Loading...
HomeMy WebLinkAbout20031376 Ver 1_COMPLETE FILE_20031030 Regulatory Division DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS PO BOX 1890 WILMINGTON NC 28402-1890 September 29, 2004 Action ID No. 200400113 and State Permit No. 137-04 Michael Lopez D 96 West Salisbury Street OC T 0 4 2004 Wrightsville, North Carolina 28480 DENR _ WATL, nkjR QUALITY vsANDSTONW 7ii Dear Mr. Lopez: Reference your application for a Department of the Army permit to add (4) additional slips to an existing commercial dock, remove sidewalks and add grassed parking areas at your condominium development located at 96 Salisbury Street, adjacent to Banks Channel, Wrightsville Beach, New Hanover County, North Carolina. Your proposal has been reviewed and found to be consistent with the provisions and objectives of general permit No. 198000291. Therefore, you may commence construction activity in strict accordance with applicable State authorization and the approved plan (enclosed). Failure to comply with the State authorization or conditions of the general permit could result in civil and/or administrative penalties. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Questions or comments may be addressed to me at the Wilmington Field Office, Regulatory Division, at (910) 251-4930. Sincerely, Henry Wicker Regulatory Project Manager Enclosure -2- Copies Furnished without enclosure: . John Dorney vision of Environmental Management .C. Department of Environment and Natural Resources 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Mr. Ronald J. Mikulak, Chief Wetlands Section - Region IV Water Management Division U.S. Environmental Protection Agency 61 Forsyth Street, SW Atlanta, Georgia 30303 Mr. Doug Huggett Division of Coastal Management N.C. Department of Environment and Natural Resources 151-B, NC Hwy 24 Morehead City, North Carolina 28557 Mr. Pete Benjamin U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Ron Sechler National Marine Fisheries Service Pivers Island Beaufort, North Carolina 28516 Mr. David Rackley National Marine Fisheries Service Habitat Conservation Division 219 Fort Johnson Road Charleston, South Carolina 29412-9110 Mr. Jim Gregson, District Manager Wilmington City Regional Office N.C. Division of Coastal Management 127 Cardinal Drive Extension Wilmington, North Carolina 28405 MEMORANDUM TO: John Dorney Regional Contact: Noelle Lutheran Non-Discharge Branch WO Supervisor: Bick Shiver Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Michael E. Lopez Middle Sound Business Condos Project Number 03 1376 Recvd From DCM Received Date 10/30/03 Recvd By Region Project Type add additional boatslips County New Hanover County2 Region Wilmington Certificates Stream Stream Impacts (ft.) Permit Wetland Wetland Wetland Stream Class Acres Feet BE Type Type Impact Score Index Prim. Supp. Basin Req. Req. CAMA Waters O Y O N I 18-87-24 FS-B#-F- 30,624. 0.03 F_ F_ ?- Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? 0 Y 0 N Did you request more info? 0 Y 0 N Have Project Changes/Conditions Been Discussed With Applicant? 0 Y 0 N Is Mitigation required? 0 Y O N Recommendation: *issue O Issue/fond 0 Deny Provided by Region: Latitude (ddmmss) Longitude (ddmmss) Comments: This office has no objection to this eject as imposed. A 401 Water Ouaility Cerftication is not required. NL 11/07/03 cc: Regional Office Central Office Page Number 1 NCD NR 031376 North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary October 27, 2003 MEMORANDUM TO: Mr. John R. Dorney WETLANDS/401 ORQUp Division of Water Quality OCT 3 4 ?4Q3 FROM: Doug Huggett WATER Major Permits Processing Coordinator QUA SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Michael E. Lopes / Middle Sound Business Condos Project Location: 96 West Salisbury Street, Wrightsville Beach, New Hanover County Proposed Project: To add (4) four additional slips to an existing commercial dock, remove sidewalks and add grasse*reas at a business condominium development. potrktn5 Please indicate below your agency's position or viewpoint on the proposed project and return this form by November 20, 2003. If you have any questions regarding the proposed project, please contact Jim Gregson at 910-395-3900. