Loading...
HomeMy WebLinkAbout19970135 Ver 1_COMPLETE FILE_19970214State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director APPROVAL of 401 Water Quality Certification Ms. Annette Oppegaard P.O. Box 3031 Topsail Beach, NC 28445 Dear Ms. Oppegaard: E:) EHNFi June 24, 1997 Pender County WQC 401 Project #970135 You have our approval, in accordance with the attached conditions, to place fill material and excavate waters for the purpose of reconfiguring a dock and add a boat ramp at Topsail Sound Pier, as you described in your application dated 10 June 1997. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3112. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Watershed regulations. Also this approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-1786. Sincerely, Pr ton How , Jr. P Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Wilmington Field Office Wilmington DWQ Regional Office Mr. John Dorney Central Files John Parker; DCM 970135.1tr Division of Water Quality • Environmental Sciences Branch Environmental Sciences Branch, 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Aff irmative Action Employer • 50% recycled/10% post consumer paper 9701353un Page Two MARINA ARE THE FOLLOWING ADEQUATELY ADDRESSED? SEWAGE DISPOSAL: N/A MARINA SERVICES: N/A OXYGEN IN BASIN: N/A CLOSURE OF SHELLFISHING WATERS: N/A (ATTACH A MARINA USE ATTAINABILITY EVAL.) RECOM UNDED_CONDMONS_ORPERMri' RE-STR CTIONS: That the project be done in such a manner so as to not cause turbidity outside the immediate construction area to exceed 25 NTU. DIVISION OF COASTAL MANAGEMENT RECE/?E f FIELD INVESTIGATION REPORT JU1y 101997 1. APPLICANT'S NAME: Topsail Sound Pier / Annette B. Oppegaard EM'/RONMENrqtsc?eNCFs 2. LOCATION OF PROJECT SITE: 1520 Carolina Boulevard, Topsail Beach Photo Index - 1995: 25-305 GR M-4,5 1989: 4 173 28 GR I,J-13, 14 State Plane Coordinates - X: 2 408 500 Y: 223 000 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - February 10, 1997 Was Applicant Present - Agent Was Present 7. 5. PROCESSING PROCEDURE: Application Received - cc: May 19, 1997 Office - Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Town Of Topsail Beach Land Classification From LUP - Developed (B) AEC(s) Involved: PT, ES, EW (C) Water Dependent: Yes (D) Intended Use: 10-Slip Docking Facility (E) Wastewater Treatment: Existing - Septic System Planned - No Change (F) Type of Structures: Existing - Commercial building, parking, bulkhead, pier Planned - Boatramp & pier alteration (G) Estimated Annual Rate of Erosion: N/A Source - N/A HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (B) Non-Vegetated Wetlands (C) Other Excavated High Ground (Boatramp) 40' x 15' High Ground (Spoil Disposal) 6,000 SF Shallow Bottom (Boatramp) 15' x 15' (D) Total Area Disturbed: Approximately 7,000 Square Feet (E) Primary Nursery Area: No (F) Water Classification: SA Open: Yes 8. PROJECT SUMMARY: The applicant is applying to put in a commercial boatramp, and reconfigure an existing docking facility to provide mooring slips for 10 boats. Topsail Sound Pier Page 2 9. PROTECT DESCRIPTION The existing Topsail Sound Pier is located at 1520 Carolina Boulevard, Topsail Beach, Pender County. The project is on Banks Channel off of the Atlantic Intracoastal Waterway just north of New Topsail Inlet. Presently there is a commercial building, parking, and pier structures on the site. The building and pier were significantly damaged by Hurricane Fran. The building is presently being repaired and will house a store and restaurant. The owner wishes to make some changes in configuration and use when the pier/dock facilities are fixed. Under the proposed plan there will be 10 boat slips for rent to the general public. Historically the pier structure has been principally used for fishing. The high ground portion of the development consists of 4 lots that have been developed for a number of years. Presently there