navigation projects. The alternatives are sited in Watauga County, which participates in the Federal Flood Insurance Program. Alternatives A, B, and C have planned crossings of South Fork New River and Gap Creek, which have been studied by detailed methods with the 100-year flood elevations determined and a floodway defined. The preferred alternative's hydraulic effects on the 100-year flood levels and the floodways should be addressed in the Final Environmental Impact Statement (EIS). Line 3, paragraph 1, page IV-88, should be corrected to read "Zones A4 and A6 for Gap Creek and South Fork New River, respectively." "Zone A4 indicates...." should be changed to read "Zones A4 and A6 indicate...." on Line 4, same paragraph and page. Alternatives A, B, and C _ also have planned crossings of reaches of South Fork New River and Gap Creek, which have been mapped by approximate methods (Zone A). For those reaches of South Fork New River and Gap Creek mapped by approximate methods and those other stream crossings, the preferred alternative's roadway and drainage structures would be designed as cited in paragraph 3, same page. The final project's hydraulic effect should be coordinated with Watauga County for Exhibit 3, Page 1 #1 VIII-2 -2- compliance with their flood plain ordinance(s) and possible revisions to their flood insurance maps and report. Executive Order 11988 appears to have been complied with. Our Asheville Regulatory Office has reviewed the draft EIS and noted the various alternative alignments which were discussed in relation to potential impacts to natural and cultural resources. The Build Alternative (new road) versus the No Build Alternative seems valid to us for the following reasons. a. The accident rate on the current roadway is two times the state and national average for 2-lane roads. The current alignment has many sharp curves, steep grades, and numerous access points close to the road. Therefore, a new road alignment seems to be a necessity. b. The Level of Service (LOS) designated by your agency for the current roadway is E, meaning it has a high driver discomfort with forced flow. It is projected that by the year 2015 the LOS will drop to the worst level F, which means a breakdown of flow conditions with long periods of delay due to congestion. c. Simply improving the existing roadway does not seem feasible due to the numerous relocations that would be necessary. For example, the Parkway Elementary school grounds would be degraded by the removal of some of their property in order to do the necessary improvements. Due to the topography of the region, residences and businesses were forced to locate very close to the current road and, therefore, it would be very difficult to accomplish the relocations and successfully improve the road. It is predicted by your agency that if a new road were constructed, most of the traffic would relocate to the new road and leave the old road to serve as a local collector. Three alternatives were narrowed down from a long list of potential candidates for new road alignment. Paragraph 1, page S-11, states that Alternative A, with Alternative C substituted for a 1-mile section and Blue Ridge Parkway Crossing Alternative 4 (BRP 4), is the present preferred alternative. However, the rationale for substituting the 1-mile section with Alternative C does not appear to be discussed in the Draft EIS. We agree that "BRP 4" should be the preferred crossing of the Parkway since it has no significant impacts. The Final EIS should present the rationale for selecting III-1 -III-2 the preferred alternative. The three main alignment alternatives were projected to cost relatively the same and all were of equal length. All skirt the most important aquatic resource of the project, a 3.3-acre southern Appalachian bog located adjacent to the BRP. The bog is considered by your agency, ourselves, and many other agencies and the public to be a pristine southern Appalachian bog. All of the other wetlands that would be impacted by the project are considered by your agency to be degraded based on site investigations. However, we have not had Exhibit 3, Page 2 1 t r 1 1 1 L? -3- the opportunity to confirm this. In addition, all three alignments impact the total stream crossing area about equally, and no Designated Public Mountain Trout Waters would be impacted by any of the alternatives. We concur with your agency's decision to not choose Alternative B. The number of relocations are much higher than either A or C. In addition, state- threatened plant species, Bent avens, would be impacted by this alternative. In consideration of Alternatives A or C, Alternative A would impact 2.4 acres of wetlands, while Alternative C would impact 5.0 acres of wetlands. In addition, Alternative A would impact 74 acres of upland oak and cove forests, while Alternative C would impact 45 acres of these forests. Upland cove and oak forests are important ecologically for habitat for nongame animal species and provide winter food. Also, cove forests have a high density and diversity of species. In consideration of the upland and wetland natural system area to be impacted by the project, it is difficult to choose between the alternatives. Since Alternative A would potentially impact less than one-half the wetland area of Alternative C, but would impact 29 additional acres of upland habitat, the rationale for choosing the selected plan should be given. In particular, the value of upland cove and oak forest habitats should be presented. Seven alternatives were chosen for the BRP crossing. Four would have impacted the bog wetland, while three would not. Based on cost estimates and avoidance of the bog consideration, we agree with your agency that . Alternative 4 is a good choice. This alternative avoids the bog and will not be cost prohibitive. ' In the EIS, your agency states that a sheet pile wall may be installed between the new road and the bog in order to prevent siltation and other IV-17 damaging runoff from reaching the bog. We commend your agency for this idea. We would like to see this decided upon and have detailed plans provided for the structure in the final EIS. We have no comment on historic or archaeological sites which may be disturbed by Alternatives A or C. None of the properties are on the National Register. Five archaeological sites and seven historical sites in the project area are currently eligible and awaiting review. 1 e In conclusion, we have determined that impacts will be minimal to aquatic resources in the project area. The most important resource, the bog wetland, will be avoided entirely and we strongly endorse this. Your agency needs to identify the measures for compensatory mitigation of wetland losses. The EIS indicates that much study has been done to accomplish this. We would like to be able to review your plan for enhancement of degraded wetlands, including an area where restoration or enhancement of wetlands could be accomplished. Exhibit 3, Page 3 -4- There may be an area within the watershed where siltation or some other impact has severely degraded the values associated with the wetland. The Final EIS for the preferred alternative should include a mitigation plan proposed to offset unavoidable wetland impacts. Although specific mitigation sites may VI-1- VI-2 not be known at that time, the Final EIS should include those concepts of mitigation considered for the preferred alternative, the proposed ratios of compensatory mitigation, and the acreage of mitigation proposed according to wetland types. The Draft EIS indicates that.several segments of the project qualify for nationwide permit authorization. Nationwide permits are not applicable #2 for those normally qualified segments since their function or usefulness is VIII-2 dependent upon the remainder of the project which requires individual permit authorization. All portions of the proposed project must be evaluated as part of the individual permit. Department of the Army permit authorization, pursuant to Section 404 of the Clean Water Act of 1977, as amended, will be required for the discharge of excavated or fill material in waters of the United States or any adjacent and/or isolated wetlands in conjunction with your proposed improvements, including disposal of construction debris. On February 6, 1990, the Department of the Army and the U.S. Environmental Protection Agency signed a Memorandum of Agreement establishing procedures to determine the type and level of mitigation necessary to comply with the Clean Water Act Section #3 404(b)(1) Guidelines. The final EIS should indicate a conceptual mitigation VIII-2- plan to offset the impacts for the preferred alternative, the proposed ratios VIII-3 of compensatory mitigation, and the acreage of mitigation proposed according to wetland types. When final plans for the project are complete, including the extent and location of any work within waters of the United States and wetlands, our Regulatory Branch would appreciate the opportunity to review those plans for a project-specific determination of Department of the Army permit requirements. Should you have any questions, please contact Mr. Steve Chapin of our Regulatory Branch, Asheville, North Carolina, at (704) 259-0856. We appreciate the opportunity to comment on this project. If we can be of further assistance to you, please do not hesitate to contact us. Sincer VJawren Chief, Exhibit 3, Page 4 Saunders ning Division n r] i { art. GE Lr? ?3 CSS P 1 1992 VISION OF c5 WAvNorth Carolina Department of Cultural Resti?sEAW James G. Martin, Governor Patric Dorsey, Secretary ' September 9, 1992 Nicholas L. Graf Division Administrator Federal Highway Administration Department of Transportation 310 New Bern Avenue Raleigh, N.C. 27601-1442 Re: US 421 Improvements from US 421 west of South Fork New River to SR 1631, Watauga County, B- 529B, 8.1750601, FR-86-1(6), CH 93-E-4220- 0079 Dear Mr. Graf: Division of Archives and History William S. Price, Jr., Director We have received the draft Environmental Impact Statement (DEIS) from the State Clearinghouse and would like to comment. As stated in the DEIS, Alternative C (preferred) will have an adverse effect upon the National Register-eligible Moretz House. Alternative C would take 4.5 acres of rural landscape and diminish the integrity of the property's location, setting, feeling, and association. In compliance with Sections 106 of the National Historic ' Preservation Act and 4(f) of the Department of Transportation Act, Alternatives A and B were also evaluated in the DEIS. We feel that both Alternatives A and B are prudent and feasible alternatives that will not adversely affect or use the historic property. By law, the protection of historic resources is of special importance. Thus, these resources must be given a value above community dislocation and mere costs of a project. We understand ' that several of the structures which Alternative A would take are abandoned. Also, the additional cost of $433,000 for Alternative A is small considering the total project cost is nearly $60 million. In addition, Alternative A can be built and serve transportation needs safely. Thus, we recommend that Alternative A or B be selected so that an intact and important historic property may be preserved. The above comments are made pursuant to Section 106 of the National Historic Preservation Act of 1966 and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106, codified at 36 CFR Part 800. VIII-7 109 East ones Street • Raleigh, North Carolina 27601-2807 Exhibit 4, Page 1 Nicholas L. Graf September 9, 1992, Page 2 Thank you for your cooperation and consideration. If you have questions concerning the above comment, please contact Renee Gledhill-Earley, environmental review coordinator, at 919/733-4763. Sincerely, c ' David Brook Deputy State Historic Preservation Officer DB:slw cc: State Clearinghouse "C. J. Ward B. Church Exhibit 4, Page 2 t > .. stn't e ;5 ?... State of North Carolina Department of Environment, Health, and Natural Resources 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor Douglas G. Lewis William W Cobey, Jr., Secretary Director Planning and Assessment MEMORANDUM f TO: Chrys Baggett Y State Clearinghouse From: Melba McGee lr Project Review Coordinator RE: DEIS for US 421 West of South Watauga County Fork New River to SR 1631, DATE: September 8, 1992 The Department of Environment, Health, and Natural Resources has the revi ewed the draft environmental impact statement for the proposed improvements to US 421 in Watauga county. Attached are the comments of our agencies for the Department of Transportation's (DOT) consideration in the final document. The environmental impacts of the "preferred" alternative combining III-I portions of alternatives "A" and "C" should be addressed in the III-2 same manner as the other build alternatives. Please note the questions raised by the Division of Environmental Management (DEM). The biological concerns of DEM could be covered by providing them a copy of the technical document on natural systems. Thank you for the opportunity to respond. We look forward to continuing to work with DOT on this project. Exhibit 5, Page I P.O. Box 27687. Ral6k!h. North Carolina 27611 7657 Tclcphonc 919-733.6376 State of North Carolina ?w Department of Environment, Health, and Natural Resources Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27604 James G. Martin, Governor A. Preston Howard, Jr., P.E. William W. Cobey, Jr., Secretary Acting Director August 31 , 1992 Memorandum To: Melba McGee Through: John Dorneyle) , 1 ( onica Swihart ?y14 V From: Eric Galamb Lj` Subject: DEIS for US 421 West of South Fork New River to SR 1631 Watauga County State Project DOT No. 8.1750601, TIP #R-5298 EHNR # 93-0079, DEM WO # 6456 The subject document has been reviewed by this office. The Division of , Environmental Management is responsible for the issuance of the Section 401 Water Quality Certification for activities which may impact waters of the state including wetlands. The following comments are offered in response to the DEIS prepared for this project which will impact between 2.2 and 5.0 acres of wetlands depending upon the alternative chosen. 