Loading...
HomeMy WebLinkAbout19880131 Ver 1_COMPLETE FILE_19880101 DIVISION OF ENVIRONMENTAL MANAGEMENT WATER QUALITY SECTION Comments concerning an application for State Federal CAMA Permits from A. PERMIT: This office cannot comment on this project until after the close of the Section 401 Certification Public Comments Period. This office has no objection to the issuance of the permit(s) for the proposed project with the following conditions: That the activity be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction- related discharge (increases of 25 NTU's or less are not considered significant). That the instream turbidity not be increased by more than 50 NTU's as a result of the proposed activity after a reasonable opportunity for dilu- tion and mixture. That turbidity levels in shall not be increased by more than 10 NTU's as a result of the proposed activity after a reason- able opportunity for dilution and mixture. B. CERTIFICATION STATUS: C tifi _ er cation is not required for this project. Certification is required for this project.- Such action to process the certification has been initiated. Proposed Certification will be acted on or after , .,The proposed project is certified under General.Certification A) No. 1179 issued on January 25, D) No. 1431 issued on October 16, 1977, for sewer line construction 1980, for boat ramp construction. .B) No. 1272 issued on November 10, E) No. 1664 issued on September 8, 1978, for bulkhead construction. 1983, for Rip-Rap Placement. C) No. 1273 issued on November 10, F) No. 1665 issued on September 19, 1978, for discharges of liquid 1983, for incidental bridge effluent from diked upland disposal construction. areas. WA ER QUALITY SECTI N_ DIVISION OF ENVIRONMENTAL MANAGEMENT t ,I DIVISION OF ENVIRONMENTAL MANAGEMENT MEMORANDUM DATE : 1111,91 it TO: Bill Mills Operations Branch FROM: James H. Gregson s-V(Cp- Wilmington Regional Office THROUGH: Donald Safri Wilmington Re ional Office SUBJECT: Regional Office Review & Recommendations Application for Permit for Excavation and/or Fill 4,t? !. v PROJECT DESCRIPTION:. ?o1P? J' d yv G?- CzD?e? ADJACENT WATER BODY: C%- CLASSIFICATION: 5A- Status:c>P N The project has been reviewed to determine impacts to water quality. The appropriate comments below have been checked: () The project will/ ill not equire a 401 Water Quality Certification. ( ) The project complies with the General 401 Water Quality Certification # for (x) The proposed project should be done in such a way as to not cause the turbidity outside the immediate construction area to exceed NTU. This office has no objection to the project as proposed. JHG:mb cc: DCM-w• 6A'J;b 4-03/ CF, WiRO Y FAST TRACT DIVISION OF COASTAL MANAGEMENT Lat:34°42102" FIELD INVESTIGATION REPORT Long:76046121" 1. APPLICANT'S NAME Fred Laier 2. LOCATION OF PROJECT SITE Lot #10, Heather Street, Hoop Ho Creek, Atlantic Beach, Carteret County; SEE 1984 AERIAL PIE] #32-1174 (P-10) 3. INVESTIGATION TYPE: DREDGE & FILL CAMA X (ONLY) 4. INVESTIGATIVE PROCEDURE: (A) DATES OF SITE VISIT 10-24-88 (B) WAS APPLICANT PRESENT NO- 5. PROCESSING PROCEDURE: APPLICATION RECEIVED October 6, 1988 OFFICE Morehead City 6. SITE DESCRIPTION: (A) LOCAL LAND USE PLAN Town of Atlantic Beach Transitional/ LAND CLASSIFICATION FROM LUP Conservation DEVELOPMENT CONSTRAINTS IDENTIFIED IN LUP NONE (B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE WETLANDS PUBLIC TRUST TRUSTEWATERS X ESTUARINE WATERS X OTHER (C) WATER DEPENDENT: YES X NO (D) INTENDED USE: PUBLIC PRIVATE X COMMERCIAL (E) TYPE OF WASTE WATER TREATMENT: EXISTING se tic tank PLANNED SAME (F) TYPE OF STRUCTURES: EXISTING house and dock PLANNED dock extension (G) ESTIMATED ANNUAL RATE OF EROSION N/A SOURCE 7. HABITAT DESCRIPTION: AREA (A) VEGETATED WETLANDS DREDGED FILLED OTHER NONE (B) NON-VEGETATED WETLANDS: NONE (C) OTHER: estuarine pier extension - waters _ 200 sq.ft. (D) TOTAL AREA DISTURBED: 200 s q. ft. 8. PROJECT SUMMARY: Applicant proposes to extend an existing 40' dock b an additional 401. FIELD INVESTIGATION REPORT - FRED LAIER, CARTERET COUNTY PAGE #2 9. NARRATIVE DESCRIPTION: Applicant owns a .4 acre lot with an existing home at #10 Heather Street, on Hoop Hole Creek, in Atlantic Beach, Carteret County. Applicant has an existing 40' x 5' dock with a 'T' and is proposing to make a 5' x 40' addition to have 2' of water at MLW. Currently, MLW is approximately at the end of the dock, thus, the applicant desires to extend his pier. The waters of Hoop Hole,Creek are designated as 'SA' by the Division of Environmental Management and are open to shellfishing by the Division of Health Services. This project is a Major Permit Application because one of the neighbors is objecting to the project. 