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 127 Cardinal Drive Extension, Wilmington, North Carolina 28405-3845 Phone: 910-395-3900\Fax: 910-350-2004 \ Internet: http://dcm2.enr.state.nc.us An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \10% Post Consumer Paper DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Mr. Michael E. Lopez / Middle Sound Business Condos 2. LOCATION OF PROJECT SITE: 96 West Salisbury Street, Wrightsville Beach, adjacent Banks Channel, New Hanover County Photo Index - 2000: 24-308 H18-19 1995: 24-289 J17-18 1989: 176-25 P20 State Plane Coordinates - X: 2364200 Y: 172400 Rover File: 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 10/24/03 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received - 10/16/03 Office - Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Wrightsville Beach Land Classification From LUP - Conservation (B) AEC(s) Involved: EW PT (C) Water Dependent: Yes (D) Intended Use: Commercial (E) Wastewater Treatment: Existing - New Hanover County Sewer Planned - N/A (F) Type of Structures: Existing - Condominiums, parking lot, pier and docking facility Planned - Addition of (4) four slips to existing dock., removal of sidewalks, and the addition of grassed parking areas (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA] DRFDnFD 171T T Fr) (1T14PI? (A) Vegetated Wetlands (B) Non-Vegetated Wetlands 1,150 sq.ft. (open water incorporated (C) Other 436 sq. ft. (high round disturbance) (D) Total Area Disturbed: 1,586 sq. ft. (E) Primary Nursery Area: No (F) Water Classification: SB# Open: No 8. PROJECT SUMMARY: The applicants propose to add (4) four additional slips to an existing commercial dock, remove sidewalks and add grassed parking areas at a business condominium development. Mr. Michael E. Lopez Page Two PROJECT DESCRIPTION: The applicant's project is located at 96 West Salisbury Street, adjacent to Banks Channel, within the Town of Wrightsville Beach, in New Hanover County. To find the property, cross the US Highway 74/76 Draw Bridge over the Atlantic Intracoastal Waterway into Wrightsville Beach. Follow US Highway 74 as it breaks off to the left just over the draw bridge. Keep straight on U.S. Highway 74 (West Salisbury Street) until just before the bridge over Banks Channel. 96 West Salisbury Street will be on your left. The property consists of a 4,387 sq. ft. tract of land located along Banks Channel, at its confluence with Lee's Cut. Both of these water bodies are included in the over all area of Wrightsville Sound known as the Wrightsville Recreational Area. The northern and eastern boundaries of the property are bulkheaded. This bulkhead extends for approximately 176 feet along the northern shoreline and approximately 72 feet along the eastern shoreline. Existing structures on the property include a three story, pile supported office building, a nine space, asphalt parking lot, bulkhead and pier. The existing 6 feet wide pier extends from the bulkhead on the northeastern corner of the lot for approximately 65 feet. The pier then curves approximately 45 degrees to the east and continues for an additional 48 feet. At the terminal end of the pier, a ramp accesses a 6 feet wide by 97 feet long floating dock centered on and perpendicular to the access pier. Approximately 45' waterward of the floating dock are five (5) mooring piles spaced approximately 16 feet apart. The mooring pilings, along with three finger provides docking space for five vessels. Water depths at the end of the structure average approximately -8.5 feet at mean low water (MLW) The waters of Banks Channel and Lees Cut are classified SB by the Division