is a building, parking lot and a septic system on these contiguous, bulkheaded lots. The building and pier structure show on the aerial photography from 1978. Only slight modifications have been made to the pier since that time. The proposed docking structure will not offer sewage pump-out nor sell fuel. A total of 10 boat slips are planned. The Pre-Hurricane Site Map and Marina Plan Map show the differences between what is existing (though damaged) and what is proposed. The Pre-Hurricane Site Map does not show that the existing, damaged structure is over into the adjacent riparian corridor. That should be resolved as the "Tee" head is reduced in size. The most significant change in the pier structures is that the size of the waterward-most "Tee" will be decreased by 300 linear feet and will be 8' wide instead of 16' wide. The pier extending toward the tee is to be decreased to 8' in width from the present 16' and the overall length would remain the same. All portions of the damaged structure should be removed as a part of the re-building efforts (since it poses a hazard to navigation). No dredging is being proposed in conjunction with this proposal. The proposed boat ramp is totally new. A portion of the bulkhead would be removed to make way for the ramp. It will be used commercially in connection with this marina facility. The proposed ramp is shown on the Marina Plan and labeled as New Concrete Boat Ramp. The proposed ramp would be 15' wide and extend less than 20' below mean high water, which is in keeping with Coastal Management Rules 7H. 1300. Excavated material from the boat ramp construction will be used to fill ruts and holes in the parking lot that were created during the last hurricane. The waters of Banks Channel in this area are classified as SA by the Division of Water Quality. They are not Primary Nursery Areas as determined by the Division of Marine Fisheries. They are open to the taking of shellfish. The Topsail Beach Land Use Plan classifies the high ground portion of this property as "Developed". 10. ANTICIPATED IMPACTS No impacts to coastal marsh or federal wetlands are expected. A small amount of shallow bottom will be affected by the installation of the boat ramp. The amount of public trust waters taken up by the proposed development will be similar to that being used by the existing fishing pier. An increase of boating usage would be expected with the leasing of the slips and installation of the public boatramp. Janet M. Russell / May070, 1997 / Wilmington Topsail Sound Pier Page 2 9. PROTECT DESCRIPTION The existing Topsail Sound Pier is located at 1520 Carolina Boulevard, Topsail Beach, Pender County. The project is on Banks Channel off of the Atlantic Intracoastal Waterway just north of New Topsail Inlet. Presently there is a commercial building, parking, and pier structures on the site. The building and pier were significantly damaged by Hurricane Fran. The building is presently being repaired and will house a store and restaurant. The owner wishes to make some changes in configuration and use when the pier/dock facilities are fixed. Under the proposed plan there will be 10 boat slips for rent to the general public. Historically the pier structure has been principally used for fishing. The high ground portion of the development consists of 4 lots that have been developed for a number of years. Presently there is a building, parking lot and a septic system on these contiguous, bulkheaded lots. The building and pier structure show on the aerial photography from 1978. Only slight modifications have been made to the pier since that time. The proposed docking structure will not offer sewage pump-out nor sell fuel. A total of 10 boat slips are planned. The Pre-Hurricane Site Map and Marina Plan Map show the differences between what is existing (though damaged) and what is proposed. The Pre-Hurricane Site Map does not show that the existing, damaged