Loading...
HomeMy WebLinkAbout19880291 Ver 1_COMPLETE FILE_19880101DIVISION OF ENVIRONMENTAL MANAGEMENT! WATER QUALITY SECTION Comments concern-Ing an application for State Federal CAMA`Permit(s) from A. PERMIT: This office cannot comment on this project until after the close of the Section 401 Certification Public Comments Period. This office has no objection to the issuance of the permit(s) for the proposed project with the following conditions. That the activity be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction- related discharge (increases of 25 NTU's or less are not considered significant).' That the instream turbidity not be increased by mor..e than 50 NTU's as a result of the proposed activity.after a reasonable Opportunity for dilu- tion and mixture. That turbidity levels in shall not be increased by more than 10 NTU's as a result of.the proposed activity after a reason- able opportunity for dilution and mixture. B. CERTIFICATION STATUS: Certification is not required.. for this project. Certification is required for this project.- Such action to: process the certification has been initiated. Proposed Certification will be acted.on or after _ The proposed project is certified . under General.Certification A) No. 1179 issued on January 25,. D) No. 1431 issued on October 16, 1977, for sewer line construction 1980, for boat ramp construction. B) No. 1272 issued on November 10, E) No. 1664 issued on September 8, 1978, for bulkhead construction. 1983, for Rip-Rap Placement. -?i No. 1273 issued on November 10, F) No. 1665 issued on September 19, 1978, for discharges of liquid 1983, for incidental bridge effluent from diked upland disposal construction. areas.. i . ? 4 7 - WATER UALTTY E TION f DIVISION OF ENVIRONMENTAL MANAGEMENT N ? DIVISION OF ENVIRONMENTAL MANAGEMENT ZID100 i"lam DATE : Y TO: Bill Mills Operations Branch FROM: James H. GregsonJ'16- Wilmington Regional Office THROUGH: A. Preston Howard, Jr. Wilmington Regional Office RC C C r `, AIL 2 0 1988 WATEF r SUBJECT: Regional Office Review & Recommendations plic tion for Permit for Excavation and/or Fill Project Description:' pcax ?iYo?'IoL?a Dui yip aM (?? .• /R Z7 Adjacent Water Body: Classification: 6L Status: &,e) S,:Pd The project has been reviewed to determine impacts to water quality. The appropriate comments below have been checked: (X) The project it /will not require a 401 Water Quality Certification. (?) The project complies with th General 401 Water Quality, Certification # 1027 3 for • (x) The proposed project should be done in such a way as to not cause the turbidity outside the immediate construction area to exceed oZ,S" NTU. This office has no objection to the project as proposed. JHG:kc cc: DCM Abe f srn&&4t) CF, WiRO r r r 1 1. 2. 3. 4. 5. DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT Applicant's name Port Cape Fear, Inc. (Skip Fry, Manager) Location of project site Man-made basin off Cape Fear River on River Road - South of Wilmington - New Hanover County - New photo 15-191 - Grid P,Q,R - 19.20.21 Investigation type: Dredge & Fill "K CAMA Investigative procedure: (A) Dates of site visit 3-14-88 6-29-88 (B) Was applicant present yes yes Processing procedure: Application received 6-20-88 Office Wilmington 6. Site description: (A) Local Land Use Plan Wilmington - New Hanover Land Classification from LUP Transition Development constraints identified in LUP None for maintenance projects of this type. (B) AEC(s) involved: Ocean Hazard Estuarine Shoreline Coastal Wetlands Public Trust Waters Estuarine Waters x Other (C) Water dependent: Yes (D) Intended use: Public (E) Type of waste water treatment: Planned N/A Private Commercial x Existing Municipal system (F) Type of structures: Existing Covered boat slips/dock/buildings Planned Additional docks (G) Estimated annual rate of erosion N/A Source --- 7. Habitat description: (A) Vegetated wetlands: Spartina alterniflora AREA No Other Both Dredged Filled Appx. 300 sf (B) Non-vegetated wetlands: Basin area (open water) Appx 195,500 sf (4.5 ac) Access channel Appx. 21,600 sf (.50 ac) (C) Other: High ground available Other Appx. 36.5 ac (D) Total Area Disturbed: Appx. 2172400 Appx. 36.5 ac (5.0 ac) 8. Project Summary The applicants propose to maintain the existing marina basin and access channel and to develop additional docking space. a ? L Port Cape Fear, Inc. Page Two 9. PROJECT DESCRIPTION The project is located in and around a man-made basin dug off the Cape Fear River south of Wilmington, North Carolina. The site is just downstream of the Gold Bond Gypsun plant pier and conveyer belt. The basin is very irregular in shape. There are also two subbasin areas located on the east side of the feature. The larger basin measures approximately 670' long x 270' wide. One of the subbasins appears to have been a barge slip. It measures approximately 50' wide x 120' long. The other subbasin is a railway/haul out area. It measures approximately 100' long x 140' wide. Water depths within the basin and associated areas range from +1' mean low water (mlw) to approximately -8' mlw. The average depth is approximately -3.5' mlw. The access and entrance channel depths range from -5' mlw up to -10' mlw with the mediam depth approximately -6' mlw. Although the basin appears to have been originally excavated into high ground there are some areas of marsh re-established around the perimeter. Spartina alterniflora, Spartina cynocoroides and Typha spp are the predominant species. All these plants are beyond the excavation limits of the existing features except for approximately 300 sf of Spartina alterniflora within the railway area. The waters are classified as SC and are a designated nursery area. There is an existing boat shed located within the basin. This feature is approximately 300' long x 60' wide. There are 15 approximately 50' slips located under this shed roof. There are also two enclosed structures attached to the shed roof. Around the basin are also several docks and piers in various stages of repair. Approximately 460' of 6' wide dock exists. On the high ground portion of the property there are approximately six existing buildings which are utilized by boat owners and others who work around the basin. An existing palisade type bulkhead is located along the eastern shoreline between the railway and barge slip. There are identified "404" wetlands on the southern end of the property. There is a row of large pilings located within the river just landward of the access channel. They extend along a line approximately 320' in total length. The applicants propose to maintain the entire basin area. The original dimensions will be more or less re-established. There will be a 3:1 setoff along all bulkheads and vegetation areas to prevent sloughing. The applicants propose to dredge the basin to various depths as shown on the blue line labeled Composite Analysis. The entrance channel will be dredged to -6' mlw. The two subbasins will be dredged to a depth of -4' mlw and the remainder of the basin will be dredged to -5' mlw. Approximately 480' of new docking is proposed along the north side of the basin 10 additional 50' slips will be provided by this docking. An additional 600' of docking is shown on the plans utilizing the pilings out in the river. Approximately 40,000 cubic yards of material will be removed and will be deposited in the area between the basin and wetlands shown on the blue line labeled Composite Analysis. The applicant has furnished a notarized statement that there will be no high ground development including building and parking. or roads at this time. ? . Y Port Cape Fear, Inc. Page Three 10. ANTICIPATED IMPACTS If the project is accomplished as. proposed and is timed to avoid periods of peak biological activity, no significant adverse impacts are anticipated. Submitted by: C. Robert ,try, Jr. Date: June 30, 1988 Office: Wilmington Please type or print. Carefully describe all an- ticipated development activities, including construc- tion, excavation, filling, paving, land clearing, and stormwater control. If the requested information is not relevant to your project, write N/A (not ap- plicable). Items 1.4 and 8-9 must be completed for all projects. ilk. J al ksr QRT C4PE FEAR, INC. d. Describe the planned use of the project. commercial marina and boat yard a. Cry b. a. Name c/o a ip Fr Address 3410 River Road C. City Wilmington State NC d Zip 28401 IDay phone 395-5055 Landowner or XX Authorized agent e b. Project name (if any) Port Cape Fear Marina c. If the applicant is not the landow the owner's name and address Same JUN v 1988 Size. of entire tract 36.5 Acres Size of individual lot(s) 22+-, 11+- & 3+- Ac. Elevation of tract above mean sea level or Na- tional Geodetic Vertical Datum A4g . -14 MSL Soil type(s) and texture(s) of tract Fine sand and Dorovon muck Vegetation on tract Pine - Turkey oak 'wTnegrass & mixed shrubbery Man-made features now on tract Dry boat storage,repair bldgs.,covered slips, ramps, What is the CAMA Land Use.Plan Classifica- bulk- tion of the site? (Consult the local land use head, plan.) etc. ni:nrp OF AL MANAGEMEN1 Conservation XX Transitional E61ONAL OFFICE Developed Community aQ ' Rural Other l ., h. How is the tract zoned by local government? I-2.Heavy Industrial i. How are adjacent waters classified? SC a. Street address or secondary road number j. Has a professional archaeological survey been S.R. 1100 - 3410':River Road carried out for the tract? No b. City, town, community, or landmark . If so, by whom? N/A Wilmington= Old Stackhouse Marina) c. County New Hanover d. Is proposed work within city limits or planning jurisdiction? Yes e. Name of body of water nearest project Cape Fear River a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or pier). Maintenance excavation of existine marina basin and maintenance/repair of existing docks and bulkheading If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an ex- isting project, new work, or both? existing basin and 20 years old c. Will the project be for community, private, or commercial use? commercial use - boat storage and repair Complete this section if the project includes any upland development. a. Type and number of buildings, facilities, or structures proposed New docks capable of 50 slips of wet storaee. b. Number of lots or parcels 1 tract c. Density (Give the number of residential units and the units per acre.) N/A d. Size of area to be graded or disturbed 1?