Loading...
HomeMy WebLinkAbout20030065 Ver 2_Mitigation Monitoring Report_20171212Soil & Environmental Consultants, PA 8412 Falls of Neuse Road, Suite 104, Raleigh, NC 27615 • Phone: (919) 846-5900 • Fax: (919) 846-9467 sandec.com December 15, 2017 S&EC Project No. 7325.D5 NCDENR — DWR 401 & Buffer Permitting Unit Attn: Ms. Katie Merritt 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Reference: Year Three Monitoring Report Rosewood Industrial Park (Hwy 70 & 581 Buffer Restoration Site) NCDWR Project No. 2003-0065 v2 Wayne County, NC Attached please find the Year Three Monitoring Report for the above referenced site. Based on the success of planted tree species and the overall stability of the buffer area, it is our opinion that the site restoration efforts are successful to this point. Observations made during the annual monitoring visit indicate that the Rosewood Industrial Park Buffer Restoration efforts are in compliance with the conditions 401 WQC and Major Variance Approval. We thank you for your assistance to date and look forward to the continued success of this project. Please let us know if you have any comments or questions at your earliest opportunity. Sincerely, SOIL & ENVIRONMENTAL CONSULTANTS, PA Justin Smith Environmental Scientist Attachments: Year Three Monitoring Report dated December 2017 Cc: Mr. David Weil, HWB, Inc. Year Three Monitoring Report for the Rosewood Industrial Park Buffer Restoration Site Wayne County, North Carolina NCDWR Project No. 2003-0065 v2 S&EC Project No. 7325.D5 Prepared for: HWB, Inc. December 2017 Environmental Consultants, 8412 Falls of Neuse Road, Suite 104, Raleigh, NC 27615 • Phone; (919) 846-5900 • Fax: (919) 846-9467 sandec.com Table of Contents 1.0 INTRODUCTION.........................................................................................................1 1.1 Introduction...........................................................................................................1 1.2 Project History......................................................................................................1 2.0 SITE MONITORING METHODS................................................................................2 2.1 Monitoring Overview...........................................................................................2 2.2 Monitoring Components.......................................................................................2 2.2.1 Vegetation Monitoring Plots.........................................................................2 2.2.2 Buffer Photo Points.......................................................................................2 3.0 SITE MONITORING RESULTS..................................................................................3 3.1 Vegetative Monitoring & Site Stability................................................................3 3.2 Monitoring Success - Year Three (2017).............................................................3 Table 1 — Buffer Vegetation Counts....................................................................................3 Appendix A — Site Maps Figure 1 —Vicinity Map Figure 2 Monitoring Layout Appendix B Vegetation Monitoring Photos n 1.0 INTRODUCTION 1.1 Introduction This monitoring report has been prepared by Soil & Environmental Consultants, PA (S&EC) to present and evaluate site monitoring data for the Rosewood Industrial Park Buffer Restoration Site for year three of the five year monitoring period. The site is located approximately 1,500 feet south of the intersection of NC Highway 70 and NC Highway 581 in Wayne County, NC. See Figure 1. The site drains generally northeast to the Little River in the Neuse River Basin (03-04-06) (WS -IV, NSW). As noted above, the approved Buffer Restoration Plan calls for the site to be monitored for a total of five (5) consecutive years, with monitoring and reporting conducted on an annual basis. This monitoring report provides data collected during Year Three of the required five year monitoring period. 