June 14, 1994
Carolina Power & Light Company
Attn: R.M. Pitts, Jr., P.E.
P.O. Box 1551
Raleigh, NC 27602
dmk
DEHNR
JUiI 51994
RE: DEM IDI 94450, Nationwide Permit Application for an
activity located on NC HWY 101, Carteret County.
Dear Mr. Pitts:
The North Carolina Division of Coastal Management has reviewed the
above referenced application for a Nationwide Permit dated may 6,
1994 pursuant to Section 307 of the Coastal Zone Management Act of
1972 as amended. Based upon our review, we have determined that
the proposed activity is consistent with the North Carolina Coastal
Management Program provided the following conditions are met:
1. The activity described in the above referenced
application qualifies to receive one of the Nationwide
Permits described in 33 CFR Part 330 with the exception
of Numbers 17, 21, 24, and 34 which were found inconsis-
tent with the North Carolina Coastal Management Program.
2. A 401 Water Quality Certification is received, where
required, from the North Carolina Division of
Environmental Management.
This letter does not relieve you of the responsibility to insure
that all other State authorization and/or permit requirements are
met prior to implementation of the project. Please feel free to
contact me at (919) 726-7021, Ext. 263, if you have any questions
or need further assistance.
Sincerely,
Charles S. Jo s
District Manager
csj
cc: Preston P. Pate, Jr.
Steve Benton, Consistency Coordinator
Wilmington District Engineer; ATTN: CESAW-CO-E
John Dorney, DEM/Raleigh
P.O. Box 769, 3441 Arendell St., Morehead City, North Carolina 28557 Courier i 11-12-09
Telephone 919-726-7021 FAX 919-247-3330
An Equal opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper
State of North Carolina
Department of Environment, ALIVI: XWy; WA
Health and Natural Resources • VA
Division of Environmental Management
James B. Hunt, Jr., Governor ID E H N F1
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
May 13, 1994
Carteret County
DEM Project # 94450
APPROVAL of 401 Water Quality Certification
Mr. Robert Pitts, Jr.
Carolina Power and Light Company
P.O. Box 1551
411 Fayetteville Street Mall
Raleigh, N.C. 27602
Dear Mr. Pitts:
You have our approval to place fill material in 0.7 acres of wetlands or waters for the
purpose of substation enlargement at NC 101 near Beaufort, as you described in your
application dated 11 May, 1994. After reviewing your application, we have decided that
this fill is covered by General Water Quality Certification Number 2671. This certification
allows you to use Nationwide Permit Number 26 when it is issued by the Corps of
Engineers.
This approval is only valid for the purpose and design that you described in your
application. If you change your project, you must notify us and you may be required to
send us a new application. For this approval to be valid, you must follow the conditions
listed in the attached certification. In addition, you should get any other federal, state or
local permits before you go ahead with your project.
If you do not accept any of the conditions of this certification, you may ask for an
adjudicatory hearing. You must act within 30 days of the date that you receive this letter.
To ask for a hearing, send a written petition which conforms to Chapter 150B of the
North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box
27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and
binding unless you ask for a hearing.
This letter completes the review of the Division of Environmental Management under
Section 401 of the Clean Water Act. If you have any questions, please telephone John
Dorney at 919-733-1786.
Sincerely,
- l,it , bj'i i
i y P eston Howard, J . P.E.
rector
Attachment
cc: Wilmington District Corps of Engineers
Corps of Engineers Wilmington Fie ,d Office
Wilmington DEM Regional Office
Mr. John Dorney
Central Files
94450.1t ^
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper
CP&L
Carolina Power & Light Company
PO Box 1551
411 Fayetteville Street Mall
Raleigh NC 27602
May It, 1994
Water Quality Planning
Division of Environmental Management
N. C. Department of Environment, Health and Natural Resources
P. O. Box 29535
Raleigh, NC 27626-0535
Attn: Mr. John Dorney
Subject: Nationwide Permit Number 26 Application
CP&L's North River 115 kV Substation Addition
Dear Sir or Madam:
CP&L needs to construct a spare transformer bank at its North River 115 kV Substation. CP&L's
wetlands specialists have determined that although previously cleared and planted in grass, the expansion
area is wetlands. I have enclosed seven copies of the permit application, the erosion control plan, the
Land Quality Section approval, the density limits application for coastal stormwater disposal, DEM's
certification, photographs, the topographic map and grading plan. If you need any additional information
or have any questions, please contact me at telephone number 919-546-6748 (Fax 919-546-7175).
Sincerely,
Robert M. Pitts, Jr.
Project Engineer
Transmission Location
(08549RMP. RMP/sb)
Enclosures
c: Wilmington District Engineer
441 ISSUED
DEM ID: ACTION ID:
NATIONWIDE PERMIT APPLIED FOR (PROVIDE NATIONWIDE PERMIT #):
JOINT FORM FOR
NATIONWIDE PERMITS THAT REQUIRE NOTIFICATION TO CORPS OF ENGINEERS
NATIONWIDE PERMITS THAT REQUIRE APPLICATION FOR SECTION 401 CERTIFICATION
WILMINGTON DISTRICT ENGINEER
CORPS OF ENGINEERS
DEPARTMENT OF THE ARMY
P.O. BOX 1890
WILMINGTON, NC 28402-1890
ATTN: CESAW-CO-E
TELEPHONE (919) 251-4511
WATER QUALITY PLANNING
DIVISION OF ENVIRONMENTAL MA-
NC DEPARTMENT OF ENVIRONMtl T, 0134Tq, `j
AND NATURAL RESOURCES
P.O. BOX 29535
RALEIGH, NC 27626-0535 i'4, y c
ATTN: MR. JOHN DORNEY
TELEPHONE (919) 733-5083
ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SENT TO THE CORPS OF E9aIERS:
SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DIVISION OF ENVIRONMENTAL MANAGEMENT.