1. Written concurrence of 401 Water Quality Certification may be required for this project. Applications requesting coverage under our General Certification 14 or General Permit 31 will require written concurrence. 2. DOT should require that the contractor not impact additional wetland areas due ?I to the disposal of excavated spoil material, as a source of borrow material or VIII-5 other construction related activities. Prior to the approval of any borrow source, the contractor shall obtain a 401 Certification from DEM. 3. The document states on page IV-64, "In the event of a hazardous materials #2 spill, special design considerations, such as providing for the drainage of VIII-5 structures into off-side detention basins and not directly into surface waters, would minimize the severity of impact to receiving waters." DOT may wish to consider these detention basins for major stream crossings in this projects. REGIONAL OFFICES Asheville Fayetteville Mooresville Raleigh Washington Wilmington Winston-Salem 704/251-6208 9 19/4 86-154 1 7 04 /663 -1699 919/571-4700 919/946-6481 919/395-3900 919/896-7007 Pollution Preyentlon Pays Exhibit 5, Page 2 P.O. Box 29535, Ralcigh, North Carolina 27626-0535 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer 4. Bog turtles are difficult to locate. Please discuss the methodology used to locate and the intensity of the search for bog turtles and Gra 's lil A , y y. Ira certification for absence by a qualified herpetologist would avoid the above VIII-! discussion for the bog turtles. In addition, a certification for absence by a lifi d b i l id h ' qua e st wou otan d avo t e above discussion for Gray s Lily. 5. To minimize the effect on a bog by construction, DOT proposes to install sheet 4 pilings. A bog may be impacted if the groundwater is stabilized by the sheet 1 pilings. DOT may wish to consult with a qualified herpetologist to determine if VIII-5 the methods proposed to minimize harm to a bog will not alter the bog that VIII-6 ' DOT is trying to save. 6. The COE's September 14, 1990, letter to Hensley-Schmidt, Inc. states that #5 there are two wetland areas separated by a dirt road. DOT has acknowledged VIII-6 that the 3.34 acre wetland (bog) may be impacted. However, will the 0.718 acre bog be avoided or impacted? 7. DOT should not include narratives nor maps of precise locations of natural areas of concern (rare, threatened or endangered species locals) in public documents. There are pet store owners who pay individuals to collect bog turtles and other special concern species . 8. Endorsement of the EIS by DEM does not preclude the denial of a 401 Certification upon application if wetland impacts have not been avoided and minimized to the maximum extent practicable. Questions regarding the 401 Certification should be directed to Eric Galamb in DEM's ' Water Quality Planning Branch. cc: Eric Galamb F1 I Exhibit 5, Page 3 VIII-6 DIVISION OF PARKS AND RECREATION August 25, 1992 Memorandum TO: Melba McGee FROM: Stephen Hall SUBJECT: FEIS -- US 421 Improvements, Watauga County REFERENCE: 93-0079 As noted in the document, there is significant natural area potentially threatened by the proposed project. The Deep Gap Bog, identified as a Priority Natural Area by the Natural Heritage Program, lies just to the north of the Blue Ridge Parkway along the existing route of US 421. Mountain bogs are one of the most imperiled ecosystems in the Southeast and provide habitat for many rare, threatened, or endangered species. The Deep Gap Bog, for instance, is known to possess a population of Gray's lily (Lilium ra i), a candidate for federal listing and state-listed as Threatened. It also potentially harbors bog turtles (Clemmys muhlenbergii), another candidate for federal listing and state-listed as Threatened. As long as the preferred Blue Ridge Parkway is the concerns about impacts to strongly object if one of either cross or encroach alternative (Number 4) for crossing the one implemented, we have no significant Deep Gap Bog. We would, however, the alternatives is selected that would upon this natural area. We commend the preparers for assessing the potential impacts of this project not only to federally-listed species, but also to candidates for federal listing and to state-listed species. The descriptions of the biotic communities, on the other hand, are too general and sketchy, at least as presented in the DEIS (pp. III-23 - III-27). The list of animals expected to occur within the project area (Table III-10) contains many species that do not occur in this region of the mountains. Indeed, if the green salamander, Junaluska salamander, or zig-zag salamander were actually thought to be potentially present, why weren't they considered along with the other state-listed or federal candidate species? The document should be amended to correct these mistakes. F?l E I Exhibit 5, Page 4 Forestry ' ,.•:: nor, ? .. AN:NI ERSARY l N. C. Where it all began State of North Carolina Department of Environment, Health, and Natural Resources Division of Forest Resources 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor Griffiths Forestry Center tanford M. Adams William W. Cobey' Jr., Secretary 2411 Garner Road Director ' Clayton, North Carolina 27520 , August 13, 1992 1 TO: `v Melba McGee, Planning & Assessment j ' FROM: Don H. Robbins, Staff Forester ?`ys SUBJECT: Draft EIS for US 421 on New Location from US 421 West of South Fork New River to SR 1631 in Watauga County (TIP #R-529B) PROJECT # 93-0079 i DUE DATE: 8-24-92 ' We have reviewed the above subject draft document and have the following comments: 1. This proposed project will have a heavy impact on forest and related resources no matter which alternative is selected. From a forestry stand point, alternative "C" would involve the least number of woodland acres. 2. Perhaps as suggested on page-S-11, a combination of Alternative "A" and "C" could be acceptable. With the alignment away from woodland whenever possible, the impact to woodland could be reduced. We would hope the woodland impact could be reduced. 3. The document does address other forestry concerns. pc: Warren Boyette - CO File P.O. Box 27687, Raleigh, North Carolina 27611 7687 Telephone 919-733-2'62 Exhibit 5, Page 5 An Equal Opporruniry Affirmatr.'c Action Employer State of North Carolina . -\ Department of Environment, Health, and Natural Reso_ urces Division of Land Resources James G. Martin, Governor PROJECT RSVISiii C024IENTS Charles H. Gardner Willlam W. Cobey, Jr., Secretary Director Project Number: County: Project Name: -' Geodetic Survev #1 __?/This project will impact geodetic survey markers. N.C. Geodetic survey should be contacted prior to construction at P.O. Box 27687, VIII-6 Raleigh, N.C. 27611 (919) 733-3836. Intentional destruction of a, geodetic monument is a violation of N.C. General Statute 102-4. This project will have no impact on geodetic survey markers. Other (comments attached) 1? 57? For more information contact the Geodetic Survey office a !(9197,-3 3836.' Z_ cc A Reviewer Date Erosion and Sedimentation Control l No comment GZ bG 06 t This project will require approval of an erosion and sedimentation control plan prior to beginning any land-disturbing activity if more than one (1) acre will be disturbed. If an environmental document is required to satisfy Environmental Policy Act (SEPA) requirements, the document must be submitted as part of the erosion and sedimentation control plan. #'2 ? If any portion of the project is located within a High Quality Water VIII-6 Zone (HQW), as classified by the Division of Environmental Management, / increased design standards for sediment and erosion control will apply #3 l? The erosion and sedimentation control plan required for this project VIII-6- should be prepared by the Department of Transportation under the erosion control program delegation to the Division of Highways from the V1II"7 North Carolina Sedimentation Control Commission. Other (comments attached) For more information contact the Land Quality Section at Y (919) 733-4574. 8 -? o - 9.Z Reviewer Date P.O. Box 27687 • Raleigh, N.C. 27611-7687 • Telephone (919) 733-3833 Exhibit 5, Page 6 An Equal Opportunity Affirmative Action Employer a 0 N fir, ?r ? Y? ? ° •Y i 0 J 4A 380 ?w- d O a F a SN ,gyp ^ 81 G ?= r J ^ " \ E a N 01 ?? - re o ?, = a e si 8 ? .?? -- o® '/' N® r _. ? .. b ' .^. 1 V?o H p /?}Y???•_ - ??O Q y `w a ? Q e'.?' TA 11 ?N 3 I - I ? Zat ?1 ? !? ' f Iu =o= o= a a - :: NHU Is ?0 y ?. m vi Al M o "^i? =?? }2} ° >y ° - J - c Exhibit S, Page 7 = -= y's_ < = J 3 2y 00 / _ ?. 41=19 ' NORTH CAROLINA DEPARTMENT OF ENVIRONMENT HEALTH AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL MANAGEMENT ' August 10, 1992 M E M O R A N D U M - - - - - - - - - - TO: M Steven Mauney, Water Quality Supervisor FROM: Jim Johnston, WSRO SUBJECT: Watauga County Draft Environmental Impact Statement Highway 421 Project There are 18 wetland areas and 27 hydrologic crossings that are in the proposed highway paths. One of these is a Mountain Bog with the rarest habitat and home for some of the least common plants and animals. This Bog covers approximately 3.3 acres and is located south ' of US 421 at Deep Gap just at the Blue Ridge Parkway entrance off highway 421. Bog turtles and Gray's lily which has been found in the bog are on the threatened list in North Carolina. Many naturalist consider the Bog turtle to be the United States' rarest turtle species. cc: WSRO Central Files u Exhibit 5, Page 8 1 State of North Carolina Reviewing Office: Depariment of Environment, Health, and Natural Resources INTERGOVERNMENTAL REVIEW - PROJECT COMMENTS Proidcl Number: Due Date: ?- 00/ °9 1 --?101{I`1 After review of this project it has been determined that the EHN ' Tmit(s) and/or app als indicated may need to be obtained In order for this project to comply with North Carolina Law. bc.:. Questions regarding these permits should be addressed to the Region sled on the reverse of the form. All applications, information and guidelines relative to these plans and permits are available from the same Normal Process Regional Office. Time {statutory time PERMITS SPECIAL APPLICATION PROCEDURES or REQUIREMENTS limit) Permit to construct L operate wastewater treatment Application 90 days before begin construction or awardiof 30 days facilities, sewer system extensions, L sewer construction contracts On-site inspection. Post-app (90 days) systems not discharging into slate surface waters. technical conference usual NPDES • permit to discharge into surface water andlor Application 1130 days before begin activity. on-site inspection. 60.120 days Additionally, obtain permit to rence usual f i 1 permit to operate and construct wastewater facilities . e on con Pre-applicat nstruct wastewater treatment facility-granted after NPDES Reply (NIA) J discharging into state surface waters. co time, 30 days after receipt of plans or issue of NPDES permit-whichever is later. 30 nays Pre-applic.