Loading...
HomeMy WebLinkAbout19940979 Ver 1_COMPLETE FILE_19941118 State of North Carolina Department of Environment, Health and Natural Resources s P Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director October 31, 1994 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Mr. A. Preston Howard, P.E., Director Division of Environmental Management John R. Parker, Jr. Major Permits Processing Coordinator 0/y 9 9 9 Al"WA C) F=1 11 D F03-1177 NOV 0,1994 DIVISION OF COASTAL MANAGEMENT CAMA/DREDGE & FILL Permit Application Review Swans Bluff, Inc./Patten Carolina Land, Inc. r Off Hwy. 24 and SR1551, southwest of Swansboro, below the SR1509 bridge over Queens Creek, adjacent to the 4-H Camp Mitchell, in Onslow County Proposed Project: to construct a community pier with 10 boat slips Please indicate below your agency's position or viewpoint on the proposed project and return this form by November 21, 1994. If you have any questions regarding the proposed project, please contact Jim Mercer at (919) 726-7021. When appropriate, in-depth comments with supporting data is requested. REPLY: ? This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED 1?t L lL E-, t' v r- DATE I P.O. Box 769, 3441 Arendell St„ Morehead City, North Carolina 28557 Courier #E11-12-09 Telephone 919-726-7021 FAX 919-247-3330 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Swans Bluff Inc. / Patten Carolina Land Inc. 2. LOCATION OF PROJECT SITE: off Hwy. 24 and SR //1551, southwest of Swansboro, below the SR /11509 Bridge over Queen's Creek adjacent to the 4-H Camp Mitchell in Onslow County. Photo Index - 1989: Strip #/154, Frame /131, @ H-12 State Plane Coordinates - X: 2660100 Y: 361200 USGS 7.5 min. Topographic Quadrangle "Hubert" Photo-revised 1983. 3. INVESTIGATION TYPE: CAMA (ONLY) 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 10/06/94 Was Applicant Present- NO 5. PROCESSING PROCEDURE: Application Received - 09/15/94 Incomplete Office - Morehead City 10/27/94 Completed 6. SITE DESCRIPTION: (A) Local Land Use Plan - Onslow County LUP Up-Dated (Nov. 1992) Land Classification From LUP - Transition / Conservation (B) AEC(s) Involved: Estuarine Waters, Coastal Wetlands, Estuarine Shoreline (C) Water Dependent: YES (D) Intended Use: Housing Development (E) Wastewater Treatment: Existing - NONE Planned - Individual Septic Systems (F) Type of Structures: Existing - Paved Roads (3,800 In. ft.) - 61 Single Family Residential Lots Planned - Community Pier with 10 Boat Slips (G) Estimated Annual Rate of Erosion: NONE Source - Marsh Fringe 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands: Saltmarsh Fringe / Pier footprint 165 sq. ft. (B) Non-Vegetated Wetlands: 652 sq. ft. Open Water / Pier (Leg+Basin) 4,245 sq.ft. (C) Other: Highground / access walk 105 sq. ft. Highground / Paved Parking 4,680 sq. ft. 404 Wetlands / Pier 270 sq.ft. (D) Total Area Disturbed: Approximately 0.3 acres Community Access Area (E) Primary Nursery Area: YES (Hall's Creek) (F) Water Classification: 'SA' Open: Open FIELD INVESTIGATION REPORT: PATTEN CAROLINA LAND, INC., ONSLOW COUNTY PAGE #2 8. PROTECT SUMMARY: The applicant proposes to construct a community pier with 10 boat slips to be located on a water access easement'next to Lot #1 in Swans Bluff Subdivision. 9. NARRATIVE DESCRIPTION: The land owner and applicant is Swans Bluff Inc. / Patten Carolina Land Inc. The CAMA application has been submitted by their agent and environmental consultant, Mr. Wayne Ragland. Development of Swans Bluff Subdivision has been underway for the pass several months. Although most all of the lots have sold, construction of individual houses has not started. Until now, all construction activities have been limited to work within the 50 ft. roadway alignment all of which has occurred well landward of the Estuarine Shoreline Areas of Environmental Concern. As the project plan show on sheet 2 of 4, three areas of 404 Wetlands were crossed in the construction of the roadway within the subdivision. The applicant has provided the following calculations to the Corps of Engineers. Authorization has been confirmed under the Nationwide Permit No. 14 for Minor Road Crossings: site #1, 34 ft.long = 1724 sq.ft., site #2, 61 ft. long = 3114 sq.ft., and site #3,97 ft. long = 4304 sq.ft. Today, the applicant proposes to develop a community access facility on a 0.35 acre tract of land located on Queen's Creek next to Lot #1 and adjacent to the 4-H Camp Mitchell. The proposal calls for the construction of a 327 foot pier with 10 boat slips and a paved parking for 7 cars on the highground landward of the CAMA AEC. Other components of the access facility plan includes construction of a 5 foot wide gravel walkway connecting the parking area with the pier and two (2) roof covered platforms or gazebos situated at either end of the walkway. Within the Estuarine Shoreline AEC, the 5 foot wide gravel walkway will account for approximately 105 sq. ft. of contact area and the roof covered gazebo will occupy another 94 sq.ft. impervious surface. Construction within the AEC will generate an estimated 199 square feet of impervious surface; that is, approximately 10.6% of the total AEC that equals 1,871 sq.ft. The proposed 327 ft. pier begins on the landward side the saltmarsh fringe. The marsh measures about 25 to 35 feet wide and is dominated by saltmarsh cordgrass and black needle rush. The 5 foot wide pier will create a footprint shadow of about 175 square feet on the coastal wetlands AEC. The open water section of the pier will measure approximately 126 feet long and includes a T-Head platform and a designated boat slip/basin that will measure 76 feet long by 56 feet wide. The T-Head platform will measure 8 ft. wide by 30 ft. long and each of the 8 finger piers will measure 2 to 3 ft. wide by 15 ft. long. The 10 slip basin will impose a footprint of 4,256 square feet on the Estuarine Waters AEC of FIELD INVESTIGATION REPORT: PATTEN CAROLINA LAND, INC., ONSLOW COUNTY PAGE #3 Queen's Creek. As the workplat drawings show (sheet 3 of 4), the associated finger piers and tie-off pilings will overlap the 15 ft. sideline set requirement as well as the extended property lines of the adjacent riparian land owners. On the south east side of the pier, the 6 tie-off pilings are shown to extend 10 feet beyond the property line to an area that is considered the riparian corridor assigned to the 4-H Camp Mitchell property. Water depth information provided with the application drawings show that the average depths in and around the boat docking area range from -2.0 ft. to -3.5 ft. on mean low water. The outer limits of the pier will terminate in waters that measure -3.5 ft. relative to the mean low water level. The T-Head platform will parallel those water depths. The same workplats indicate deeper waters of -3.7 ft. and -3.8 ft. occur outboard of the proposed structure. 