PLEASE PRINT.
1. OWNERS NAME: Carolina Power & Light Company
2. OWNERS ADDRESS: P.O. Box 1551. Raleigh. NC 27602
Attn: Mr. R. M. Pitts Jr P E (CPR 60)
3. OWNERS PHONE NUMBER (HOME): N/A (WORK): 919-546-6748
4. IF APPLICABLE: AGENT'S NAME OR RESPONSIBLE CORPORATE OFFICIAL, ADDRESS, PHONE
NUMBER: Lester E. Misenheimer. P.E.
Transmission Department Manager
5. LOCATION OF PLANNED WORK (ATTACHED MAP). COUNTY: Carteret
NEAREST TOWN OR CITY: Beaufort
SPECIFIC LOCATION (INCLUDE ROAD NUMBERS, LANDMARKS, ETC.): NC Hwy. 101. 3 miles north of
6. NAME OF CLOSEST STREAM/RIVER: Russell Creek (1000' +)
7. RIVER BASIN: Newport River
8. IS THIS PROJECT LOCATED IN A WATERSHED CLASSIFIED AS TROUT, SA, HQW, ORW, WS I, OR WS
II? YES [ X ] NO [ ]
9. HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS PROPERTY?
YES [ ] NO [XI
IF YES, EXPLAIN.
10. ESTIMATED TOTAL NUMBER OF ACRES OF WATERS OF THE U.S., INCLUDING WETLANDS,
LOCATED ON PROJECT SITE: Wetlands area=4 0 ac of 4.9 ac Existing roads and substation=0 9 ac
6/10/92
-2-
11. NUMBER OF ACRES OF WATERS OF THE U.S., INCLUDING WETLANDS, IMPACTED BY THE
PROPOSED PROJECT:
FILLED: 0.5
DRAINED: 0.0
FLOODED: 0.0
EXCAVATED: 0.2
TOTAL IMPACTED: 0.7
12. DESCRIPTION OF PROPOSED WORK (ATTACH-PLANS): Fernand existing substation graded area 90 ft by
205 ft. (with 3:1. H:V. side slopes), extend driveway to northeast comer of enlarged substation and relocate
drainage ditch.
13. PURPOSE OF PROPOSED WORK: CP&L. will construct a spare transformer bank at he site to increase electric
power reliability to the surrounding area and minimize potential electric outage time for local customers
14. STATE REASONS WHY THE APPLICANT BELIEVES THAT THIS ACTIVITY MUST BE CARRIED OUT IN
WETLANDS. ALSO, NOTE MEASURES TAKEN TO MINIMIZE WETLAND IMPACTS.
CP&L. cleared the site and graded the existing substation approximat y20 years ago CP&L. needs to add a spare
transformer bank in the general area around this site. Much of the surrounding _ area is wetlands, Expansion of the
existing site will require less clearing grading and impervious rea than a new substation in he same general area
Only 25% of the surface area will be impervious. covered with gravel
15. YOU ARE REQUIRED TO CONTACT THE U.S. FISH AND WILDLIFE SERVICE (USFWS) AND/OR
NATIONAL MARINE FISHERIES SERVICE (NMFS) REGARDING THE PRESENCE OR ANY FEDERALLY
LISTED OR PROPOSED FOR LISTING ENDANGERED OR THREATENED SPECIES OR CRITICAL
HABITAT IN THE PERMIT AREA THAT MAY BE AFFECTED BY THE PROPOSED PROJECT.
HAVE YOU DONE SO? YES [ ] NO [ X ] Site previously cleared, no species/habitats present.
RESPONSES FROM THE USFWS AND/OR NMFS SHOULD BE FORWARDED TO CORPS.
16. YOU ARE REQUIRED TO CONTACT THE STATE HISTORIC PRESERVATION OFFICER (SHPO)
REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA WHICH MAY BE
AFFECTED BY THE PROPOSED PROJECT?
HAVE YOU DONE SO? YES [ ] NO [ X ) Site previously cleared, no historical resources present.
RESPONSE FROM THE SHPO SHOULD BE FORWARDED TO CORPS.
17. ADDITIONAL INFORMATION REQUIRED BY DEM:
A. WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS, AND LAKES ON THE
PROPERTY. Except for the previously graded portion, the site is wetlands. See enclosed, marked map.
B. IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY
PROJECT. See enclosed photographs.
C. IF DELINEATION WAS PERFORMED BY A CONSULTANT, INCLUDE ALL DATA SHEETS
RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE. Work done by Mr. Don Cooke and
Mr. Walt Pollard of the CP&L Brunswick Biology Unit.
D. IF A STORMWATER MANAGEMENT PLAN IS REQUIRED FOR THIS PROJECT, ATTACH COPY.
Density limit submittal transmitted to NC DEM on 4/5/94. See enclosure.
E. WHAT IS LAND USE OF SURROUNDING PROPERTY? _Residential and church
F. IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL?
OWNER'S SIGNATURE
Lester E. Misenheimer, P.E.