of Water Quality. The area is not designated as a Primary Nursery Area by the Division of Marine Fisheries and closed to the harvesting of shellfish. PROPOSED PROJECT The applicant proposes to add four (4) additional slips to the existing dock, remove an area of sidewalk on high ground and add grassed parking. In order to accommodate the additional slips, the applicant is proposing to extend the floating dock 27 feet to the north. The existing short finger piers, as well as, the existing tie pilings would be removed. Four new finger piers measuring 4 feet in width by 45 feet in length would be added along the floating dock to create a total of nine (9) slips. The old tie pilings would be relocated between the new finger piers. I order to accommodate the Town of Wrightsville Beach Zoning Ordinance requirement for parking spaces, the applicant is proposing to remove the entire concrete walkway area on the east side of the building to create four (4) additional grassed parking spaces. 10. ANTICIPATED IMPACTS: The expansion of the existing docking facility would result in the incorporation of an additional 1,150 sq. ft. of public trust area. The high ground work would result in the elimination of approximately 436 sq. ft. of impervious area within the 75' estuarine shoreline AEC. Submitted by: Jim Gregson Date: October 24, 2003 Office: Wilmington Forin DCM-MP-1 APPLICATION (To be completed by all applicants) b. City, town, community or landmark Wrightsville Beach 1. APPLICANT a. Landowner: c. Street address or secondary road number 96 West Salisbury Street Name Michael E. Lopez Address _ 96 West Salisbury Street City Wrightsville Beach State N. C. Zip 2§480 Day Phone 910.256.8999 Fax N/A b. Authorized Agem: Name Civelli Inc. c/o Richard V. Civelli Address PO Box 199 City Wrightsville Beach State N. C. Zip 28480 Day Phone 910.256.7873 Fax 910.2,&2686 c. Project name Of any) Middle Sound-Business Condos AM: PermEt "U be isiwd in mw e f kwdowwr(t), mid/or pmjea WW. 2. LOCATION OF PROPOSED PROJECT a. County New Hanoygr County Re red 63/" d. Is proposed work within city limits or planning jurisdiction? X Yes No e. Name of body of water nearest project (e.g. river, creek, sound, bay) Banks Channel 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Addition ol'4 Boat slips, remove concrete walk _Rcalacc existing docking facility b. Is the proposed activity maintenance of an existing project, new work, or both? maintenance/new c. Will the project be for public, private or commercial use? Commercial Use d. Give a bri?e1'description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. See attached project summary. APR 16 ZM3 LUJ N OF aIVISI MENT C.OASYAL MANAGE Form DC&f-MP-1 4. LAND AND WATER CHARACTERISTICS m. Describe existing wastewater treatment facilities. CiN sewer a. Size of entire tract 4,387 sf b. Size: of individual lot(e) N/A C. Approximate elevation of tract above MHVfI or NW L 1 d_ Soil types} aid texture(s) of tract. New1m. n nine send /Tidal Marsh Soils_ _ e. Vegetation on tract landscaped flora f. Man-made feamares now on tract QgLld 2fS31121?t1L?? Carkipl, docking facifij,?. g. 'ghat is the CAMA Land Use Plan land classification of the site? (Car odl Aw Lo cd kn d we pkm.) Conservation Tuitional Developed coinmunity Rural Other Is. How is the erect zoned by local gov nt? i. Is the proposed project consistent with the applicable zoning? --X- Yes No (Aaaoh z camnhuac ewrifflawt. (t *) j. Has a professional ambaeological a snhent been done for the trait? Yes --IL No if yes, by wbom?, NA k. Is the project located in a Nateaaal Registered Historic District or does it involve a Na ti real Register lidfed or eligible ptopftiy? Yea _--2L No 1. Art there w edatnds on the site? X Yes Nv Coastal (marth) X Other If yes, has a deli n been conducted? n. Describe location and ryes of diasaah wSes to water of the state. (For example, surface: nmff, sanitar; wastewater,, industrial/commercial