structure is over into the adjacent riparian corridor. That should be resolved as the "Tee" head is reduced in size. The most significant change in the pier structures is that the size of the waterward-most "Tee" will be decreased by 300 linear feet and will be 8' wide instead of 16' wide. The pier extending toward the tee is to be decreased to 8' in width from the present 16' and the overall length would remain the same. All portions of the damaged structure should be removed as a part of the re-building efforts (since it poses a hazard to navigation). No dredging is being proposed in conjunction with this proposal. The proposed boat ramp is totally new. A portion of the bulkhead would be removed to make way for the ramp. It will be used commercially in connection with this marina facility. The proposed ramp is shown on the Marina Plan and labeled as New Concrete Boat Ramp. The proposed ramp would be 15' wide and extend less than 20' below mean high water, which is in keeping with Coastal Management Rules 7H. 1300. Excavated material from the boat ramp construction will be used to fill ruts and holes in the parking lot that were created during the last hurricane. The waters of Banks Channel in this area are classified as SA by the Division of Water Quality. They are not Primary Nursery Areas as determined by the Division of Marine Fisheries. They are open to the taking of shellfish. The Topsail Beach Land Use Plan classifies the high ground portion of this property as "Developed". 10. ANTICIPATED IMPACTS No impacts to coastal marsh or federal wetlands are expected. A small amount of shallow bottom will be affected by the installation of the boat ramp. The amount of public trust waters taken up by the proposed development will be similar to that being used by the existing fishing pier. An increase of boating usage would be expected with the leasing of the slips and installation of the public boatramp. Janet M. Russell / Mayc?Q, 1997 / Wilmington Form DCM-MY-1 APPLICATION (To be completed by all applicants) 1. APPLICANT b. City, town, community or landmark TnpGa i 1 Raarh' Tai(` c. Street address or secondary road number a. Landowner: Name Annette B. Oppegaard Address PO Box 3031 City Topsail Beach State NC d. Is proposed work within city limits or planning jurisdiction? x Yes No e. Name of body of water nearest project (e.g. river, creek, sound, bay) Banks Channel Zip 28445 Day Phorrq:L910-328. 3641 DESCRIPTION AND PLANNED USE Fax None MAY 1 6 1997 :?-_O OF PROPOSED PROJECT V. Authorized Agent: Cii+i;SKX,i OF Name Walton EngiEQATi. L MAIJAGEMENTa. (Mark Walton, P.E.) Address PO Box 564 City Castle Hayne State NC Zip 28429 Day Phone 910-675-9363 b List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Replace a portion of pier destroyed by Hurricane Fran. Add boat slips to pier (for a total of ten). Add boat -ranp•Rin91 S' Is the proposed activity maintenance of an existing project, new work, or both? Both. Fax 910-675-2925 c. Will the project be for public, private or commercial use? Public & commercial. c. Project name (if any) Oppegaard CAMA Permit d. Give a brief description of purpose, use, methods of construction and daily operations of proposed NOTE: Permit will be issued in name of landowner(s), andlor project. If more space is needed, please attach project name. additional pages. See attachments. 2. LOCATION OF PROPOSED PROJECT a. County Pender Revised 03/95 c. Form DCM-MP-1 m. Describe existing wastewater treatment facilities. 4. LAND AND WATER On-site septic system. CHARACTERISTICS a. Size of entire tract 2 6 , 12 7 s a u a r e feet n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary b. Size of individual lot(s) 6 , 569s . f . , 19 , 558 s . f . wastewater, industrial/commercial effluent, "wash down" and residential discharges.) c. Approximate elevation of tract above MHW or N.C. DOT storm sewer discharges ILL, 2'-31 above MHWL D ??!!1 < FA ?? 