MAY-11-1994 13:41 FROM EHNR WILM REG OFFICE TO 39195467175 P.02
14 ('0& s^ A,,
State of North Carolina
Department of Environment, Health, and Natural Resources
Wilmington Regional Office
James B. Hunt, Jr., Governor DIVISION OF ENVIRONMENTAL MANAGEMENT Bob Jamieson
Jonathan B. Howes, Secretary Regional Manager
May 3, 1994
Mr. Lester E. Misenheimer
Carolina Power & Light Company
Post Office Box 1551
Raleigh, North Carolina 27602
Subject: CERTIFICATION OF COMPLIANCE
with Stormwater Regulations
Stormwater Project No. SW8 940404
North River Substation
Carteret County
Dear Mr. Misenheimer:
The Wilmington Regional Office received the Stormwater Submittal for North River Substation on
April 7, 1994. Based on our review of the project plans and specifications, which limit the built-upon area
to 52,272 square feet, we have determined that the project complies with the Stormwater Regulations set
forth in Title 15A NCAC 2H.1003(a)(2) (3).
Any modification of the plans submitted to this Office or further development of this contiguous
project will require an additional Stormwater Submittal/Modification and approval prior to initiation of
construction, regardless of the fact that such modification may be less than one acre. Modifications include
but are not limited to; project name changes, transfer of ownership, redesign of built-upon surfaces,
addition of built-upon surfaces, redesign or further subdivision of the project area as shown on the
approved plans.
This Certification shall be effective from the date of issuance until rescinded. The project shall be
constructed and maintained in accordance with the plans and specifications approved by the Wilmington
Regional Office. This Certification does not supersede any other permit or approval. The developer is
responsible for obtaining any and all permits and approvals necessary for the development of this project.
This could include the Division of Coastal Management under CAMA requirements, the Division of
Environmental Management under Wetland 401 Water Quality Certification and/or a Dredge and Fill
Permit and/or a Sewer Extension/Collection Permit, U.S. Army Corps of Engineers 404 Wetland Permit,
NPDES stormwater permit if disturbing five acres or more, local County or Town-Agency permits under
their local ordinances, or others that may be required.
127 Cardinal Dive Extonsion, Vlrimington, N.C. 28QS-3845 • Telephone 910-395-3900 • Fax 910350,2004
An Equal Oppormnity Affirmative Action Employer
MAY-11-1994 13:41 FROM EHNR WILM REG OFFICE TO 39195467175 P.03
,/
Mr. Misenheimer
May 3, 1994
Stormwater Project No. SW8 940404
--------------------------------------
Deed restrictions must be recorded with the Office of the Register of Deeds. A copy of the
recorded deed restrictions, including deed book number and page, must be forwarded to this Office within
30 days of the date of the recording. Failure to record and/or submit the deed restrictions to this Office
is considered a violation of this Certification.
An Engineer/Designer/Owner Certification (copy attached) must be received at the time the
recorded Deed Restrictions are submitted. The Certification will verify to this Office that the stormwater
controls and the general layout of the project (amount of impervious area) are in substantial compliance
with the approved Stormwater Plan.
If you have any questions concerning this matter, please contact Greg Stuffs or me at (910) 395-3900.
Sincerely,
Dave Adkins
Water Quality Supervisor
DA/ges: S:1WQSISTORMWATICERTMC1SW8940404
cc: Mr. Robert M. Pitts, Jr., P.B., Carolina Power & Light Co.
Carteret County Inspections
Bradley Bennett
Gres Stutts
Wilmington Regional Office
Central Files
1
CP&L
Carolina Power & Light Company
PO Box 1551
41 1 Fayetteville Street Mall
Raleigh NC 27602
April 5, 1994
Mr. David Adkins
Regional Water Quality Supervisor
Division of Environmental Management
127 Cardinal Drive Extension
Wilmington, NC 28405-3845
Dear Mr. Adkins:
;,
For your review under the coastal stotmwater disposal code, I have enclosed a density limits submittal
form and a copy of the erosion control plan for the construction of a spare transformer bank and an
associated transmission line tap at CP&L's existing North River 115 kV Substation. I have submitted the
erosion control plan to Mr. Daniel Sams, Regional Engineer of the Land Quality Section, for his review.
Concurrent with your review, CP&L employees will investigate whether the expansion area is a wetland.
I will be the contact person for this project. Please contact me at telephone number 919-546-6748 (Fax
919-546-7175) if you have any questions. ..
Sincerely,
Robert M. Pitts, Jr., PE
Project Engineer
Transmission Location
(08496RMP. RMP/sb)
CARO
4l
SEAL
11312
Enclosures
c: Mr. Daniel Sams
DIVISION OF ENVIRONMENTAL MANAGEMENT
DENSITY X ENGINEERED
PROJECT DATA
Project Name North River 115 kV Substation - Add Spare Transformer Bank
Location (County, Township/Municipality, Address, State Road) Carteret Countv
r
NC Highway 101, 3 miles north of Beaufort
Owner's Name Carolina Power & Light Company
Mailing Address P.O. Box 1551. Raleigh, NC 27602
Attn: R. M. Pitts (CPB-6C3)
Phone Number 919-546-6748 Submittal Date 4/6/94
Brief Description (include map and appropriate drawings) Expand existing substation
90' x 205' 1 izraded area, relocate ditch, and add new drivewav.
