Loading...
HomeMy WebLinkAbout20081379 Ver 2_Triage Comments_20090519? ow.e, Triaged By: Reviewer 1 Reviewer 2 Reviewer 3 Use this form instead of writing inside the folder Triage Comment Sheet L Date: 4/2') kfl, I Date: Date: ? Issue with conditions (Reviewer 2) ? More Information (Reviewer 1) ? More Information (Reviewer 2) ? Return Application (Reviewer 1) ? Return Application (Reviewer 2) ? Send to Regions (Reviewer 1) ? Send to Regions (Reviewer 2) SATriage FormsUriage Issue Sheet.doc PLEASE PRINT CLEARLY Issue Project (Reviewer 1) ? Issue Project (Reviewer 2) 08-1379v2 Grace Haven Baptist Church AML comments May 19, 2009 Please provide the Required Items Checklist for each of the proposed BMPs, plus all required items that were omitted in the previous submittal, including: a. The delineated drainage basins, b. A construction sequence that shows how the BMPs will be protected from sediment until construction of the project is complete, c. Signed and notarized Operation and Maintenance Agreements, and d. A soils report that is based on actual field investigation and soil borings. 2. Please address the following issues associated with the planting plans: a. The DWQ recommends that greatly reduce the use of trees in the stormwater wetlands and the bioretention area; these will shade the shrubs and herbaceous species as they mature. b. DWQ does not recommend the use of Alnus serulata (hazel alder) in stormwater wetlands because it is a nitrogen fixer and also because of its tendency to out-compete other plants. c. Please provide the list of "approved equals" that might be used in place of the plants specified in the planting plan. d. Please provide a list of source nurseries for the proposed plants.