7 ght-of-way across property. l d. Soil type(s) and texture(s) of tract zisting drinking water supply source. o. Descri e Sand Ci ater. . MAY 16 1997 e. Vegetation on tract Mostly clear & gra ,? covered. Some grass. Shr?3F AL MAIJAGEMENT around building. f. Man-made features now on tract Commercial building, bulkhead. 5. ADDITIONAL INFORMATION g. What is the CAMA Land Use Plan land In addition to the completed application form, the classification of the site? (Consult the local land use plan.) following items must be submitted: Conservation Transitional 0 A CDPY of the deed (with state application only) or x Developed Community Rural Other other instrument under which the applicant claims title to the affected properties. If the applicant is not h. How is the tract zoned by local government? claiming to be the owner of said property, then B-2 (business) forward a copy of the deed or other instrument under which the owner claims title, plus written permission i. Is the proposed project consistent with the applicable from the owner to carry out the project. zoning? X Yes No (Attach zoning compliance certificate, if applicable) • An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black j. Has a professional archaeological assessment been ink on an 8 1/2" by II" white paper. (Refer to done for the tract? Yes x No Coastal Resources Commission Rule 7J.0203 for a If yes, by whom? detailed description.) k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes x No Are there wetlands on the site? Yes x No Coastal (marsh) Other If yes, has a delineation been conducted? (Attach documentation, if available) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the ALTON LNGINEERIN Ms. Janet Russell NC DEHNR 127 Cardinal Drive Extension Wilmington, NC, 28405 Dear Ms. Russell, March 14, 1997 MAR 31 1997 DIVISION OF COASTAL MA14AGEMENT Attached is a CAMA Major Permit application for Kip & Annette Oppegaard formerly d.b.a. Topsail Sound Fishing Pier. This letter serves as a narrative description of the project and is therefore an integral part of the permit application. Please include a copy of this letter with all copies of the permit application. As you know the Oppegaards' pier was practically completely destroyed by Hurricane Fran. All that remains undamaged are the pilings and certain small sections of the pier close to the shore. The Oppegaards plan to rebuild portions of the pier and construct boat docks connected to the pier. The docks will be rented or leased to private boat owners for mooring their boats. The typical size of boats to be moored is expected to be 20' to 30' in length. Two slips are presently available that can accommodate larger boats, up to about 50' in length. No utilities or facilities will be provided for live aboard dockage. No sewage pump out service is immediately planned although such service may be provided in the future. In addition to the private boat slips, public dockage will be available. A "tee" at the end of the pier will accommodate public docking for boaters in Banks Channel. The proximity of the marina to New Topsail Inlet will also make the marina easily accessible to boaters from the Atlantic Ocean. The public dockage will give public boaters access to the restaurant and store that presently exists where the fishing pier meets the shore. The restaurant and store are housed in a two-story building that covers approximately 4,000 square feet of ground. The building existed long before Hurricane Fran hit, and survived the Hurricane in relatively good condition.. No significant structural damage was done, and no structural repairs will be required to resume business in the building. The only on-shore construction planned for the marina is the construction of a boat ramp for launching and retrieving boats via trailer. The boat rampp will be 15' wide and approximately 30' long to the water line. A section of the existing bulkhead will be removed to construct the boat ramp. The boat ramp will be located 20' from the property line of the adjacent lot. All other facilities including the building, parking lot, storm drains, walkways, landscaping, septic system, and utilities were in existence prior to Hurricane Fran and no modifications are planned. If you have any questions or 910-675-2925. I can be of further assistance, please call me at 91o-675-9363 or fax me at Sincerely, ?a R. Mark Walton, P.E. Tel: 910-675-9363 PO Box 564, Castle Hayne, North Carolina, 28429 Fax: 910-675-2925 Form L' CM-MP-1 ?