Name of Water Body Receiving Stormwater Runoff Russell Creek (1000'±)
Classification of Water Body SA If SA waters, engineered system, and distance is < 0.5
miles, attach report of chloride sampling results mg/1
State/Federal Permits/Approvals Required (Check appropriate blanks)
CAMA Major
Sedimentation/Erosion Control x
404 Permit DEM/DHS Sewage Disposal
Other (Specify)
CALCULATION OF BUILT UPON AREA
Built upon area means that portion of a development that is covered by impervious or partially pervious cover including
buildings, pavement, recreation facilities, gravel, etc., but not including wood decking. If the project includes areas
draining to different water classifications, please note them separately below.
Classification
Built upon area
Total Project Area
% Built upon Area
Allowable B/U Area
Subwaters hed
1.2 ac
4.8 ac
0
1.2 ac 1 0
Is the Project B/U Area:!. the Allowable B/U Area? Yes (If no, an engineered system is required).
% Build upon area= (built upon area / total project area) * 100
Built upon area limits for projects to meet density: SA waters -- 25%, Other --- 30%
STORMWATER COLLECTION SYSTEM
Describe how the runoff will be treated Surface flow to grass-lined
ditch (S=0.1 %) to existing Hive under road along north property line.
BUFFER AREA
Is the built upon area at least 30 feet from mean high water of all surface waters? Yes If no, please
provide a description
(Note: Only boat ramps, public roads, public bridges, and walkways to water related facilities are allowed within
30 feet of the mean high water if the project is intended to meet stormwater control requirements through density
limits.)
DEED RESTRICTIONS AND PROTECTIVE COVENANTS (Not applicable--property will not be subdivided.)
By my signature below, I certify that the recorded deed restrictions and protective covenants for this project shall
limit the allowable built-upon area per lot to square feet inclusive of right-of-way, structures,
pavement, walkways or patios of brick, stone, or slate, not including wood decking, state that the covenants will
be binding on all parties and persons claiming under them, that they will run with the land, and that benefits may
be enforced by the State of North Carolina, therefore, the covenant cannot be changed or deleted without consent
of the State.
CERTIFICATION
1, Lester E. Misenheimer , certify that the information included on this submittal form is correct,
that the project will be constructed in conformance with this information, and that to the best of my knowledge,
the proposed project complies with the requirements of 15 NCAC 2H. 1003 (b). I authorize the below named
person or firm to submit stormwater on my behalf, and agree to abide by the deed restriction statement
above.
Owner's Signature Date
Provide authorized person or firm name and address below:
Robert M. Pitts, Jr., PE Carolina Power & Light Company
P.O. Box 1551 (CPB 60)
Raleigh, NC 27602
a Notary Public for the State of
County of do hereby certify hat -% ?- r- personally appeared
before me this `- day of , 19 and acknowledges the due execution of the
foregoing instrument. Witness my hand and official seal,
My commission expires y?y 9
Regional Office
Date
Date
DIVISION OF ENVIRONMENTAL MANAGEMENT SIGN-OFF
Individual Evaluating Forms/Plans
Regional Water Quality Supervisor
cc: ApplicanvWiRO/Bradley Bennett/Central Files
'-`A,
I
l Cfieek
13
- ,
65
" x -?? • AM, 300
orth River Come:
¦
a i\
-IQI? -k?aer== '?
y : raj
%sand
\? ?(\ I BM
l ? ? `-? ?- ?2N ?° ?P?P
ov.
- w•? :Mutation '?? „
' t j hreewtll.Ch : • o
Acct I CP&L'S NORTH RIVER
R„ii 115 KV SUBSTATION •, : '
(Cy _'7:77- Bhp 9 .
NEWPORT RIVER •lo_ j
i _
k .f • • iMn ?-
SCALE: 1"=2000' ELEV. IN FT 348 -ieAUFC4T J49 USGS CORE CREEK QUAD
PHOTOREVISED 1983
State of North Carolina
Department of Environment,
Health and Natural Resources
Wilmington Regional Office
Division of Land Resources
Land Quality Section
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Bob Jamieson, Regional Manager
April 28, 1994
00
[D EHNR
LETTER OF APPROVAL
Carolina Power & Light Company
Mr. Robert M. Pitts, Jr., P.E., Project Engineer
PO Box 1551
Raleigh, NC 27602
Dear Mr. Pitts:
Carteret County
Submitted by: Mr. Robert M. Pitts, Jr., P.E.
Date Received: April 8, 1994
New Submittal
_4.
Project Name: North River 115-KV Substation
Project No.: 940407CA
Location: NC Highway 101 (3 miles north of Beaufort) -
This office has reviewed the subject sedimentation and erosion control Plan. We find the plan to be
acceptable and hereby issue this letter of approval with comments as attached.
Please be advised that Title 15A, of the North Carolina Administrative Code, 413.001 7(a) requires that
a copy of the approved plan be on file at the job site. Also, you should consider this letter to give the Notice
required by GS 1 13A-61(d) approved plan. The last page(s) which lists approval comments should be copied
and attached to the sedimentation and erosion control plan that is maintained on site.
North Carolina's Sedimentation Pollution Control Program is performance oriented, requiring protection
of the natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 1 13A-51 thru 66), this office
may require revisions to the plan and its implementation to insure compliance with the Act.
