Loading...
HomeMy WebLinkAbout20001118 Ver 3_Beaver Lake Dredging Schematic Rev_20190215/// -LU Ir - - - L� /:::: MER�� RIMO� ._ BEAVER LAKE ACCESS ROAD; COARSE STONE i min�Di Am RV RIAYIAI rz�nrrRin DREDGE 2,500 CY, PLACE DREDGE SPOILS AT DISPOSAL SITE TO BE EXCAVATED BY OTHERS 5 MAX. ---- I1 TIMBER BRIDGE MATS SECTION BRIDGE MAT DETAIL 2 NTS J NOTE: MATS SHALL FULLY SPAN CHANNEL WITH NO GAPS BETWEEN AND SHALL BE PLACED OVER THE CHANNEL RATHER THAN DRAGGED INTO PLACE. INSTALL BRIDGE MATS TO CROSS CHANNEL '7 1 11 X11 .11 a Q w Q U) ❑ z O z O U) F-- > IL w U U W 0 CD Q o 0c) Lu (� � 0009 U Q� 2z o z W c (i b Lu O J z > C/)W (DY�J LLJ LU Q U z z C) U w z 0� LLI C) LL w J J w -17 U) w Q Q w 00 DATE: FEB. 2019 SCALE: AS SHOWN DREDGING SCHEMATIC SHEET 2 OF 4