_i J J J l 1 MAY 18 1997 ?-`-? site. Include highway or secondar UAST?ALR )1ANA(&:1,CERTIFICATION AND PERMISSION numbers, landmarks, and the like. • A Stormwater Certification, if one is necessary TO ENTER ON LAND • A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. Name David W. Litton & wife Ellen I certify that I am authorized to grant, and do in fact, Address Po Box 145, Hampstead . Me ?8443grant permission to representatives of state and federal Phone review agencies to enter on the aforementioned lands in Renv' S.t(,•11 connection with evaluating information related to this Name Eva Bxllarcl permit application and follow-up monitoring of the Address ` 18- [Wiest Viev --Dr .._. project. Phone aye eviT1-e; ETC, 28363 Name Address _ Phone I further certify that the information provided in this application is truthful to the best of my knowledge. This is the 1 51 k day of Mw ?? '199 1 • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. Non o--. • A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. Print Name /k1114,d s ,4?1X)ef4e- p,7,0egaart? Signature Landowner o A ri: d Ageru Sign.KrC Please indicate attachments pertaining to your proposed project. DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development DCM MP-4 Structures Information DCM MP-5 Bridges and Culverts x DCM MP-6 Marina Development NOTE. Please sign and date each attachment in the space provided at the bottom of each form. • Form DCM-MP-2 EXCAVATION. AND FILL-m?,?,? ?- I??n J 'J (Except bridges and culverts) L'v MAY 1 1997 DIVISMo OF See V15u (- C, (1, "1 odtll V'5,, r 7, " 6oafi K k-1 X-SeCTT a. Attach this form to Joint Application for CAV*Sfafdr Permit, Form DCM-MP-1. Be sure to complete all 1. EXCAVATION other sections of the Joint Application that relate to this nroaosed vroiect. Describe below the purpose of proposed excavation or fill activities. All values to be given in feet. Average Final EAsting Project Length Width Depth Depth Access channel (MLW) or (NWL) Canal Boat basin Boat ramp Rock groin Rock breakwater Other (Excluding shoreline stabilization) Revised 03/95 / S2A l S a?io ve MFtw L MlAwL ARM a. Amount of material to be excavated from below MHW or NWL in cubic yards (Von e. b. Type of material to be excavated Ex\st%nL S o%l 6el,tt,A ek1 5tt .,, V t kk,. c. Does the area to be excavated include coastal wetlands (marsh), submerged aquatic vegetation (SAVs) or other wetlands? Yes X No d. Highground excavation in cubic yards 2. DISPOSAL OF EXCAVATED MATERIAL . a. Location of disposal area ?n - sic . ?1(I rut: rl-? ? eS 1 n 04 ! k6 r, c ? cffi . b. Dimensions of disposal area 000 59u M r ?CCT c. Do you claim title to disposal area? X Yes No If no, attach a letter granting permission from the owner. d. Will a disposal area be available for future maintenance? X Yes No If yes, where? Sclr?, C- a r e a. be 6-4arr-\ cd o%J NOtP C k gL.} 1t0r\ n c 1 ??4WL bpp?,l A'?at~? ?.5? r tvIFIWL w ??S?e precssT ?orls0^ dF boa/ ?'ar ?CI°.v 1 _ _. ?t _ t. tt l 1 L r PniQ[t? on P"t15T1?5 ?00? Form DCM-MP-2 e. Does the disposal area include any coastal wetlands (marsh), SAVs or other wetlands? Yes _ CX No f. Does the disposal include any area in the water? Yes _ X _ No If yes, (1) Amount of material to be placed in the water (2) Dimensions of fill area (3) Purpose of fill 3. SHORELINE STABILIZATION a. Type of shoreline stabilia n I i X_ Bulkhe % ad -iL*ipran. aY 16 1997 b. Length _ .4C r\ c, QI?