Recognizing the desirability of early coordination of sedimentation control, we believe that it would
be beneficial if a pre-construction conference could be arranged to discuss the approved plan for this project.
Please contact this office and let us know the date of construction start-up and the date of pre-construction
conference so that we may attend.
office.
DES/Ifc
cc: WiRO-LQS
We look forward to working with you on this project. If you have any questions, please contact our
Sincerely,
Daniel Sams, P.E.
Regional Engineer
127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004
An C--1 rl,.,,,..+....c+.. A4s)......+0..., A-..,.., c......1.-.....
APPROVAL COMMENTS AND CONDITIONS
PROJECT NAME: North River 1 15-KV Substation
PROJECT NUMBER: 940407CA
LOCATION: NC Highway 101 (3 miles north of Beaufort)-
Carteret County
SUBMITTED BY: Mr. Robert M. Pitts, Jr., P.E.
DATE RECEIVED: April 8, 1994
The developer is responsible for the control of sediment on-site. If the approved erosion measures
prove insufficient, the developer must take those additional steps necessary to stop erosion from
leaving this site.
2. Any and all existing ditches on this project site are assumed to be left undisturbed by the proposed
development unless otherwise noted. The removal of vegetation within any existing ditch or channel
is prohibited unless the ditch or channel is to be regraded with side slopes of 2 horizontal to 1 vertical
or less steep. Bank slopes may be mowed, but stripping of vegetation is considered new earth work
and is subject to the same erosion control requirements as new ditches.
3. The developer is responsible for obtaining any and all permits and approvals necessary for the
development of this project prior to the commencement of this land disturbing activity. This could
include the Division of Coastal Management under CAMA requirements, the Division of Environmental
Management under stormwater regulations, the U.S. Army Corps of Engineers under Article 404
jurisdiction, local County or Town Agencies under their local ordinances, or others that may be
required. This approval cannot supersede any other permit or approval; however, in the case of a
Cease and Desist Order from the Corps of Engineers, that Order would only apply to wetland areas.
All highland would still have to be in compliance with the Sedimentation Pollution Control Act.
4. If any area on site falls under the jurisdiction of Section 404 of the Clean Water Act, the developer
is responsible to the orders of the U.S. Army Corps of Engineers. Any erosion control measures that
fall within jurisdictional wetland area must be relocated to the transition point between the wetlands
and the highlands to assure that the migration of sediment will not occur. If that relocation presents
a problem or contradicts any requirements of the Corps of Engineers, it is the responsibility of the
developer to inform the Land Quality Section Regional Office so that an adequate contingency plan
can be made to assure sufficient erosion control on site. Failure to do so will be considered a
violation of this approval.
5. Any borrow material brought onto this site must be from a legally operated mine or other approved
source. A single use borrow site or an area to waste material is only permissible if it is operated
under total control of the Financially Responsible person or firm who is developing this site and a plan
modification is submitted to this office that includes the area in question.
6. This permit allows for a land disturbance, as called for on the application plan, not to exceed 1.0
acres. Exceeding that acreage will be a violation of this permit and would require a revised plan and
additional application fee. Any addition in impervious surface, over that already noted on the
approved plan, would also require a revised plan to verify the appropriateness of the erosion control
measures and stormwater retention measures.
C O
v C c4 rn
O C a' p U
Qz C a
C L
L V ,Q r.+
a A O c .N
a `? ? ,c a ? •° a
c
a? v C ?
•? c .? ao .o
U -o E-+ cs
L c c
0 V Cz (:j
O r
L z 0 CZ
cAR o L
' Ovk1 Qj
)Coo:,
L. v p C , pC
4 CZ .0 =
14 P" I L. Z
O t ... ' o y L 8
?? ¢w z
u o Z ? ?
L-. C to .. +r L .?
LO Q .1
N L M •a u rpj ?. o
?n C, r? p C C.
N d
C O t.. C%'
o ? ? ?p,, ?? a? ?o N :g
.0 dlow
h¦i¦+ vn C .. v? L O of as
.c cs c a? •a ; =
Ey aW??? cs.U
CP"
Carolina Power & Light Company
PO Box 1551
41 1 Fayetteville Street Mall
Raleigh NC 27602
April 5, 1994
Mr. Daniel Sams, PE
Regional Engineer
Land Quality Section
127 Cardinal Drive Extension
Wilmington, NC 28405-3845
Dear Mr. Sams:
For your review, I have enclosed the erosion control plan for the construction of a spare transformer bank
and an associated transmission line tap at CP&L's existing North River 115 kV Substation. In
conformance to our agreement with the Land Quality Section, I have enclosed only the first page of the
Financial Responsibility/Ownership Form. Also, I have enclosed a $30.00 check for the plan review fee
for one acre or less disturbed. I have submitted this erosion control plan with a density limits form to
Mr. David Adkins, Regional Water Quality Supervisor. Concurrent with your review, CP&L employees
will investigate whether the expansion area is a wetland. I will be the contact person for this project.
Please contact me at telephone number 919-546-6748 (Fax 919-546-7175) if you have any questions.