10. ANTICIPATED MACTS: The proposed pier and associated docking area will generate a footprint impact of approximately 4,897 square feet on the Estuarine Waters of Queen's Creek. The 5 foot wide pier will create an additional 165 sq. ft. footprint shadow over the coastal saltmarsh and 270 sq. ft. as the pier crosses the fringe of 404 wetlands. Construction activities on the high ground will render about 199 square feet of undeveloped land as impervious surface. As previously mentioned, this figure represents about 10.6% of the total AEC (1,871 sq.ft.). Landward of the CAMA 75 ft. AEC the paved driveway and parking lot will produce 4,680 sq. ft. of developed area that should have little to no adverse effects on the local estuarine resources. PREPARED BY: JAMES L. MERCER DATE: October 31, 1994 Please type or print. Carefully describe all anticipated development activities, including construction, excavation, filling, paving, land clearing, and stormwater control. If the requested information is not relevant to your project, write N/A (not applicable). Items 1-4 and 8-9 must be completed for all projects. _ /a't"? G,?",/` 1 APPLICANT ? f LA-V1 C,-(I- a. ' Name Wane Ragland Address 120 Balsam Road City Jacksonville State NC Zip 28546 Day Phon 910-347-9036 Landowner or Authorized Agent b. Project name (if any) Swans Bluff S/D c. If the applicant is not the landowner, also give the owner's name and address. Swans Bluff Inc PO Box 6055 Wilmington NC 28403 910-763-0071 c. Will the project be for community, private, or commercial use? Community pier d. Describe the planned use of the project. Detached single family residential subdivision. 4 LAND AND WATER CHARACTERISTICS Size of entire tract 571 acres b. Size of individual lot(s) ranges from 1/2 to 2t acres c. Elevation of tract above mean sea level or National Geodetic Vertical Datum 0 to 26 msl NGVD d. Soil type(s) and texture(s) of tract Newhan, Fripp, & Alpin taxadjuncts on uplands. Duckston and Cart tax ad units on wet areas. most are deep sands. e. Vegetation on tract Mixed hardwoods and pines on most of site, & mostly Juncus marsh along creek margin. f. Man-made features now on tract Roadway g. What is the CAM A. Land Use Plan Classification of the site? (Consult the local land use an ) 2 LOCATION OF PROPOSED PROJECT Conservation -V Transitional a. Street address or secondary road number Roped Community NCSR 1551 Other b. City, town, community, or landmark h. How is the tract zoned by the local government? Swansboro Not Zoned c. County Onslow i. Hove are adjacent waters classified? SA NSW d. Is proposed work within city limits or planning j. Has a professional archaeological survey been jurisdiction? NO carried out for the tract? NO If so, by whom. WA e. Name of body of water nearest project Queen Creek 5 UPLAND DEVELOPMENT 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or pier,) 61 lots for detached single family residences, one Complete this section if the project includes any land development. a. Type and number of buildings, facilities, or structures proposed Streets, picnic area, parking and pier b. Number of lots or parcels 61 community pier for 10 boat slips, 38001 linear feet of proposed street If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an existing project, nc«, work, or both? New work. (verbatim copy of Form DCP-NIP-1, 3191 & DCP-NIP-2, 4'89) c. Density (Give the number of residential units and the units per acre.) 61, 1.09 units per acre d. Size of area to be graded or disturbed 4.3 f acres (i.e. street oortstrtx lion ) O ? OC I ?: ?? i1 U e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion & sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and control plan been submitted to the Division of Land Resources. YES f. Give the % of the tract within 75' of mean high water to be covered by impermeable surfaces, such as pavement, buildings, rooftops. < 25% by covenant g. List the materials, such as marl, paver stone, asphalt, or concrete, to be used for paved surfaces. Street paved with BCSC h. If applicable, has a stormwater management plan been submitted to the Division of Environmental Management? Yes, concurrent with Sediment Control i. Describe proposed sewage disposal and/or waste water treatment facilities. Septic tanks j. Have these facilities received state or local approval? Permits Issued by Onslow Co Health dept. k. Describe existing treatment facilities. None 1. Describe location and type of discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial / commercial effluent, "wash down"). None, other than the remote possibility of stormwater runoff during rare high intensity precipitation events. m. Water supply source Individual wells n. If the project is ocean front development, describe the steps that will be taken to maintain established public beach accessways or provide new access. NA o. If the property is on the oceanfront, what will be the elevation above mean sea level of the first habitable floor. NA i :'? r ( I 1 C. Ui l;. ? i `t j?;L L`-f':-i ?1 :may --------_--------..."? 