Loading...
HomeMy WebLinkAbout20140957 Ver 2_Letter to FERC_20170911701 East Cary Street Richmond, VA 23219 The Honorable Neil [hattejee The Honorable Cheryl A.LaF|eur The Honorable Robert F.Puvxe|son Federal Energy Regulatory Commission 888 First Street, 0E Washington, DC 20402 Dear Chairman Chatterjee, Commissioner LaFleur and Commissioner Powelson: As partners responsible for executing and delivering expanded supplies of natural gas through the proposed 600 -mile Atlantic Coast Pipeline (ACP), we respectfully request that the Federal Energy Regulatory Commission (FERC) issue an order granting the Certificate for the projectattheear|iest possible time, consistent with the rules and regulations ofthe Commission. The Commission Staff issued the Final Environmental Impact Statement (EIS) for the project July 21, 2017. |nthe EIS, FERC staff concluded that the majority ofimpacts would bereduced to!ess-than' significantieve|swiththeinnp|ementationofACP'sproposednnitigationandtheaddiduna|mneasureo recommended inthe EIS. VVeare pleased bvthe favorable findings inthe EIS and have every confidence that the Staff recommended conditions can be incorporated into our construction framework. Further, activities by other federal agencies including the US Forest Service, US Fish and Wildlife Service, Army Corps of Engineers and the National Park Service for permits and related authorizations remain on schedule. Similarly, State actions for section 401 Water Quality Certifications and other state requirements are proceeding and align with our anticipated construction schedule to begin tree clearing inNovember 2O17. ACP will deliver 1.5 MMDt/day and has commitments for 93 percent of the pipeline capodty. Of this amount, 68 percent of the supplies will serve the electric generation needs in North Carolina and Virginia, thereby improving regional air quality. |naddition, 24percent ofACPs capacity will provide expanded supplies of natural gas for local gas utilities to meet the critical needs of residential, commercial and industrial customers ingas constrained areas. Virginia Natural Gas, agas distribution subsidiary of Southern Company Gas serving nearly 300,000 customers in Eastern Virginia, best exemplifies the urgency with this statement onthe FERC docket: "There is not currently enough interstate pipeline capacity to serve any substantial economic development east of Richmond, Virginia, and often throughout the heating season, large transportation customers are adversely impacted by having their natural gas use restricted by operational flow orders issued from existing interstate pipelines." (VNG, April, 2015) Piedmont Natural Gas of North Carolina has documented similar critical needs: "Increasing demand for natural gas inPiedmont's rapidly growing Carolinas market is the The Honorable Neil Chatterjee The Honorable Cheryl A. LaFleur The Honorable Robert F. Powelson Page Two customers. Not only will ACP deliver the needed additional supplies to support customer growth, but it also will provide operational pressure critical to Piedmont's physical infrastructures at strategic locations on its pipeline system. The significant natural gas pipeline also will create much needed economic development opportunities through a portion of North Carolina that historically has been economically challenged." The established record about the project confirms that natural gas delivered by ACP will enhance energy security and fuel diversity for the region. The associated economic benefits are well documented as the project will bring over 17,000 new jobs in the construction industry, $377 million in annual energy cost savings for customers and $28 million in new, annual tax revenues for local governments along the pipeline route. These are only a few of the project's benefits. Since ACP formally filed with FERC in September, 2015 for permission to build the project, it has gained an expansive record of support from state and local governments, skilled craft labor organizations and leading business groups. We recognize the Commission has a number of cases pending consideration with the restoration of quorum. The Commission's timely issuance of the order for the ACP project, however, is essential to meeting our contract obligations, ensuring customers realize the energy savings, providing manufacturing access to needed supplies of natural gas, and offering enhanced energy security and reliability to the region. For these reasons, we respectfully request that the Commission issue an order approving the ACP certificate in September, so that the initial construction activities and tree clearing can begin in November and conclude in early 2018 as described in the Final EIS. Thank you for your attention to and consideration of this request. Respectfully, Diane Leopold President & CEO Gas Infrastructure Group Dominion Energy *04-6- lrll�l Andrew W. Evans President & CEO Southern Company Gas Cc: Ms. Kimberly Bose, Secretary Franklin H. Yoho Executive Vice President & President Natural Gas Duke Energy