HomeMy WebLinkAboutTimothy Keith to STATE .
�o s U
� R n
ROY COOPER
Governor �� 1
MICHAEL S.REGAN ,;"'a
Secretary &qWvTa
S.DANIEL SMITH NORTH CAROLINA
Director Environmental Quality
March 4,2020
Timothy B.Keith
2705 Alveston Cir
Wake Forest,North Carolina 27587-3912
Subject: Buffer Determination Letter
NBRRO#20-042
Wake County
Determination Type:
Buffer Intermittent/Perennial
® Neuse(15A NCAC 2B .0233)
❑Tar-Pamlico(15A NCAC 213 .0259) ® Intermittent/Perennial Determination(where local buffer
ordinances apply)
ElJordan (15A NCAC 2B .0267)
(governmental and/or interjurisdictional
projects)
Project Name: Timothy Keith
Address/Location: 4624 Durham Rd,Wake Forest
Stream(s): Un-named Tributary to Laurel Creek
Determination Date: 03/03/2020 Staff: Erin Deck
Stream EXP Not Subject Start@ Stop@ Soil USGS
Subject Survey Topo
A I X Approx. Not identified-Stream X
35.99049, flows away from the
-78.68112 project boundary
*GPSpoints taken using a hand held Garmin. Accuracy t9 ft
*E/I/P=Ephemeral/Intermittent/Perennial
(1)E=Ephemeral,1=Intermittent,P=Perennial,NP=Not Present,NA=Not applicable
(2)Refers to riparian buffer rules only.Stream,wetland,or pond impacts may still be subject to applicable water quality standards and
permitting requirements.
Explanation: The features(s) listed above has been located on the most recent published NRCS
Soil Survey of Wake County,North Carolina and/or the most recent copy of the USGS
Topographic map at a 1:24,000 scale. Each feature that is checked"Not Subject"has been
determined to not be at least intermittent or is not present. Streams that are checked"Subject"
have been located on the property and possess characteristics that qualify it to be at least an
intermittent stream. There may be other features located on the property that do not show
North Carolina Department of Environmental Quality 1 Division of water Resources
Raleigh Regional Office 13800 Barret:Drive 1 Raleigh,North Carolina 27609
919.791.4200
Timothy Keith
Wake County
Page 2 of 2
up on the maps referenced above but may be considered jurisdictional according to the US
Army Corps of Engineers.
This on-site determination shall expire five (5) years from the date of this letter.
Landowners or affected parties that dispute a determination made by the DWR may
request a determination by the Director. An appeal request must be made within sixty (60)
days of date of this letter. A request for a determination by the Director shall be referred
to the Director in writing. If sending via US Postal Service: c/o Paul Wojoski;DWR—401 &
Buffer Permitting Unit, 1617 Mail Service Center;Raleigh, NC 27699-1617. If sending via
delivery service(UPS,FedEx, etc.):Paul Wojoski;DWR—401 &Buffer Permitting Unit,512 N.Salisbury
Street,Raleigh,NC 27604.
This determination is final and binding unless, as detailed above, an appeal is requested
within sixty (60) days.
This project may require a Section 404/401 Permit for the proposed activity. Any inquiries
should be directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at
(919)-554-4884.
If you have questions regarding this determination, please feel free to contact Erin Deck at (919)
791-4200, or by email at Erin.Deck@ncdenr.gov
Sincerely,
Scott Vinson, Regional Supervisor
Water Quality Regional Operations Section
Raleigh Regional Office
Division of Water Resources, NCDEQ
cc: RRO DWR File Copy
Steve Puckett via email: smpuckkett@puckettesurveys.com
Timothy Keith
DWR Project # 20-042
r
1 �
•k
�t -
1
4
1
1
A
H
Noe � R
rx ■
=3
N
`� �• }- 1 =sir- _• �'�r'" 1
Or
IL
`; \�' f �� I � (�, 4" - sic � �ti g _ �� �✓�__„_
„ mil
.ova
Legend: Locations are approximate
-Approx. Project boundary — and are provided for refer-
ence only
w �Ax aVN' y �U,Vv�
°�auua vciy