Loading...
HomeMy WebLinkAbout20181638 Ver 2_More Info Received Email_20190716Strickland, Bev From: Patti, Heather < H Patti @trccom pa nies.com > Sent: Tuesday, July 16, 2019 11:19 AM To: Homewood, Sue Cc: Higgins, Karen; Miller, Alex; Hamberg, Alexis; Zimmer, John; David.E.Bailey2 @usace.army.mil; Faul, Travis Subject: [External] Southgate: Updated Variance crossings/List of streams for July 26th Site Visits External email. Do not click links or open attachments unless you reoort.saamna nc.eov Hi Sue, Per our phone conversation yesterday afternoon, I have posted a set of variance impact figures to the project Sharepoint site for your review: https://trcextranet.tresolutions.com/sites/CS-KM1/MVP-Southgate- Agency/SitePages/Home.aspx?RootFolder=%2Fsites%2FCS%2DKM1%2FMVP%2DSouthgate%2DAgency%2FShared%20D ocuments%2FMaior%20Variance%20Aoolication%2FJuly%202019%20Addendum&FolderCTID=0x012000BB735D23F68C BE43BOEA67C7FE3D6E6E&View=%7BBCBB181D % 2DF76D % 2D460C%2D9A9F%2D7E063BA81F3E%7D These figures depict crossings where the design team has been able to make the perpendicular crossing alternative work, thereby removing these crossings from the existing variance application. If you would, please review these crossings and let us know if they look good on your end and if you have any questions as soon as possible. We will be following up with an addendum to our Major Variance application in early August, with updated maps and impact table. Also, below is the list of Jordan watershed streams we would like to visit with you in the field on July 26t" for potential removal off of the Southgate route. These are all currently green tracts (access permitted), and we are coordinating with the land agent. Milepost Resource ID Variance crossing? Comments 52.5 SS-USGS 19-01 No Surveyed, nothing there, should be reviewed to potentially remove 53.1 SS -SOIL 18-03 No 54.2 SS -SOIL 19-13 No but something may/may not be present assoc w/S-C18-66 55.8 SS -SOIL 18-05 No impounded 62.2 SS -SOIL 19-16 No 65.8 SS -SOIL 19-07 Yes remove Surveyed, should be reviewed to potentially remove Access road shift after initial surveys; not surveyed Surveyed - open water pond adjacent; stream may be Open field, may not be present Mapped, but should be reviewed to potentially 67.3RR SS -SOIL 19-31 & No Mapped, but stream delineated as ephemeral. Visit to potentially remove S-B18-80 67.8 SS -SOIL 19-11 Yes SS Soil 19-11 should be reviewed, SS -SOIL 19-10 likely present — trib to Boyds Creek Please let me know of any questions. As always, thank you for your assistance with this project! Heather Patti, PWS Senior Ecologist TRC5540 Centerview Drive, Suite 100, Raleigh, NC 27606 T: 919-256-6236 F: 919-838-9661 1 C: 262-623-1079 Linkedln I Twitter Blog I Flickr I www.TRCcompanies.com Please note that our domain name and email addresses have changed