HomeMy WebLinkAbout19880301 Ver 1_COMPLETE FILE_19880101DIVISION OF ENVIRONMENTAL MANAGEMENT
WATER QUALITY SECTION
Comments
t(s) f 416ev - ..
A. PERMIT:
This office cannot comment on this project until after the close of the Section
401 Certification Public Comments Period.
i This office has no objection to the issuance of the permit(s) for the proposed
project with the following conditions:
/ , That the activity be conducted in such a manner as to prevent significant
increases in turbidity outside the area of construction or construction-
related discharge (increases of 25 NTU's or less are not considered
significant).
That the instream turbidity not be increased.by.mor..e than 50 NTU's as a
result of the proposed activity.after a reasonable opportunity for dilu-
tion and mixture.
That turbidity levels in shall not be increased
by more than 10 NTU's as a...result of the proposed activity after a reason-
able opportunity for dilution and mixture.
B. CERTIFICATION STATUS:
Certification is not required
for this project.
Certification is required for
this project. Such action to
process the certification has
been initiated. 'Proposed
Certification will be acted..on
or after
The proposed project is certified .
under General.Certification
A) No. 1179 issued on January 25, D) No. 1431 issued on October 16,
1977, for sewer line construction
No. 1272 issued on November 10, E) 1980, for boat ramp construction.
No. 1664 issued on September 8,
1978, for bulkhead construction. 1983, for Rip-Rap Placement.
C) No. 1273 issued on November. 10, F) No. 1665 issued on September 19,
1978, for discharges of liquid 1983, for incidental bridge
effluent from diked upland disposal construction.
areas.. i
/ 51/2; - -
WATER QUALITY SECTION
DIVISION OF ENVIRONMENTAL MANAGEMENT
i1!K,D iT t)F,iCAMA/401
ACTION > ADz? FILE f ? i i° t..: f.? t•:I f:t :::! f_? 't P;,. , • ? ,
ACTION ADD, ENTER DATA, REC. ADDED
t"';''._ ?: j r 00535 P t'; t. J : °.; 1 . : K , EARL .
ASSIGNED TO: 7
(. i t c
TYPE t..• #::. t'; T IF !CAT!
s
4 04 ' N 0 .. .. i.3
!.: . •: t.x.: BULKHEAD
t!'! 3"3 t- : t.? 3 •: l...: F
D F.' CfAi 1' 1 A : 1f` .4 E #..: f" . r:+.. t,t P ."'; {::. Q :
RECEIVING STREAM: 4°` E::: i'': i:: t. 1"# A.''•::::• RIVE R
COMMENTS:
SITE LOCATED ON HARVEY PT. RD.. S R 1336
PROPOSAL TO COMET. 427' WOODEN BU LKHEA.'-.;.*)
< ONE ACRE DEVELOPED PER
COPIES: WARO-CENTRAL-MILLS-DCM
REV DATE
IS 00532 FRD DATA
COUNTY: PERQUIMANS REGION: 0*7
c.3.3. # @ t NOTICE: t1;
ISSUE: .f 3 ::t::.f 1.. 3 tr,.. f, 1'38
,. - ,..
HOLD: FINAL REPORT: 81.. 1 .:... , ,...
CLASS: SB BASIN: PAS
RC`s
C E C, 12 1988
ft i i..;-: Qi,;A I t' ; ECTION
UPERiJ1UNS R- N('t'
MEMORANDUM
• qSN/NC'-? DIY G
TO: Bill Moore%
FROM: Richard L. Watts
SUBJECT: APPLICATION FOR CAMA MAJOR PERMIT AND/OR
DREDGE AND FILL PERMIT
DATE: November 21, 1988
Attached is an application by EARL J. RIDDICK
which was received by me on 11/1%88 I am
considering this application complete, have acknowledged
receipt, and have begun processing.
If you have any questions, do not hesitate to contact me.