6 EXCAVATION AND FILL INFORMATION a. Describe below the purpose of proposed excavation or fill activities (excluding bulkheads, which are covered in Section 7). Length Width Depth Access channel (MLW) or (NWL) Boat basin Other (breakwater, vier, boat ramp, rock jetty) Fill placed in wetland or below MHW Upland fill areas NA NA NA NA NA NA 32T± 51 NA 0 0 NA NA b. Amount of material to be excavated from below water level in cubic yards None c. Type of material NA d. Does the area to be excavated include marshland, swamps, or other wetlands? NA e. High ground excavation, in cubic yard NA Dimension of spoil disposal area g. Location of spoil disposal area NA NA h. Do you claim title to the disposal area? NA If not, attach a letter granting permission from the owner NA i. Will a disposal area be available for the future maintenance? NA If so, where? NA j. Does the disposal area include any marshland, swamps, or water areas? NA k. Will the fill material be placed below mean high water? NA Amount of fill in cubic yards NA m. Type of fill material NA n. Source of fill material NA o. Will fill material be placed in marsh or other wetlands? NO (%erbatim copy of Form DO'-IMP- 1, 3'91 & DCPA P-2, 4'89) p. • Dimensions of the wetland to be filled NA q. , How will excavated or fill material be kept on site and erosion controlled? Silt fences, rip rap dams, & sediment traps for street construction. r. What type of construction equipment will be used (for example, draghne, backhoe, or hydraulic dredge)? NA s. Will wetlands be crossed in transporting equipment to the site? NO If yes, explain steps that will be taken to lessen environmental impacts. NA 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap None b. Average distance waterward of mean high water or normal water level NA c. Shoreline erosion during preceding 12 months, in feet NA d. Type of bulkhead material NA e. Amount of fill, in cubic yards, to be placed below mean high water None Type of fill material NA 8 ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims tide, plus written permission from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 1/2 by l 1 white sheet. (Refer to Coastal Resources Commission Rule 710203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 24 high quality copies are provided by applicant. (Contact the US Army Corps Of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. (verbatim copy of Form DCP-MP-1, 3'91 & DCP-'\i1-2, 4'89) A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete address of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Division of Coastal Management and should be advised by the applicant of the opportunity. Name: David L & Susan M Dickey Address: 2310 North Lumina Avenue Wrightsville Beach NC 28480 Name: Hammocks Beach Corporation Address: C/O Robinson, Bradshaw & Hinson, PA 1900 Independence Center 101 North Tryon Street Charlotte NC 28246 Name: Address: A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. (1) NWP #14 (wetland road crossings) (2) DEM low density option storm water management plan (3) LOS Sedimentation control permit (4) NC DOT driveway/street access permit A check for $250.00 made payable to the Department of Environment, Health & Natural Resources to cover the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. (N/A) A statement on the use of public funds. If the project involves the expenditure of public funds, attach a statement documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). (N/A) 71 • ti n r r.......................::i 9 CERTIFICATION AND PERMISSION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of project. This is the-day of , 19 --?641Z X ?J Gz Landowner or uthoriz A ent Limited Agent: B Wayne Ragland 120 Balsam Road Jacksonville NC 28546-8508 ,-.. ...,? ti F _7 ; TI VLj l r (verbatim copy of Form DCP-MP-1, _'9I & DCP-.\IP-2, 4189) ti: --• - 5. -. Form DCM-MP-2 MARINA DEVELOPMENT Attach this form to Joint Application for CAMA Major Permit. Be sure to complete all other sections of the Joint Application which relate to this proposed project, including upland areas, even if duplicative. All shorebased facilities must be included in application and work plats. 1 MARINA CHARACTERISTICS a. Check below the type of marina proposed. Commercial Public J Residential (i.e. community pier with 10 boat slips) b. Will the marina be open to the general public? NO c. If there is residential development associated with the marina, how many units or lots are planned? 61 lots d. Check all of the types of service to be provided. Full service, including travel lift or rail Dockage, fuel, and marine supplies V Dockage("wet slips') only NN-Mier of slips 10 Dry storage Number of boats Boat ramps(s) Other (describe) e. Check below the proposed type of siting. Land cut and access channel Open water with dredging for basin and/or channel open water, no dredging required other (describe) f. Describe the typical boats to be served (for example, open runabout, charier boats, sail boats, mixed types). runabouts & skiffs, mixed sizes g. Typical boat length 16-22' h. Maximum boat length 25' Are any floating buildings planned? If so, describe NA (verbatim copy of Form DCP-MP-1, 3/91 & D(T-NIP-2, 4'89) NO 2 MARINA OPERATIONS a. Check each of the following sanitary facilities which will be included in the proposed project. Office toilets Toilets for patrons Number None Location NA Showers Boat holding tank pumpout Type and location NA b. Describe treatment type and location for all sanitary wastewater. Septic tanks to serve lots only c. Describe solid waste, fish offal, and trash disposal. None d. How will overboard discharge of sewage from boats be controlled. Posted "NOT ALLOWED" e. Give the location and number of "No Sewage Discharge" signs proposed. One at pier entry f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste, and petroleum products. None, none allowed g. Where will residue be disposed of? NA h. Give the number of channel markers and "no Wake" signs proposed. None proposed Note: Regulatory signs such as these require additional approval by the NC Wildlife Resources Commission. i. Give the location of fuel handling facilities and describe the safety measures planned to protect area water quality. None proposed, none allowed j. Describe design measures that promote boat basin flushing or circulation and reduce water quality impacts. Pier to channel in open water k. What will be marina policy on overnight and live- aboard dockage? Not allowed 1. Is the proposed marina located near any shellfish leases? Nearest lease unknown. If so, give the name and address of the leaseholder. Unknown m. If this project is an expansion of an existing marina, what types of services are currently provided? NA n. How man), slips are now available? None i 2 I11. t t 30 QT. ,`? j- (\ '843 34 V \ ?S 1 CJ? b V S ? p. 8 ?as 1 '\ 42'30.. 