-ationn technical conference usually necessary (NIA) Water Use Permit p 7 day: lication must be received and permit issued (15 tlays) s Well Construction Pstmit stallation of a well. rian properly 55 days l i pa r Application copy must be served on each wlf acen i owner. On-site inspection. Pre-application c ,ference usual. Filling 190 days) t Dredge and Fill Perm may require Easement to Fill from N.C. DeDarlment of Administration and Federal Dredge and Fill Permit. Permit to construct d operate Air Pollution Abatement NIA ( 1 60 clays (90 days) facilities and/or Emission Sources as per 15A NCAC 21H. Any open burning associated with subject proposal '. :. st be in compliance with 15A NCAC 2D.0520. m u Demolition or renovations of structures containing 60 days ast>estos material must be in compliance with 15A NIA L (? NCAC 2D.0525 which requires notification and removal prior to demolition. Contact Asbestos Control Group J f? (90 days) 919.733.0820 Complex Source Permit required under 15A NCAC 2D.0800. The Sedimentation Pollution Control Act of 1973 must be properly addressed for any land disturbing activity. An erosion b sedimentatio er Regional Office (Land Ouality Sect.) at least 30 ro ith l d 20 y ? p p w e control plan will be required if one or more acres to be disturbed Plan fi A fee of S30 for the first acre and S2000 for each additional acre or art must accompany the tan s 0 da 3 days before be innin activity trol Act of 1973 must be addressed with respell to the referrenced Local Ordinance: ' i C (30 days) ? on on The Sedimentation Pollut mount d R a Bon On•slte Inspection usual. Surety bond filed with EHN days 30 varies with type mine and number of acres of affected land Any area t6o days) ? Mining Permit mined greater than one acre must be perrnited.The appropnaie bond must be received before the permit can be- issued. On•sile inspection by N.C. Division Forest Resources If permit 1 day I day North Catohna Burning permit exceeds A days r " 1 day e If mo Special Ground Clearance Burning Permit • 22 On-site inspection by N.D. Division Forest Resources required d clearing activities are involved. Inspections f (NIA) D groun counties In coastal N.C. with organic sNIs than five acres o should be requested at least ten days before actual bum is planned." 90.120 days (NIA) El Oil Refining Facilities NIA If permit required. application 60 days before begin construction. repare plans. r to, i i d 50 days nee eng p e Applicant must hire N.C. qualif rov• ? Page 9 Inspect construction, cerlify construction Is according to EHNR app Dam Safety Permit, Exhibit S also require permit under mosquito control program. And M dt? s (60 Y ) , ay ed plans. a AoI permit from Corps of Engineers An inspection of site is neces- - sary to verify Haierd Classilicalion. A minimum fee of &200.00 must Ac romnanv the aDplicalion. An additional processing fee based on a ^^ Normal Process Time PERMITS SPECIAL APPLICATION PROCEDURES or REQUIREMENTS (statutory time limit Fite surety bond of 95,000 with EMNR running to State of N C ) Permit to drill aocploratory oil or pas well . . conditional that any well opened b drill operator by stall upon 10 days , abandonment, be plugged according to EHNR rules and regulations. (N/A) F G*ophys" Exploration Permll Application filed with EHNR at Iea3t 10 days prior to fasue of permit A li 10 days pp cation by letter. No standard application form. (N/A) 6lste lakes Construction Permit Application lee based on structure size is charged Must Include descriptions t drawings of structure i proof of ownership 15.20 days of ri ari (NIA) p an property. 401 Water Quality Gniliutron NIA 60 Days (130 days) CAMA Permit for MAJOR development !250.00 fee must accompany application 55 days (150 (says) AM 22 da s C A Permit for MINOR develo anent P 150.00 tee must accompany application y FC 25 days) Several geodetic monuments are located in or near the project area if any monuments need to be moved or destroyed, please notify: N.C. Geodetic Survey, Box 27687, Raleigh, N.C. 27611 J Abandonment of any wells. If required. must be In accordance with Title 15A, Subchapter 20.011X). Notification of the proper regional office Is requested If "orphan" underground storage tanks (USTSi are discovered during any excavation operation. Co?plrance with 15A NCAC 2H.1000 (Coastal Stormwater Rules) Is required. 45 days (NIA) Other comments (attach additional pages as necessary, being cenarn to cite comment authority): 1-/4'?5' w/L G "T/4?? A AV 7,,?' 7,j /moo G q?- Q?.?? GAS A r9 t L REGIONAL OFFICES Ouestions regarding these permits should be'addressed to the Re ional Offi k ? g ce mar ed below. ? Asheville Regional Office 59 W ? Fayetteville Regional Office oodfin Place Asheville NC 28801 Suite 714 Wachovia Building ' , (704) 2516208 Fayetteville, NC 28301 (919) 486.1541 ? Mooresville Regional Office l ? R i 919 North Main Street, P.O. Box M a e gh Regional Office Mooresville, NC 28115 (704) 6631699 3800 Barre(I Drive, Suite 101 Raleigh, NC 27609 (919) 733.2314 ? Washington Regional Office Exhibit 5, Page 10 14 ? Wilmington Regional Office ' 24 Carolina Avenue Washington NC 27889 127 Cardinal Drive Extension , (919) 9464;481 Wilmington, NC 28405 (919) 395.3900 f I 1 1 ® North Carolina Wildlife Resources Commission 9 512 N. Salisbury Street, Raleigh, North Carolina 27604-1188, 919-733-3391 Charles R. Fullwood, Executive Director MEMORANDUM TO: Melba McGee, Planning and Assessment Dept. of Environment, Health, & Natural Resources FROM: Dennis Stewart, Manager Habitat Conservation Program DATE: August 27, 1992 SUBJECT: State Clearinghouse Project No. 93-0079, review and comments on Draft Environmental Impact Statement for US 421 from just west of the South Fork New River to SR 1361 near Deep Gap, Watauga County (Federal Aid Project FR-86-1(6), State Project 8.1750601, TIP R-529B) This correspondence responds to a request by you for our review and comments on the Draft Environmental Impact Statement (DEIS) for improving US 421 from just west of the South Fork New River to SR 1361 in Watauga County. These comments are provided ' in accordance with the provisions of the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661-667d.) and the North Carolina Environmental Policy Act (G.S. 113A-1 through 113A-10; 1 NCAC 25). The North Carolina Department of Transportation (NCDOT) proposes to improve a 10-mile stretch of US 421, mainly on new location. Three alternatives for the US 421 corridor, denoted A, B, and C, are described in the DEIS. Seven Blue Ridge Parkway crossing alternatives (1, 2, 3, 4, 5, 6, and 6A) located in the area where Alternatives A, B, and C share a common corridor are also described. The North Carolina Wildlife Resources Commission (NCWRC) has the following comments and recommendations regarding the DEIS: ' 1) The NCDOT makes the following statement on page S-11: "Due to the overall advantages, Build Alternative A, from the #1 western terminus of the project limits to approximately one VIII-8 mile west of US 221, and Build Alternative C, from one mile west of US 221 to the eastern terminus of the project Exhibit 6, Page 1 limits, is recommended as the preferred alignment at this time." The NCWRC is confused by this statement because the DEIS did not assess environmental impacts resulting from a combination of Alternatives A and C; therefore, we are unsure as to how the NCDOT selected this combination as the preferred alternative. If indeed the NCDOT wants resource agencies such as the NCWRC to review the feasibility of a combined alternative, the Final EIS (FEIS) should contain information on this alternative (as Alternative D?) in the same manner as presented for Alternatives A, B, and C by giving acreages of various fish and wildlife habitat types potentially affected by this alternative. 2) At this time, no one alternative out of the DEIS for the US 421 corridor (namely and C) stands out as either preferred or NCWRC. those presented in ' Alternatives A, B, unacceptable to the 3) Alternatives 1, 5, 6, and 6A for the Blue Ridge Parkway crossing are unacceptable to the NCWRC because they would involve placement of fill material in part of the 3.3-acre mountain bog (Site No. 10) in this area. The NCDOT at this time prefers Alternative 4 for the crossing, and the NCWRC has no objection to this alternative nor to Alternatives 2 or 3. 4) The NCWRC agrees with the comment on page IV-76 that enhancement of disturbed wetland areas is more desirable as mitigation for unavoidable losses of wetlands than #2 attempting to create new wetlands, as.the latter is often VIII-S unsuccessful. The NCDOT has listed potential wetland areas that could be enhanced for mitigation in Table IV-17, and we concur that possibilities do exist. The FEIS should state that wetland mitigation will be coordinated with the U.S. Army Corps of Engineers, North Carolina Division of Environmental Management, the NCWRC, and the U.S. Fish and Wildlife Service. Except for the issue raised under #1 of our comments, we found the DEIS to be extremely well-written and thorough concerning potential impacts to fish and wildlife resources in the project area. Thank you for the opportunity to review and comment on this project. If we can be of further assistance before the FEIS is available for review, please advise. cc: Ms. Stephanie Goudreau, Mt. Region Habitat Biologist Mr. Joe Mickey, District 7 Fisheries Biologist Mr. David Sawyer, District 7 Wildlife Biologist Mr. David Yow, NCWRC Highway Coordinator Mr. Allen Boynton, Mt. Region Nongame Biologist Exhibit 6, Page 2 7 1J 1 N?EN7 E , r W 9 N O a United States Department of the Interior y4'9CH 7.`?6j9 J FISH AND WILDLIFE SERVICE Asheville Field Office 330 Ridgefield Court Asheville, North Carolina 28806 June 22, 1993 ' Mr. L. J. Ward, P.E., Manager Planning and Environmental Branch ' Division of Highways North Carolina Department of Transportation P.O. Box 25201 Raleigh, North Carolina 27611-5201 Dear Mr. Ward: TAKEN ? 9+i PRIDE IN ? AMERICA naminnow /CE r__ ??N 2 d 1993 Subject: Proposed widening and improvements to U.S. 421, from west of the South Fork New River to S.R. 1366 near Deep Gap, Watauga County, North Carolina, T.I.P. No. R-529B H L J t An interagency meeting was held on June 10, 1993, at the North Carolina Department of Transportation (NCDOT) building in Raleigh, NC, to discuss the selection of a preferred alternative for a section of the subject project. A U.S. Fish and Wildlife Service (Service) biologist from our office was in attendance. The following comments are a follow up to this meeting and are provided in accordance with the provisions of the Fish and Wildlife Coordination Act, as amended (16 U.S.C. 661-667e), and Section 7 of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531-1543). The meeting specifically focused on alternative alignments through the community of Deep Gap at the junction of U.S. 221. Additional alternatives for this section were examined because the preferred alignment--Alternative C--falls within the property boundaries of the W. S. Moretz House, which is eligible for the National Register of Historic Places. Because this project is anticipated to be constructed with Federal-Aid funds and will potentially involve a taking of historic property lands for highway use, this project must comply with the requirements of Section 4(f) of the Department of Transportation Act. The following three alternatives were examined and discussed at the meeting: Alternatives Al and A2 which would relocate U.S. 421 south of the existing road, and Alternative B which would utilize the existing portion of U.S. 421 through the community of Deep Gap. These alternatives would avoid=the 4(f) property, while Alternative C would impact approximately 4.5 acres of the site. Alternatives Al and A2 would require relocating a portion of Gap Creek (1900 and 850 feet, respectively), directly downstream of the sensitive mountain bog located at the Blue Ridge Parkway crossing. Alternatives B and C would require Exhibit 7, Page 1 only perpendicular crossings over Gap Creek. Impacts to the area's important aquatic and wetland resources and to the historical site were discussed for each alternative. At the conclusion of the meeting, resource agencies were requested to submit written comments on the various alternatives and to provide justification for their preferred alignment. , On June 9, 1993, a Service biologist conducted an on site inspection of the project area. At that time, it was noted that the portion of Gap Creek south of, and parallel to, existing U.S. 421 is of medium to high quality. The creek has a sand, cobble, and gravel substrate with an alder-willow riparian zone. The portion of Gap Creek north of existing U.S. 421 was of relatively low quality. This section runs directly through the W. S. Moretz site, which is a cow pasture, and is channelized and degraded by sedimentation (no woody riparian zone exists along this section). After conducting the site visit and further discussing the proposed alternatives at the interagency meeting, the Service prefers either Alternatives B or C. In addition, the Service strongly opposes Alternatives Al and A2 for the following primary reasons: (1) these alternatives would directly impact a relatively high quality section of Gap Creek, and (2) these alternatives involve the relocation of portions of Gap Creek downstream of the bog, which may result in adverse hydrological changes to this rare mountain