/yTl
Enclosures
OFFICE OF COASTAL MANAGEMENT Lat:36008;30"W
FIELD INVESTIGATION REPORT Long:76023150"N
1: APPLICANT'S NAME EARL JACKSON RIDDICK
2. LOCATION OF PROJECT SITE S.R. 1336, Harvey Point Road adjoining
the Perguimans River. Photo ref. 1984 115-779 M-9, M-10. N-11
3. INVESTIGATION TYPE: DREDGE & FILL X CAMA X
4. INVESTIGATIVE PROCEDURE:
(A) DATES OF SITE VISIT 11/1/88 11/16/88
(B) WAS APPLICANT PRESENT yes no
5. PROCESSING PROCEDURE: APPLICATION RECEIVED 11/1/88
OFFICE Elizabeth City
6. SITE DESCRIPTION: (A) LOCAL LAND USE PLAN Perguimans County
LAND CLASSIFICATION FROM LUP Rural
DEVELOPMENT CONSTRAINTS IDENTIFIED IN LUP
Purpose of the rural district is "to provide for agricultural,
forestry, mineral extraction, and various low-intensity uses on large
sites including low density dispersed residential uses."
(B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE X
COASTAL WETLANDS PUBLIC TRUST WATERS X
ESTUARINE WATERS X OTHER
C) WATER DEPENDENT: YES X NO OTHER
(D) INTENDED USE: PUBLIC PRIVATE X COMMERCIAL
TYPE OF WASTE WATER TREATMENT: EXISTING N/A
N
(F) TYPE OF STRUCTURES: EXISTING none
PLANNED bulkhead
(G) ESTIMATED ANNUAL RATE OF EROSION 2-5' SOURCE applicant
7. HABITAT DESCRIPTION:
(A) VEGETATED WETLANDS
(B) NON-VEGETATED WETLANDS:
DREDGED FILLED OTHER
(C) OTHER:
Shallow-water habitat 3416 sq. ft. _
Upland embankment 4270 sq. ft. graded
(D) TOTAL AREA DISTURBED: 7686 sq. ft.
8.
across three lots which
end. In order to have a
extend a maximum of 10'
8'. Applicant estimates
licant wishes to build 427 ft. of
ould tie into existing bulkheads
straight bulkhead the applicant p
aterward of NWL an average of app
1326 cy fill coming from the stee
bulkhead
on either
roposes to
roximately
p embankment
will be needed behind the proposed
EARL RIDDICK Submitted by: Richard L. Watts
BIO REPORT Date: November 18, 1988
PAGE 2
SITE REPORT
The applicant owns approximately two acres of land along the
Perquimans River, Perquimans County, which he has subdivided into
three lots having shorelines of 137, 133, and 153 feet
respectively. Between these properties and SR 1336 (Harvey Point
Road) is Mr. Riddick's home.
The riverbank is high along the Perquimans River in this
area averaging 10'. The land is characterized as upland and is
currently farmed. The vegetation along the toe of the bank
consists primarily of fescue grass (Festuca sp.), Giant Foxtail
(Setaria sp.), red maple (Acer rubrum), Loblolly pine (Pinus
taeda), sweet gum (Liquidamber styraflua) and Honeysuckle
(Lanicera sp.). Sporadically there are a few Wax Myrtle (Myrica
cerifera), and red cedar (Juniperus virginiana). A few patches
of golden rod (Solidago sp.) are also present. Along the
shoreline are numerous Bald cypress (Taxodium distichum) and
several tupelo trees (Nyssa sp.).
There are no submerged aquatic plant species in the
adjoining water.
Desiring a straight bulkhead, the applicant proposes to
construct approximately 427 ft. of bulkhead tying into two
existing bulkheads. This bulkhead would be a maximum of 10' and
an average of 8'waterward of the NWL. The fill behind the
bulkhead will come from the steep river bank.
ANTICIPATED IMPACTS
No coastal wetland species nor submerged aquatic vegetation
will be impacted by this project. Construction will cause
temporary turbidity in the Perquimans River. Bulkheading and
grading will reduce long-term sedimentation caused by normal
erosion along this property's high bluff. An estimated 3,416 sq.
ft. of shallow-water habitat will be lost.
Approximately 4270
disturbed when grading t
cubic yards of material.
Bald cypress) will be
numerous small trees
Archaeological surveys
archaelogical site near t:
CAMA REVIEW
sq. ft. of upland embankment will be
:o fill behind the bulkhead with 1316
Several large trees (Loblolly pine,
removed during construction as will
(trunk less than 5" in diameter).
indicated there is a potential
his project (pg. 29.)
This project is consistent with the rural classification as
described in the Perquimans County LUP.
Please type or print. Carefully describe all an-
ticipated development activities, including construc-
tion, excavation, filling, paving, land clearing, and
stormwater control. If the requested information is
not relevant to your project, write N/A (not ap-
plicable). Items 1-4 and 8-9 must be completed for
all projects.