11 2e .? Z 0 30 % 3842 b i` ``?a1 • ?I50? l /I C. , 35 I„ 0 D44 " 8 • •" c a ?` II 11 <a . ? Ip ?3' W 'u a'`? III s? '•?•3p r, - Q ?l u 1 y J` -? 11 7 N n\ 14 '0 J 2 laN ? II J I/ ? .a/• Swans rp _ :? \ O w v' .S 25 / 2 ??' r' _ (? ?? _ ?' ??1 ht? ??• ?,'' 3640 Holland I and " o ?J`?Pie I y? VZr Pro . r ?f TE posed Community Ple `• """ gnc Pier Location ) ?20 35 \,? "? ?/ ` ,Foul Foul z ja' 3839 in s ?l j II I `?.-. n ................ oul Q 4 ?? (?•) Foul ?•, 0 ??? _ r? H \? 1?•?E? !a oo ?,, e? ti Area ?. c r 4 =F JU ° Foul \?,1?) 2 t D ?`o -0 Vicinity D Location Map 94°•- 3,38 ?) `l o CRMR RPPLICRTION -`: bge ???pl 2 40' L; Community Pier to Dock 10 Boat - ?N;r _,??t I /VE e To Serve Swans Bluff S/D-?? ??. Onslow County, NC 3/23/94 -.1 b S. SCRLE: 1 2000' -?--- -- -- --- a ,? `'` 4 Reference: USGS Hubert Quadranglef 7.5 Minute Series 9 .113837 \ Deacon 17 .f.ti?. /•.!'?'v - yr: . -' I• :. .•. ^,;:?:. ...: ,r., .. .•" ..^-r:"r:` 15 14 19 13 20 12 • W 6 10 21 r ? ^s r'? J 22 ?: ••?•9?c. a. 9 G--.- °;?yNE RQ ;4` ' 8 23 oede?o??tfNgJ 'y 7 24 Y :v^ 6 25 r: .rJ'J?. %5 26 ;QUEEN C D-- REE:, 27 ^:s r:?s r?s• ?:r•?.? 3 28 CROSSING #3 97LONG 4304± SF i 32 33 31 60 T59 LOCATION PROPOSED'r? 2 30 COMMUNITY PIER 62 61 WATER ACCESS EASEk1FNT (f 6dub on & - 4H Camp Alitcbcll - C?r/u6d` U'jTiip s7v t G9jv?l?tioir• mot ?ontnu«ut? ?cer (f'eur 70 cWoezb LEGEND 9l'Qy?.?, ,yl??? APPROa1?1ATE MARSH ABOVE MHWM ? 404 WETLANDS SCALE: V = 300' UPLANDS WATERS, & MARSH BELOW MHNNIN1 0 150 300 600 ----- 100' N1HWh1 SE TBACK & 50' MARSH SETBACK, NNIMCHEVER 1S GREATER F Tr,?`4 .r , t SHEET 2 of 4 SEP I 57 56 55 5.1 53 52 n-- 34/ 5 36 i -----CROSSING RD 37 CROSSING #2 61' LONG 3114 ± SF 38 ?!::: 39 40 41 42 ,NVETLAND RD 44 CROSSING #1 34' LONG 45 1724± SF 46 47 t? 48 4H ROAD NCSR 1551,60' R/W SHEET 3 OF 4 z 6" treated pilings 2.0 X 1.8 - 2.0 ? X \ ??\ 15'-i \ typ \ 2.6 \\ \\ 2.5 2.5 \ o ?\ \ finger piers \ \ 2.7 aC NOTE 1~1 v ti v'ded b P t Phi11' 12LS 15-- -- Riparian access line 0 -; X 2.7 , e a on surrey pro y a e cps W3. elevation data shown is depth of water on 4/1219=1, water r MHW elevation on that date was -0.50' msl NGVD I r . benches , \ 8' \ - \?? \ 2.0 \\ 2.9X \ -X3.5 X 1.3 1 I 1 I 1 I 1 1 I 1.4 1.8 )( 1 X lr 1.3 A1.?Iww?wr r?????M??¦•??w?M1 \ ? \ X r 3.7 \ \ 3.8 \ \ Approximate 2.4 X1 \\ \ , Center Line 1 Channel I \\ Alinement 1 ?\ -- ---X 3.0 \ 3.0 1 1 ,? 1 1 ?? X 1 2.2 2.4x 1 SWANS BLUFF S/D 2.3X WATER DEPTH CONTOURS 1.s WITH FINGER PIER & BOAT DOCKING LAYOUT t SCALE: 1" = 20' \ 1 _---?C 2.0 \ 1.6 2.0 _------ 694 ; a 0 '600BOr?ree?ouo ..................................................................................327.3.. f...... .................................................................... 4.5 ................ ? .......................... 3 . ................. ................................................................ ..2*8 DECKIN ................................... f........................... .1.5 ........ .............................. . O.ONGVD --- - - - - ----------- ......................... . ..... ..... -1.5 ............................ PILES 8 O'C. .............. ................................. TYP -2.5 .............................................. ......................... -3.5 ..................................................................................................................... -4.5 ....................................................................................................................................... - IL-, ........... ..................................................................................................................................................................................... SCHEMATIC PROFILE : SWANS BLUFF COMMUNITY PIER SCALE : I" = 60' HORIZONTAL 1" = 6' VERTICAL 2*8 ST 6"-8" ] TYPICAL PIER SECTION DETAIL NOT TO SCALE rl UI -. 2*8 DECKING 2*8 CROSS BRACES SWANS BLUFF S/D PIER DETAILS SCALE AS SHOWN 9?aJ?e .1??9lo.d 9zlo-9-z ,'o .oeooo a V. *19 60 sot SHEET 4 OF 4 000 P!s •t NE R ASZV oNorow?oooeap° TYPICAL PIER PROFILE DETAIL NOT TO SCALE COMMUNITY LOT ; treated piling ; ; 2.0 ?15'I yp t --? 75' ES AEC Gazebo Start Board Walk At Existing Ground Grade approximate mh%%,m along property line QUEEN CREEK SHORELINE DETAIL SCALE: 1 "=30' QUEEN CREEK NOTE: Elevation survey provided by Pate Phillips RLS, elevation data shown is depth of water on 4/12/94, water elevation on that date was -0.50' msl NGVD 6 20 va '5' Wide Washed SWANS BLUFF S/D WATER DEPTH CONTOURS WITH FINGER PIER & BOAT DOCKING LAYOUT SCALE: 1" = 30' 0 15 30 60 SHEET 3 OF 4 1 9rw- SGyr?.,d River Gravel Walk 4H Camp Mitchell 5' Board Walk TBM EIP top = 2.7' NGVD ??- - Spartina alterniflora 71" A. marsh CW AEC i 0.0 X-- ---------X a 0.0 ; ; 1.8 Edge Of Pier Along 15' Riparian Setback b o Access Line 5' 25' _ ` tali a 1 Xfo o 2. 3 - x2 2 2.5 c ?.wsru....w?r*rr.*re... O finger piers o ? 2.7 x X 23 327' to -- - MHWM benches ' r 2. X ? 0' ---?; 3.5 x - - 3.7 2.4 x. Approximate Center Line % I ?`? Channel Alinement 3.0 NOTE: 75' ES AEC total area is 1871 SF River Gravel Walk _4H Camp Mitchell and contains 93.5 SF built upon (i.e. =5.0%K l I I 75' ES AE( Section 404 wetlands - - -' - - -. - Gazebo TBM EIP TOP LOT 2 LOT 1 = 2.7' NGVD Spartina alterniflora LOT 3 marsh CW AEC y. 50typ.7 :.. 40. 01 x--------- --- ----x 0.0 0.0 SANS BLUFF S/D - ~- ` - x x 1.? proximate mhwm 1.3 x ' along property line 1.3 ; 5' wood pier t)p x 1.4? (correction 9/27/94) 1.5 x . , 15', edge of 1.5 pier along Camp , --QUEEN CREEK Mitchell riparian ? x access setback line 1.4 x w 1.4 x 1.4 ' NOTE: Spot elevations by Pate Phillips & Associates. Elevations are water depths from water surface at -0.5' mean sea level (1929 NGVD) on April 12, 1994. x- X- _ 1.s 1 1.5 , 1 , Boat Dock Area 1.811 -XI CAMA APPLICATION 2 u>?- - - - ` - '- , 11 EXHIBIT MAP ADDENDUM #1 26 REVISION #1 \ X . WATER DEPTH CONTOURS, 2. Center Unc CAMA AEC & PIER ALINEMENT x 2.s _ Channel Alin •ment SCALE: 1 "=50' 7 7 3.5 0 25 50 100 r I ,. i . _. \ 2 ( ?\ 2. 9/4- sf-94--d x t 1 1 \ \ ' , -x 3.7 1.3 \ x- ( 2 Si'.. 