wetland habitat. In our September 12, 1991, letter on the draft environmental impact statement for this project, the Service highlighted the importance of mountain bog wetlands and pointed out that they represent one of the rarest habitat types in North Carolina. (Experts believe that only 500 acres of bog wetlands remain in the state, a ten-fold decrease over the last 200 years.) We further stressed that ". . . any loss could only be considered significant" and "we are strongly opposed to any alternative that could result in adverse modification of this type of habitat." At that time, we stated our opposition to three of the four proposed Blue Ridge Parkway crossing alternatives as these alternatives involve direct encroachment on the bog. The issue of historic preservation and natural resource protection came up as a result of a conflict between preserving the stone arch bridge over U.S. 421 and the mountain bog. A meeting was held specifically to discuss this issue and it was decided that an alignment that avoids the bog would be selected as the preferred alternative. The Service believes that it is important to point out that NCOOT and the Federal Highway Administration (FHA) have already made a significant effort towards protecting the bog from direct adverse impacts associated with the Blue Ridge Parkway crossing even at additional project expense. We should not risk this investment by now selecting an alternative that may indirectly result in negative impacts to the bog. It is the Service's opinion that the channelization and reconstruction of Gap Creek associated with Alternatives Al and A2 have the potential to cause adverse hydrological changes to the bog by increasing water flow away from the bog and potentially lowering the water table. The Service is presently involved in several cooperative bog restoration efforts in the western part of the state and has worked with a hydrologist in order Exhibit 7, Page 2 F, L rI to identify potential adverse hydrological alterations and to seek appropriate solutions to these problems. One example is a bog in Henderson County that is believed to have been impacted by the channelization of an adjacent stream. Channelization and subsequent ' lowering of the water table appears to have dried out one side of the bog, which is now occupied by non-wetland vegetation. We must stress that bog ecology is poorly understood, but believed to be complex. Likewise, the hydrology of these mountain bogs is complex, and experts believe them to be sensitive to alterations. Our experience confirms that changes in hydrology are not only difficult to predict and evaluate, but are also extremely difficult to ameliorate. Thus, the Service ' recommends erring on the side of caution by avoiding Alternatives Al or A2 and insuring protection of the hydrological integrity of the bog at Deep Gap. Finally, we would like to reiterate another point made in our September 12, 1991, letter, "because of the scarcity of the Southern Appalachian bog habitat and the rarity of many of the species associated with this type of habitat, we are considering petitioning the Service's Atlanta Regional Office to have all remaining bog habitat in North Carolina designated under the Service's Mitigation Policy (Federal Register 45(15):7644-7663, June 23, 1981) as "Resource Category 1" habitat habitat of high value to fish and wildlife species that is unique and irreplaceable on a national or ecoregion basis." Under Part IV of the Memorandum of Agreement between the Department of the Interior and the Department of the Army, procedures are outlined for the elevation of individual U.S. Army Corps of Engineers permit decisions. Specifically, it notes that "the elevation of specific individual permit cases will be limited to those cases that involve aquatic resources of national importance." We consider the Southern Appalachian mountain bog wetlands in North Carolina to be resources of national importance, and we ' will reserve our right to elevate a permit decision in this particular case if necessary. The Service appreciates the consideration given to date to natural resources protection in the project analysis. The decision to avoid the bog at the Blue Ridge Parkway crossing highlighted the FHA's commitment ' to their April 20, 1990, Environmental Policy Statement to give equal consideration to the environment and to protect significant natural resources during the alternative analysis/selection process. The Service believes that the selection of either Alternatives B or C would be most ' consistent with this latter decision and would protect the bog from potential indirect adverse impacts. The Service understands the importance of protecting our historical resources, but believes that the "sliding rule" should apply in this particular case which conflicts with the protection of a significant wetland habitat. Indeed, Alternatives B and C would not result in the loss of historic buildings but only in the loss of a portion of the property, which in this case is a cow pasture with a billboard on it. Again, we thank you for the opportunity to provide input into the ' alternatives selection process and hope that you will give our comments serious consideration. Please direct any questions regarding our comments to Ms. Janice Nicholls of our staff at 704/665-1195, Ext. 227. Exhibit 7, Page 3 In any future correspondence concerning this project, please reference our Log Number 4-2-91-088. 1 Sincerely, . Currie Acting Field Supervisor cc: ' Mr. Bob Johnson, U.S. Army Corps of Engineers, Regulatory Field Office, Room 75, Grove Arcade Building, 37 Battery Park Avenue, Asheville, NC 28801 , Mr. Dennis L. Stewart,. Program Manager, Division of Boating and Inland Fisheries, North Carolina Wildlife Resources Commission, Archdale Building, 512 N. Salisbury Street, Raleigh, NC 27604-1188 ' 7 Exhibit 7, Page 4 STArt Cb ` ( DED 0 8 1994 North Carolina Department of Cultural Resou Y s James B. Hunt, Jr., Governor Divisi4'stla'?? istp?fy Betty Ray McCain, Secretary WWI r Price, fir., iip?e I!j?ON December 2, 1994 Nicholas L. Graf Division Administrator Federal Highway Administration Department of Transportation 310 New Bern Avenue Raleigh, N.C. 27601-1442 Re: US 421 South Fork River to Deep Gap, Watauga County, Federal Aid FR-89-1(6), State 8.1750601, ' TIP R-529B, ER 95-7837 Dear Mr. Graf: ' Thank you for your letter of November 2, 1994, concerning the above referenced project and questions raised by your Atlanta regional office about archaeological site 31 WT301. Since receipt of your letter we have discussed this matter with ' Blue Ridge Parkway Superintendent Gary Everhardt and his staff, Thomas Hargrove who originally reported the site, and Dr. Novick of North Carolina Department of Transportation (NCDOT). Based on information provided by all parties we believe the site is outside the area of potential effect; that the Memorandum of Agreement among Federal Highway Administration, the North Carolina State Historic Preservation Office, and the ' Advisory Council on Historic Preservation with the concurrence of NCDOT and the National Park Service, adequately addresses the site should remnants be identified within the construction area; and that the site is important only for the information it is likely to yield rather than for preservation in place. Indeed, this last point is specifically addressed in the MOA and was accepted by all the signatories to the agreement. Equally important is the possibility that the site is actually within the ' area of the mountain bog which is being avoided and will be carefully monitored for natural resources during and after construction. The above comments are made pursuant to Section 106 of the National Historic ' Preservation Act of 1966 and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106, codified at 36 CFR Part 800. 109 East Jones Street • Raleigh, North Carolina 27601-2807 ?Cy ' Exhibit 8, Page 1 Nicholas L. Graf December 2, 1994, Page 2 Thank you for your cooperation and consideration. If you have questions concerning the above comment, please contact Renee Gledhill-Earley,_ environmental review coordinator, at 919/733-4763. RSincerely, Davi Brook Deputy State Historic Preservation Officer DB:slw cc: ?. F. Vick North Carolina Department of Transportation Gary Everhardt Blue Ridge Parkway Robert M. Baker National Park Service Southeast Regional Office Exhibit 8, Page 2 1 Appendix E Agency Comments on Preferred Alternative at Deep Gap 11 11 AGENCY COMMENTS ON THE PREFERRED ALTERNATIVE AT DEEP GAP Exhibit 9 State of North Carolina Department of Environment, Health, and Natural Resources Division of Environmental Management Exhibit 10 North Carolina Wildlife Resources Commission Exhibit 11 Department of the Army, Wilmington District, Corps of Engineers Exhibit 12 United States Department of the Interior, Fish and Wildlife Service Exhibit 13 North Carolina Department of Cultural Resources State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director June 28, 1993 Memorandum I To: Michelle Wagoner NC DOT - P&E r Ll Through: John Dornly a l e From: Eric Galamb < (?. DEM Subject: Relocation of US 421: Alternative to Avoid the Moretz Property Watauga County, TIP # R-529B This memo is in response to the request for written comments made during the June 10, 1993 meeting on the subject project. DEM still believes that DOT should avoid the section of Gap Creek and an unnamed tributary on the west side of US 421 in Deep Gap. Both streams are classified as C-Trout and are high quality resources except for the degraded section on the Moretz property. Gap Creek on the Moretz property has been channelized and impacted by grazing. As stated in the meeting, DEM and the WRC made a site inspection on June 2, 1993 to determine if the proposed alternative (highway in the stream valley) to avoid the Moretz property would be acceptable. Based on this site visit, DEM maintains that the 1900 feet of stream relocation to Gap Creek and the unnamed tributary west of US 421 should be avoided. The crossing on the Moretz property would be perpendicular to the stream with no stream relocation. It is always preferable to impact a degraded stream over a high quality stream, and to make perpendicular crossings. ' DOT has avoided a bog near the Blue Ridge Parkway. An unnamed tributary to Gap Creek draining the bog would be impacted by the Moretz avoidance alternative. The main concern surrounding the bog is not to disturb the springs. Alterations or relocations of this tributary may change the hydrology of the bog. If the bog becomes wetter with the stream relocation, then the bog may ' become a freshwater marsh or other wetland type. If the bog becomes drier, then the area may dry up and no longer be a wetland. These statements were confirmed by Mr. Dennis Herman, bog turtle specialist with Zoo Atlanta. From water quality and aquatic life view points, the alternative of going through a portion of the Moretz property is preferred rather than the alternative which impacts the high quality unnamed tributary and Gap Creek on the west side of US 421, and the uncertain impacts to the bog. DEM believes that the alternative through the Moretz property is a practicable alternative which would not require relocation of 1900 feet of Ga Creek and the unnamed tributary. 