Loading...
HomeMy WebLinkAbout20081020 Ver 1_Information Letter_20091217OAS North Carolina Beverly Eaves Perdue Governor KAY o?® NCDENR Department of Environment and Division of Water Quality Coleen H. Sullins Director December 17, 2009 Mr. J. B. Setzer, P.E. Division 14 Engineer N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Natural Resources Dee Freeman Secretary Subject: Inspection-NCSR 1102 Pearson Falls Road DWQ Project08-1020 TIP No. B-4239 Polk County Dear Mr. Setzer: On December 3, 2009, I inspected the construction work at the new bridge site on NCSR 1102, Pearson Palls Road in Polk County. Construction work appears to be going well. Both of the MSE walls are complete. Rip rap has been placed at the base of each MSE wall and it was recommended that the rip rap be extended to the edge of water. The erosion and sedimentation control structures, vegetative covering, and matting appear to be working properly. Please continue to ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect downstream waters. A copy of the inspection report is attached to this letter. If you have questions, please call me at 828-296-4500. Sincerely, Michael R. Parker Environmental Senior Specialist Attachment cc: Aaron Powell Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental 'T'ransportation Permitting Unit Niki Maher, NPS Assistance and Compliance Oversight Unit Mike Parker, Asheville Regional Office (Selzer) NCSR 1102 Inspection Letter December 2009 SURFACE WATER PROTECTION SECTION -Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211 Phone: 828-296-45001 FAX :828-299-7043 One Customer Service: 1-877-623-6748 North Caro] i na Internet: www.ncwatemualiry.oro w -Kn???N???? An Equal Oppotlunily l Atrrmative Action Employer (//?Y/ DWQ Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: December 3, 2009 County: Polk Region: Asheville DOT Division: Division 14 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 401 9: OS-1020 NW Permit #:?? IP 3E: Project Name: Location of Project: NCSR 1102 Pearson Falls Road B-4239 From NC 176 in Saluda travel south on NCSR 1102, Pearson Falls Road, approximately 1 mile to the new bridge site Project Complete: ?Yes X No Activities (DOT): X? Bridge X? Culvert ? Bottomless Culvert ? Bottomless Arch X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration ? Bank Stabilization ? Other If no, estimated date of completion: Water Oualitv Concerns (DW ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stoimwater Permit Violation X? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes X? no Estimated Acres ? Zone I Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no List Linear feet Estimated linear feet of impact: F_ Buffer Impacts: ?NeLlse ?Tar-Pam ?Randleman ?Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact Pt/ ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited Name of Waterway(s): DWO Site Visits for DOT Projects Background Info North Pacolet Rivcr Basin/ Subbasin: Broad 030501 Wetland Type: []Isolated []Non-Isolated (Waters of US) Stream Class: []Class B ?303d Listed ?WS-II ?WS-V ?SB X?Class C ?ORW X[]Trout ?WS-lll []NSW ?HQW ?WS-I ?WS-IV ?SA ?CA Type of Authorized Impact: X[]Culvert []Bottomless Culvert X?Bridge []Bottomless Arch X?Riprap InICUOtttlet Stabilization X?Fill Authorized Wetland Impacts: ?0- I/101h acre ?I/11d'to 1/3`d acre ?1/3`d to 1.0 acre ?> 1.0 acre Authorized Stream Impacts: X?< 150 linear feet ?> 150 linear feet Additional comments: Reviewed project with DOT staff. Both end bents and MSE walls complete. Sediment and erosion control structures appear to be working properly. Seeding and/or matting should be performed as needed. Rip rap has been placed at the base of both MSE walls. Recommended extending rip rap down to waters edge at both end bents. Maintain erosion control devices and continue with seeding and matting as required to protect State surface waters. B-4239 NCSR 1102 December 2009