1.2 Project History As required by the February 2008 401 WQC and Major Variance Approval (DWQ Project No. 03- 0065), S&EC prepared the Highway 70 & 581 Buffer Restoration Plan in January 2013. This plan was subsequently approved by the NCDENR Division of Water Resources (DWR) on March 12, 2013. Planting bed preparation and buffer planting activities were performed by North State Environmental, Inc. of Winston-Salem, NC between April 13 and 17, 2015. During this period, S&EC provided periodic construction observation, interpretation of construction documents and necessary contractor guidance including select field adjustments based on conditions encountered during construction. In May of 2015, S&EC submitted a modification request for the WQC, the Major Variance, and corresponding Buffer Restoration Plan to allow for minor modifications to the recorded buffer area boundaries. DWR approved the modification request on August 17, 2015. In October of 2015 the required Deed Restriction and Plat Map were recorded with the Wayne County, NC Register of Deeds. These documents, along with a legal description of the buffer restoration areas were prepared by McDavid Associates, Inc. of Farmville, NC. Copies of all these documents were provided to DWR. The year two monitoring report was similarly prepared by S&EC and submitted to DWR via email on November 17, 2016. 2.0 SITE MONITORING 2.1 Monitoring Overview As described in the Buffer Restoration Plan, monitoring frequency will be annually for the required five (5) year duration or until DWR has determined success of the site. The annual monitoring report will be submitted to DWR by December 31St of each monitoring year. Annual reports are to include quantitative and qualitative monitoring results, a map showing the location of vegetation sample points and photo points, and a map showing any problem areas. Reports will also include recommendations for supplemental stabilization and planting as appropriate. The overall site survival rate and number of surviving planted stems per acre will be calculated by averaging the survival rate of all of the sample points. The site will be deemed successful if the average survival rate of planted stems within the sample points is equal to or greater than the required 320 stems per acre at the end of the five year monitoring period and success is confirmed by DWR. For further detail regarding site monitoring the interested reader is referred to the approved buffer restoration plan. The annual monitoring site visit for Year Three was performed by S&EC on September 21, 2017. Monitoring consisted of traversing the length of the buffer restoration area for the purpose of observing and photo documenting the condition of the buffer and overall vegetative success. General site conditions were also observed during this site visit. 2.2 Monitoring Components Monitoring Components including vegetation monitoring "sample points" and photo points were established at various locations as shown on the attached Site Monitoring Layout. 2.2.1 Vegetation Monitoring Plots A total of eight (8) vegetation sample points are located across the site within the restored buffer areas. See Figure 2. Each sample point consists of a driven steel rebar and wooden stake locating the central point within the count area and 10 stems within the general vicinity of the stake. Sample points are sequentially numbered. Each specimen identified as a planted specimen was flagged and staked, and sequentially numbered so it can be counted during subsequent site monitoring visits. Each sample point encompasses an area of approximately 640 square feet (SF) (10 trees planted on 8 -foot centers or 64 SF/tree). The total area included within all 8 sample points will be 5,120 sf, or approximately 5% of the total 2.45 -acre (106,722 SF) buffer restoration area. This exceeds the DWR requirement that 2% of the restoration area is sampled. 2.2.2 Buffer Photo Points Eight (8) buffer photo points are located across the site to document the general condition of the site, including the staked vegetation plots, at the time of our site visit. 2 3.0 SITE MONITORING RESULTS This section details the observations made during the Year Three monitoring visit with regard to vegetative monitoring and an evaluation of overall site restoration success. 