Loading...
HomeMy WebLinkAbout19971101 Ver 1_COMPLETE FILE_19971229.,t` - State of North Carolina Department of Environment, Health and Natural Resources • Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary C) E N A. Preston Howard, Jr., P.E., Director January, 2 1998 Wake County WQC 401 Project #971101 APPROVAL of 401 Water Quality Certification Mr. Steve Davenport Briar Creek Associates c/o AAC Real estate Services 333 Fayetteville St Suite 300 Raleigh NC 27601 Dear Mr. Davenport: You have our approval, in accordance with the attached conditions, to place temporarily fill in 0.017 acres of wetlands or waters for the purpose of realigning a power line at Brier Creek CP&L Power Line Realignment as you described in your application dated December 23, 1997. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3114. This Certification allows you to use Nationwide Permit Number 33 when it is issued by the Corps of Engineers. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Watershed regulations. Also this approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-1786. Sincerely, r stop 'Howard, Jr. P.E. Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Raleigh Field Office Raleigh DWQ Regional Office Division of Water Quality • Non-Discharge Branch 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer • 50% recycled/10% post consumer paper Soil & Environmental Consultants, Inc. 244 West Millbrook Road ¦ Raleigh, North Carolina 27609 i (919) 846-5900 ¦ Fax (919) 846-9467 December 23, 1997 US Army Corps of Engineers - Regulatory Attn: Ms. Eric Alsmeyer 6508 Falls of the Neuse Road Suite 120 Raleigh, NC 27615 NCDEHNR - DWQ WOSW ,D Attn: John Dorney 4401 Reedy Creek Road c 1991 Raleigh, NC 27607 ?F??IAtC1?NGl Dear Mr. Alsmeyer & Mr. Dorney: The purpose of this letter is to request a Nationwide Permit 33 for the project known as Brier Creek CP&L Power Line Realignment. The project is located near RDU Airport, NC (Wake County). The site is shown on the attached plans and USGS Topo Quad vicinity map. A Nationwide Permit 33 will be necessary to temporarily impact 0.017 acres (see map) of jurisdictional waters and wetlands above headwaters for the realignment of a CP&L power line. Impacts will be associated with temporary access roads. No towers will be in jurisdictional areas. Temporary wetland impacts are to intermittent and stormwater channels. Clearing of the right-of-way should not require a 401 or 404 permit. Such clearing also should be consistent with the Neuse Basin Buffer Rules. See the attached letter from the project owner describing the need for the realignment. The attached plan shows both the existing and proposed alignment. An agent authorization form is enclosed. Please call if you have questions or if you intend to perform additional site visits. Danny Smith of DWQ and Eric Alsmeyer of the Corps. have previously visited the site. Sincerely, Kevin C. Martin President Soil/Site K' lultsh ¦ Mapping and Physical Analysis ¦ Wetlands Mapping and Mitigation ¦ Environmental Au On-Site Waste Treatment Systems, Evaluation and Design DWQ ID: Corps Action ID: Nationwide Permit Requested (Provide Nationwide Permit ft 33 Pre-Construction Notification Application cCivED For Nationwide Permits that Require: ?g9? 1) Notification to the Corps of Engineers ?LL 2) Application for Section 401 Certification ENVIRONMENTALSOIENGES 3) Coordination with the NC Division of Coastal Management Send the original and (1) copy of this completed form to the appropriate field office of the Corps of Engineers (see agency addresses sheet). Seven (7) copies should be sent to the NC Division of Environmental Management (see agency addresses sheet). PLEASE PRINT. ?r`•?-r C??e?? F?SSoc.h 1. Owner's Name:c/o AAC Real Estate Services Attn: Steve Davenport 2. Mailing Address: 333 Fayetteville Street; Suite 300 Subdivision Name: Brier Creek City: Raleigh State: NC Zip Code: 27601 Project location address, including subdivision name (if different from mailing address above): Between Highway 70 & SR1644 (see vicinity map) 3) Telephone Number (Home): (Work): 919-821-2700 4) If applicable, agent's name or responsible corporate official, address, phone number: '\ Soil & Environmental Consultants, Inc. Phone: (919) 846-5900 244 W. Millbrook Road - Raleigh NC 27609 5. Location of work (provide a map, preferable a copy of USGS topographic map or aerial photograph with scale): County: Wake Nearest town or city: RTP Specific Location (include road numbers, landmarks, etc.): South of Highway 70, west of 1644 & SR 1973, north of SR 1002 See Vicinity Map 6. Impacted or nearest stream/river: Little Brier Creek River Basin: Neuse 7a. Is project located near water classified as trout, tidal saltwater (SA), high quality waters (HQW), outstanding resource waters (ORW), water supply (WS-I or WS- In? YES ( ) NO (X) If yes, explain: 7b. If the project is located within a North Carolina division of coastal management area of environmental concern (AEC)? YES ( ) NO ( X ) 7c. If the project is located within a coastal county (see page 7 for list of coastal counties), what is the land use plan (LUP) designation? 