Loading...
HomeMy WebLinkAbout20030283 Ver 1_COMPLETE FILE_20030310E3 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality rF,?p `C May 22, 2003 DWQ# 03-0283 Macon County Mr. Sam Greenwood 5 West Main Street Franklin, NC, 28734 APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Greenwood: You have our approval, in accordance with the attached conditions, to stabilize 2,660 linear feet of perennial streams with tree revetments along the Macon County Greenway as described in your application received by the Division of Water Quality on March 10, 2003 and in additional correspondence received May 21, 2003. After reviewing your application, we have determined that this fill is covered by General Water Quality Certification Number 3399 which can be downloaded from our web site at http://h2o.enr.state.nc.us. This Certification allows you to use Nationwide Permit Number 13 when issued by the U.S. Army Corps of Engineers. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. You should send an application to the Division of Land Resources for their review of your project under dam safety rules as well as erosion and sediment control. Also this approval will expire when the accompanying 404 permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us in writing and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification and the additional conditions listed below: 1. Equipment used in the streams shall be in good working order and be free of oil leaks and drips. Equipment shall be checked daily for leaks and drips; 2. You are required to return the attached Certification of Completion form to notify DWQ when all work included in the 401 Certification has been completed. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Kevin Barnett in our Asheville Regional Office at 828-251-6208 or Cyndi Karoly in Raleigh at 919-733-1786. AW K/cbk Attachments Sincerely, AV Alan W. Klimek, P.E. ii cc: Corps of Engineers Asheville Regulatory Field Office Asheville DWQ Regional Office Central Files File Copy Doug Johnson, Macon SWCD, 191 Thomas Heights Rd., Franklin, NC, 28734 030283 N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 :4 Customer Service 1 800 623-7748 MEMORANDUM TO: John Dorney Regional Contact: Barnett, Kevin Non-Discharge Branch WO Supervisor: Forrest Westall Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS 1w Facility Name Macon County Greenway County Macon ? Project Number 03 0283 County2 Recvd From APP Received Date 3110103 Recvd By Region Project Type stream bank stabilization Certificates Stream Stream Impacts (ft.) Permit Wetland Wetland Wetland Stream Class Acres Feet Type Type Impact Score Index Prim. Supp. Basin Req. Req. 13 Stream P-7 O N F-- 2-(1) FC [-- 40,401. F 2,660.00 2,660.0 Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? Q Y (0 N Did you request more info? QQ Y O N Have Project Changes/Conditions Been Discussed With Applicant? Q Y O N Is Mitigation required? Q Y O N Recommendation: Q Issue 0 Issue/fond O Deny Provided by Region: Latitude (ddmmss) Longitude (ddmmss) Comments: Placed on hold... Application unclear on location of Project. ARO will send out add-info request. 05/21/2003 - Add info received. Issue as requested. Region Asheville cc: Regional Office Central Office Page Number 1 MEMORANDUM TO: John Dorney Regional Contact: Non-Discharge Branch WO Supervisor: Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Macon County Greenway County Macon Project Number 03 0283 County2 Recvd From APP Region Asheville Received Date 3110103 Recvd By Region Project Type stream bank stabilization Certificates Stream Stream Impacts (ft.) Permit Wetland Wetland Wetland Stream Class Acres Feet Type Type Impact Score Index Prim. Supp. Basin Req. Req. 1 Stream '- O O T 1) C 40.4()1. 2.660.00 2,660.0 F Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? 0 Y (0 N Did you request more info? 0 Y 0 N Have Project Changes/Conditions Been Discussed With Applicant? 0 Y 0 N Is Mitigation required? 0 Y O N Recommendation: 0 Issue 0 Issue/Cond 0 Deny Provided by Region: Latitude (ddmmss) Longitude (ddmmss) Comments: Placed on hold... Application unclear on location of Project. ARO'will send out add-info request, cc: Regional Office Central Office Page Number 1 Triage Check List Date: cl Project Name: Cam. DWQ#: County ?C U-Y'1 To:ARO Mike Parker ? WaRO . Tom Steffens ? FRO Ken Averitte ? WiRO Noelle Lutheran ? MRO Mike Parker ? WSRO Cyndi Karoly (Central Office) ? RRO. Steve Mitchell From. I Telephone (919) The file attached is being. forwarded to your for .your evaluation. Please call if you need assistance. ? Stream length impacted ? .Stream determination ? Wetland determination and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues ? Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill ? Mitigation Ratios Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy ? Is the application consistent with pre-application meetings? ? Cumulative impact concern Comments: l5 s Mae A- 4) '? 1 u, Office Use Onlyt Form Version May 2002 ®30283 USACE Action ID No. WQ No. (If any particular item is not applicable to this se enter "Not App ' " 'b?'4b1 GROUP 1. Processing MAR Z 0 2003 1. Check all of the approval(s) requested for this project: x Section 404 Permit F] Riparian W QUh ffiERON Section 10 Permit Fj Isolated Wetland Permit from DWQ x 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: 13 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: 11. Applicant Information 1. Owner/Applicant Information Name: Sam Greenwood Mailing Address: 5 West Main St. Franklin NC 28734 Telephone Number: (828) 349-2025 Fax Number: E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Doug Johnson Company Affiliation: Macon S WCD Mailing Address: 191 Thomas Heights Road Franklin NC 28734, Telephone Number: (828) 369-5347 Fax Number: same E-mail Address: douglas-iohnsonna nc.nacdnet.org Page 5 of 13 III. Project Lhformation .4. 