11711.:... Mfr r Of'DL*XT- ° f' hteir0Uafli?i Certffie n 416N ;twouId be Ilkely Madd R an alternative it ' tl 66M wl ldh diets WtWhirnize stream and wetland Impacts. cc: David Foster ' David Yow, WRC DEM WQ Winston-Salem Regional Office Exhibit 9, Page 1 ' P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper V-11 V-11 11 u ?JIIL 1 9 1993 ; North Carolina Wildlife Resources Commission E 512 N. Salisbury Street, Raleigh, North Carolina 27604-1188, 919-733-3391 Charles R. Fullwood, Executive Director MEMORANDUM TO: Michelle Wagoner, Project Planning Engineer Planning and Environmental Branch N. C. Dept. of Transportation ' / FROM: David Yow, Acting Highway Project Coordinator Z; f Habitat Conservation Program DATE: July 14, 1993 SUBJECT: Supplementary comments on 114(f)" property avoidance alternatives, US 421 at Deep Gap, Watauga County, North Carolina, TIP No. R-529B. This memorandum responds to a request from the N. C. Department of Transportation (NCDOT) and the Federal Highway Administration (FHWA) for reviewing agency comment regarding avoidance alternatives for the Moretz Property, a "Section 4(f)" tract potentially affected by the proposed project. Our comments are provided in accordance with provisions of the National Environmental Policy Act (42 U.S.C. 4332(2)(c)) and the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661-667d). The N. C. Wildlife Resources Commission (NCWRC) has actively participated in the planning process for the subject project, and comment on the Draft Environmental Impact Statement (Dennis Stewart, August 27, 1992) recommended avoidance of sensitive wetlands to the south of the existing 421 corridor. A preliminary "preferred" alignment, which avoids these wetlands and minimizes impacts on associated trout streams, was presented for agency review on June 17, 1993. This alignment would involve the southern margin of the remaining Moretz Property, since portions adjacent to existing US 421 have previously been subdivided for commercial development. Two alternative corridors were also presented which would completely avoid direct taking of the Moretz Property. However, Exhibit 10, Page 1 Memo Page 2 July 14, 1993 both would involve extensive longitudinal encroachment on several streams to the south of existing US 421, including a small stream draining the wetland area mentioned above. It is the opinion of the NCWRC that neither avoidance corridor represents a feasible and prudent alternative to highway construction on the north side of US 421, where the Moretz Property lies. The stream channel modifications required for construction on the south side of the existing highway would result in permanent loss of reproductive habitat for native trout, and would require extensive and costly monitoring and possible mitigation of nearby wetland habitat. Successful mitigation may not be possible due to the unique and complex nature of the wetlands involved. Resources Affected Gap Creek appears typical of many coldwater mountain streams in watersheds impacted by human development. However, on-site investigation by NCWRC staff (June 2, 1993) revealed several unique characteristics of this aquatic system. The segment of the creek which would be crossed by the "preferred" alternative has been cleared of vegetation and channelized, partly due to historical land management practices on the Moretz Property. Crossing of the creek by the proposed project would be nearly perpendicular and no stream channel modification would be required. In contrast, the segment of Gap Creek on the south side of US 421, immediately upstream, retains many qualities conducive tc trout survival and reproduction. Riparian areas are heavily vegetated, with overhanging streambanks associated with root systems of shrubs. Distinct pools and riffles are present, with a resulting diversity of substrate types, and the stream channel exhibits a moderate amount of meander. Deep sediment deposits within the streamside vegetation attest to the filtering function of these areas. A small tributary of Gap Creek flows into the system from the east, draining the wetland area near the Blue Ridge Parkway at Deep Gap. This stream also exists in a natural state over most of its length, with good water clarity and clean gravel substrate. Cursory examination of the macroinvertebrate population in both streams found that many intolerant insect species were present, indicating relatively unpolluted waters. Crossing of this area under the "avoidance" alternative would require culverting and/or channelization of more than 800 feet of stream channel, including a substantial portion of the tributary draining the wetland area. Riparian shrub vegetation would be lost along this entire length, and changes in thermal regimes would be anticipated. The wetland area is an Appalachian mountain bog 3.3 acres in size. This area represents a regionally rare and unique resource, as 80 to 90 percent of the historical statewide extent of this habitat has been lost. This particular bog is also exceptional due to its size. Large mountain bogs of this type Exhibit 10, Page 2 u 1 D fl ' Memo Page 3 July 14, 1993 ' have good potential to support rare plant and animal species, including those listed for protection by federal and state resource agencies. Project development to this point has sought ' to avoid or minimize impacts to the bog. The small tributary to Gap Creek is the outlet of water flow from the bog and is an integral factor in bog hydrology. Channel alteration in this ' area has the potential to adversely affect the wetland by changing the dynamics of water flow, above and below ground. Information on bog ecology is limited, and the aspects mentioned ' here result from discussions among biological personnel of the NCWRC, the U. S. Fish and Wildlife Service, the N. C. Natural Heritage Program, and the N. C. Nature Conservancy. Hal Bryan, Senior Ecologist of Eco-Tech, Inc., a regional wetland and ' environmental consultant, also provided information on bog hydrology and mitigation potential. ' On July 8, 1993, NCWRC personnel conducted a survey of fish poulations in Gap Creek and the bog tributary. The results are detailed in the attached memo (Stephanie Goudreau, July 8, 1993). Gap Creek contains a large population of brook trout as well as wild (not stocked) brown trout, including individuals of exceptional size among both species. The tributary contains young brook trout along its entire length, including this year's ' young. Numerous nongame fish species were also collected form both sites. Based on sampling results, the portion of Gap Creek threatened by the "avoidance" alternative represents a significant fishery resource, in terms of population density, size of game fish present, and species diversity. The quality of 1 this system is partially attributable to the thermal and chemical water quality benefits of the groundwater-fed bog tributary. The tributary itself acts as a vital nursery area for the local trout population, a function which is dependent on the existing water quality, temperature, velocity, and substrate size and diversity. Alteration of this system would likely reduce or eliminate trout ' reproduction in the area and possibly further restrict the range of brook trout in the system. In summary, the "avoidance" alternatives would result in alteration or loss of aquatic and wetland resources of regional significance. Water quality and fishery potential of Gap Creek would be impaired, and the trout nursery function of the unnamed tributary would likely be lost. Effects on the mountain bog are impossible to predict, although some hydrologic alteration must be expected. Degradation of the mountain bog could potentially ' result in loss of habitat for multiple plant and animal species under federal and state protection. Exhibit 10, Page 3 IV it Memo Construction Alternatives Page 4 July 14, 1993 1. Mitigation- Highway construction on the south side of US 421 (under the "avoidance" alternative) would require restoration of the stream channels to natural gradient, width, depth, sinuosity, and habitat structure. While the segment of Gap Creek involved could conceivably be restored to its original function, it is likely that this area will be permanently culverted. Restoration of the present value of fishery habitat would then be impossible. Relocation of the unnamed tributary would require extensive monitoring to ensure that the mountain bog wetland would not be affected. This monitoring would include long-term measurement and modeling, before and after construction impact, of surface, sub-surface, and groundwater dynamics within the bog watershed. Such monitoring, while possible, would likely be prohibitive in terms of time and monetary expenditure required for the NCDOT to provide sufficient information to resource agencies. If hydrologic impacts on the bog were detected, remediation of these impacts would be problematic due to the limited understanding of bog ecosystems. Successful mitigation could not be assured, and it is the opinion of the NCWRC that mitigation is not a prudent and feasible alternative to construction on the "preferred" alignment. 2. Minimization- Impacts on stream and bog habitat could conceivably be minimized by complete bridging of the area containing both stream channels. Length of such a structure would likely exceed 2000 feet, and the NCWRC anticipates that such expense would be considered prohibitive by the NCDOT. Minimization of impact by bridging is therefore not considered a prudent and feasible alternative to the "preferred" alignment by the NCWRC. 3. Avoidance- The original "preferred" corridor, developed in the environmental document, would avoid channel alteration of Gap Creek and the unnamed tributary, virtually eliminating the likelihood of hydrologic alteration of the mountain bog wetlands. Crossing of Gap Creek would still be necessary, but the angle of this crossing would be nearly perpendicular, the optimal condition in such situations. Attending natural resource impacts, including loss of riparian wildlife habitat, would also be minimized under this alternative. The NCWRC considers the original "preferred" corridor, which involves marginal taking of the Moretz Property, to be the only prudent and feasible construction alternative. H r 7 Exhibit 10, Page 4 r Gay ?? ' ,? n? /11,,,1 r 'I -o0 E North Carolina Wildlife Resources Commission 512 N. Salisbury Street, Raleigh, North Carolina 27604-1188, 919-733-3391 Charles R. Fullwood, Executive Director MEMORANDUM ' TO: David Yow, Piedmont Region Coordinator Habitat Conservation Program t 1 FROM: Stephanie Goudreau, Mt. Region Coordinator. Habitat Conservation Program , DATE: July 8, 1993 SUBJECT: Results of fish sampling in Gap Creek, Watauga County Mr. Joe Mickey (District 7 Fisheries Biologist) and I sampled Gap Creek and a tributary for trout on July 8, 1993 using a backpack electroshocker. Below are descriptions of sites sampled and lists of fish collected: 1) Gap Creek - sampled from US 421 Bridge near Shell gas station upstream to mouth of unnamed tributary (approximately 60-70 feet). Other information: bankfull width of 10-12 feet; substrate of sand, cobble, and gravel; temperature of 18 degrees Celsius. Brook trout (10 total) Brown trout (2 total) Rosyside dace Blacknose dace Creek chub Blacknose dace Mottled sculpin Fantail darter range in size from 7-13 inches 6 and 13 inches 2) Unnamed tributary to Gan Creek - sampled from mouth to approximately 40 feet upstream behind Shell gas station. Other information: bankfull width of 4-5 feet; substrate of sand, cobble, and gravel; and temperature of 15 degrees Celsius. Brook trout (10 total) - 6 young-of-year, 4 @ 5-7 inches Mottled sculpin Blacknose dace Exhibit 10, Page 5 r We also examined the same unnamed tributary to Gap Creek in the bog near the Blue Ridge Parkway and observed young-of-year trout as far upstream as Station T21 12+50 (as marked on r flagging), which was just downstream of a braided, shallow section of the tributary. In summary, Gap Creek upstream of the US 421 bridge contains a large population of wild brook trout, the only salmonid native to North Carolina. Gap Creek also supports wild brown trout, although to a lesser degree. The unnamed tributary serves as a brook trout nursery stream as far upstream as the bog; therefore, this small stream is very important in maintaining trout resources in Gap Creek. Based on this fish sample, I recommend that neither Gap Creek nor the unnamed tributary be relocated and culverted in conjunction with widening US 421 through Deep Gap. cc: Mr. Joe Mickey, District 7 Fisheries Biologist Ms. Janice Nicholls, USFWS, Asheville Exhibit 10, Page 6 1 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 September 15, 1993 IN REPLY REFER TO Regulatory Branch Action ID 199301489 1 t Mr. L.J. Ward, P.E., Manager Planning and Environmental Branch Division of Highways North Carolina Department of Transportation Post Office Box 25201 Raleigh, North Carolina 27611-5201 Dear Mr. Ward: Reference your August 10, 1993 submittal of information to our Asheville Regulatory Field Office concerning the U.S. 421 South Fork New River to Deep Gap project near Boone, Watauga County, North Carolina (State Project No. 8.1750601, Tip No, R-529B). The submittal requested our comments on three possible alternative alignments in the area of the W. S. Moretz property in Deep Gap. The Moretz property is eligible for listing on the National Register of Historic Places; therefore, the three alignments deal with that segment of U.S. 421 in the area of the historic property. We have reviewed the information provided, including comments from the U.S. Fish and Wildlife Service, the N.C. Wildlife Resources Commission, and the N.C. Department of Environment, Health and Natural Resources. Your summarized table of potential impacts associated with each alternative, and the agency's comments, indicates WSM-2 to be the best compromise alternative. While this alternative would brush the southernmost border of the Moretz property and result in a 1.8-acre loss of pasture, it would not segment the property as would alternative WSM-1, nor would it be likely to have any more visual effect than the existing U.S. 421. This alternative also appears to be well away from any historical structures and at the same time would allow a perpendicular crossing of Gap Creek in an area where the creek has