Loading...
HomeMy WebLinkAbout1809 Heisser LaneROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director Yosbany and Milagros Machado 1809 Heisser Lane Fuquay-Varina, NC 27526 NORTH CAROLINA Environmental Quality January 10, 2020 Subject: Buffer Determination Letter NBRRO #19-453 Wake County Determination Type: I Buffer I Intermittent/Perennial ® Neuse (15A NCAC 2B .0233) ❑ Tar -Pamlico (15A NCAC 26 .0259) ❑ Intermittent/Perennial Determination (where local buffer ordinances apply) ❑ Jordan (15A NCAC 213 .0267) (governmental and/or interjurisdictional projects) Project Name Address/Location Stream(s): 1809 Heisser Lane 1809 Heisser Lane, Fuquay-Varina, NC 27526 UT to Black Creek Determination Date: January 9, 2020 Staff: Vanessa Manuel Stream E/1/P* Not Subject Subject Start@ Stop@ Soil Survey USGS To o Feature A ✓ ✓ ✓ *EIIIP = Ephemeral/Intermittent/Perennial Explanation: The stream(s) listed above has been located on the most recent published NRCS Soil Survey of Wake County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each stream that is checked "Not Subject" has been determined to not be at least intermittent or is not present. Streams that are checked "Subject" have been located on the property and possess characteristics that qualify it to be at least an intermittent stream. There may be other streams located on the property that do not show up on the maps referenced above but may be considered jurisdictional according to the US Army Corps of Engineers. This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter. A request for a determination by the North Carolina Department of Environmental Quality I Division of Water Resources Raleigh Regional Office 1 3800 Barrett Drive I Raleigh, North Carolina 27609 NOR9C�R_ a � a.r� /'� 919.791.4200 1809 Heisser Lane (Project # 19-453) Wake County January 10, 2020 Page 2 of 2 Director shall be referred to the Director in writing. If sending via US Postal Service: c/o Karen Higgins; D WR — 401 & Buffer Permitting Unit, 1617 Mail Service Center; Raleigh, NC 27699-1617. If sending via delivery service (UPS, FedEx, etc.): Karen Higgins; DWR — 401 & Buffer Permitting Unit, 512 N. Salisbury Street; Raleigh, NC 27604. This determination is final and binding unless, as detailed above, unless an appeal is requested within sixty (60) days. This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884. If you have questions regarding this determination, please feel free to contact Vanessa Manuel at (919) 791-4255. Sincerely, Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ cc: RRO DWR File Copy I19-,-153: 1809 Heiser Lane, Wake Co. I C,4: -e Legend 19-453: 1899 Heisser Lane, Wake Co. W" MINLIM �01 w i r. s t, g, 4Ago- Map provided by NCDEQ Division of Water Resources Site boundary: - Locations are approximate and are provided for reference only :.