/ l!C' , ?( :. ') P OASTAL MAIgAGEMENT c. Average distance waterward of MHW or NWL &Ikl\ej = MVO d. Maximum distance waterward of MHW or NWL 1? Ir'?'csj = M4V') e. Shoreline erosion durin preceding 12 months V,1or,.e Cpo9% \c -k IKk\eL (Source of information) f. Type of bulkhead or riprap material g. Amount of fill in cubic yards to be placed below water level (1) Riprap pdn'r (2) Bulkhead backfill L1e m e h. Type of fill material ?31A i. Source of fill material WA 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) a. Will fill material be brought to site? Yes Y\ No b. Will fill material be placed in coastal wetlands (marsh), SAVs or other wetlands? Yes /X,_ No If yes, (1) Dimensions of fill area (2) Purpose of fill 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? _Tru e"rd To a CKN-h It CJ b. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Na?k?aP c. Will wetlands be crassed in transporting equipment to project site? Yes /\ No If yes, explain steps that will be taken to lessen environmental impacts. CA e m' Applicant o j e aJ p 6 . Signature Date Revised 03/95 Form DCM-MP-2 e. Does the disposal area include any coastal wetlands (marsh), SAVs or other wetlands? Yes X_ No f. Does the disposal include any area in the water? Yes X_ No 3. SHORELINE STABILIZATION a. Type of shoreline stabilization _X Bulkhead J l_1 ?=Ripra v _ r ". i?i r, 16 iQ^ ??? b. Length X} C G r\ c, PdiEtE7 OASTAL MA1uAGE c. Average distance waterw rd of MHW or NWL QuW\ej = Mi~1V--) d. Maximum distance waterward of MHW or NWL (-uIK?,ccd = M4VJ Shoreline erosion during preceding 12 months ?'AorLe (Cous???r $ulkhead (Source of information) f. Type of bulkhead or riprap material nrruc r AQ vGn? r me a , g. Amount of fill in cubic yards to be placed below water level (1) Riprap d n (2) Bulkhead backfill _Nlt" A P h. Type of fill material Q IA i. Source of fill material WA 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) Will fill material be brought to site? Yes x No If yes, (1) Amount of material to be placed in the water (2) Dimensions of fill area (3) Purpose of fill b. Will fill material be placed in coastal wetlands (marsh), SAVs or other wetlands? Yes /X, No If yes, (1) Dimensions of fill area (2) Purpose of fill 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? r e, ?cd D 1 c`1-tO0Sa,1 arcs a5 rrK,bit c b. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? NQ ? k IUD t° c. Will wetlands be crassed in transporting equipment to project site? Yes A No If yes, explain steps that will be taken to lessen environmental impacts. C-,V i m Applicant o TJ e-? ? P. . Signature Date Revised 03/95 NCDE}N2 W1R0 Fax:9103502004 May 19 '97 11:24 P. W PO 1, Form DCM-MP-4 S - T R uc?s (Constructs m within -Fubuc I1-uet Ards) Attach this fotin to Jolat Application for CAMA Mtjor e. Penult, Form XU-W-1. be sure to complew all other sections of the Joint Appliestion which relay to this proposed pmjecL a. Dock(s) sWlor Pier(s) (1) ,X, Commercial JLCommunity - Private (2) Number (3) Length 1 (4) Width $ (5) Finger piers X Yea No 0) Number 4 00 Length 'tCo 0I' ir, $461 IP4G 0U) Width g, (t) Platform(s) X Yes No 0) Number 1 (i1) Length 1O? r (Ill) Width ?4 r2`j • (7) Number of slips pt+npoad to R, (g) Proximity of structure to Meow diwan property lines 14 W . ISO, (9) Width of water u, body J o a Do, (10) Water dep* at watoward and of pler at MLW or NWL r. ice' '- ISI Moorlm buoys (1) - Commercial -,.Community w Private (2) Number (3) Description of buoy (Color. Inscription. size. anchor, etc.) (4) Width of water body (5) Distance buoy(s) to be placed beyond shoreline Mooring structure (boadift, mooring pilings, etc.) (1) _ Commercial -Community _ Private (2). Number (3) Length (4) Width Other tar.. ?'kAr t"s' t C• .....