effluent, 'was] down' and midemial discharges.) Surface water runoff o. Describe existing drinking water supply source. eV water viw 5. ADDITIONAL INFORMATION In addition to the completed applica don form, th following items must be submitted: A topy of the decd (with state application only) o other instrtlmot under which the applicant claims tid to the affected properties. If the applicant is w claming to be the owner of tsaid property, tM forward a copy of the deed or other instrument uncle which the owner claims title, plus Written permissiol from the owner to carry out the project. An aarurata„ dated work plat (including plan viev and cross-secxiotW drawings) drawn to scale its bland lids on an 8 1/2" by Il" white paper. (Refer t Coastal Resources Commission Rule W.0203 for 4 t t7e d description.) lime bote that original drawings are pnftr d an only high quality copies will be accepted. Blue-lien prints or and lager plats acre mopub1ea only if an sdsgrautte number of quality dopier are prov 1e d b, sppliic =t. (Contact the U.S. Army Corps o Fughw rm? s that agency's use of large lotion map is a part of pla V must be sufficiently detailed to a3cy unfaamiliar with the area to th; APR ide 16 i)lViSiON OF rrnp,STAL MANAGEPAENT Form DCM-MP-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. • A Stormwater Certincation, if one is necessary. • A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that suds owners have reWvW a copy of the appH adw and plats by certified mall. Such landowners must be advised that they have 30 days In which to submit commons on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Mr. Owen G. Kenan / A ent Address 1511 ine urst rive Phone Chapel Hill. NC 27517 Name NC Dot Right of W_y Division Address 124 Division Drive. Wil. NC 28401 Phone Attn: Allen Pope 910.251. 5733 Name Address Phone • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. $400 • A dw& for made payable to the Department of Environment, Haft, and Natural Resources (DEHNR) to cover the costs of processing the application. • A signed AEC Murd notice for projects in oceanfront sad inlet arms. • A statement of compliance with the N.C. Environmental Polio Act (N.C.G.S. 113A - 1 to 10) If the project involves, the expenditure of public Nods or use of public landle, attach a a steamnt documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMLSSION TO ENTER. ON LAND I understand that any permit issued in response to this apllliaKion will allow only the development described in the application. The project will be subject to conditions and restrictions Contained in the permit. I cer tyr that to the beat of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be eonductad in a manner consistent with such program. I certify thst I am authorized to grant, and do in fact, gram permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify drat the information provided in this application is truthful to the beat of my knowledge. This is the a?,~ day of ace, , ?? Print Name Richard V. Civelli /A ent r?IA- 1Z, (4;4 Signature Lawk wr or Marborka Apm Plena indicate attachments pertaining to your proposed project. DCM MP -2 Excavation sad Fill Information :TZDCM MP-3 Upland Development V DCM MP-4 Structures I nfnrmation -._. DCM MP-5 Bridges sad Culverts DCM MP-6 Marina Development NOM, Ame sign and dote each avadoxernt In the vaee praviided atthe bottom of ea 2 I-V D APR 16 Z003 EDIVISION OF COASTAL MANAGEMENT RPVI"a rt" Form DCM-MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-I. Be sure to complete all other sections of the Joint Application that relate to this proposed project. a. Type and number of buildings, facilities, units or structures proposed _ Structure existing_ b. Number of lots or parcels One c. Density (give the number of residential units and the units per acre) N/A h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. Has a site development plan been submitted