been channelized and cleared of riparian vegetation. Although alternative WSM-1 involves little impact to waters or wetlands, it is likely to have a significant negative impact on the Moretz property by segmenting it and taking 5.7 acres of pasture. In addition, this alternative would locate the highway nearer to historic structures on the property and thus increase visual/aesthetic impacts. Regarding WSM-3, the U.S. Army Corps of Engineers is in agreement with the permit review agencies with regards to the high quality waters and riparian area that would be impacted if you selected this alternative. This plan would Exhibit 11, Page 1 result in the needless relocation of approximately 2,000 feet of Gap Creek and the loss of associated wetland and upland riparian habitats. As Gap Creek has already been channelized and cleared of vegetation on the historic Moretz property, we believe the 1.8-acre loss of historic pasture (associated with WSM-2) to be a more reasonable alternative when compared to the water quality and general habitat degradation that would occur should alternative WSM-3 be implemented. In addition to anticipated water quality and fish and wildlife impacts in Gap Creek, a number of agencies have expressed concern as to whether or not the channel work proposed by WSM-3 would have a hydrologic impact on the upstream Deep Gap bog. It is our understanding that the bog is situated on Blue Ridge Parkway/National Park Service property and that it is at least as old as the Parkway. The bog has been the subject of discussion at numerous highway planning and agency coordination meetings over the past several years. These meetings resulted in the selection of a highway alignment that avoided the bog, even at the expense of a parkway bridge with historic value. In view of the anticipated relocation impacts to Gap Creek, and the risk of hydrologic ' impact to Deep Gap Bog, it seems apparent these projected and potential impacts would outweigh the 1.8-acre lass of perimeter pasture associated with WSM-2. In further consideration of the age and location of the bog, I expect any potential project effects may require additional Section 4(f) review. In summary, WSM-2 represents our preferred alignment. This alignment is not only expected to minimize and avoid adverse impacts to aquatic resources but is also likely to minimize to a great extent, overall impacts to the W.S Moretz property. The opportunity to comment is appreciated. If you have any questions regarding our comments, please contact either Mr. Bob Johnson or Mr. Steve Chapin in our Asheville Regulatory office at (704) 271-4855. Sincerely, ' G. Wayne Wright Chief, Regulatory Branch I Exhibit 11, Page 2 t 1 1 -3- Copies Furnished: Asheville Field Office U.S. Fish and Wildlife Service U.S. Department of the Interior 330 Ridgefield Court Asheville, North Carolina 28806 Mr. John Dorney Water Quality Section Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 29535 Raleigh, North Carolina 27626-0535 Mr. David Yow N.C. Wildlife Resources Commission 512 N. Salisbury Street Raleigh, North Carolina 27604-1188 Mr. David Foster DOT/State Coordinator Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. Roy Shelton U.S. Department of Transportation Federal Highway Administration 310 New Bern Avenue, Room 410 Raleigh, North Carolina 27601 Exhibit 11, Page 3 PP?M,ENT OF lh,? Z W ? vi O M4RCH 7 r 4 i 1 United States Department of the Interior P 1511 AND WILDLIFE SERVICI: Asheville Field Ollice 330 Ridgefield Court Asheville, North Carolina 28806 September 12, 1991 Mr. L. J. Ward, P.E., Manager Planning and Environmental Branch Division of Highways North Carolina Departrient of Transportation P.O. Box 25201 Raleigh, North Carolina 27611-5201 Dear Mr. Ward: TAKES ¦ii PRIDE IN AMERICA?? 44/ ?'Y & ??..? Subject: Draft Environmental Impact Statement for US 421, west of the South Fork New River to SR 1361 near Deep Gap, Watauga County, North Carolina - State Project No. 8.1750601, TIP No. R-529B, Federal Aid Project No. FR-86-1(6) This responds to your letter of August 12, 1991, received August 19, 1991, requesting our comments on the subject project. These comments are provided in accordance with the Fish and Wildlife Coordination Act, as amended (16 U.S.C. 661-667e), and Section 7 of the Endangered Species Act, as amended (16 U.S.C. 1531-1543). The draft is a well-written document that, in general, properly highlights the importance of the fish and wildlife values of the area. However, the U.S. Fish and Wildlife Service (Service) is particularly concerned about the potential impacts the proposed action may have on listed endangered or threatened species and on stream and wetland ecosystems, particularly mountain bogs, within the project impact area and the proposed measures to mitigate such iiiipacts. Preference should be given to alternative alignments, stream-crossing structures, and construction techniques that avoid or minimize encroachment and impacts to these resources. Mitigation/compensation, on a habitat value basis, will be required for all unavoidable stream and wetland losses associated with the proposed action. To the extent possible, mitigation should occur on-site or on the stream or watershed impacted. To lessen impacts, the Service recommends bridging streams wherever possible. If bridging is not achievable and box culverts are used, we recommend that the Department of Transportation explore the possibility of creating a stone substrate on the inside floor of the culverts adequate to create small pools and eddies to provide fish resting areas and facilitate fish movement. This substrate also would provide attachment areas for aquatic insects and other organisms and would help to offset the loss of streambottom habitat Exhibit 12, Page 1 eliminated by the culverts. The substrate could be placed to create a low-flow channel through the center of the culvert. We are particularly concerned that all feasible alternatives would impact the mountain bog wetland. As you correctly stated in the subject document, this is one of the rarest habitat types in North Carolina, and any loss could only be considered significant. If, according to the Federal Highway Administration's April 20, 1990, Environmental Policy Statement that "...environmental consideration to be given equal weight with engineering, social, and economic factors in project decision making...," then alignments that impact significant wetlands should be as easily dismissed from consideration as those that impact historic sites, cause relocations, or other negative impacts. This is not reflected in your list of alternative segments eliminated from consideration, as none were dismissed for environmental constraints. Also, if Parkway Crossing alternatives can be developed (ranging from 3.6 to 31.6 million dollars), then similar consideration should be given to the mountain bog area, as it is as important a resource. Further, it appears that wetland and stream alterations are not viewed as environmental impacts but as economic impacts because of the costs of crossing them (bridges, culverts, etc.). Further, because of the scarcity of Southern Appalachian bog habitat and the rarity of many of the species associated with this type of habitat, we are currently preparing to petition the Service's Atlanta Regional Office to have all remaining mountain bog habitat in North Carolina designated under the Service's Mitigation policy (Federal Register 45(15):7644-7663, January 23, 1981) as "Resource Category 1" habitat--habitat of high value to fish and wildlife species that is unique and irreplaceable on a national or ecoregion basis. Accordingly, we are strongly opposed to any alternative that could result in adverse modification of this type of habitat. Since you received our original scoping comments, there have been several changes in the list of threatened and endangered species and the II-7 - candidate species list. Spreading avens (Geum radiatum), a candidate II-8 species on our 1988 letter, is now listed as endangered; the Roan Mountain bluet (Hedyotis purpurea var. montana), which has been listed as L endangered, is also known from Watauga County. In addition to the listed species detailed above, eight additional candidate species of plants are now known from Watauga County and are currently under status review by the Service--butternut (Ju lans cinerea), rock skullcap (Scutellaria saxatilis), wolf's milk spurge (Euphorbia purpurea), mountain bittercress (Cardamine glematitis), tall larkspur (Delphinium exaltatum), a liverwort (Bazzania nudicaulis), bog bluegrass (Poa paludigena), and Heller's trefoil (Lotus helleri)--and may occur in the impact area of the project. Though the latter seven species, rock skullcap, wolf's milk spurge, mountain bittercress, tall larkspur, Heller's trefoil, bog bluegrass, and the unnamed liverwort have not been found in Watauga County for over 20 years, we cannot dismiss the possibility that they do not exist in the project area until a survey has been completed. We are including these species in our response to give you advance notification so that should these species be listed you will be aware that you will need to reinitiate Section 7 consultation and so that you will realize that any future projects in the immediate area may be affected. Therefore, though candidate species are not legally protected under the Endangered Species Exhibit 12, Page 2 1 Act and are not subject to any of its provisions, including Sections 7 and 9, until they are formally proposed or listed as endangered or threatened, we recommend the project area be surveyed for the above candidate species before any construction to prevent inadvertent harm to these species and to limit future potential conflicts. In summary, we suggest that: (1) additional surveys be conducted to ensure that no listed species will be adversely affected by the proposed project and (2) alternatives be developed to prevent impacts to the mountain bog area. If additional alternatives cannot be devised, the alternative with the least impacts to the bog should be selected. Additionally, a detailed monitoring plan must be developed prior to project approval so that all impacts to the bog (both physical and I-3 biological components) are detailed throughout construction and for at ' least 1 year after project completion. We look forward to working with you to develop a plan to prevent or lessen further impacts to wetland areas or, as a last resort, to identify appropriate mitigation/compensation areas. We look forward to meeting with you and your staff to discuss our concerns. We have assigned log number 4-2-91-088 to this project. Please refer to this number in all future correspondence directed to us concerning this matter. Sincerely, Robert R. Currie Acting Field Supervisor cc: Mr. Randall C. Wilson, Nongame Section Manager, Division of Wildlife Management, North Carolina Wildlife Resources Commission, 512 N. Salisbury Street, Raleigh, NC 27604-1188 Director, North Carolina Natural Heritage Program, P.O. Box 27687, Raleigh, NC 27611 Mr. Cecil Frost, North Carolina Department of Agriculture, Plant Conservation Program, P.O. Box 27647, Raleigh, NC 27611 Division Administrator, Federal Highway Administration, Box 26806, Raleigh, NC 27611 Exhibit 12, Page 3 ? G EE 1 ?F 0 9 " z 1 DIVISION OF North Carolina Department of Cultural Resourc HIGHWAYS 0? ?FN , James B. Hunt, Jr., Governor Division o or Betty Ray McCain, Secretary William S. Price, r., Director November 5, 1993 Nicholas L. Graf Division Administrator ' Federal Highway Administration Department of Transportation 310 New Bern Avenue Raleigh, N.C. 27601-1442 Re: Relocation of US 421 west of South Fork New River to SR 1361, R-5296, 8.1750601, FR-86-(6), Watauga County, ER 94-7582 Dear Mr. Graf: Thank you for your letter of September 27, 1993, concerning the above project. Both Alternatives WSM-2 and WSM-3 appear to be in the vicinity of a previously ' recorded archaeological site, 31 WT300. The site was identified during the reconnaissance survey for this project and was recommended for additional testing. We previously concurred with this recommendation. If either of these alternatives is selected, the recommended testing should be undertaken. We have reviewed the information provided to us concerning the three proposed alternatives in the vicinity of the W. S. Moretz House, a property eligible for listing ' in the National Register of Historic Places. We understand that Alternative WSM-1 and WSM-2 would take 5.7 and 1.8 acres, respectively, from the historic property, while Alternative WSM-3 would avoid the property entirely Having applied the criteria of effect, [36 CFR 800.9(a),(b)], we believe Alternatives; WSM-1 and WSM-2 would have an adverse effect upon the M.oretz House.