3.1 Vegetative Monitoring & Site Stability Planted woody stems were counted at the eight (8) buffer vegetation sample points. Planted woody stem counts by species and by sample point are presented in the following table: Woody Stems, Year Yearly Three (2017) Sample Points Totals 1 2 3 4 5 6 7 8 River Birch (Betula nigra) 8 1 7 2 6 4 2 4 34 Green Ash (Fraxinus pennsylvanica) -- 4 1 4 -- -- -- 1 10 Tulip Poplar (Liriodendron tulipifera) -- 0 -- -- 1 1 -- 1 3 American Sycamore (Platanus occidentalis) 2* 2 2 2 3 4 8 2 25 As -built/ Year One Totals 10 10 10 10 10 10 10 10 80 Year Three Totals 10 7 t0 8 10 9 10 8 72 Plot Survival Rate 100% 70% 100%80% 100% 90% 100% 80% 90.0% Plot Live Stem Density (stems/acre) 680 476 680 544 680 612 680 680 Site Average Live Stem 1 Density 629 stems per acre is average of all sample points * One American Sycamore identified as dead during the Year Two monitoring was determined to be live during the Year Three vegetation count. The average number of surviving planted woody stems per sample point is 9 stems. A review of the sample plots reveals a current (2017 — Year Three) site cumulative live stem density of approximately 629 stems per acre. Four (4) planted woody species are represented. No areas of instability within the restored buffer areas were observed during our site visit. Please refer to Appendix B for comparative photographs of each vegetation monitoring plot. 3.2 Monitoring Success — Year Three (2017) Based on the success of planted tree species and the observed stability of the buffer area, it is our opinion that the site restoration efforts are successful to this point. Observations made during the annual monitoring visit indicate that the Rosewood Industrial Park Buffer Restoration efforts are in compliance with the conditions 401 WQC and Major Variance Approval. APPENDIX A - SITE MAPS Ve � . � � 2 z� / \ � � j K IV`` � � `�\� � ` � �\ - ) ..._�� \ � , ' - ° z� � } : �� d w J 41L , o j z. ./ � �� -� - � � / f - 4 f R dL i r 4 P 'z� + or ir + J Site lk dkr �� , �� � 4 � \�� � �/ 74 12 ? L AP r2255 dL / ƒ r !/ / \ . ass Ir ir 4, Project Number:N 7325DS Map Title: 0 1,000 2,000 . Project Manager: Figure 1- USGS Map I I I I I I I I I PKS Rosewood Industrial Feet Scale: 1 1000' Source: Wayne County, NC 11 & Environmental Consultants, PA Date: 94 L I F.LN .1 %— R -d. �.i� I" RdLmo. NC ZXI 5 �9 19) �-5� - F..: (919) 12/22/15 Wayne County GIS = Oki -'k— IV O cn o rn < 11 I oil O 3 1111, 11111 v —, , I 111 I o 1 „ 6 , N I'll It2 I1 1 1 1 I I 1 1 ` i> ` 1 I 21 s N I PROPERTY LINE I'll I , L I'll 1 I Cb N G(0 I 1 I I 1 Cb O I I 1 I I I 1 I I I I I 1 I 1 I 1 I _ " 4 1 / ESTOKATION AREA 1 , % 11 1 , , 1 1 I EXISTING PON 1 111 1 I -----�ITCI1 I 1 I I 1 I 1 , 1 1 Notes: 1 I / I .) Re5toration area boundrie5 provided by �J 11'11' McDavid A550ciate5, INC. of Farmville, Q/ ; NC. 11 2.) Location of sample points and photo - - - - - - - point5 are approximate. / I 1 1 1 , I 8 1 / 1 / 1 / 1 --------------------------------------------------------------------JI - - - - - - - ;---------------- -------------------------------------,, -------------------------------------------- 11111 ITCh "� 11/ Project: Project No.: ROSEWOOD INDUSTRIAL 5 PMr.: rq. j.Wg- ' PKS , soil & Environmental Consultants, PA Location: WAYN E CO., NC Client: 5cale: a= P.05EWOOD INDUSTRIAL PARK I 100' 8412 Falls of Neuse Rd., Suite 104 Raleigh, North Carolina 27615 heet Title: Sheet No.: Phone: (919) 846-5900 • Fax: (919) 846-9467 SITE MONITORING LAYOUT FIGURE w .SandEC.cotn 2 APPENDIX B - VEGETATION MONITORING PHOTOS Rosewood Industrial, Hwy 70 & 581 Buffer Restoration Site December 2017 Soil & Environmental Consultants, PA S&EC project No. 7325.D5 Sample Point 1 — September 21, 2017 Sample Point 2 — September 21, 2017 Rosewood Industrial, Hwy 70 & 581 Buffer Restoration Site December 2017 Soil & Environmental Consultants, PA S&EC project No. 7325.D5 Sample Point 3 — September 21, 2017 Sample Point 4 — September 21, 2017 Rosewood Industrial, Hwy 70 & 581 Buffer Restoration Site December 2017 Soil & Environmental Consultants, PA S&EC project No. 7325.D5 Sample Point 5 — September 21, 2017 Sample Point 6 — September 21, 2017