to the Division of Environmental Management for review? Yes X No If yes, date submitted N/A i. Describe proposed method of sewage disposal. existinm town sewer j. Have the facilities described in Item i. above .received state or local approval? N/A (mach appropriate docu nentation) d. Size of area to be graded, filled or disturbed including roads, ditches, etc. +- 7000-- to be landscaped or disturbed If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? Yes No If yes, date submitted N/A f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for paved surfaces. N/A g. Give the percentage of the tract within 75 feet of MHW or NWL, or within 575 feet in the case of an Outstanding Resource Water, to be covered by impervious and/or built-upon surfaces, such as pavement, buildings, rooftops, or to be used for vehicular driveways or parking. N/A Revised 03/95 k. Describe location and type of proposed discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial /commercial effluent, "wash down" and residential discharges). surface runoff Describe proposed drinking water supply source (e.g. well, community, public system, etc.) 1v?avn evefva-ra m. Will water be impounded? Yes X No If yes, how many acres? n. If the project is a oceanfront development, when was the lot(s) platted and recorded? N/A Michael E. Lopez 96 West Salisburv street Ap 1 icant Project Na A /v _ '- A, 9J Signature 3?4 Dale V? APR 16 2003 DIVISION OF ^._..?.r MANAGEMENT Form DCNr-MP4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major e. Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application which relate to this proposed project. a. Dock(s) and/or Pier(s) (1) _IL Commercial ,Community X Private (2) Number 1 (3) Length 97' existig extension proposed (4) Width 6' (5) Finger Piers X Yes No C) Number 4 (ii) Length 41' f. (iii) Width 4' (6) Platform(s) X Yes No (i) Number 1 (ii) Length 12' (iii) Width 10' () Number of slips proposed 9 (5 existing, 4 proposecd. (8) Proximity of structure to adjacent riparian property lines > 15' (9) 'Width of water body +- 880 feet .(10) Water depth at waterward end of pier at MLW or NWL +- 8 feet mllw b. Boathouse (including covered lifts) (1) NA Commercial NA Private (2) Length NA (3) Width NA c. Groan (e.g. wood, sheetpile, etz.) .(1) Number NA -(2) ' Length (s) NA d. Breakwater (e.g. wood, sheetpile, etc.) (1) Length NA (?) Average distance from MHW, NWL or wetlands _ NA (3) Maximum distance beyond MHW, NWL or wetlands NA Mooring buoys (1) Commercial Community - Private (2) Number (3) Description of buoy (Color, inscription, size, anchor, etc.) NA (4) Width of water body NA (5) Distance buoy(s) to be placed beyond shoreline Mooring structure (boatlift, mooring pilings etc.) (1) Commercial „Community„ Private (2) Number g (3) Length ?NA (4) Width NA Other (cave complete de:aWfian) Applicant would also like to replace existing floating dock. M ; c.?ngel Lampe 2 G ?n/?Sgls6t,?? A 'cast ar P'rn' ? - Dats APP 1 6 M3 olVISION OF COASTAL MANAGEMENT 1"011 Fro, P "I R., 0 - - !IV C?I'n r.. \ ?r ?Q ?j w V /.J UL. IGHT :7a I ?_?•\r a )_'i ^lV ?l\ICZ •2'JVt.I` .1;. pI'..? I I ? "•-?. ' SCWAr, F_? % F y? or 5h O5 AL' All HARBOR ° '?• AMU -N, 'A! ?, r' r `? nA o r rs ' ISLAND ` BM, 'UltrAL GA.HOEN$ MONEY is «?ttrs?l'TSVLLr.F 1; ExkCH ?A? MONEY wl Mchael Lopez 96 West Salisbury Street O tr Rgure 1 , pc Civelliftt 1 t April 1 01?'R I ? 