9.2'7 qa F >d'>B 44 `' ' I ll 1\ \? / 3 0 ac' 18' Hide paved drive 7 paved parking spaces CO:NIMUNITY LOT NOTE: 75' ES AEC total area is 1871 SF and contains 93.5 SF built upon (i.e. X5.0%) Lot 62 _4H Camp _ Mitchell Picnic Tables Gazebo N \' I& Washcd River Gravel V1'alk 75' ES AEC / Section 404 wetlands - _ - 4H Camp Mitchell Gazebo LOT 2 LOT 1 LOT 3 ,TBM EIP top- - 2.7' NGVD Spartina alterniflora marsh CW AEC 0.0 I SWANS BLUFF S/D X! x _ - - - ; 1 2 approximate mh%%,m - . 1'3 1.3 ; 5' N%,ood pier typ along property line x 14 (correction 9/27/94) 1.5 1.5 ; . X X x 1.?t N J 1.4 1.4 - 15', edge of pier along -QUEEN CREEK- - - -"- 1'5 -- 5 1 -Camp Mitchell riparian . 1.5 access setback line 1.8 2V 2 0- Va6?S B 1 oat Dock Area CAMA APPLICATION 2 1.8 ? \ f7 Approximate EXHIBIT MAP ADDENDUM #2 \ x 211) 1 -A Center Line OVERALL LAYOUT 1.3 ` L\x3.7 , 2'.3t Channel Alinement COMMUNITY LOT AND PIER x'1.4 1? 3 0" SCALE: I"=100' . 2 2 1.3 i , 2<4 . ? J 1 _" ? 2 1. , ? VS - - so 100 ` \Vx L k - l.l) 2.0 / ?.U 9l4- k3 k:5 /,1.4 /Q.5 1.3 1.5 111 n7 .. ....................... .. " ?.??ANS C.LUFF11 1- 7 O vil W 1yj ?-? DAMP l Ea / o A????eox' Me.tvJ t-11411 ?I-/n-i-EK O -?,_ / o ? ov o O 0 al_I?E??S ??EE IC a I.Z N 0 1.3 o I, 3? 0 1.4 o I.5 • o I . S' 0 1,4, , 0 1.4 0 IA' •'•N CARp•., o I.S .• l,,y •. t1•• P?GISiEII '•. q ? a I•S, • ? 01.6 • SEA'Jq • 264 ' v • o Z.S' o z•o' o z.Z' 01.5 , o Z.s 0 2.T' o Z.7' 03.5' , DIMEIJSIoIJ? -SH.- id AKE oz.o 02.9' o ?S 0 1.3' 0 3,g' 0 3.?' L?IATEK DEPT??S. N1 F?.I I SFA L E.i E L E LEJ. of 0 1-4- LdATElz L-0 APPIL Iz) 179.q 01.15 ' 03'O 03.0' , (J A'01.4' , o I-V o Z.3 o I, 9 o LSD Z.v o I•b' 0 grez - rr-G '11r 82 ?r1 'c??vgyNy?7. ° shN t(I Nr-1 ?f 31-Vfri DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Swans Bluff Inc. / Patten Carolina Land Inc. 2. LOCATION OF PROJECT SITE: off Hwy. 24 and SR #1551, southwest of Swansboro, below the SR #1509 Bridge over Queen's Creek adjacent to the 4-H Camp Mitchell in Onslow County. Photo Index - 1989: Strip #154, Frame #31, @ H-12 State Plane Coordinates - X: 2660100 Y: 361200 USGS 7.5 min. Topographic Quadrangle "Hubert" Photo-revised 1983. 3. INVESTIGATION TYPE: CAMA (ONLY) 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 10/06/94 Was Applicant Present - NO 5. PROCESSING PROCEDURE: Application Received - 09/15/94 Incomplete Office - Morehead City 10/27/94 Completed 6. SITE DESCRIPTION: (A) Local Land Use Plan - Onslow County LUP Up-Dated (Nov. 1992) Land Classification From LUP - Transition / Conservation ;B) AEC(s) Involved: Estuarine Waters, Coastal Wetlands, Estuarine Shoreline (C) Water Dependent: YES (D) Intended Use: Housing Development (E) Wastewater Treatment: Existing - NONE Planned - Individual Septic Systems IF) Type of Structures: Existing - Paved Roads (3,800 In. ft.) - 61 Single Family Residential Lots Planned - Community Pier with 10 Boat Slips (G) Estimated Annual Rate of Erosion: NONE Source - Marsh Fringe 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED nTUFR (A) Vegetated Wetlands: Saltmarsh Fringe / Pier footprint 165 sq. ft. (B) Non-Vegetated Wetlands: 652 sq. ft. Open Water / Pier (Leg+Basin) 4,245 sq. ft. (C) Other: Highground / access walk 105 sq. ft. Highground / Paved Parking 4,680 sq. ft. IL_ 404 Wetlands / Pier 270 sq. ft. (D) Total Area Disturbed: Approximately 0.3 acres Community Access Area (E) Primary Nursery Area: YES (Hall's Creek) (F) Water Classification: 'SA' Open: Open FIELD INVESTIGATION REPORT: PATTEN CAROLINA LAND, INC., ONSLOW COUNTY PAGE #2 8. PROTECT SUMMARY: The applicant proposes to construct a community pier with 10 boat slips to be located on a water access easement next to Lot #1 in Swans Bluff Subdivision. 9. NARRATIVE DESCRIPTION: The land owner and applicant is Swans Bluff Inc. / Patten Carolina Land Inc. The CAMA application has been submitted by their agent and environmental consultant, Mr. Wayne Ragland. Development of Swans Bluff Subdivision has been underway for the pass several months. Although most all of the lots have sold, construction of individual houses has not started. Until now, all construction activities have been limited to work within the 50 ft. roadway alignment all of which has occurred well landward of the Estuarine Shoreline Areas of Environmental Concern. As the project plan show on sheet 2 of 4, three areas of 404 Wetlands were crossed in the construction of the roadway within the subdivision. The applicant has provided the following calculations to the Corps of Engineers. Authorization has been confirmed under the Nationwide Permit No. 14 for Minor Road Crossings: site #1, 34 ft.long = 1724 sq.ft., site #2, 61 ft. long = 3114 sq.ft., and site #3,97 ft. long = 4304 sq.ft. Today, the applicant proposes to develop a community access facility on a 0.35 acre tract of land located on Queen's Creek next to Lot #1 and adjacent to the 4-H Camp Mitchell. The proposal calls for the construction of a 327 foot pier with 10 boat slips and a paved parking for 7 cars on the highground landward of the CAMA AEC. Other components of the access facility plan includes construction of a 5 foot wide gravel walkway connecting the parking area with the pier and two (2) roof covered platforms or gazebos situated at either end of the walkway. Within the Estuarine Shoreline AEC, the 5 foot wide gravel walkway will account for approximately 105 sq. ft. of contact area and the roof covered gazebo will occupy another 94 sq.ft. impervious surface. Construction within the AEC will generate an estimated 199 square feet of impervious surface; that is, approximately 10.6% of the total AEC that equals 1,871 sq. ft. The proposed 327 ft. pier begins on the landward side the saltmarsh fringe. The marsh measures about 25 to 35 feet wide and is dominated by saltmarsh cordgrass and black needle rush. The 5 foot wide pier will create a footprint shadow of about 175 square feet on the coastal wetlands AEC. The open water section of the pier will measure approximately 126 feet long and includes a T-Head platform and a designated boat slip/basin that will measure 76 feet long by 56 feet wide. The T-Head platform will measure 8 ft. wide by 30 ft. long and each of the 8 finger piers will measure 2 to 3 ft. wide by 15 ft. long. The 10 slip basin will impose a footprint of 4,256 square feet on the Estuarine Waters AEC of FIELD INVESTIGATION REPORT: PATTEN CAROLINA LAND, INC., ONSLOW COUNTY PAGE #3 Queen's Creek. As the workplat drawings show (sheet 3 of 4), the associated finger piers and tie-off pilings will overlap the 15 ft. sideline set requirement as well as the extended property lines of the adjacent riparian land owners. On the south east side of the pier, the 6 tie-off pilings are shown to extend 10 feet beyond the property line to an area that is considered the riparian corridor assigned to the 4-H Camp Mitchell property. Water depth information provided with the application drawings show that the average depths in and around the boat docking area range from -2.0 ft. to -3.5 ft. on mean low water. The outer limits of the pier will terminate in waters that measure -3.5 ft. relative to the mean low water level. The T-Head platform will parallel those water depths. The same workplats indicate deeper waters of -3.7 ft. and -3.8 ft. occur outboard of the proposed structure. 