1 APPLICANT
a. Name E N k
Addr -
city ss' b State N . C -
Zip *1'79 `F 'k I Day phone9/ 9-'fa 6 -'75 3
?- Landowner or Authorized agent
b. Project name (if any)
c. If the applicant is not the landowner, also give
the owner's name and address.
d. Describe the-planned use of the project.
'T- u E
ULk eA .S Eac11 SI__C
4 LAND AND WATER
CHARACTERISTICS
a. Size of entire tract a 6 S
b. Size of individual lot(s) Acs I,( q
c. Elevation of tract above mean sea 1 1 or N -
'
tb 1
tional Geodetic Vertical Datu . ,
d. Soil type( and texture(s) of tract
I.OA
kA-
.
e. Vegetation on tract A ? ru
3 e 5 2 ,v `- r II N
f. Man- d. features now on tract
o N e,
- g. What is the CAMA Land Use Plan Classifica-
tion of the site? (Consult the local land use
plan.)
Conservation Transitional
Developed Community
-X - Rural Other
How is the tract zoned by
2 LOCA'T'ION OF PROPOSED
PROJECT h.
a n Street o dress or seconds road num r .?
a a e4 ? A?
b. Ci town, cgmmunity, or landmar
N
c. County Co J 10't L4
d. Is proposed work within city limits or planning
jurisdiction?
e. NMe of body of water nearest project
i f ?- oL) y?ti0?ty S y 9.r
3 DESCRIPTION AND PLANNED
USE OF PROPOSED PROJECT
a. Describe all development activities you propose
(for example, building a home, motel, marina,
bulkhead r ier).
It \A3 .? a
local government?
How are adjacent waters classified? F W
Has a professional archaeological urvey been
carried out for the tract? NO
If so, by whom?
L
j•
5 UPLAND DEVELOPMENT
Pmplete this section if the project includes any
upland development.
a. Type and number of buildings, facilities, or
structures proposed
b. Number of lots or parcels
c. Density (Give the number of residential units
and the units per acre.)
d. Size of area to be graded or disturbed
' e. If the proposed project will disturb more than
f l
d
h
D
f
you plan to build a marina, also complete one acre o
an
; t
e
ivision o
Land
Resources must receive an erosion and sedimen-
and attach Form DCM-MP-2. tation control plan at least 30 days before land
b. Is the proposed activity maintenance of an ex- disturbing activity begins. If applicable, has a
isting project, new w'orrko r bob? -! S?/
A sedimentation and erosion control plan been
1,
C. Will the project be for commu ity, p ivate, or U(k ubmitted to the Division of Land Resources?
g
commercial use? 1 d? Give the percentage of the tract within 75 feet
of m
hi
h
b
d b
ean
g
water to
e covere
y im-
bl
f
h
permea
e sur
aces, suc
as pavement,
buildings, or rooftops.
g. , List the materials, such as marl, paver stone,
asphalt, or concrete, to be used for paved
surfaces.
h. If applicable, has a stormwater management
plan been submitted to the Division of En-
vironmental Management?
i. Describe proposed sewage disposal and/or waste
water treatment facilities.
j. Have these facilities received state or local
approval?
k. Describe existing treatment facilities.
1. Describe location and type of discharges to
waters of the state (for example;-surface runoff,
sanitary wastewater, industrial/commercial
effluent, or "wash down").
m. Water supply source
n. If the project is oceanfront development,
describe the steps that will be taken to main-
tain established public beach accessways or pro-
vide new access.
o. If the project is on the oceanfront, what will
be the elevation above mean sea level of the
first habitable floor?
EXCAVATION AND FILL
J
INFORMATION
a. Describe below the purpose of proposed excava-
tion or fill activities (excluding bulkheads,
which are covered in Section 7).
b. Amount of material to be excavated from
below water level in cubic yards _
c. Type of material _
d. Does the area to be excavated include marsh-
land, swamps, or other wetlands?
e. High ground excavation, in cubic yards
f. Dimensions of spoil disposal area
g. Location of spoil disposal area
h. Do you claim title to the disposal area?
If not, attach a letter granting permission from
the owner.
i. Will a disposal area be available for future
maintenance??
If so, where?
j. Does the disposal area include any marshland,
swamplland,'or water areas?
k. Will the fill material be placed below mean
high water?