1 Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Macon County Greenway 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 4 Location County: Macon Nearest Town: Franklin Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): 5. Site coordinates, if available (UTM or Lat/Long): (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): 7. Nearest body of water (stream/river/sound/ocean/lake): Little Tennessee River 8. River Basin: Upper Little Tennessee (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Page 6 of 13 10. Describe the overall project in detail, including the type of equipment to be used installation of whole-tree revetments to areas of raw and eroding bank using trackhoe or rubber- tired hackhne_ 11. Explain the purpose of the proposed work: Stabilization of eroding streambank to reduce amount of sediment entering the watercourse IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts' in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be Page 7 of 13 included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: 2. Individually list wetland impacts below: Wetland Impact Area--o cated within Distance to Site Number Type of Impact* ImpacFloodplainNearest Stream Type of Wetland*** (indicate on map) (acres(yes/no) (linear feet) .-10L taco impact: separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fema.-gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: Total area of wetland impact proposed: 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Site Number Type of Impact* Length of Impact Stream N ** Average Width Perennial or (indicate on map) (linear feet) ame of Stream Intermittent? 1 Tree Revetment 1290 Little Tennessee Before Impact 60 ft (please specify) 2 Tree Revetment 720 Little Tennessee 60 ft Perennial Perennial 3 Tree Revetment . 650 Little Tennessee 60 ft Perennial -0& cacu ,uipaci separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated dams. (separately list impacts due to both structure and rip-rap, flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, ?gabions, etc;), excavation, ditching/straightening, etc. If stream relocation is proposed,; plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If'a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at Page 8 of 13 www.usgs.gov. j Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.mapquest.com etc.). Cumulative impacts (linear distance in feet) to all streams on site: 2660 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number (indicate on map) Type of Impact* Area of Impact (acres) Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) -- ------ ----r--- --r-----? ---- •?--••^--F •-•••y?•W? •••.F-" u'F- ulVauua., vul. MV IIVL u1111LGU W: an, excavation, areaging, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands F? stream wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken.to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why, these design; options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. VIII. Mitigation Page 9 of 13 DWQ - It accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/stringide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is, the applicant's responsibility to contact the NCWRP at (91.9) 733-5208 to determine availability,. and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of 'the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Page 10 of 13 Athount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): IX. . Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes x No If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes No x If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes F-? No X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a .map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the, applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other. (please identify )? Yes 0 No If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 2 1.5 Total T c.vnc r cx?cnus ouL w reef perpenmcuiar rrom near oanx of cnannei; cone z extenas an additional 20 feet from the edge of Zone 1. Page I I of 13 J If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation R Property, Conservation. Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. XII. - Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. X1II. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes F-1 No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Page 12 of 13 rI AppT` t/Agent's 9tgnature - - - (Agent's sig ature is valid only if an authorization letter Date i the app scant is provided.) Page 13 of 13 Al , ?S Reve(nimt Structure Stccl Cablc.Anchorlng -` Trees to Dca&nan Log UscdasDcadmant Tree Revetment Structure ux 1Ycnc? Macon County North Carolina USDA Natural Resources Conservation Service r? Aa• ?? ? \I?`f' Qv ',iii, ?l - `j?\\\..? 1 ? ;/L' i??? r./ Va-10 FT r7QC ?I it , ? -? X11 ? xx \ ?? ? _?J ???. /• ?- ; ,yl `/ -? / (, E R/ qH"%? .?/' s _ P .-/ ••0 00 K?LILQ 10.11 haj BM F 47Y ?-? ?? ??? ?. ?? ? • ?'• ...'DDS 16 ? ?_ i 117 J =-t eat u / \\ • •• • •1\• ? ?? : r •1111 ?? \ : ? • 2 '? _ ' ? i L I dl ?slrr?? - ?_r?• . -`;;n\ ?• ./ ? ?? ??? •.? ??,. ,>•.,•• ? lie 0/yl /,/`• \ \ E 4 • r \ O r? -=\ y •-1 . ? ?? / rig l/ ?\\ / \? SC ` II II• ??•?,• '\4? 000 p• ri //i ?\ "I 1 ?? II OUNTRY ?St-C /ya ••7 d' _ Iff k\ - v n M1 II 2120\?? / /\ ?,--?° • -S mm I II • II ? ? ?? err _ • / n "mod 1VIiTI I ?? 11 ?I ?r `? / ?jK M' ?p Fo \\ n ? 111'??C[YYY////'''2221 f1/ ?/ \ titi?0 ri . \It__: \ S7A'O1N li ?\• ? ii I - I . ?° .111 1\