% b. BosMouse (including coveted lifts) (1) Commercial Private (2) Length (3) Width c. Groin (e.g. wood. sheetpile, etc.) (1) Number (2) L=9*(s) d. Brwkwater (e.g. rood, sbeetpils, etc.) (1) L"O (2) Average distance from MW. NWL or wetands (3) Maxhzum distance beyond MHW, NWL or wedands r A nab Nab" an b/ 14) -17 S •• Q V7 V 56/£0 P4S1AaH ?( ?? ??»1bvblS •p.,?n.? ?ptia.,?b "O'SL • •d V °?`' i- pa•zaAoD 15q OZ 1?0 'Sunind 1o SAUManup lulnoig9A 1o3 pasn aq of 1o `sdoi3ool `sguipl!nq `iuma'A9d b c se gons `w:)upns uodn-il!nq 1o/pup sno!A1adwi vnluuB!S Xq palanoo aq of `1aiuM aomosag Bulpumsinp uu 3o Ose3 OLD u! 1903 SLS u!tP!M 10 `'IMN JO MHW ameN p f ,o wean v 30 iaa3 SL u!guM Pull agi 3o aSpiuansad ayl an![) 2 4TUII@d V14VD pju2 a o e/u Lpaplo3a1 pup paiield (s)iol aql s Ai uagm `iuawdolanap 1UOJJM3o p sl ioafold atp 3I -u Ls0139 AMW Moq `SaX 3I ON x sa,k Lpapunodwi aq 1aieM ll!M -w AT ns lagPM aiTgnd uzgsixg (-oia `waisXs ollgnd `Xi!unwwoo `llom -2-a) aomos Xlddns 1aieM 2unlu!1p posodold aq!13saQ .1 • TauunuD sxupa oqut dtun.z 4Loq •3-s ZZg Lau a moij jjouni aq TT?M abzuuDszp mall Tuo OU, '(sa2.regoslp le!iaap!sa1 pee „uMop gsEm. `iuan113a lu!olaunuon/lp!lisnpu! `1aluMaiseM A1ei!ups `33oun1 aonpns `alduma 1o3) aims atp 3O slaieM of salmgos!p pasodold3o adAi pup uo!lwol aq!1osaQ (uopv;uawn.7op ait udoiddv yovvy) L19Ao1dde 19301 so aims PAWN L, u aAOge -! ail u1 paq!lowp sa!i!I!ne3 atp 9A9H 'pauuaTd S014TT?op3 u . gpjaua a Exas riau oN -wagsds oigdas butgszxg -lesods!p aftmas 3o poglaw posodold Oq!1os a L6/vl/E pan!wgns aipp `saX 3I. ON SPA x LMa!Aa1 1031uawaSeupW IMUatuu011AUg 3o UOISIATQ agi of pali!wgns uaaq upld luawdolanap ails a seH -uo!ipogpiaD 1alumuuoiS p alinbal osle ,few i!wlad luawdolana(I 1ofVW dWVZ) p a1lnbal Imp si39f0ld .x . f • aga.zou0D 's0op31ns paned 103 pasn aq of (ai moo so `ilugdse `auols laved `I.rew su gons) slpllai9w Ogi isl-l '3 pa11!wgns amp `say( 3I ON x sad Lsaamosag pue'I 3O UO!s!AlQ ag1 of pa11!wgns uaaq ueld lo11um uo!sola pee uolimuaw!pas p seq `olgeo!lddu 3I •sutRaq Xi!A1138 Su!gimslp peel alo3aq shp 0£ isual It, ueld loliuo3 Uo1imuawtp9s pee U01SO10 ue aAlanal isnw saolnosag pue-I 3o UOISIAlQ agi `pU913O aloe auo tmEp aloes gjms!p ll!M ioafold pasodold atp 3I via `sagni!p `speol fu!pnpui paglnis!p 1o pallg `pop9m2 oq of ease 30 On p • auoN (ant, sad sl!un aqi pup sl!an l9!luap!sa13o lagwnu aqi aA!?)X)!suaQ •3 OZ 43Z T sl0o.md 1o sio13o lagwnN -q pasodosd sasnionlls 1o si!un `sa!i!pop3 `s3u!pl!nq 3o lagwnu puu adXjL •u •ioafold pasodold sltp of aiplal Imp uopto!lddd lu!o f atp 3o suo!inas 1a po HE mldwoo of alns ag ' I-dw-WD(I w1O,q `i!wlad •g loftW VWVD jog Uo!lpo!lddd iu!of of w1o3 s!tp gomid 1N3i/V?JHNt/V11 ld1Sd0? (sa111AI v Vulganlslp pull ao/pus uollawlsuoa) ?iGISIA110 Zl?I?L?Id Z?A3Q Z6061 9 T AM (lNvrldfl £-JW-NJU tuJ0J 9SU !OM spulel"m jo -MN 'AM pwfaq goMgp mtm qnn (f) tpaspeM so 'IMN 'mim may molp sllsjaw (Z) - Tf"I W (ma logdpoge `pWm '8•a) JOPAgMg 'P em ZIP v r ? M P-* SS x jj%rn Sl , OWN sor -iwJ arglp Owl (f) ?a4maN '(Z) ?^!?e[ ? ?to?amaJ- IsI???J (tl (•a» `ssacttd halm `>?llAml? a?nrrntss smsoay?l mil" pw&q p riold oq ca (s).(onq wa rla (t) itpoq jsro jo WtA (t) jmqwnN (t) ('fir'oltdwgg `pom TO) atoij) '3 *PtM (t;) TIM I W vx4m Istoi WMD W ON PMAW BWPnlout) osnogsm I S l -, 1 Im jo A&I M ix jiotd jo pa PnAinlsln a Odep jenAk (0I) ,Oa'a 01;7- Am Swm jo wom (6) 10,5 1 l ?%ql bodwd wP0411 mnfps 01 oiawnm ;o 41tamcoxd (9) •s 0 p"odwd sdlts;o .aquenN (V qlplm 010 J q ,04 Rft'I (lt) t AgMnN (D ON NA X (s)Uuopw (9) 9-va'j ipplAA (no e ? 0 ON MAX scold JOSMi (S) WMA is . (b) Qowl (£) OX"Nd -.tlaammo;J'r Is :12*U= 'J -T (I) (*)?!d ?olp (=)VOU e (o» `:ogoae rows'uopdpmq •solo Aonq )o aWdlmQ (f) A9maN (T) of.onq npoopq •a -wetwd pesodwd wip 01 apps q*IKM UOR"ltdy vlo# ov fo sooq?vs 40*0 IM *Pldmo? 00 ww OR '-dplii-f'11A 4M3 `Ilwmd JOW VNIVJ .q aoWtlddV Uqot 01 aUM ntp gxUV (?V T?-tL angn?: ?!M? n°Iptulwo?) s?rntan?rs Vlau-NOG tuna to "el VL: It 26. 