HomeMy WebLinkAbout20081760 Ver 1_DCM Permit_20090219.a.......:..,>,-M-. r'....,.?.Y: J.: :. ', ?.,.,b. Y.....:...Y:.Y .r '. a.?.ti-.`?;O.Y;.r.r: }...... c..r.?_' ._4. ...'» ri :??}*YY, ^. :. _ .. ? i.. , .. .. ... , _
Permit Class Permit Number
NEW
'
17-09
STATE OF NORTH CAROLINA ??????
Department of Environment and Natural Resources D
and
Coastal Resources Commission FEB 1 9 2009
ikrmft WETLANDS AND STORMWATER BRANCH
for
X Major Development in an Area of Environmental Concern O S 11 (0 0
pursuant to NCGS I I3A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Christonher Lutterloah Sr., 100 Circle Drive, Hampstead, NC 28443
Authorizing development in Pender County at Battery Lane Canal adj. Lot 11 Hughes
Road, Hampstead, NC 28443 as requested in the permittee's application dated 9/30/08, including the att'd
workplan drawings (7) Fig_1,2,3,4,& 6 dated 10/17/08 and revised fig; 1 & revised fig. 5 dated 11/12/08
This permit, issued on Fehruary 17, 2009 is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subiect to fines, imprisonment or civil action; or may cause the permit to be null and void.
Excavation
1) In order to protect juvenile finfish resources, no excavation shall be permitted between April 1 and
September 30 of any year without prior approval of the North Carolina Division of Coastal
Management and the U.S. Army Corps of Engineers.
2) No excavation shall take place outside the area indicated on the attached workplan drawings.
3) Excavation shall not exceed -4 feet below the normal low water level. In no case shall the depth of
excavation exceed the depth of the connecting waters.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2012
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Progrem.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
James . regson, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Christopher Lutterloah Sr. Permit #17-09
Page 2 bf 3
ADDITIONAL CONDITIONS
4) A turbidity curtain shall be placed between the area to be excavated and the existing waters of the canal, z
and a 24 hour period after completion of excavation shall elapse prior to removal of the curtain to
prevent unnecessary siltation into the adjacent water body.
5) No vegetated wetlands shall be excavated outside the area indicated on the attached workplan drawings.
6) The temporary placement of double handling of excavated materials within waters or vegetated wetlands
is not authorized.
Spoil Disposal
7) All excavated materials shall be confined above normal high water and landward of regularly or
irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spillover of
solids into any marsh or surrounding waters.
8) No spoil material shall be placed within 30 feet of the normal high water line.
9) The spoil area shall be inspected and approved by the Division of Coastal Management prior to the
beginning of any dredge activities.
Sedimentation and Erosion Control
10) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
11) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence,
diversion swales or berms, etc.).
12) A ground cover sufficient to restrain erosion shall be provided within the shorter of 15 working or 30
calendar days of completion of any phase of grading on cut or filled slopes.
General
13) The permittee understands and agrees that, if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon
due notice from the Corps of Engineers, to remove, relocate or alter the work or obstructions caused
thereby, without expense to the United States or the state of North Carolina. No claim shall be made
against the United States or the state of North Carolina on account of any such removal or alteration.
14) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
PN '.rN4 ... ^.Yrt ..-. .w^±. ,.'Xt?e.. r?w`,.X.i.-ii x ... .a"...?.. X._Y;w: ?..?n'>.. l.n. .a n. n :.:..4-'- ... ..-.??"ow „. ..v-. .. ...r> .. . -M?'ap A. . r. .a.. , Y,+?i^Y?a. ?.. f.•}.'w?.tn ,w .+ i _ .
Christopher Lutterloah Sr. Permit 417-09
rs
Page 3 of 3 }
h
t
ADDITIONAL CONDITIONS
{
?f
MOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, f
approvals or authorizations that may be required.
NOTE: The N.C. Division of Water Quality has authorized the proposed project under DWQ Project No. r
08-1760.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No.
SAW-2009-00058-071 which was issued on 1/7/09.
L,f fitr l o 4
Prgpvty
Lurre,N'? MN?
?De
--. ---- --------- -•...........
ProPos?
fip rOJe6 r?ePth Propose
(?1'I1 Greek Proposed M H W
e, MLW
Pr mpose? A reA
Rein sect
5, IyP;l-Al GrosS Sect,'OIJ of Propose 6OA'r 9AsIInJ
Sf? AOe.
I''_a?' 1?AMpsteAd? Pe?der Gn,,,??'y ? t\1 G
II-1a-0?
®?Pw?Ny Qy: ?0},j EvbANkS
Rd
J 71 ?-6 MASo.)borv 30v j
w; I -%? RPM 1 N ` ag yog
NOVI
???? f{ep ? ?ulk'?+?" ' ? c NJykw4y?.lo Q
n?
'Put Hampgead
us
I?t?bu,Jfe?° "? .
17 Nj5 6a ?? kiFfia?1AY
Propoa
r•pepth Apt Circle Or
Project'
t :10
F;g. tr?o? S rl,
T PiaRl Crosx Ssat?or? Of &o?ai SA£i.•t F+g l- stAie Isle pp A'
P 1,5 3 PeA. r Covoty Proredty'"Ax MAp Pra cs4 ? oA r, s + N
DA$ed : Decem6er? A16,0 Q WAM step. Peodcr Gov,rt N c
',nrAueiMs` ?, 6 M? ?i?oksi souii.) k? 10-1?•`p? '
5? e 1 = 130 ?y 1M e?roN,N ,6s:k
P.T Pa p? pr L11 '
?K pQ• >6°?_..?O3'E 5639E 80.8' go,l• 79q 5
i? 5? ? E 'S6 ?-4.3'E. 567?49'E 5??? 4 E .
?aa!'.E _410 0 . ' w 1g
/ 59 14 w 1? !g" fGs ?mP 1 °va 16 ow
T b W
`u ?N Im Z f mV ?m5 g0
-.Z - Z_ oo W
14-7,1V
b. z -
Imp ?? S ? p tit\?
4 Z
55.1_ 0
IDG•4'_ 47:0'
qb:3? iao•?' _
•? 575"47 E Nin ??-- ? _ 0 '
? to
141-7
? ? PO e?°9F ?•
\ 2 AiN / ? N •
>S / N N
PAje I b•F Y
ODl1'rU!LNIINGTQN, NC
La tr
PAJeaoFY
HI=GEIVED
OCINA WILMINGTON, NC
I (^ r. "t 008
N
E ep ,(y?y?? ? //(jy
L 1 O S9 V( I
S??Ng
a
B
k?
VI
N?
A
•"
Lu?tefloAk `' Doc K
MArsb
9 As
s
%
I ?. deep ..
°
• .
1'pl Fed
ao ??zoog
MNW MLW
Proposed ?.
rep,
Rcv?sed
F; 5
Proposed SoAt BA510
w
L
S?AIe 1'': y0'
oC?W;Ny gr
f
.:
?b?rl EVIoA.NkS
bcvn Sou?? Ra
? r
`A3oN
7126 /
?, la-
w I Sgol
Vii` 1?i''il
pAl a q.f
CM WILMINGTON, NC