8a. Have any Section 404 permits been previously requested for use on this property? YES ( ) NO ( X ) If yes, provide Action ID number of pervious permit and any additional information (including photocopy of 401 certification). To our knowledge 8b. Are additional permit requests expected for this property in the future? YES ( X ) NO ( ) If yes, describe anticipated work: Residential & commercial development infrastructure roads, utilities, etc. Planning is currently underway 9a. Estimated total number of acres in tract of land: Roughly 1500 acres 9b. Estimated total number or acres of wetlands located on project site: Unknown r 10a. Number of acres of wetlands impacted by the proposed project by: Filling: Flooding: Drainage: Other: Total acres to be impacted: 0.017 10b. (1) Stream channel to be impacted by the proposed project (if relocated, provide distance both before and after relocation): Length before: 150 ft After: 150 ft Width Before (based on normal high water contours): ft Width After: ft Average depth before: ft After: ft (2) Stream channel impacts will result from: (check all that apply) Open channel relocation: Placement of pipe in channel: X Channel Excavation: Construction of a Dam/Flooding: Other: 11. If construction of a pond is proposed, what is the size of the watershed draining to the pond? What is the expected pond surface area? 12. Description of proposed work including discussion of type of mechanical equipment to be used (attach plans 81/2" x 11" drawings only): 0.017 ac (5 crossings, 30' wide) Excavation: Typical construction of a large aerial CP&L power transmission line. 13. Purpose of proposed work: Realignment of existing power line, see attached letter from AAC 14. State reasons why it is believed that this activity must be carried out in wetlands (include any measures taken to minimize wetland impacts): See attached letter from AAC 15. You are required to contact the U.S. Fish and Wildlife Service (USFWS) and/or National Marine Fisheries Service (NMFS) (see agency addresses sheet) regarding the presence of any federally listed or proposed for listing endangered or threatened species or critical habitat in the permit area that may be affected by the proposed project. Date contacted: (attach responses from these agencies). NA (performed by Corps.) 16. You are required to contact the state historic preservation officer (SHPO) (see agency address sheet) regarding the presence of historic properties in the permit area which may be affected by the proposed project. Date contacted: NA (performed by Corps.) 17. Does the project involve an expenditure of public funds or the use of public (state) land? YES ( ) NO ) If no, go to 18. a. If yes, does the project require preparation of an environmental document pursuant to the requirements of the North Carolina Environmental Policy Act? YES ( ) NO ( ) b. If yes, has the document been reviewed through the North Carolina Department of Administration State Clearinghouse? YES ( ) NO ( ) If answers to 17b is YES, then submit appropriate documentation from the state clearinghouse to division of environmental management regarding compliance with the North Carolina Environmental Policy Act. Questions regarding the State Clearinghouse review process should be directed to Ms. Chrys Baggett, Director State Clearinghouse, North Carolina Department of Administration, 116 West Jones Street, Raleigh, North Carolina 27603-8003, telephone (919) 733-6369. 