1. Amount of fill in cubic yards
m. Type of fill material
n. Source of fill material
o. Will fill material be placed on marsh or other
wetlands?
p. Dimensions of the wetland to be filled
q. How will excavated or fill material be kept on
site and erosion controlled?
r. What type of construction equipment will be
used (for example, dragline, backhoe, or
hydraulic dredge)?
s. Will wetlands be crossed in transporting equip-
ment to the project site? If yes, explain
the steps that will be taken to lessen en-
vironmental impacts.
Length Width Depth
Access channel
(MLW) or (NWL)
Boat basin
Other (break-
water, pier,
boat ramp,
rock jetty)
Fill placed in
wetland or below
MHW
Upland fill
areas
V 7 SHORELINE STABILIZATION
X a. Length of bulkhead or riprap. f r o . _ QoP*.
b. Average distance waterward of m nl high water
or normal wafer levelb;lr-) 0 Q
c. Shoreline erosion during preceding 12. months,
in feet 00 e: S f'or,XA- Los* Ao r.ox6-"j )
d. Type of bulkhead material SA L--& T 1-- eA -t7ciq_
e. Amount of fill, in cubic yards, to be placed
below mean high water` G??G
f. T pe of fill material S ti jQ
t7 i ti
2
8 ADDITIONAL INFORMATION
In addition to the completed application form, the
following items must be submitted:
A copy of the deed (with state application only) or
other instrument under which the applicant claims
title to the affected property. If the applicant is not
claiming to be the owner of said property, then for-
ward a copy of the deed or other instrument under
which the owner claims title, plus written permis-
sion from the owner to carry out the project.
An accurate work plat (includinWplan view and
cross sectional drawings) drawn to scale in black
ink on 8 1/2 x 11 white paper. (Refer to Coastal
Resources Commission Rule 7J.0203 for a detailed
description.)
Please note that original drawings are prefe and
only high quality copies will be accepted? lue-line
prints or other larger plats are acceptable only if 16
high quality copies are proviJe6 by the applicant.
(Contact the U.S. Arrn ?rps of Engineers regard-
ing that agency's uhf larger drawings.) A site or
location map ism part of plat requirements and it
must be sufficiently detailed to guide agency per-
sonnel familiar with the area to the site. Include
cou ty road (SR) numbers, landmarks, and the like.
A stormwater management-plat[ applicable, that
may have been-&-V-eloped in consultation with the
Di.v Environmental Management.
A list of the names and complete addresses of the
adjacent. waterfront (riparian) landowners. These
individuals have 30 days in which to submit com-
ments on the proposed project to the Division of
Coastal Management. The applicant must advise
the adjacent landowners of this opportunity by sen-
ding a copy of the permit application to them by
registered or certified mail. This notification is re-
quired by G.S. 113-229(d). ,
Name_
Address
A list of previous state or federal permits issued
for work on the project tract. Include permit
numbers, permittee, and issuing dates.
YA check for $.100 made payable to the Depart-
ment of Natural Resources and Community
Development to cover the costs of processing the
application.
A signed A C hazar"otice-for projects in ocean=
onft and inlet areas.
A statement on the use of public funds. If the
project involves the expenditure _of-public-funds, at-
tach a sta nt-dtfcurimentir g compliance with the
_ _N a Environmental Policy Act
(N.C.G.S. 113A-1 to 10).
9 CERTIFICATION ANT) PERMIS4
SION TO ENTER ON LAND y
1irSa'h
Any permit issued in response to this application
will allow only the development described in the
application. The project will be subject to condi-
tions and restrictions contained in the permit.
I certify that to the best of my knowledge, the pro-
posed activity complies with the State of North
Carolina's approved Coastal Management Program
and will be conducted in a manner consistent with
such program.
I further certify that I am authorized to grant, and
do in fact, grant permission to representatives of
state and federal review agencies to enter on the
aforementioned lands in connection with
evaluating information related to this permit ap-
plication and follow-up monitoring of project.
This is the 15 day of &-pt . ,
19__<9_1_.
X c>r - V,,?
Landowner or Auth ized agent
Send the completed application materials to the
Division of Coastal Management Office nearest you
and the U.S. Army Corps of Engineers. See the
map on the inside front cover for the appropriate
DCM office and addresses and phone number.
?n
-ti
A?
?M
t>
1
;?'j J
fti.
r
?-cl
V
r ?
.f
r .E
`x
t ?
w
r
rv
r.
x?
I'x
J ?r 7
ti
yA?
t1...
h
F ?°