HomeMy WebLinkAboutYeargan ParkCD
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
Town of Garner
Rodney Dickerson, Town Manager
900 T" Ave
Garner, North Carolina 27529-3796
NORTH CAROLINA
Environmental Quality
December 3, 2019
Subject: Buffer Determination Letter
NBRRO #19-405
Wake County
Determination Type:
Buffer
Intermittent/Perennial
N Neuse (15A NCAC 2B .0233)
❑ Tar -Pamlico (15A NCAC 2B .0259)
❑ Intermittent/Perennial Determination
❑ Jordan (15A NCAC 2B .0267)
(governmental and/or interjurisdictional
projects)
Project Name: Yeargan Park
Address/Location: 607 E Garner Road. Garner
Stream(s): Un-named Tributaries to Little Arm Branch
Determination Date: 12/03/2019
Staff: Erin Deck & Zach Thomas
Stream
Not
Subject
Start@
Stop@a
Soil
USGS
Subject
Survey
Topo
S-1 (A)
-
X
Approx.
Off site
X
35.707542,-78.594102
S-2 (B)
-
X
Approx.
Off site
X
X
35.708311,-78.596375
S-3 (C)
-
X
Approx.
Off site
X
35.708112,-78.596015
D
X
Subject where buffer encroaches on the project
X
X
area
*EIIIP = Ephemeral/Intermittent/Perennial
*GPS points were provided by McAdams Staff
Explanation: The features(s) listed above has been located on the most recent published NRCS Soil
Survey of Wake County, North Carolina and/or the most recent copy of the USGS Topographic map at a
1:24,000 scale. Each feature that is checked "Not Subject' has been determined to not be at least
intermittent or is not present. Streams that are checked "Subject' have been located on the property and
North Carolina Department of Environmental Quality I Division of Water Resources
Raleigh Regional Office 1 3800 Barrett Drive I Raleigh, North Carolina 27609
DoperbnnftImtof EnEnyirommenlelOwl\ 919.791.4200
Yeargan Park
Wake County
Page 2 of 2
possess characteristics that qualify it to be at least an intermittent stream. There may be other features
located on the property that do not show up on the maps referenced above but may be considered
jurisdictional according to the US Army Corps of Engineers.
This on -site determination shall expire five (5) years from the date of this letter. Landowners or
affected parties that dispute a determination made by the DWR may request a determination by
the Director. An appeal request must be made within sixty (60) days of date of this letter. A
request for a determination by the Director shall be referred to the Director in writing. If sending
via US Postal Service: c/o Karen Higgins; DWR — 401 & Buffer Permitting Unit, 1617 Mail Service
Center, Raleigh, NC 27699-1617. If sending via delivery service (UPS, FedEx, etc.): Karen Higgins,
DWR — 401 & Buffer Permitting Unit, 512 N. Salisbury Street, Raleigh, NC 27604.
This determination is final and binding unless, as detailed above, an appeal is requested within sixty
(60) days.
This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should
be directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884.
If you have questions regarding this determination, please feel free to contact Erin Deck at (919) 791-
4200, or by email at Erin.Deck@ncdenr.gov
Sincerely,
'z '-10_���
Scott Vinson, Regional Supervisor
Water Quality Regional Operations Section
Raleigh Regional Office
Division of Water Resources, NCDEQ
cc: RRO DWR File Copy
Jennifer Burdette via email:burdette@mcadamsco.com