Sincerely,
Robert M. Pitts, Jr., PE
Project Engineer
Transmission Location
(08497RMP.RMP/sb)
Enclosures
`???ttlIIIt# ,,
CARO
" a
_ SEAL _-
11 M
r
/ "Y9 P11,
Mr. David Adkins
EROSION CONTROL PLAN FOR THE CONSTRUCTION OF A SPARE TRANSFORMER BANK
AND TRANSMISSION LINE TAP AT CP&L'S NORTH RIVER 115 kV SUBSTATION
Carolina Power & Light Company will construct a spare 115/33 kV transformer bank and an associated
transmission line tap at its North River 115 kV Substation to increase electric power reliability to the
surrounding area, simplify maintenance and minimize potential outage times. CP&L will extend the
existing fenced area 86 feet east. CP&L anticipates that the grading will begin by July of this year.
CP&L will place the new transformer bank in service by December 31, 1994.
CP&L has operated a substation at the site for approximately 20 years. The site, located immediately east
of NC Highway 101 and approximately three miles north of Beaufort; contains 4.9 acres, including 0.3
acre of highway right of way. Grass covers most of the site except for the gravel-covered substation
fenced area and driveways. Trees and undergrowth cover only a narrow band along the east property
line. The site slopes from both west and east to a south-to-north draining ditch. Surface water drains
from this ditch through a pipe under the soil road along CP&L's north property line, into a east-to-west
flowing ditch just north of this road, through a 5-foot-square box culvert under NC 101, and then, into
a tributary of Russell Creek and the Newport River. The existing ground surface elevations range from
approximately 10.5 to 6.1 feet.
CP&L will expand the graded area dimensions from 150 to 236 feet east-west while maintaining 205 feet
north-south. The substation will have a finished stone grade sloping from the crown of 10.5 feet, at the
center driveway, to 9.3 feet along the existing west fence and 10.0 feet along the new east fence. The
grading will require maximum cut and fill depths of approximately 2.5 and 3.5 feet, respectively, and will
move approximately 1000 cubic yards of soil. The permanent cut and fill surfaces will slope at three to
one, horizontal to vertical or flatter.
The Soil Survey of Carteret County North Carolina indicates that the site soils are primarily Arapahoe
fine sandy loam with a small area of Augusta loamy fine sand in the northwest corner. Arapahoe fine
sandy loam generally has the following characteristics: very poorly drained, moderately rapid
permeability, extremely to strongly acid surface soils and subsoils unless lime has been added, and a
seasonal high water table at or near the surface. The survey indicates that developed areas have "intensive
drainage systems similar to those used for cropland. "
CP&L anticipates the grading for the substation will proceed as follows:
1. The grading contractor will install a temporary gravel construction entrance near the intersection
of the existing substation driveway and NC 101. The contractor will complete this work in
general accordance with Section 6.06 of the North Carolina Erosion and Sediment Control
Planning and Design Manual (hereafter reference as the Manual) and Drawing Number RAC-
24805.
2. The grading contractor will install sediment (silt) fence between the existing north-south ditch and
the proposed ditch DI as shown on the Grading Plan. The contractor will excavate this ditch
relocation Dlb and c as shown on the Grading Plan and enclosed table. The ditch will have a
trapezoidal cross section. The contractor will use a construction sequence which minimizes
surface water runoff into or from the new segments until they are seeded and mulched with straw
held by netting or approved equivalent. The contractor will store the excavated soil between the
(08497RMP.RMP/sb)
-2-
new ditch and the downgradient silt fence and later will use it as fill. They will connect the outlet
of segment c to the existing ditch before connecting the inlet of segment b to the new Dla. They
will immediately seed and mulch these connections and D 1 a. The contractor will construct ditch
D2 using similar procedures. They will complete this work in general accordance with Sections
6.03, 6.11 (table v), 6.14, 6.21, 6.30, and 6.62 of the Manual and Drawing Number RAC-24525.
3. When they have completed ditches D1 and D2, the grading contractor will relocate portions of
the silt fence and install additional segments as shown on the Grading Plan. The majority of the
relocation and extension will place silt fence along the west bank of the new ditch Dlb and c and
along both sides of the driveway addition. They will complete this work in general accordance
with Section 6.62 of the Manual and Drawing Number RAC-24525.
4. The grading contractor will strip the topsoil from the expansion areas and use it to construct the
fill slopes.
The grading contractor will rough grade the substation and access road as shown on the Grading
Plan, filling with both on-site cut soils and off-site borrow soils. The contractor will obtain off-
site soil only from legally operated borrow pits. As the grading progresses, the contractor will
install pipe P1 as shown on the Grading Plan and enclosed table. They will install flared-end
sections and riprap protection at the inlet and outlet of pipe P1. They will complete this work
in general accordance with Sections 6.15 and 6.41 of the Manual.
6. The grading contractor will cover the driveways with a six-inch-thick layer of ABC stone
7. CP&L anticipates that the contractor will complete the rough grading by August. At that time,
the landscaping contractor will permanently seed and mulch the disturbed areas which are not to
be covered with stone. They will complete this work in general accordance with Sections 6.11
(table p) and 6.14 of the Manual.
8. The fence contractor will install the new substation perimeter fence. The substation contractor
will excavate and construct the structure and equipment foundations, erect the structures, and
install the equipment. The transmission line contractor will construct the transmission tap.
CP&L anticipates that the contractors will complete all this work by December 31, 1994.
9. Upon completion of the substation, the grading contractor will fine grade the substation with the
surface draining from the center crown to the east and west edges. The contractor will cover the
fenced area with a layer of ABC stone three to four inches thick.