2Q03 S H N UIVISI GEMENN IVIA C MICAIE OF ACCURACY & MAPPW 4 Briars N. Hobbs do certify that this plot was drawn under my supervision from on actual survey made under my supervision (deed description recorded in Deed Book 2014, Page 0398); that the boundaries not surveyed are dearly indicated; that the ratio of precision as calculated Is 1:10,000. Witness my original signature, regatrotion numbs and seal this Llb day of A.D., 2003. Br1an HN ebbs P.L.S. -31HN. ebbs P.LS L- 122 Updated 10/13/03: Additional Info. per Civelii 03/07/03: Decks 02/20/03; Additional Grass Parking & Remove Concrete Walks z s rc a \k CAR 'f4 SEAL L-3122 U,S. Nwy. #74 (H. Salisbury "' Varies Street) (Public) Design and Developmental Compliance: AN Information regarding setbada lines, impervious surfaces. and wetlands shown hereon must be verified by the local, state and federal agencies responsible for enforcing those encumbrances at the time of I igi and development Any and all developmental restrictions must be wedded with the responsible for enforekig those restrictions. C:i 1 6 203 piVSION OF COASTAL MANAGEMENT 2.55 A N, 6 \\ \ vk \7AELEV2.6 • Piling (Typ.) S ?y Piling• 100 (Typ.) INSET 'A' 'C?_ / •"\ Piling • (Typ.) ? dye Piling (Typ.) • Project Location Y SST 7QL?. & _C w?N??a40 a wF ?O,iz? sr AVE >r y sr F ?s`1Fy ?Sr ST VICINITY NAP (n.ta) f y? ?? sT D\ s 0 sr ?0 Sr4Y Sr ? a $ „Me tu7 p'^ PARKING CALCULATKXM54 TOTAL WEATED SaIJARE FEET- I,416 S.F.+225 - 6.5 BOAT SLIPS AVAILABLE- 2 SLIPS X I PARKING SPACE • 2 TOTAL PARKING REQUIRED, 6 SPACES TOTAL PARKING F4WyIDM q SPACES GENERAL NOTES -Boundary information referenced to Deed Book 2014, at Page 398. -Tax Parcel 316118422414 -ThIS property is located in the 100 year flood boundary. -Elevations referenced to NGVD-29 datum. -Ths contractor is responsible for the location and protection of existing utilities during construction. For location of underground utilities contact U-LOCO at 1-800-632-4949. -Tha contractor is responsible for the repair and replacement of any utilities, curb & gutter, pavement etc. that may be damaged during construction. All FS damaged Items shall be repaired to at least the quality of workmanship found in the original item. `9 - W ta 40) .A o I Piling t (Typ ) Legend o EXISTING IRON PIPE BAR SCALE : 1"=30' 301 151 01 301 601 OZ 0 V? 0 r,? c C:6 '0 C U ?z m ? 0 u N c° Jm ? O C ?w L 4/.?1 `v C X W 3 a n n 0 ° Z o=? L<a ty o'? ?i 3 8 1 \2.82 p?V2.8 1 i 1 -J +277 ELEV2.6 TorAL maw . lee er. EAST ELEVATION as"t aeawur aeuw or leuer Wn'OWAFA wo .eO 'awe 1N 07fMllr Fell me CLAW". "IT. R I? 4 i a U Uy m 8 0 J?a as I J `??IIICAR,O N, % ? CERTIFICATE OF SURVEYOR ` ' L Brion N. Hobbs certify \ \ ` =0 404 E55 ? /0y9?that under my direction and vVer sM. ft \ = 2 SEAL attached phydcd uny was dram tram an aeWd survey made under my a gwv1in shot L-3122 = e raW of deparkree Is 1:10,000+. Mbnee my \\ ? hand and aed ifib 13th dap of October 2003. Y \ Il'q,TgM MAN K (P.LS. L-3122 Banks Chanr3l Irllllltttltt? -cell \ \. Project Location B4 Y? w ? v? ?wq rY ? Ofip ST f ??y ST Sl AVE W q ??17? ST f y, q?0 0 Syfh? S? 'I?'ORO'S?TSQy ST ?T VICINITY MAP (n.t.s.) 1 9?7 p, Leana 0s \ \ \ A?Sc.'e x-m Elevation shot token by Hobbs S h n ' Surveying o A PK nail (PK) v 1 \ ' v X Pilinn to be moved \NN L .1 rising Dock ?i P -),,aseb Dock Addition V \ \ %_ ,9 4 a nr7n ' I GC 116 ,:uu3 i DIV1"ION OF ?. COASTAL MANAGFM?NT Design and Developmental Compliance: All information regarding setbacks lines, impervious surfaces, and wetlands shown hereon must be verified by the local, state and federal agencies responsible for enforcing those encumbrances at the time of des ;n and ceveiopment. Any and ail developmental restr -`irns must be ve,iiied with the parties responsible for enforcing those restrictions. N07E5c -All N.C. Grtf rron::menta within 2000 feet of this property have been disturbed or destroyed. Ore Stay Brick Bldg. -Elevations referenced to NGVD-29 datum with a datum shift SCOTC14MAN of -1.35' to reflect mean low water "VSTORE -All cress figured by coordinate mathcd. n/f property is located in the 100 Year Flood Boundary. lelad Petrvleun -This D.B. 1315, Pg. Leo -Boundary information referenced to Deed Book 2014, Page N 23'44'000 E 39.57' 398. -Elevations at existing dock reflect 'Mean Low Mater (MLW) Asphalt with a datum shift f 1.35 f Parkk)G ,ion - 35°O.66 L F. Shoreline 390.18' x 4' = 1353 of of G'lowctle a-aG 7.76 49',wB'1C, E 176.46 Bel .u x @jr _ P' - Pr^,oeac. 0-.