18. The following items should be included with this application if proposed activity involves the discharge of excavated or fill material into wetlands: a. Wetland delineation map showing all wetlands, streams, lakes and ponds on the property (for Nationwide Permit numbers 14, 18, 21, 26, 29 and 38). All streams (intermittent and permanent) on the property must be shown on the map. Map scales should be 1 inch equals 50 feet or 1 inch equals 100 feet or their equivalent. b. If available, representative photograph of wetlands to be impacted by project. C. If delineation was performed by a consultant, include all data sheets relevant to the placement of the delineation line. d. Attach a copy of the stormwater management plan, if required. e. What is land used of surrounding property? Undeveloped or residential & commercial f. If applicable, what is proposed method of sewage disposal? NA g. Signed and dated agent authorization letter, if applicable. NOTE: Wetlands or Waters of the U.S. may not be impacted prior to: 1. Issuance of a Section 404 Corps of Engineers Permit, 2. Either the issuance or waiver of a 401 Division of Environmental Management (Water Quality) certification, and 3. (in the twenty coastal counties only) A letter from the North Carolina Division of Coastal Management stating the proposed activity is consistent with the North Carolina Coastal Management program. Owner's gent Signature L? I -Z 71 Date (Agenfs signature valid only if Agent Authorization Letter from the owner is provided (18 g.)) n SCALE 1:24 000 1 2 0 1 MILE 1000 0 1000 2000 3000 4000 5000 6000 7000 FEET * 1 ,5 0 1 KILOMETER MN GN CONTOUR INTERVAL 10 FEET NATIONAL GEODETIC VERTICAL DATUM OF 1929 7' 1'17' 124 MILS 23 MILS UTM GRID AND 1987 MAGNETIC NORTH FIGURE 2. TOPOGRAPHIC FEATURES OF DECLINATION AT CENTER OF SHEET SUBJECT PROPERTY `i SOUTHEAST DURHAM, N. NE/4 DURHAM SOUTH 15' OUADRANOLE 35078-H7-TF-024 1973 PHOTOREVISED 1987 DMA 5255 IV NE-SERIES V842 viiox?ta1 Consultants, Z44 West Millbv6ok Rtg*411RAcigh, NOtthCarol"utx 27609111(919) 846-5900111 Fat (919) 846-9467 T. m01WAT14*F0RM - ALL 13LA t NE Name. Addr"B' n Add4sfr: Pllpt'18: Project Name/Desctf*n: ' Date- ._Iv y 3 JF? The Deparimertt of the Army V.5. ArMy Corps of t~nglnes&. Wilmington District PO Box 1890 `,. Wilmington, NC 2$402 ??? Attn: d a C-..li. zw"s Field Otrice: C. Re- Wetlands Related Conlt tM}` Ittkv To Whom it May Concern: 4? 3'o v -_z70 w?. l/?L ./.Cd??fcttSte? 1.t?t4 i, the current Prop owner,:Jvbhatj grid sUie Sall and Envirollmentdl Consultants, tnc. to actin my-b?s!t IA..," GOO In the ?'viceSopq of permit appiicatlons, to fumish upon request It sfOr?ta Nuon Irk su k 7 f applICMIOns, eta, from this day fotwaro. Thisthe Sy d4of This notification supersedes: Amy pmq*a oormWnde* 0013 1 the agent for this project. 32?eK ?o ce-?crII SvG, h 14A G a t?Q ? H?S??•,? Print Owners Name: PMO C owners Signature: cc'. Mr. John DOmey NOOF-M&NR - DWI Water Quality P1ONt±tq . x101 Reedy Creeltfkoad Raleigh. NC 27t'W cc, Mr. Kevin Marttn Soil and Emironow- gel C.a"witards, inc. ?,,,:1 ti+++ i-.valuat+on 111 Mapping an 't'lty?tC 11Cnatvsis gi W4!jtjnd% Mappiog and Mitigation f l:tn•+ronmrnt,il :Nl:. Urs-5it?' w,,stq"litcatmcht Systcais. F '`'+`tum and Design U-l,-Lj-j; 1U" ?v lt1A Av. U1U1:1ULLUU r. L PA 12/19/1997 18:46 9198469467 S 92 llJ?-LJ-?i l?'li J LJ till nr+ a! lVn'U l§!J! i nJJUt,. Prim Av. .ilU1OOLLUU AAC }tEAIG UTSTATEn SL1KVICl:s. INC. J.)) YAYY.,r,"vli-4X s,rRF T MA1,1. gu1TY wo RA),)SK--11 Noxi'rtl GA6LO1ANA 27601 r. j '>.T6LeP1101N Fw (o191F71-2700 FAC6(Mi1.C: (91917SS-ZZOo December 23, 11997 U.S. Arimy Corps of Engineers N.C. Division of Water Quality C/o Kevin Malin Soil & Environmental Consultants, Inc. 244 West Millbrook Road Raleigh, North Carolina 27609 Re: Brier Creek - CP&L Transmission Line Relocation AAC Real Estate Services, Inc., as development agent for Brier Creek Associates, owner of the approximately 1,800 acres generally known as the "Airport Assemblage°, has submitted permit applications to relocate an existing CP&L transmission line. The existing line bisects property designated for residential development. Relocation of the line to the proposed right of way has two major benefits. It will remove a substantial hazard and disruptive agent from the interior of the residential community, and it will create a significant buffer between a more cohesive community and the proposed Aviation Parkway. Thank you for this opportunity to describe why this transmission line needs to be moved. If you have any questions or need further information, please call. Very truly yours. AAC REAL ESTATE SERVICES, INC. 49fv-?? teve Davenport Senior Vice President Cc: Paul Herndon Tom Anderson 17 'III ?\1\• ? r • I li I r r Y2 r N D Z O O ? ? Z o O x c T m En m Z ? D Z W m D m ?, gg Ln Z 8 r ga r p„ r ?.ox? Sotl do En vlro nmental Consultants, Ine. 2-05-97 COx9NED RdMr1.DYx0 Ax0 RDO 12.0eC RDU MLIL PHASE Z i0ll BROTHERS w+.. v+e.a.e. xuwq.,v.ti cn?e..1w???e?e?.wxn??..?•.e?wu.• rp_gT REUSE gn4N inwr; ANDS RDU WETLANDS