10. Depending on the time of year, the landscaping contractor will either temporarily or permanently
seed, lime, fertilize, and mulch any disturbed areas which are not covered with stone, including
the 20-foot-wide perimeter outside the fence. If the seeding is temporary, then the landscaping
contractor will permanently seed during the next planting season. They will complete this work
as described in general accordance with Sections 6.10 (table a or c), 6.11(table p), and 6.14 of
the Manual.
(08497RMP. RMP/sb)
-3-
11. When all the areas are stabilized, the grading contractor will remove the sediment fence.
As referenced above, the following information is enclosed as part of this erosion control plan: tables
presenting the design parameters for the ditches and pipe; standard detail drawings for the temporary
construction entrance and silt fences; the Grading Plan; the Topographic Map; and the applicable sections
of the Erosion and Sediment Control Pla ning and Design Manual.
(08497RMP.RMP/sb)
-4-
NORTH RIVER 115 kV SUBSTATION
SPARE 115/33 kV BANK
DITCH PARAMETERS
Ditch
Drainage Runoff
Coeffi- Flow
Rate, Invert Elevation,
ft
Length,
Slope, Bottom
Width, Flow
Velocity Flow
Depth
Linin
Number
Area, ac
cient, C
cfs
Inlet
Outlet
ft
%
Ft ,
fps ,
ft g
Type
D la 0.64 0.30 1.4 7.30 7.21 90 0.1 0 0.7 0.9 A
D lb 1.98 0.47 6.9 7.21 6.92 290 0.1 2 1.0 1.3 A
D 1c 2.46 0.43 8.0 6.92 6.77 150 0.1 2 1.0 1.3 A
D2 0.16 0.56 0.7 7.70 7.59 T 110 0.1 0 0.5 0.6 A
The flow rate calculations utilized the Rational formula Q=CIA. Cis the weighted average of C=1.0 for stone-
covered surfaces and C=0.3 for undisturbed or grass-covered surfaces. I=7.5 for 10-year storm and 5-minute
time of concentration.
2. The invert elevations are top of soil grade for lining Type A. The invert elevations and ditch lengths are
approximate.
3. The flow velocity and depth calculations utilized Manning's and the Continuity equations. N=0.04 for grass-
lined channels.
4. The contractor will grade the ditches with three to one, horizontal to vertical, side slopes.
5. Type A lining consists of permanent grass; seeded, limed, fertilized, and mulched with straw held in place with
netting or approved equivalent.
(08497RMP.RMP/sb)
-5-
NORTH RIVER 115 kV SUBSTATION
SPARE 115/33 kV BANK
PIPE PARAMETERS
Pi
Drainage Runoff
Coefficient, Flow
Rate Pipe Invert Elevation, ft Flow
pe
Number
Area, ac
C ,
cfs
Diameter,
in
Length,
ft
Inlet
Outlet
Velocity,
fps
Depth,
ft
P1 0.16 1.00 1.2 12 44 7.11 6.89 3.4 0.5
The flow rate calculations utilized the Rational formula Q =CIA. Cis the weighted average of C=1.0 for stone-
covered surfaces and C=0.3 for undisturbed or grass-covered surfaces. I=7.5 for 10-year storm and 5-minute
time of concentration.
The contractor will install precast reinforced concrete pipes with flared end sections at both the inlet and outlet
and on a 0.5% slope. The pipe length is approximate.
The pipe flow velocity and depth calculations utilize the formulas and tables in the Concrete Pip Design h^ Manual.
4. The contractor will install inlet and outlet protection for pipe P1 consisting of Class A erosion control stone, 9
inches deep on an ABC stone base 3 inches deep, 10 feet long and extending up the channel sides 1.5 feet.
Selected references from the State of North Carolina Erosion and Sediment Control Planning and Design Manual:
6.03 Surface Roughening
6.06 Temporary Gravel Construction Entrance/Exit
6.10 Temporary Seeding (table b)
6.11 Permanent Seeding (tables p and v)
6.14 Mulching
6.15 Riprap
6.21 Permanent Diversions
6.30 Grass-Lined Channels
6.41 Outlet Stabilization Structure
6.62 Sediment Fence
(08497RMP. RMP/sb)
FINANCIAL RESPONSIBILITY/OWNERSHIP FORM
SEDIMENTATION POLLUTION CONTROL ACT
No person may initiate any land-disturbing activity on one or more contiguous acres as covered by the Act
before this form and an acceptable erosion and sedimentation control plan have been completed and approved by
the Land Quality Section, N.C. Department of Environment, Health, and Natural Resources. (Please type or print
and, if question is not applicable, place N/A in the blank.)
Part A.
1. Project Name North River 115 kV Substation - Add Spare Transformer Bank
2. Location of land-disturbing activity: County Carteret , City
or Township Beaufort . and Highway/Street NC 101 Q miles N. of Beaufort)
3. Approximate date land-disturbing activity will be commenced: July 1994
4. Purpose of development (residential, commercial, industrial, etc.): Electric Power Substation
5. Total acreage disturbed or uncovered (including off-site borrow and waste areas): 1.0 acre
6. Amount of fee enclosed $ 30.00
7. Has an erosion and sedimentation control plan been filed? Yes X No
8. Person to contact should sediment control issues arise during land-disturbing activity.
Name Robert M. Pitts. Jr.. P.E. Telephone 919-546-6748
9. Landowner(s) of Record (Use blank page to list additional owners.):
Carolina Power & Light Company
Name(s)
P.O. Box 1551
Current Mailing Address Current Street Address
Raleigh NC 27602
City State Zip City State Zip
10. Recorded in Deed Book No. 353
Page No. 119
Part B.