- If either of these 'alternatives are chosen, we recgmmend that the Federal Highway Administration (FHWA) initiate consultation with us to develop ways to reduce the effects on'the. historic property. Also., FHwA should notify the Advisory: Co un cil. on Historic Preservation of the adverse effect determination. The project would also be .tubject•to Section 4('f) of the U.. S. Department of Transportation Act since land from',a historic property' would be used. On the othl r -hand, Alternative WSM-3 "bypasses the historic property..If FHwAr chooses' WS'M-3 as the "preferred alternative, we believe the adverse effect upon the property,-'as welFas the use under Section 4(f), can be avoided. - ' The above Comments are'Mad , pursy'ght to Section 106 of the,. National. Historic Preservation Acv6f 1906- andthe' Advisoi y. Cquncil on Historic-Pr;eseTvation's Regulations far ComplfaNOe wlith teetion 106, codified at 36 CFR Part 800. Exhibit 13, Page 1 109 East Jones Streit - Raleigh, North Carolina 27601-2807 VIII-7 Nicholas L. Graf November 5, 1993, Page 2 Thank you for your cooperation and consideration. If you have questions concerning the above comment, please contact Renee Gledhill-Earley, environmental review coordinator, at 919/733-4763. Sincere David Brook Deputy State Historic Preservation Officer DB:slw cc: L-A'F. Vick B. Church T. Padgett Exhibit 13, Page 2 Ll- 11 Appendix F Memorandum of Agreement u ' MEMORANDUM OF AGREEMENT SUBMITTED TO THE ADVISORY COUNCIL ON HISTORIC PRESERVATION ' PURSUANT TO 36 CFR PART 800.5(e)(4) REGARDING CONSTRUCTION OF US 421 FROM JUST WEST OF THE SOUTH FORK OF THE NEW RIVER TO SR 1361 WATAUGA COUNTY, NORTH CAROLINA FEDERAL AID PROJECT NO. FR-86-1(6), TIP NO. R-5296 ' WHEREAS the Federal Highway Administration (FHWA) has determined that Ri ver construction of US 421 from just west of the South Fork of the New to SR 1361 will have an effect upon the W.S. Moretz Farm and the Blue Ridge Parkway (BRP), properties eligible for inclusion in the National Register of Historic Places (NR), and has consulted with the North Carolina State Historic Preservation Officer (SHPO) pursuant to 36 CFR part 800, regulations implementing Section 106 of the National Historic 1 Preservation Act (16 U.S.C. 470f); and WHEREAS the design of US 421 from just west of the South Fork of the ' New River to SR 1361 in Watauga County is as described in the Draft Environmental Impact Statement and Draft Section 4(f) Evaluations (EIS), US 421 Watauga County, North Carolina (with Alternative A as the Preferred ' Alternative); and WHEREAS Jimmy Moretz , the property owner of the W. S. Moretz Farm, has been invited to concur in this Memorandum of Agreement; WHEREAS the National Park Service (NPS) and the North Carolina Department of Transportation (NCDOT) have participated in the consultation t and have been invited to concur in this Memorandum of Agreement; NOW, THEREFORE, FHWA and the North Carolina SHPO agree that the undertaking shall be implemented in accordance with the following ' stipulation in order to take into account the effect of the construction of US 421 on historic properties. ' STIPULATIONS ' The FHWA will insure that the following measures are carried out: I. In the event the final design plans for US 421 and the Blue Ridge Parkway change from Alternative A as described in the final EIS, and alter the location or cross-section of the roadway or require substantial amounts of additional right-of-way from those shown in the final EIS, the FHWA shall consult with the North Carolina SHPO and initiate procedures set forth at 36 CFR 800.5(e). f7 ?,J II. The Blue Ridge Parkway A. Federal Highway Administration (Eastern Federal Lands Highway Division) shall develop design plans and administer the construction contract for the bridge and related construction where US 421 crosses the Blue Ridge Parkway (BRP). B. A dual-arch bridge as depicted in Exhibit V-6 of the DEIS will be constructed to replace the existing BRP single-arch bridge. Final bridge and roadway design plans will be submitted to the North Carolina SHPO and NPS for review and comment. FHWA shall coordinate with the NPS throughout the design and construction of the project as stipulated in the MCA among FHWA, NCDOT, and the NPS (Appendix B). C. The rock face of the existing BRP bridge over US 421 will be salvaged by the contractor. The salvaged rock will become the property of the NPS and will be stacked at a location designated by NPS and approved by NCDOT. D. NCDOT shall document the existing bridge in accordance with Appendix A: Historic Structure and Landscape Recordation Plan prior to and during construction. E. In consultation with North Carolina SHPO and the NPS, NCDOT shall develop and implement a landscape plan for the land within the NPS boundaries at the crossing of US 421 and the BRP. This landscape plan will specify plants indigenous to the Blue Ridge Mountains and compatible with the historic landscape plan for the Blue Ridge Parkway. The plans will be submitted to the North Carolina SHPO and the NPS for review and comment prior to construction. F. NCDOT shall erect directional signs pertaining to the BRP in the vicinity of the US 421/BRP interchange which will conform to NPS standards. Any signs that NCDOT and FHWA considers to be essential for reasons of safety will be submitted to the North Carolina SHPO and NPS for review and comment. G. NCDOT shall acquire adequate protective buffer lands on both sides of US 421 to protect the viewshed of the BRP and prevent non-conforming development in the vicinity of the US 421/BRP interchange. Areas NCDOT proposes to acquire for buffer lands will be reviewed and approved by the FHWA and NPS prior to purchase. H. NCDOT shall deed additional right-of-way acquired for construction of the ramp in the northwest quadrant of the US 421/BRP interchange to the NPS in fee simple. This land will not be considered compensation\mitigation for the NPS property required for roadway construction. I. The FHWA and the NCDOT will coordinate with the North Carolina SHPO and NPS to continue assessment of archaeological site 31Wt301 (Stoneman's Fort). The fort, constructed of earth and t J [i f] I materials from a dismantled house during the closing days of the Civil War, was impacted by the construction of the BRP. Current plans indicate between one to 20 feet of land will be used in the area where remnants of the fort may remain. Should these fort remnants be impacted, a qualified archaeologist will assess the National Register eligibility of the site by several methods which may include archival research, site mapping and site ' testing. Since the integrity of the fort was compromised, FHWA h e preservation in place is not anticipated at 31Wt301. T and NCDOT will transmit the results of this work to the NCSHPO and NPS for review. Should additional archaeological work be ' required to mitigate impacts to 31Wt301 a mitigation plan will be developed in consultation with the NCSHPO and the NPS prior ' to construction. J. A research project for the Deep Gap Southern Appalachian Bog as defined on page III-30 of the DEIS will be performed by the NPS and funded by FHWA and NCDOT. An agreement to perform this research project will be completed prior to the ROD. The research project will monitor the hydrology and function of the bog located on BRP property prior to construction and continuing ' through and following construction for a minimum of five years. ' K. Utility lines relocated by the construction of the US 421 improvements will not be routed through the Deep Gap Southern Appalachian Mountain Bog. ' L. Design plans the retaining wall in the vicinity of the US 421/BRP Interchange will be submitted to the NPS and North Carolina SHPO for review and comment. M. The traffic control plans in the vicinity of the US 421/BRP Interchange will be submitted to the NPS and North Carolina SHPO for review and comment. III. W.S. Moretz A. In consultation with the North Carolina SHPO and owner of the ' Moretz Farm NCDOT shall develop and implement a landscape plan to landscape US 421 along its border with the W.S. Moretz Farm. This landscape plan will plant material indigenous to the area and be submitted to the North Carolina SHPO for review and comment prior to construction. B. NCDOT shall document W. S. Moretz Farm prior to construction in accordance with Appendix A: Historic Structure and Landscape Recordation Plan. ' C. During construction and following completion of the project, access to the W. S. Moretz Farm from US 421 will be maintained along the existing driveway. IV. DISPUTE RESOLUTION: Should the North Carolina SHPO object within thirty (30) days to any plans or documentation provided for review pursuant to this amendment, FHWA shall consult with the North Carolina SHPO to resolve the objection. If FHWA or the SHPO determines that the objection cannot be resolved, FHWA shall forward all documentation relevant to the dispute to the Council. Within thirty (30) days after receipt of , all pertinent documentation, the Council will either: A. Provide FHWA with recommendations which FHWA will take into account in reaching a final decision regarding the dispute, or B. Notify FHWA that it will comment pursuant to 36 CFR Section 800.6(b) and proceed to comment. Any Council comment provided in response to such a request will be taken into account by FHWA in accordance with 36 CFR Section 800.6(c)(2) with reference to the subject of the dispute. Any recommendation or comment provided by the Council will be understood to pertain only to the subject of the dispute; FHWA's , responsibility to carry out all the actions under the amended MOA that are not the subject of the dispute will remain unchanged. 4 U I F71 117 J n? U Execution of this Memorandum of Agreement by FHWA and the North Carolina SHPO, its subsequent acceptance by the Council, and implementation of its terms, is evidence that FHWA has afforded the Council an opportunity to comment on the construction of US 421 from just west of the South Fork of the New River to SR 1361, Watauga County, North Carolina, and its effects on historic properties and that FHWA has taken into account the effects of the undertaking on historic properties. FEDERAL HIGHWAY ADMINISTRATION By: A52? r oz? Date: Or Nicho L. G P.E. Division Administrator NORTH CAROLINA STATE HISTORIC PRESERVATION OFFICER By: (? I t ?Ci ULA %Date: William Price, Ph.D.' North Carolina State Histo is Preservation Officer ACCEPTED for the Advisory Council on Historic Preservation By: 4 2"'. " Date: /!Ieit?* 5 MEMORANDUM OF AGREEMENT SUBMITTED TO THE ADVISORY COUNCIL ON HISTORIC PRESERVATION PURSUANT TO 36 CFR PART 800.5(e)(4) REGARDING CONSTRUCTION OF US 421 FROM JUST WEST OF THE SOUTH FORK OF THE NEW RIVER TO SR 1361 WATAUGA COUNTY, NORTH CAROLINA FEDERAL AID PROJECT NO. FR-86-1(6), TIP NO. R-529B Concur: NATIONAL PARK SERVICE By : W . J mes W. Co eman eaional Director Date: 7 s? 6 MEMORANDUM OF AGREEMENT SUBMITTED TO THE ADVISORY COUNCIL ON HISTORIC PRESERVATION PURSUANT TO 36 CFR PART 800.5(e)(4) REGARDING CONSTRUCTION OF US 421 FROM JUST WEST OF THE SOUTH FORK OF THE NEW RIVER TO SR 1361 WATAUGA COUNTY, NORTH CAROLINA FEDERAL AID PROJECT NO. FR-86-1(6), TIP NO. R-5298 Concur: NORTH CAROLINA DEPARTMENT OF TRANSPORTATION i By: Date: H. ran in Vick, P.E, na er Planning and Environmental Branch 5 MEMORANDUM OF AGREEMENT SUBMITTED TO THE ADVISORY COUNCIL ON HISTORIC PRESERVATION PURSUANT TO 36 CFR PART 800.5(e)(4) REGARDING CONSTRUCTION OF US 421 FROM JUST WEST OF THE SOUTH FORK OF THE NEW RIVER TO SR 1361 WATAUGA COUNTY, NORTH CAROLINA FEDERAL AID PROJECT NO. FR-86-1(6), TIP NO. R-5298 Concur: W. S. MORETZ FAMILY By : Date: APPENDIX A HISTORIC STRUCTURE AND LANDSCAPE RECORDATION PLAN ' for Construction of US 421 from the South Fork of the New River to SR 1361 in Watauga County, North Carolina w Photographic Requirements (1) Photographic views of the Blue Ridge Parkway Bridge over US 421 including: - both elevations - views showing the relationship of the bridge to the roadway and the surrounding landscape - views documenting the dismantling of the existing bridge (2) Photographic views of the W.S. Moretz Farm including: - each elevation of the Moretz house - views showing all other buildings on the farm plus their relationships to the house and each other views showing the relationship of the property to the roadway, including the entrance - views showing the overall landscape of the farm and the position of the buildings in that landscape Format 35 mm black and white negatives (all views) 8" x 10" black and white prints (all views) Color transparencies (all views) All processing to be done to archival standards All photographs, negatives, and transparencies to be labeled according to NC Division of Archives and History Standards. Fiber-based paper is the traditional archival standard. According to Kodak, however, their resin-coated paper meets archival standards if it is stored in total darkness (an envelope) and at low humidity. HISTORIC STRUCTURE AND LANDSCAPE RECORDATION PLAN for Construction of US 421 from the South Fork of the New River to SR 1361 in Watauga County, North Carolina ' Copies and Curation One (1) set of all negatives, prints and transparencies will be deposited with the North Carolina Division of Archives and History/State Historic Preservation Office to be made a permanent part of the statewide ' survey and iconographic collection. One (1) set of prints of the Blue Ridge Parkway Bridge will be deposited with the National Park Service. 