10. ANTICIPATED IMPACTS: The proposed pier and associated docking area will generate a footprint impact of approximately 4,897 square feet on the Estuarine Waters of Queen's Creek. The 5 foot wide pier will create an additional 165 sq. ft. footprint shadow over the coastal saltmarsh and 270 sq. ft. as the pier crosses the fringe of 404 wetlands. Construction activities on the high ground will render about 199 square feet of undeveloped land as impervious surface. As previously mentioned, this figure represents about 10.6% of the total AEC (1,871 sq.ft.). Landward of the CAMA 75 ft. AEC the paved driveway and parking lot will produce 4,680 sq. ft. of developed area that should have little to no adverse effects on the local estuarine resources. PREPARED BY: JAMES L. MERCER DATE: October 31, 1994 Please type or print. Carefully describe all anticipated development activities, including construction, excavation, filling, paving, land clearing, and stormwater control. If the requested information is not relevant to your project, write N/A (not applicable). Items 1-4 and 8-9 must be completed for all projects. 1 APPLICANT r. ' NameWade Ragland Address 120 Balsam Road City Jacksonville State NC Zip 28546 Day Phon 910-347-9036 Landowner or Authorized Agent b. Project name (if any) Swans Bluff S/D c. If the applicant is not the landowner, also give the owner's name and address. Swans Bluff Inc PO Box 6055 Wilmington NC 28403 910-763-0071 2 LOCATION OF PROPOSED PROJECT a. Street address or secondary road number NCSR 1551 b. City, town, community, or landmark Swansboro c. Will the project be for community, private, or commercial use? Community pier d. Describe the planned use of the project. Detached single family residential subdivision. 4 LAND AND WATER CHARACTERISTICS Size of entire tract 571 acres b. Size of individual lot(s) ranges from 1/2 to 2t acres c. Elevation of tract above mean sea level or National Geodetic Vertical Datum 0 to 26 msl NGVD d. Soil type(s) and texture(s) of tract Newhan, Fripp, & Alpin taxadjuncts on uplands. Duckston and Carteret taxad units on wet areas. Most are deep sands. e. Vegetation on tract Mixed hardwoods and pines on most of site, & mostly juncus marsh along creek margin. Man-made features now on tract Roadway g. What is the CAMA Land Use Plan Classification of the site? (Consult the local land use plan.) Conservation V Transitional Developed Community Rural Other h. How is the tract zoned by the local government? Not Zoned C. County Onslow i d. Is proposed work within city limits or planning jurisdiction? NO e. Name of body of water nearest project Queen Creek How are adjacent waters classified? SA NSW j. Has a professional archaeological survey been carried out for the tract? NO If so, by whom. N/A 5 UPLAND DEVELOPMENT 3 DESCRIPTION AND PLANNED USE Complete this section if the project includes any land OF PROPOSED PROJECT development. a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or pier,) 61 lots for detached single family residences, one a. Type and number of buildings, facilities, or structures proposed Streets, picnic area, parking and pier b. Number of lots or parcels 61 community pier for 10 boat slips, 38001 linear feet of proposed street If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an existing project, new work, or both? New work. (verbatim copy of Form DCP-MP-1, 3/91 & DCP-MP-2, 4/89) c. Density (Give the number of residential units and the units per acre.) 61, 1.09 units per acre d. Size of area to be graded or disturbed 4.3:t acres (i.e. street construction) CT i994 i, (( ? 1 e. - If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion & sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and control plan been submitted to the Division of Land Resources. YES f. Give the % of the tract within 75' of mean high water to be covered by impermeable surfaces, such as pavement, buildings, rooftops. < 25% by covenant g. List the materials, such as marl, paver stone, asphalt, or concrete, to be used for paved surfaces. Street paved with BCSC h. If applicable, has a stormwater management plan been submitted to the Division of Environmental Management? Yes, concurrent with Sediment Control i. Describe proposed sewage disposal and/or waste water treatment facilities. Septic tanks j. Have these facilities received state or local approval? Permits Issued by Onslow Co Health dept. k. Describe existing treatment facilities. None 1. Describe location and type of discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial / commercial effluent, "wash down"). None, other than the remote possibility of stormwater runoff during rare high intensity precipitation events. m. Water supply source Individual wells n. If the project is ocean front development, describe the steps that will be taken to maintain established public beach accessways or provide new access. NA o. If the property is on the oceanfront, what will be the elevation above mean sea level of the first habitable floor. NA 6 EXCAVATION AND FILL INFORMATION a. Describe below the purpose of proposed excavation or fill activities (excluding bulkheads, which are covered in Section 7). Length Width Depth Access channel (MLW) or (NWL) Boat basin Other (breakwater, pier, boat ramp, rock jetty) Fill placed in wetland or below MHW Upland fill areas NA NA NA NA NA NA 32r± 51 NA 0 0 NA NA b. Amount of material to be excavated