-k o Piing _ a ? mt7g Pl:'vg ?P S to be ro, d 1 \ z j P. 3e Dcc; rdc'raing k x :::4f Existing Fnger ?-? 40' "-to be re, oved m- : ?ro s me r -?- x: ? Y ? Exi?tins ?'' Finger t: 31 x _2? z..: ?i' p, ?S be rerr .vad c C: nti x h Piling to bs C r \ g?`Q `unmoved (t)p.) { n ? ?) o z? riii7 y(tQ? euv2e 27G o. 1 • 0 ?rinna ?ti -2? ypQ 1t o S \ N, "w - q4X a. N 49?kz'c \ • q tiert.a x ? e X r? Ze Ex sWg N o -2.77 X MW Merl Finger to C \ be removed a- 0 x 0 OZ 0 ° x rU. m o Face of Bulkhead \? nvz e \2M is Property L'ux 4)' 1 x - , Q c J S Ill ?.. 0? E 7az ? ? ye io 4,387 s.f.t Isimd n/f D.B. 2014, g. OMO N 57'48 u A '05 W 167 A:,pholt Parking Lot 3 U . C Ci O C C v G L c l- 0 ? ? RVEYED BY: BH i A Y: WAS GR ALE 1' - 40' I ATE October r 13, 2002 BAR SCALE: 0-40' JOB: S1ptS-22494 -1 12.62' ORAIYNIG: 22494.dwg x 2.77 .W 20r "*F3 of 4 l:y IJ COA a c NmQ S I 8 Revised: 10/13/03 Revised: 9/8/03 ..::........? . One Story . . Brick Bldg.,'. •'SCOTCHMAN .• SCORE 36' • ' ' CT 16 2003 J, ?f 'VISION OF Islmd Petroleum S At_ MANAGF;91PN) 1"" Pg. 1380 Asphalt / Pal king Lot 1 •,e,?,a,CAur„ CER11Fi 7E OF ACCURACY t MAPPING ELEV2.8 \ Ws R \ 4(r O?i'?. I Brian N. Hobbs do certify that this plat was drawn under my S afESStp? ;upervision from an actual survey made under my supervision (deed \ 2.76 4 S? description recorded In Deed Book 2014, Page 0398): that the \ ELEV2.8 boundaries not surveyed ore dearly indicated; that the ratio of \ e L,-3122 precision as calculated is 1:10,000; that this plot was prepared in \ S accordance with G.S. 47-30 as amended. Witness my original Project Location r? k W` this da of October \ 'a ?.• s re, registration num and seal ??''r Nicu„`••• A .D., y 2.76 \ FAF7H q? k k 0s? s? T --` \ELEV2.8 \ FfL qpo Brian N. Hobbs P.LS. L-3122 \ \\ FAR AVE k h \ \ ASYEL_ ? ST 2.78 \ \ \ sT ELEV2.8 \ \ 17 - --?- \ \ VICINITY MAP (n.ts.) ? \`? Middle S \ \ 2.52 ound \ \ELEV2.8 a $ \ ;p ELE277 8 \1 Z \ 2???2 X13 Face of Bulkhead 1 is Property Line a 3s.8' y y W y ?) E'?j . ELE V2.8 ?Mean High Water Line y 2 ,? m 1 y y y y Reptoced . Existing } 35' `?' y ?' y .y '?' y Concrete Walk with Grass .6 aO W y y le y y y - y y y V W y y y y y 4 r y Add Grass itional V V L J J y yy y v y y I c y W Parking y 4, -V P SPZes y y y y + O `o + W y v. y dditional n/f I yr Grass y 1.1--A Petroleum o I ?z 1 y Parking D.B. 2014, Pg. 3% !Ory } ?? d 57'4805' 167.32' y y 4,387 s.f.t ??N ) • y `V N o Ul ?.a..? .. y y +2.77 Cc ed of efnent Asptnlt f q, y ELEV2.8 ?o c Parking y y y y y y Lot ed Of Pavement y y GENERAL NOTES: Z Q -Boundary information referenced to Deed Book 2014, .y y y y at Page 398. C $ y y y y y -Tax Parcel 316718422414 4m 4) -This property is located in the 100 year flood 0 y y y boundary. 0. -Elevations referenced to NGVD-29 datum. a y y y -The contractor is responsible for the location and y y y protection of existing utilities during construction. c \lr For location of underground utilities contact U-LOCO F y y y y y y at 1-800-632-4949. y y -The contractor Is responsible for the repair and y % replacement of any utilities, curb dr gutter, pavement $v \y y y q, etc that may be damaged during construction. All J i `y damaged items shall be repaired to at least the quality y y of workmanship found In the original item. 0 i Updated `1' y \l. y 03/07/01: Decks 4, -4/ '4' y \L L d { a E 02/20/03: Additional Grass Parking -4- 41 y egen & Remove Concrete Walks '4, y 0 EXISTING IRON PIPE , ' o b Design and Developmental Compliance: All Information regarding setbacks lines, impervious surfaces, '• and wetlands shown hereon must be verified by the local state and v Hw #7/( ige of Pavement ALE I°=20' BAR 5C -ALE Y ' s m b , y. federal agencies responsible for enforcing those encumbrances at the time of design and development Any and all developmental restrictions ICI "T D ? Salisbury Street must be verified with the responsble for enforcing those restrictions. / `/ ICN Varies t ( 7 ' ' f Ubl l C) 20' lo' 01 20 40 2 Of 4