HomeMy WebLinkAbout20030243 Ver 1_Triage Check List_20030305Triage-Check List
. i~
Date: 3 ~~ t~ Project Name. ~ ~~~
DWQ#: Q~ Q2 ,
County: ~G ~. ~ ~~ ~
To: ^ . ARO Mike Parker ^ W~p . Tom Steffens
^ FRO Ken Averitte ^ WiRO Noelle Lutheran
^ MRO Mike Parker ^ WSRO Cyndi Karoly (Central Office)
^ RRO Steve Mitchell
From: c/~U C Telephone : (919) ,7~~ ~- hJ~
The file attached is being forwarded to your for your evaluation.
Please call if you need assistance.
^ Sixeam length impacted
^ Stream determination
^ Wetland determination and distance to blue-line surface waters on USFW topo maps
~~~Iinimization/avoidance issues
^ Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
^ Pond fill
Mitigation Ratios
^ Ditching
^ Are the stream and or wetland mitigation sites available and viable? .
^ Check drawings for accuracy
^ e application gonsistent with pre-application meetings?
Cumulative impact concern
Comments: ~~~~rlnud im~~~ ~t~u~ . ~~~ .~~0.~~
34~`~q
f
~ha~- ,~ba~,~
j ~- ~ . Q ~' i Q 1~1
D- I :'~~ac~-s ?