10. ANTICIPATED IMPACTS: As proposed, the project will cover a 200 sq. ft. area of estuarine waters. Also, as proposed, the pier will exceed the established pier line along the same shoreline. PREPARED BY: W. DAVID NOBLE DATE: NOVEMBER 2, 1988 Please type or print. Carefully describe all an- ticipated development activities, including construc- tion, excavation, filling, paving, land clearing, and stormwater control. If the requested information is not relevant to your project, write N/A (not ap- plicable): Items 1-4 and 8-9 must be completed for all projects. yr 1 ' APPLICANT a. Name Address _6L S4LL__ City ATC c - - State z ? 9d' _ Zip - £3 L JDay phone ? Landowner or Authorized agent b. Project name (if any) C. If the applicant is not the landowner, also give the owner's name and address. `2 I,OCAInON;flF. PROPOSE T ? PROJECT R } _? a. Street address or secondary road number c? '('g G' UT / O Eh'Ty?? Jr- ff P - b. City, town, community, or landmark e e--w eN c. County C, olt re-R L-7- d. Is proposed work within city limits or planning jurisdiction? Y --e,. q 7-e. j7c-// e. 14 a of body of water nearest project f{ou? 3 DESCRIPTION AND PLANNED V. USE OF PROPOSED PROJECT a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or pier). - 9 . e k t`,cTEh .? ??Sil tr n ---------- -- b. C. commercial use? nMt MfPd. Describe the planned use of the project If you plan to build a marina, also complete and attach Form DCM-MP-2. Is the proposed activity maintenance of an ex- isting project, new work, or both? "F. - Will the project be for community, private, or c. A r u? u91liR a. Size of entire tract 17,r - 23 0 S q .? b. Size of individual lot(s) c. Elevation of tract above mean sea level or Na- tional Geodetic Vertical Datum d. Soil type(s) and texture(s) of tract e. Vegetation on tract f. Man-made features now on tract /t io Z 'MCAC g. What is the CAMA Land Use Plan Classifica- tion of the site? (Consult the local land use plan.) Conservation X _ Transitional Developed Community Rural Other h. How is the tract zoned by local government? i. How are adjacent waters classified? x' s__ ?'KrK?' j. Has a professional archaeological survey been carried out for the tract? If so, by whom? S UPLAND DEVELDPMENT Complete this section if the project includes any upland development. a. Type and number of buildings, facilities, or structures proposed •f i b. Number of lots or parcels c. Density (Give the number of residential units and the units per acre.) d. Size of area to be graded or disturbed e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimen- tation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? f. Give the percentage of the tract within 75 feet of mean high water to be covered by im- permeable surfaces, such as pavement, buildings, or rooftops. g. List the materials, such as marl, paver stone, asphalt, or concrete, to be used for paved surfaces. h. If applicable, has a stormwater management plan been submitted to the Division of En- vironmental Management? i. Describe proposed sewage disposal and/or waste water treatment facilities. j. Have these facilities received state or local approval? k. Describe existing treatment facilities. 1. Describe location and type of discharges to waters of the state (for example;, surface runoff, sanitary wastewater, industrial/commercial effluent, or "wash down"). in. Water supply source n. If the project is oceanfront development, describe the steps that will be taken to main- tain established public beach accessways or pro- vide new access. o. If the project is on the oceanfront, what will be the elevation above mean sea level of the first habitable floor? ,EXCAVATION. AND FILL; I- NFQ MAON a. Describe below the purpose of proposed excava- tion or fill activities (excluding bulkheads, which are covered in Section 7). Length Width Depth Access channel (MLW) or (NWL) Boat basin Other (break- water, pier, boat ramp, rock jetty) Fill placed in wetland or below MHW Upland fill areas qQ. b. Amount of material to be excavated from below water level in cubic yards c. Type of material d. Does the area to be excavated include sh- land, swamps, or other - wetlands? 