- Ac. e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimen- tation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? N/A f. Give the percentage of the tract within 75 feet of mean high water to be covered by im- permeable surfaces, such as pavement, buildings, or rooftops. Additional 8+-% A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. In addition to the completed application form, the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then for- ward a copy of the deed or other instrument under which the owner claims title, plus written permis- sion from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on 8 V2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) A check for $100 made payable to the Depart- ment of Natural Resources and Community Development to cover the costs of processing the application. A signed AEC hazard notice for projects in ocean- front and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, at- tach a statement documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). Please note that original drawings are preferred an u only high quality copies will be accepted. Blue-line fir y? SI®N'I?OaE ?I?F.?R O ?' ? '.} prints or other larger plats are acceptable only if 16 high quality copies are provided by the applicant. .a .a.,< . (Contact the U.S. Army Corps of Engineers regard- Any permit issued in response to this application ing that agency's use of larger drawings.) A site or will allow only the development described in the location map is a part of plat requirement cation. The project will be subject to condi- must be sufficiently detailed to guide and restrictions contained in the permit. sonnel unfamiliar with the area to the sit ude county road (SR) numbers, landmarks, an IJN 3 1tify that to the best of my knowledge, the pro- U'`' posed activity complies with the State of North stormwater management plan, if in consult tpo?,Fafv?ftth(.?fh?O?STAI _ Py ''?A(?A????. 's approved Coastal Management Program may have been developed r R ..,.? rL ill be conducted in a manner consistent with Division of Environmental Management. ??lt spa i?i? h??'?" ssuc ? program. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit com- ments on the proposed project to the Division of Coastal Management. The applicant must advise the adjacent landowners of this opportunity by sen- ding a copy of the permit application to them by registered or certified mail. This notification is re- quired by G.S. 113-229(d). Name Gold Bond Building Products Address 838 Sunnyvale Dr. Wilmington, NC 28401 Name Liquid Transporters Address 3630 River Road _ Wilmington, NC 28401 Name Address ...'J I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit ap- plication and follow-up monitoring of project. This is s the 1st day of June 19 8 X ` Landowner or Authorized a nt Send the completed application materials to the Division of Coastal Management Office nearest you and the U.S. Army Corps of Engineers. See the map on the inside front cover for the appropriate DCM office and addresses and phone number. 3 Form DCM-MP-2 MARINA DEVELOPMENT Attach this form to the Application for Permits to Develop in North Carolina's Coastal Area. Be sure ' to complete all other sections of that application which relate to this proposed project, including a. Check each of the following sanitary facilities upland areas, even if duplicative. All shore-based which will be included in the proposed project. facilities must be included in application and work XX Office toilets (Existing) plats. Y- Toilets for patrons `L,L?'I. Number ----- Location ----- .? Showers _ Boat holding tank pumpout XX a. Check below the type of marina proposed. Type and location 1 pumpout at end Commercial Public of dock Residential l bl ? h b b. Describe treatment type and location for all pu ic e genera e open to t b. Will the marina sanitary wastewater. Community sewer system/septic tank c. If there is residential development associated with the marina, how many units or lots are c. Describe solid waste fish offal and trash planned? N/A , , disposal. City trash pick up d. Check all of the types of service to be provided. Full service, including travel d. How will overboard discharge of sewage from lift and/or rail XX boats be controlled. ? Posted No Discharge Dockage, fuel, and marine supplies signs in boat basin; Educate .. XX_ Dockage ("wet slips") only customers about closed-head policy. Number of slips 57+- _XX- Dry storage Number of boats 75+- e. Give the location and number of "No Sewage XX Boat a Discharge" signs proposed. aci1;ty - XX Other(describe) H ,1 o - 2 -End of docks, e. Check below the proposed type of siting. XX Land cut and access channel