61 fieW h00ZOSMT6: Xej 0WPI 8NH3(13N 'T Od USGS 1970 HAMPSTEAD, N.C. • 7.5 MINUTE SERIES ORTHOPHOTOMAP (TOPOGRAPHIC) SW/4 TOPSAIL 15' QUADRANGLE 40' 255 256 25112410000 FEET 258 77°37'30" a' ? r T 1-:V ! N+ • ; ?`J ? + n 1?(?(?? ` ice. .., i?? ?? ? + ?' ?uf 4 r.. K F r i Vi'wTV ..MA: .•x` 4', ?. ?._ 5 ?` -?, n ?? 3804 w ? _ r v- 5 •71' N:. 0 ?1? ?f,. v'4 a .:ar 24 f'-: a{?C s th 0 14'? ,..r?a+..-• s;y . r„?.*''r ^'. < ?- , i 220 000 Q FE=- t 7. ;? 'Vi'e a'?r"?yq??L ? .. .v:.' K , ? ? ?Y?,"`. Y Y "?'•x ?°` ,r+? ?} Oil twv 4 ?f i ? Y ' ~} P ,1,: k"L`?'?? A, ?f' n ?`w ? ? w,?3~•? ?.. ,3; 'S c? "? '14'?-d ;: ,n ea ih a':`..e:S _3fi.. ?? ±: .r .. -._ .., ):i , . ,e...:."X •n:.?:.. *?,,. ?;ks5* ? +s.`?x,'??'..`i ;•.. ,.'?- s:rc 3803 ;rF 0 ? c t •f'f •^ uQ ° ??' ' Ky gets x ". { + • ??,7? ?>? :rte. , 20' 3802 Figure Project: Oppegaard CAMA Permit Title: Vicinity Map W iLmv E,vGLvFERING Date: 3113/97 Scale: 124000 Drawn bv: RM W Prorect 97001 Figure Project: it O d CAMA P Title: Marina Plan WALTON ENGINEERING 2 erm ppegaar Date: 5/15/97 Scale: 1" = 40' Drawnb : RMW Project k: 97001 w BANKS CHANNEL "` v? BANKS CHANNEL v _ 56 190' NOT r0 SCAL EI "Topsail Sound Fishing Pier" BANKS CHANNEL MACS 1. 1997 DIVIS ON OF COASTAL MANAGEMENT 168' 2-Story Building croee? r ' Lot 19 w --?-- /° Upper Deck w Lots 21, 22, 23 Lot 20 Gram (Properly BoundaHe. Taken from (Property Doundorlee Token a December 1998 Plat br ThomDeon from M.B. 4, p. 2j P 7C, COIT C Surveying Co.. P.A) Counly Negl ler of Deede) . p Walk Gra-i Conc. Walk Storm t \ ".--- _ Water travel r Lot 24 "'111 •///"`?_ -? _ 60' R/W c ° °l Storm _ Drain Storm Water --- CARO OLINA BO LU?`EyARD -`--- ¦ ??_..form Drain 60' R/W 60' R/W --?_ CAROLINA R0t1LEYAR C.L. 1.1 I 60' R W---l i fY 40' 20' 0 20' 40' l - I BANKS CHANNEL M` 414' U.S. Army Corps of Engineers Dredge Refueling Bollards --MAY 16 1917 COASTAL MANAC: L::MENT Figure Project: Tille: 3 Oppegaard CAMA Permit Pro-H Fran u a Ma WALTON F_NCINEE-RING S' i p Date: 3/12/97 Scale: 1" = 40' Drawnb : RMW Project N: 97001 2"x`10" P.T. Stringers ® 2' o.c. 5/8" Galv. Bolts Thru (TYP• ) 01 19 ? V 1-9 MAR 8 1 1997 8' on Piers, 4' on Docks DIVISION OF COASTAL MANAGEMENT 2"x6" P.T. Decking 2"x12" P.T. Joists t 2.5' above MHWL 8"-12" dia. P.T. Pilings x8" P. T. Cross- Bracing Bottom of Banks Channel ~ ~ 81 10, Shell Bed 4' 2' 0 2' 4' Figure 4 Project: Oe acrd CAMA PP Permit Title: Pier/Dock Detail j?? ?YALTON ENGINEERING Date: 3/13/97 Scale: 1" = 4' Drawn b : RMW Project# : 97001 P02 P03 4, Existing Sea Wall/MHWL Grass 100.10' j 0.0 4;??40' 9 LLI MAY 16 1997 DiVISIOI',, ,F COASTAL MANAGEMENT Banks Channel .A 99.60, Gravel A 15' -¦ 99.10' - 20' Grass Proposed Concrete Boat Ramp Gravel 0. Lot 19 Lot 20 (Property Boundaries Taken from M.B. 4, P. 2, Pender County Register of Deeds) 20' 10' 0 10' 20' FM iiiii F7pure g Project: Gppegaard CAMA Permit TM*: Boat Ramp Plan WALroN ENG,NEEPwG Dre: 426197 scale' 1"- 20 Drawn b : Fi W Projw t: 97001 U A Cl X v C N \? O O p 1 CD to N 0 n co c m ::r U) o C7 R co 7 D m ato K: x D N - 4 3 r+ m cn I X I ? o o C7 1 ° + a - O a I I %p n D 9 - I D o o X I D rrl X O l n C" 7 am a ? c Cr ?n o 3? s m "" ? 1N?W3?Nrad?N -1t/ls`d0o ??, ???ISlnlr? X L661 9 T XtlW IRM zod AREA: 3.5 A.) N w ? a f lz- ^Q 2 y? 24 0.?? PLOT PLAN °a FOR ANNETTE B. OPPEGAARD TOWN OF TOPSAIL BEACH PENDER COUNTY - NORTH CAROLINA DECEMBER 1996 - SCALE. 1 " = 4b?' THOMPSON SURVEYI G CO., P.A. 111 E FREMONT STREET BURGAW, N. C. 28428 s 0 0°; `c s? F FAA 20 2.2°• `? 6 p?L i! \ ?Q u . ?o . fzv 66. 22? / 0 5580 ,r?G ,, ?,? Asa ?aR`?`,,., o L-2174 `?°• SURVEY REF. Lbr" :?3 %\L" 4 TH. SUBDMSION BLOCK 38 - MAP B. 9, P. 52 LOTS 21 AND 22 3 RD SUBDMSION BLOCK 38 - M.B. 4. P. 2 AND DEED B. 401. P. 9 f 19,558 SQ. FT. f- 4EO e,4 OLD 4 4.0 a Q `??RAa -D lgcl 'TYA /v I 0 IRON MAR 31 1997 ?DIVISION OF 5p? SPASTAL MA14AGEMENT / THIS LOT DOES LIE IN FLOOD HAZARDOUS AREA. n 5 h 19 do PA / R ?r 5'I t?`n ?• sll? J 1,y goo p? G3 . Z ? ASS ??ii? •, 0J& Spa n ` r C'o 71 ,1 ?f ,.3 ?. /2.