HomeMy WebLinkAbout1050 Northgate CourtROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
Anthony Property Group
1201 Edwards Mill Road, Suite 300
Raleigh, NC 27607
NORTH CAROLINA
Environmental Quality
November 13, 2019
Subject: Buffer Determination Letter
RRO # 19-3 69
Determination date: 11/08/2019
Staff. Brion Byers & Joshua Brigham
W axe
Determination Type:
I Buffer I intermittent/Perennial
® Neuse (15A NCAC 2B .0233)
❑ Tar -Pamlico (15A NCAC 2B .0259) ❑ intermittent/Perennial Determination (where local buffer
ordinances apply)
❑ Jordan (15A NCAC 2B .0267)
(governmental and/or interjurisdictional
projects)
Project Name: 1050 Northgate Court
Address/Location: 1050 Northgate Court, Cary, NC 27560
Stream(s): Brier Creek 27-33-4
Feature
EXPM
Not
Subject
Start@
Stop@
Soil
USGS
Subject(2)
Survey
To o
Approximately
Feature A
I/P
X*
N35.833838,
Off Property
X
W78.8059247
Feature B
I/P
X
Throughout
X
X
Feature C
P
X
Off Property
X
X
within 50 feet of Property Boundaries
(1) E=Ephemeral, I=Intermittent, P=Perennial, NP=Not Present, NA=Not applicable
(2) Refers to riparian buffer rules only. Stream, wetland, or pond impacts may still be subject to applicable water quality standards and
permitting requirements.
Explanation: The features(s) listed above has been located on the most recent published NRCS Soil Survey of Wake
County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each
feature that is checked "Not Subject" has been determined to not be at least intermittent or is not present. Streams
that are checked "Subject" have been located on the property and possess characteristics that qualify it to be at least
an intermittent stream. There may be other features located on the property that do not show up on the maps
referenced above but may be considered jurisdictional according to the US Army Corps of Engineers.
This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected
parties that dispute a determination made by the DWR may request a determination by the Director. An
appeal request must be made within sixty (60) days of date of this letter. A request for a determination by the
D E North Carolina Department of Environmental Quality I Division of Water Resources
4THAMINARaleigh Regional Oce 1 3800 Barrett Drive I Raleigh, North Carolina 27609
-
Office
sp—nmemof UonmentalUuality 919.791.4200
Buffer Determination Letter
RRO #19-369
1050 Northgate Court
November 13, 2019
Page 2 of 2
Director shall be referred to the Director in writing. If sending via US Postal Service: c/o Karen Higgins;
DWR — 401 & Buffer Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. If sending via
delivery service (UPS, FedEx, etc.): Karen Higgins; DWR — 401 & Buffer Permitting Unit; 512 N. Salisbury
Street; Raleigh, NC 27604.
This determination is final and binding unless, as detailed above, an appeal is requested within sixty (60)
days.
This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be
directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884.
If you have questions regarding this determination, please feel free to contact Brion Byers at (919) 791-4237, or by
email at brion.byersgncdenr. og_v.
Sincerely,
4JaZii'
erman, P.G., Chief
Water Quality Regional Operations
Division of Water Resources
cc: RRO DWR File Copy
Lyle Phillips, Withers Ravenel, (Via Email, 1phillips(2withersravenel.com)
D E North Carolina Department of Environmental Quality I Division of Water Resources
Raleigh Regional Office 1 3800 Barrett Drive I Raleigh, North Carolina 27609
N TH iNA �
D°�"°� °�' MmwW �`y 919.791.4200
1050 Northgate Court
Wake County, NC-DWR Project # 19-369
NRCS Soil Survey Sheet 36r�sr�
Wake Co., NC 1970 s :: Locations are approximate
Legend: o and are provided for refer-
ence only
-Project Boundary
1050 Northgate Court
Wake County, NC-DWR Project # 19-369
G
U
Aerie
USGS Topographical Map r� srAo�
Cary Quadrangle 2019
Locations are approximate
`
Legend: and are provided for refer-
ence only
-Project Boundary