from below water level in cubic yards None Type of material NA d. Does the area to be excavated include marshland, swamps, or other wetlands? NA e. High ground excavation, in cubic yard NA Dimension of spoil disposal area NA g. Location of spoil disposal area NA h. Do you claim title to the disposal area? NA If not, attach a letter granting permission from the owner. NA i. Will a disposal area be available for the future maintenance? NA If so, where? NA j. Does the disposal area include any marshland, swamps, or water areas? NA k. Will the fill material be placed below mean high water? NA Amount of fill in cubic yards NA m. Type of fill material NA n. Source of fill material NA o. Will fill material be placed in marsh or other wetlands? NO (verbatim copy of Form DCP-M11-1, 3/91 & D(P-MP-2, 4/89) 2 p. . Dimensions of the wetland to be filled NA q . How will excavated or fill material be kept on site and erosion controlled? Silt fences, rip rap dams, & sediment traps for street construction. r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? NA s. Will wetlands be crossed in transporting equipment to the site? NO If yes, explain steps that will be taken to lessen environmental impacts. NA 7 SHORELINE STABILIZATION A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete address of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Division Of Coastal Management and should be advised by the applicant of the opportunity. Name: David L & Susan M Dickey Address: 2310 North Lumina Avenue Wrightsville Beach NC 28480 a. Length of bulkhead or riprap None b. Average distance waterward of mean high water or normal water level NA c. Shoreline erosion during preceding 12 months, in feet NA Name: Hammocks Beach Corporation Address: C/O Robinson. Bradshaw & Hinson. PA 1900 Independence Center 101 North Tryon Street Charlotte NC 28246 d. Type of bulkhead material NA Name: _ Address: e. Amount of fill, in cubic yards, to be placed below mean high water None Type of fill material NA 8 ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 1/2 by 11 white sheet. (Refer to Coastal Resources Commission Rule 710203 for a detailed description.) A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. (1) NWP #14 (wetland road crossings) (2) DEM low density option storm water management plan (3) LOS Sedimentation control permit (4) NC DOT driveway/street access permit A check for $250.00 made payable to the Department of Environment, Health & Natural Resources to cover the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. (N/A) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 24 high quality copies are provided by applicant. (Contact the US Army Corps Of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. (verbatim copy of Form DCP-MP-1, 3/91 & DCP-MP-2, 4/89) A statement on the use of public funds. If the project involves the expenditure of public funds, attach a statement documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). (N/A) 77 aarsYr?e'?n V ........... w ... _... v... g+,7d 9 CERTIFICATION AND PERMISSION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of project. This is the_____7__day of , 19 x 1 1 Landowner or Authorize A ent Limited Agent: B Wavne Ra land 120 Balsam Road Jacksonville NC 28546-8508 (verbatim copy of Form DCP-MP-1, 3/91 & DCP-MP-2, 4/89) f2 ? I 4 Form DCM-MP-2 MARINA DEVELOPMENT Attach this form to Joint Application for CAMA Major Permit. Be sure to complete all other sections of the Joint Application which relate to this proposed project, including upland areas, even if duplicative. All shorebased facilities must be included in application and work plats. 1 MARINA CHARACTERISTICS a. Check below the type of marina proposed. Commercial Public V Residential (i.e. community pier with 10 boat slips) b. Will the marina be open to the general public? NO C. If there is residential development associated with the marina, how many units or lots are planned? 61 lots d. Check all of the types of service to be provided. Full service, including travel lift or rail Dockage, fuel, and marine supplies Dockage("wet slips') only Number of slips 10 Dry storage Number of boats Boat ramps(s) Other (describe) Check below the proposed type of siting. Land cut and access channel Open water with dredging for basin and/or channel %T open water, no dredging required other (describe) f. Describe the typical boats to be served (for example, open runabout, charter boats, sail boats, mixed types). runabouts & skiffs, mixed sizes g. Typical boat length 16-22' h. Maximum boat length 25' 2 MARINA OPERATIONS a. Check each of the following sanitary facilities which will be included in the proposed project. Office toilets Toilets for patrons Number None Location NA Showers Boat holding tank pumpout Type and location NA b. Describe treatment type and location for all sanitary wastewater. Septic tanks to serve lots only c. Describe solid waste, fish offal, and trash disposal. None d. How will overboard discharge of sewage from boats be controlled. Posted "NOT ALLOWED" e. Give the location and number of "No Sewage Discharge" signs proposed. One at pier entry f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste, and petroleum products. None, none allowed g. Where will residue be disposed of`? NA h. Give the number of channel markers and "no Wake" signs proposed. None proposed Note: Regulatory signs such as these require additional approval by the NC Wildlife Resources Commission. i. Give the location of fuel handling facilities and describe the safety measures planned to protect area water quality. None proposed, none allowed j. Describe design measures that promote boat basin flushing or circulation and reduce water quality impacts. Pier to channel in open water k. What will be marina policy on overnight and live- aboard dockage? Not allowed 1. Is the proposed marina located near any shellfish leases? Nearest lease unknown. If so, give the name and address of the leaseholder. Unknown M. If this project is an expansion of an existing marina, what types of services are currently provided? NA How many slips are now available? None Are any floating buildings planned? NO n If so, describe NA (verbatim copy of Form DCP-MP-1, 3/91 & DC-P-MP-2, 4/89) P?, X32 y?. J 3° ??