f. Describe the special design, if applicable, for Open water with dredging for basin containing industrial type pollutants, such as and/or channel paint, sandblasting waste, and petroleum pro- Open water, no dredging required ducts. Other (describe) Sand pits with recycled sand f. Describe the typical boats to be served (for ex- ample, open runabout, charter boats, sail boats, or mixed types). Mixed types Where will residue be disposed of? g. Typical boat length 35'+- County landfill h. Maximum boat length 100'+- i. Are any floating buildings- .planned? h. Give the number of channel markers and "No If so, describe. Wake" signs proposed. None a 19aa Note: Regulatory signs such as these require ad- ditional approval by the N.C. Wildlife np?j?, ?A?i_F \ E Resources Commission. 4 PORT CAPE FEAR, INC. Marina • Commercial & Industrial Area June 2, 1988 Mr. Robert Stroud Division of Coastal Management 7225 Wrightsville Avenue Wilmington, NC 28403 Dear Mr. Stroud: 3410 River Road Wilmington, NC 28401 (919) 395-5055 This letter is to certify that Port Cape Fear, Inc., owners of the land previously known as the Stackhouse Manna; do not wish at-this time, and will not, construct new buildings, pave parking lots or roads, or other- wise develop the property by way of new permanent structures. The intent of the application being submitted today is to obtain permission to: 1) 2) 3) 4) Dredge 20;000+:.yards:_from.::ahe::::exis:ting .basin:_area. Do various repairs to existing dock, pier„and bulkhead structures. Place into -the marina basiii.some.additional floating docks to accomodate boats. Build various walkways that enable access to docks from shore. 5) Make safe, sound and workable that area which has heretofore been used as a boat haul-out, launch and repair area. Sin rely, w Nelson B. Fry jt?.i'a Aga x General Manager NBF/dbb Sworn to and subscribed before me this day of e, 1988. Notary Public My commission expires: //// 8 DEBORAH B. BELL t4 " ' NORTH CAROLINA ! f NEW HAN VER CO.URTY S My Comm Expire I D rn ? CL E CL ca m" U? vo , 0 - a a ? o m ?- a t7 C2 C2 0 E rn 4 a)IOOp om o h d r Ih zt_ o? D • ° CO ' . d ° N t • LO CO ° N N - :vD 0 lauuL ?\ 40 gale M daaQ ob in Q J N J a 00 c 0o a r 0 c0 cu L d «..-a 0 4- ., CD cu t9 `cu 0 a C; c0? L N rr 0 a: w e CU Cc «. U a "- 0 w z a? a? o ? c) 0 z °? COF o w cu 0 CO p D N a C 0 0 N - ` N U U c,) 0 0 V a) 0 a T CD N c V cn rn' w L ~ ., y 0 -E ' o c ch V :- 1'7N U d Q 0 0 C - Z fn - m +1 0 z z 0 0 l o ? Q w w U J a > r a 0. Y Q o 1' cr U cw Q ?? o ?-C 1 ? ? m IN REPLY REFER TO DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 March 7, 1988 Regulatory Branch SUBJECT: File No. SAWC088-N-065-0208 Mr. William D. Small Port Cape Fear, Incorporated 3410 River Road Wilmington, North Carolina 28401 Dear Mr. Small: On February 6, 1986, we renewed general permit No. SAWC080-N- 000-0291 (copy enclosed),_which provides Federal authorization for construction activities that receive authorization from the State of North Carolina. A review of your application received March 2, 1988, for Department of the Army authorization to maintain a channel, canal and basin and to construct piers, floating docks, a travel lift and to install pilings to support commercial marina facilities on the Cape Fear River, Wilmington, New Hanover County, North Carolina, indicates it to be a candidate for Federal authorization under this general permit. Accordingly, the administrative processing of your application will be accomplished by the North Carolina Division of Coastal Management. Comments from Federal review agencies will be furnished to the State. If your application must be withdrawn from this general permit process for any reason, you will be informed regarding its further management. If there are no unresolved differences in State- Federal positions or policies, the final action taken on your application by the State will result in your receiving written notice from us that your application is consistent with the general permit and you may commence your activity. Only after receiving such confirmation should you begin work. Your application, pursuant to Section 10 of the River and Harbor Act, has been assigned No. SAWCO88 -N-065-0208 and will be coordinated by Mr. Hugh Heine. He is available at telephone (919) 343-4725. Sincerely, Charles W. Hollis Chief, Regulatory Branch Enclosure -2- 4t , • 1* 'w Copies Furnished (without enclosure): Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. William Mills Water Quality Section V Division of Environmental Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Post Office Box 25039 Raleigh, North Carolina 27611-5039 Mr. Randy Cheek National Marine Fisheries Service Habitat Conservation Division Pivers Island Beaufort, North Carolina 28516 Ms. Beverly Etheridge, Chief Wetlands Section Marine and Estuarine Branch Region IV U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. C. Robert Stroud, Jr. Wilmington Regional Office North Carolina Division of Coastal Management 7225 Wrightsville Avenue Wilmington, North Carolina 28403