1. Person(s) or firm(s) who are financially responsible for this land-disturbing activity (Use the blank page to
list additional persons or firms.):
Carolina Power & Light Company
Name of Person(s) or Firm(s)
P.O. Box 1551
Mailing Address
Raleigh NC 27602
City State Zip
Street Address
City State Zip
Telephone 919-546-6748 Telephone
LL p M F=-?
LLJ O LL Z p 3 V) °
?Q N W ?cfl aw a NW Zak==
?WN aOO J Jm Wxw z0 oxv)a_ Z? j~Q
_z>W W> a W° Z~c_n O`) Zcoof- Opm
?xV mWcr. cr W W QN Z 3 JW -J4.aV) (np
Q =
a Jz JaN QV) a ui wEE mF- WZ 1-WWc_ =ZWa
maw aa>-JM L= a -<>-0 ?a w303 wo?x
LL -Imwz =oaxo aw ?w?a ?W w 3a' zZmF-
JNO
LL- -? O L) CL L,) W 0 cr. o Z w W J Z O Z
=Z0 ZNZ=Wm fDW WON mW WF-?W cr-
Z m ~? ?-
m w co QJ z
NaV JJ?ZOF- J3 QJVV JQ mom V?tDOtn
?xa aa>-?wv) a >u.a? ww Jaw= -i %LLJ
zawaxw o am Q, Jpzz xo >V
W-N NW >-JW lnhW CL I x,l = W f-mZZm
a32 F-W J W aL? V1J NZF Z ?H-Ow=
WZW mmJWOQ mOC? aWOE LLJ HN tnN?F-C7 ZOU-W
/o^o W co }JI-- CG Z mtX d3 lnW F-W Z WVW m
?/ / w=m V-HOS=m 4-Ww EEV)M CL OZmNOJ ZZ JdJ
W tLU= ?xw Ix I-.- ?W?J mWx n-a== JLL W JJN =WQWm
W?3Z WF->->-cnJ WI--F- xx?= WOW OC J W LJ
X f- >->- E'N F-X W CL O Q)- = Lip Z F-
% O 3M? ?vV)CLCLL)vx) LL LL- m 3W?3 Lnnm? 3?(=/) Z? ? Le) MZz
Z _ N 11; Q Ll1 lD
0
V
? N
S ?
Q
J yy Z
N
wa
Z
W
EL
a a
N
Z ~
J m
O
N
uu
a
N
lfl
• P
N N
.--t U
O
w m
O
r ^ Q Rl
N N
W
u ? o
x
W
W
Z
C)
z
W
X w
a x
o m
CO °
W
H
V
w
p
a
N
W
a
a-
ow
?cr-
Q3
c? W
Z
?.J
w w
F- Z
N Z J
v w
Z
?
m J
Q
W p
z
w
F.,
_J x
V
LL
U
0
V)
o CO
3
J I'\l
Ja Lei _z n.,wc
'll
W°
O
I W N ?U
8
Hm
-
N; 3 "' .
III
1 zo
.9Z
.9£
If USOd 1331S) VZ
I\ USOd DOOM) .9£
z0
UI
WI
VI
0
z
O W
f- I-
U Q
Z ? 3
Lj
N J
0 0 Q
U 1- C' U
Z
Z V) O LJ
Q Q F- J
Z LLJ J O O
Q O Z L1J
Z -j
O Q Q CO
LL. <
Z N
O .
Q LLJ -
LLJ Z LLJ C) Ln
Q
u C
cl?
O
LLJ ? W N C
O
z N
Z
O
L!?
a?
2
? S
W O
z N
O
i
--------
GVMJ - 3I79fld ------
a _J
['
- a
o
n
z
T N O
Ln
°
< u
= m
v
J
Q w
.0 ? ? N Z N N
a a
° U Q
CC }y?? N 2
W Z V H
N s Cr W w
u i
a a
a
? o
W CL
¢ V)w LW
,~n ?m
i
L) <u
Z
r,
o
U ?
q
L
w
a
w
J
W
Q J
s
W
0?:
t7.
LL-
U- Z N ?
O0
Z W tt
m
?D k
LL-
Q
C
Q z
O
0 O
1-
CD ri N
~'-' N O
a-CC)
Zi LLJ
LL
=
-
OQ
Q
Z
CL
= CD l0 $ I
lD M Q
O
Li Z
Q
H
f'-
? U
W
o ?
-car -
17 -7- 1G
~
• I • I
I
_
•I
- /1 ??.. C
R? - ?
.
B O I4
/? ?
I
1161
,
•
ai
.r
.
??
l - ? y _
- ?
_
i
-_ -` 8
_ x 1165
9M
x /3
_
"1
300 I
orih River Cornet
Lip?`?`
- B =i= VNI? .I
- a,- r e>
2 r? a
t 've'Oak ve
-71
7UststlOn
... -„mot . ? - - ?. / ----- ---- e
?
®(C
m =
I
CP&L'S NORTH RIVER
•
n
Ru :
,-=• 115 KV SUBSTATION i ••
( 6M? 91,
---
NEWPORT RIVER
xi f
348 -3EAUFC.47 _ 4 Jqq MTI USGS CORE CREEK QUAD
SCALE: 1"=2000' ELEV. IN FT PHOTOREVISED 1983
i
c