- 3843 5 r I 32 34 Y/. ?? ii /- ? 1445 42'3 II 24 \ II `. ? .' 11 •' '.i 8 ? •n • ? tl 5ol) Fz 42 51 l ( (k4 D4 2 C If to ?\ z 25-- If 11 if oa: Z n 11 ?? ? ,? 4% \• n , % S\1; ?. 'wan ' Holland 3840 Pit Proposed Community ?Pier,.( Light Pier Location ?z 35 Foy a Foul J ??_T \_ Z y 7 ((v ...? N''. Foul ??? / 37 ?D. ?/ ? ?' h ? ??.?~... ?' ?•h `/ /mil _,.1 %.?? ry ca / tCL?1 ?;i i .y ?,' l 3839 /3 L R : _......... ...... oul F 4 Foul Area ?V l i %0 ?. S t"K?_G5 0 6? a o NJ Uicinity D Location Map, ?? `.6 gq CRMR RPPLICRTI? `138 ON o 0 ID 40' Community Pier to Dock 10 Boat [ To Serve Swans Bluff S/D h 5 ?. f,• Onslow County, NC 3 / 2 3 / 94 i JJ ` SCRLE: 1 " - 2000' f Reference: USGS Hubert Quadrangle, 7.5 Minute Series J o 3837 ti 7 `'ePiers ° ?e%a o '1?` .?\ Tr?i1l8 ALL W I, fl-" A' N -,,D* " R -E, CROSSING #3 97' LONG 4304± SF 32 \ 33 34 30 31 60Q - 59 59 57 56 55 -54 53 52 Y: 35 4H ROAD NCSR 1551,60'R/W 36 1 WETLAND RD 37 CROSSING #2 61' LONG 3114 ± SF 38 39 40 4 42 42 43 43 WETLAND RD 44 44 CROSSING #1 34' LONG 45 4 1724± SF 46 47 49 48 4H ROAD NCSR 1551,60'R/W COMMUNITY LOT - treated piling X 2.0? 15, \ typ NOTE: 75' ES AEC total _ -?- - 75' ES AEC area is 1871 SF and contains Gazebo 93.5 SF built upon (i.e. X5.0%) - - ? Start Board Walk At Existing Ground Grade 4H Camp Mitchell Section 404 wetlands _ 5' Board Walk QUEEN CREEK NOTE: Elevation survey provided by Pate Phillips RLS, elevation data shown is depth of water on 4/12/94, water elevation on that date was -0.50' msl NGVD SWANS BLUFF S/D WATER DEPTH CONTOURS WITH FINGER PIER & BOAT DOCKING LAYOUT SCALE: V = 30' 0 15 30 60 SHEET 3 OF 4 i SMayise ,?oyloisr/ ? 5' Wide Washed River Gravel Walk 1 Edge Of Pier Along 15' Riparian Setback s o Access Line S 251 Y, typ, b X?? 12' tYP \ 2 ) ? 2 2 2.5>4 . . 1udwrn?.?...rrrrr?rrw??r. 0 \ o , finger piers ° ?\ 2.7 x 2.7 327' to \ MHWM ` benches ' y 3.5 _ X2.0 2.9x 30, -???`x3..5 x - - - 3 7 . 2.4 x\ Approximate Center Line ? Channel Alinement 1.8 ? 3.0 ..... i ...........................................................327.3'--± ...................................................................................... 4.5 ................ .......................... .3 . ................. ................................................................ 2*8 DECKING,--X I I .......................... ........................... •1.5....... ......................... r ............... . ............... ......... ........................................ ................ 0.0 NGVD---- - - .. -. .-. - - ------------- ...... .......... ............................. ...... .. T. ....... . . .................. .... . ... ,.... PILES C -1.5 ................................. 8 O ............. TYP -2.5 .............................................. .................................................. .......................... -3.5 .................................................................................................................... ................... -4.5 ........................................................................................................................................ .. ............... ..................................................................................................................................................................................... SCHEMATIC PROFILE : SWANS BLUFF COMMUNITY PIER SCALE : i" = 60' HORIZONTAL 1" = 6'V ERTICAL 2*8 6"-F TYPICAL PIER SECTION DETAIL NOT TO SCALE ----------------- 2*8 DECKING 2*8 CROSS BRACES SWANS BLUFF S/D PIER DETAILS SCALE AS SHOWN 9yW"e . 9ZIO- 94 _..oe3?ie0oooo?1 ? V! g 60 0 SHEET 4 OF 4 v OR* P TYPICAL PIER PROFILE DETAIL. NOT TO SCALE NOTE: 75' ES AEC total area is 1871 SF River Gravel Wal and contains 93.5 SF built upon (i.e. z5.0%), Section 404 wetlands LOT 3 LOT 2 VANS BLUFF S/D )proximate mhwm ong property line --I____ -41-1 Camp Mitchell I 75ES Gazebo TBM EIP TOP LOT 1 I / - 27 NGVD Spartina a] terniflora marsh CW AEC 5.01 tvp--? A- 0.0t j - - 0.0 ; 0.0 ' X I , I -XI 1. 1.3 X I I 1.3 1 ' 5' wood pier typ X 1.4' (correction 9/27/94) 1.5 X 1.5 I ' I I ' I X I 1.4 ' X 1 4 X w . 1.4 ' J I ? , 1.5 i ' 1.5 I ' z 15', edge of pier along Camp QUEEN CREEK Mitchell riparian access setback line NOTE: Spot elevations by Pate Phillips & Associates. Elevations arc water depths from water surface at :z.? -05 mean sea level (1929 NGVD) on April 12, 1.994. Boat Dock Area 1.8 CAMA APPLICATION ? I EXHIBIT MAP ADDENDUM #1 2 0 REVISION #1 _2.6 ' ' WATER DEPTH CONTOURS Approximate , CAMA AEC & PIER ALINEMENT 2 5 2 2. Center Line X . Channel SCALE: 1 "=50' 1.8 \ \\ 7 ; Alin ment \ 7 0 25 50 1 .- ? ? \ 2. \ 2. ? 3. 3.5 9l'ay.,A .rtayre?r I \ I \ \ X X-3.7....- 9/>L4?r I 1.3 ' \ \ 38 5&, 4-27i44 Y. >l.Yifil4 2. I .ff v` ^la? 1d o? l Y q? aO? 18' wide paved drive 7 paved panting spaces -- - Lot 62 COMMUNITY LO' - -- - - NOTE: 75' ES AEC total area is 1871 SF and contains 93.5 SF built upon (i.e. ;:5.0%) Section 404 wetlands , , LOT 2 LOT I LOT 3 % 0-0 ' SWANS BLUFF S/D X - approximate mhwm 1.3 " 1.3 ' T.2 along property line X T - 1.5 x 1 4 1.5 X x X 1.1 1.4 1. 4 - QUEEN CREEK 1 1.5 t.5 18 4H Camp Mitchell I -- Picric Tables -- Gazebo s' Wide Washed River Gravel Wall: 75' ES AEC 4H Camp Mitchell - Gazebo I 'BM EIP top=27 NGVD Spartina alterniflora x marsh CW AEC 0.0 _ _ 5' wood pier typ (correction 9/27/94) w 15', edge of pier along Camp Mitchell riparian access setback line 2'li 2.0- 1 Boat Dock Area .2 CAMA APPLICATION 1.8 `2. \\ 17 .7 Approximate EXHIBIT MAP ADDENDUM #2 x 1 2?) \2. 3._ _ Center Line Channel OVERALL LAYOUT 1.3 i 2- "-3.8 , 3.7 Ali nement COMMUNITY LOT AND PIER x? 1"43 3 0 -x2.2 SCALE: I"=100' 1.3 2'.3 0 so loo r . 1.6 2.0 o k.3 ?.5. 1.4 11Q.5 35 1,0 , ,p7 1 o 8'0 IL-00 0.10 15. 0 G:ao I't1 ° 15 5,1 ° a.Z o Q,Z ° 1 4S'I ° Z ° 2Z° U o 1 Q I ° ? 1 ° ° 5'E ° 1 6 Z ° a.Z 0 , 15,E o. 1L-Z ° 1 L'2 0 5'2 0 12•Z o 5•Z o 0 1 g ° ,?'I o 4.'1 ° 4'1 ° ,4'I o v, 0 ,,--1 O ,Q.1 0 9'Z 47C,6I '21 ? ry ? c7 ?-I l 0-l ?,? rl Q -- - - --- ----- p ShN I cl }F L I `2 I "1 I d d `\`C r+o Z+ 31V (,? s?id?a '21 7?] Ldrl ?71`?/ r(n°???i c?vc?Ic?IJ? W IQ y, °'z ° ' S i,iiris • • . w V9Z 3s • ,b.1 0 510 ° 2'I ° O Q o / O ° 70 N ? ? J d W `V7 n? Ire ?' / I N 1 j, n`la Sr+vly? u? 11 ? 11 ?rl ?ayUQyNvI?+?? +n? ??.>_vr1 q ??