Loading...
HomeMy WebLinkAbout20080393 Ver 1_DC 188 404 Completion Form_20200421Action ID Number: 200300648 Permittee: NCDOT Division # County: Duplin Project Name: Bridge 188 on SR 1826 over Ninemile Creek (B-4108) Date Verification Issued: 3/4/2008 Project Manager: Brad Shaver Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: - FIELD -OFFICE - Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Digitally signed by Mason Herndon 4/21 /20 Date: 2020.04.21 15:36:03-04'00' Date