1 1 [,-]I Appendix B Memorandum of Agreement ' H:\NC421MOA February 23, 1994 Agreement No: DTFH71-94-A-00019 ' MEMORANDUM OF AGREEMENT ' AMONG DEPARTMENT OF THE INTERIOR NATIONAL PARK SERVICE AND STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION AND DEPARTMENT OF TRANSPORTATION ' FEDERAL HIGHWAY ADMINISTRATION FOR ' DESIGN AND CONSTRUCTION FOR INTERCHANGE OF U.S. ROUTE 421 AT THE ' BLUE RIDGE PARKWAY WATAUGA COUNTY, NORTH CAROLINA The purpose of this Memorandum of Agreement (Agreement) is to establish the roles, responsibilities, and procedures under which work shall be performed by the North Carolina Department of Transportation (NCDOT), the National. Park Service (NPS), and the Federal Highway Administration (FHWA), as necessary to reconstruct the interchange of U.S. Route 421 and the Blue Ridge Parkway, Deep Gap, Watauga County, North Carolina. The project is further described as the reconstruction cf U.S. Route 421 to a 4-lane divided highway at the Blue Ridge Parkway, transitioning to a 5-lane section, approximately 1.0 mile. The reconstruction of the interchange will be designed and constructed to maintain the aesthetics and scenic value of the Blue Ridge Parkway. WHEREAS, the State of North Carolina has the Jurisdictional and maintenance responsibilities for U.S. Route 421; WHEREAS, the NPS is the Federal agency with administrative oversight, maintenance, and Jurisdictional authority for the Blue Ridge Parkway; WHEREAS, the NCDOT has identified the need to improve U.S. Route 421 in Watauga County, North Carolina, from just east of the town of Boone to SR 1361, east of the town of Deep Gap. The improvements will consist of the construction of a 4-lane divided highway section, with a 5-lane curb and gutter section in the developed areas; WHEREAS, the U.S. Route 421 has been designated for inclusion in the National Highway System, and the funding for the improvement would be in accordance with the provisions of the Federal-aid National Highway System; WHEREAS, the proposed improvements to U.S. Route 421 will impact the existing interchange with the Blue Ridge Parkway; WHEREAS, the NCDOT has requested the assistance from the Eastern Federal Lands Highway Division (EFLHO), of the FHWA, in the preliminary engineering and construction of the improvements in the area of the interchange with the Blue Ridge Parkway; WHEREAS, it is feasible to construct the improvements to the interchange with the Blue Ridge Parkway and the U.S. Route 421 approaches separate from the remaining U.S. Route 421 improvements; and, WHEREAS, 23 USC 308(a) authorizes the FHWA to perform engineering and other services in connection with the survey, design, construction, and improvements of highways for other Government or State cooperating agencies. NOW, THEREFORE, the FHWA, the NCDOT, and the NPS do hereby mutually agree as follows: 1. The NCDOT shall be the lead agency for project development of the interchange (including approach road limits), and shall (1)-fund the required State share of the project; (2) approve the final design standards for the improvements to U.S. Route 421; (3) administer the activities necessary to provide the required final environmental clearances and coordination for the entire project; (4) participate in all of the design field reviews; (5) acquire necessary right-of-way and administer required utility relocations including execution of necessary agreements; (6) approve the final plans, specifications, and estimate for construction; and (7) participate in the final construction inspection. Upon successful completion of the project in accordance ' with the approved plans and specifications, and all approved contract modifications, the NCDQT will accept the completed improvements to ' U.S. Route 421 for maintenance and jurisdiction. The North Carolina Division office of the FHWA (NC-FHWA) shall be the lead Federal agency for project development and shall (1) provide the Federal funding of the project; (2) be responsible for all environmental clearances, including the Environmental Impact Statement and the Record of Decision in conformance with the National Environmental Policy Act, as amended, the required State and Federal permits, and the coordination ' in accordance with the National Historic Preservation Act; (3) approve of the right-of-way plans and administratively review the right-of-way acquisition and utility relocation activities; (4) approve the final plans, specifications, and estimate for advertisement; (5) participate in the final inspection of the project; and (6) accept the completed project as being in conformance with the approved design package. The ' current estimate of this project is $3.6 million including right-of-way, with the Federal share being 80 percent. It is recognized that this estimate is preliminary in nature. The NPS shall be a cooperating agency in the project development, and shall (1) approve the final design standards for the Blue Ridge Parkway; ' (2) participate in the evaluation and historic preservation coordination activities for resources within the NPS right-of-way and for the parkway and the existing parkway; (3) participate in the final design process including all field reviews; (4) review and approve all utility ' relocations within NPS lands, including the issuance of any required permits; (5) approve the final right-of-way plans; (6) approve the final plans, specifications, and estimate for construction; and ' (7) participate in the final construction inspection. Upon successful completion of the project in accordance with the approved plans and specifications, and all approved contract modifications, the NPS will ' accept the completed improvements to the Blue Ridge Parkway for maintenance and jurisdiction. 4. The EFLNO, of the FHWA, shall be a cooperating agency for the project ' development, and shall (1)_administer all surveyina_and mapping necessary for final design activities; (z) administer all subsurface investigat-1-ons; M incorporate all environmental commitments into the design; (4) prepare final preliminary plans for review and approval; (3) preparation of right-of-way plans and utility plans; (6) submit the final plans, specifications, and estimate for review and approval; ' (7) advertise and award the construction contract; and (8) administer the construction contract including necessary construction inspections. The design shall be in accordance with the applicable AASHTO standards ' and guides, including the NPS Park Road Standards for the work impacting the Blue Ridge Parkway. The EFLHD shall use the "Standard Specifications for Construction of Roads and Bridges on Federal Highway ' Projects" for the work. The procurement of any required design activities and the construction contracts will be in accordance with the Federal Acquisition Regulations, and the Transportation Acquisition Regulations, with the analysis of bidders and bids coordinated with the NCDOT and the NC FHWA. The EFLHD Division Engineer shall be the Contracting Officer. 5. In accordance with the approved one-time exception to the Federal Acquisition Regulations, the construction contract administered by the EFLHD will not include any provision for construction claims due to differing site condition. 6. The EFLHD will request written comments and concurrence from the NCDOT, the NC FHWA, and the NPS for the following activities and/or products: a. Preliminary plans, including alternatives, b. Right-of-way plans, based on 35 percent design. C. Plan-in-hand plans (70 percent plans). d. Final plans, specifications, and estimate (95 percent plans). e. Construction contract modifications. f. Completed construction project. 7. Funding for the project will be provided in accordance with normal FHWA Federal-aid funding procedures. The EFLHD will forward funding requests to the NC FHWA for review and approval by both the NCDOT and the NC FHWA. Upon approval of the funding request, the NC FHWA will authorize funds by the FHWA Form 1240, Project Authorization. The Project Agreement, PR-2, will be prepared and executed by the NCDOT and the NC FHWA. The EFLHD will forward quarterly billings for reimbursement. Funding requests for the NCDOT's project related activities will be processed directly by the NC FHWA. Copies of all PR-2's will be furnished to the EFLHD. 8. The FHWA Office of Fiscal Services will provide the unfunded contract authority to cover all obligations. 9. The NCDOT will assign and identify a Resident Engineer for this project once it is advertised for letting, so that all communication with the NCDOT regarding the construction of this project will be channeled through that identified person. 10. All parties to the Agreement will be afforded the opportunity to inspect, at any time, work in progress, the financial records, and any other supporting documentation; and to participate in all meetings, field reviews, bid openings, preconstruction conferences, and periodic and final construction inspections. 11. The EFLHD will be responsible for the administrative settlement or adjudication of claims arising from contracts covered by this Agreement, utilizing and subject to the availability of project funds- f f J L 12. Nothing in this Agreement shall be construed as limiting or affecting the legal authorities of the NCDOT, the FHWA, or the NPS, or as requiring the parties to perform beyond their respective authorities. Nothing in this Agreement shall be deemed to bind any party to expend funds in excess of available appropriations. ' 13. The parties shall not discriminate in the selection of employees or participants for any employment or other activities undertaken pursuant ' to this Agreement on the grounds of race, creed, color, sex, or national origin, and shall observe all of the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252; 42 United States Code 200od-1 et.sea.) ' The parties shall take positive action to ensure that all applicants for employment or participation in any activities pursuant to this Agreement shall be employed or involved without regard to race, creed, color, sex, or national origin. ' 14. No member of, or Delegate to, or Resident Commissioner in Congress shall be admitted to any share or part of this Agreement, or to any benefit ' that may arise therefrom, but this restriction shall not be construed to extend to this Agreement is made with a corporation for its general benefit. 15. The parties will abide by the provisions of Section 1913 (Lobbying with Appropriated Monies) of Title 18, United States Code, which states: ' No part of the money appropriated by any enactment of Congress shall, in the absence of express authorization by Congress, be used directly or indirectly to pay for any personal service, advertisement, telegram, ' telephone, letter, printed or written matter, or other devise, intended or designed to influence in any manner a Member of Congress, to favor or oppose, by vote or otherwise, any legislation or appropriation by Congress, whether before the introduction of any bill or resolution ' proposing such legislation or appropriation; but this shall nor prevent officers or employees of the United States or its departments or agencies from communicating to Members of Congress on the request of any ' Member of Congress, through the proper official channels, requests for legislation or appropriations which they deem necessary for the efficient conduct of public business. ' This Agreement becomes effective on the date of the last approving signature, and shall remain in effect until the project is completed. The Agreement may ' be modified by written consent of all of the parties to cover any questions which may arise subsequent to the date of this Agreement. IN WITNESS THEREOF, the parties hereto have caused this Agreement to be executed by their duly authorized representatives. DEPARTMENT OF THE INTERIOR NATIONAL PARK SERVICE SOUTHEAST REGION James o R a e Regional Director STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION j: R. Goode, ., ate State Highway Administrator DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION NORTH CAROLINA DIVISION OFFICE Nicholas L. ra Dae Division Administrator DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION ary ne ns a Division Engineer L' I J