1-17; e. High ground excavation, in cubic yards f. Dimensions of spoil disposal area /-t /,q g. Location of spoil disposal area h. Do you claim title to the disposal area? k. 1. in n. o. P• q• If not, attach a letter granting permission from the owner. Will a disposal area be avaijable for future maintenance?/ M A/ If so, where? 46! Does the disposal area include any n. rshland, swamplland,lor water areas? Will the fill material a placed below mean high water? 9 Amount of fill in cubic yards A Type of fill material R 4-:? Source of fill material Will fill material be placed on marsh or other wetlands? " Dimensions of the wetland to be filled A/ 'v How will excavated or fill material be kept on site and erosion cor)trolled? r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic. dredge)? IF 09 .4. ,hy s. Will wetlands be crossed in transporting equip- ment to the project site?_6(_0 If yes, explain the steps that will be taken to lessen en- vironmental impacts. SHQREL A, . a. b. C. d. e. . f. Length of bulkhead or riprap Average distance waterward of mean high water or normal water level Shoreline erosion during preceding 12 months, in feet Type of bulkhead material Amount of fill, in cubic yards, to be placed below mean high water Type of fill maternal: , 2 - A list of previous state or federal permits issued c?D?fl for work on the project tract. Include permit numbers, permittee, and issuing dates. In addition to the completed application form, the following items must be submitted: 2s A copy of the deedlwith state application only) or A check for $Q@ made payable to the Depart- other instrument under which the applicant claim's ment of Natural Resources and Community title to the affected property. If the applicant is not Development to cover the costs of processing the claiming to be the owner of said property, then for- application. ward a copy of the deed or other instrument under which the owner claims title, plus written permis- A signed AEC hazard notice for projects in ocean- sion from the owner to carry out the project. front and inlet areas. An accurate work plat (including plan view and cross sections rawings) drawn to scale in black ink on 8 Y2 x 11 white paper. (Refer to Coastal Resources Commission Rul 7}.0203 for a detailed -Ift description.) 10r??StA' eGfS5V, j Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 16 high quality copies are provided by the applicant. (Contact the U.S. Army Corps of Engineers regard- ing that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency per- sonnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A statement on the use of public funds. If the project involves the expenditure of public funds, at- tach a statement documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). CERTIFICA TION AND PERMIS- v TNTER ON Any permit issued in response to this application will allow only the development described in the application. The project will be subject to condi- tions and restrictions contained in the permit. I certify that to the best of my knowledge, the pro- posed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. A list of the names and complete addresses of the I further certify that I am authorized to grant, and adjacent waterfront (riparian) landowners. These do in fact, grant permission to representatives of individuals have 30 days in which to submit com- state and federal review agencies to enter on the ments on the proposed project to the Division of aforementioned lands in connection with Coastal Management. The applicant must advise evaluating information related to this permit ap- the adjacent landowners of this opportunity by sen- poccation and follow-up monitoring of project. ding a copy of the permit application to them by registered or c •tified mail. This notification is re- This _ is the day of quired by G.S. 113-229 ). 19 44_ 0 Name Jv/&r ilrA&JC q /0 / C X4/2 tVN S }{ at, Address Z O L H Q y ec N C;- Landowner or Auth zed agent K1k47-0 Name Send the completed application materials to the Address Division of Coastal Management Office nearest you and the U.S. Army Corps of Engineers. See the Name map on the inside front cover for the appropriate Address DCM office and addresses and phone number. OCT 11 1980 Iv? CEi,7e ?. ec- ?. ?I 7 r ?. L rIN c I t oz_ t yfl-70-CIT-1-1-1908._ ii:a- •?.w•??oNllll