Loading...
HomeMy WebLinkAbout20041178 Ver 1_Staff Comments_20090107The Ramble - Buncombe Co. (#04-1178) Subject: The Ramble - Buncombe Co. (#04-1178) From: Eric Kulz <eric.kulz@ncmail.net> Date: Wed, 07 Jan 2009 10:30:03 -0500 To: Kevin Barnett <Kevin.Barnett@ncmail.net>, Linda Wiggs <Linda.Wiggs@ncmail.net> CC: Roger Edwards <Roger.Edwards@ncmail.net>, Cyndi Karoly <Cyndi.Karoly@NCMail.Net> Kevin/Linda: Just following up on my phone conversation with Linda last month regarding the mitigation progress at The Ramble. As you recall, Biltmore Farms was issued a permit for 266 LF of stream impacts. Our 401 required at least 212 LF of restoration (rest is preservation). The proposed stream restoration entailed removing existing crossings (culverts) and restoring the bed, banks and riparian zone. The original plan called for restoration of 7 crossings. Per the As-Built report dated 12/18/07, crossings 11, 12, 16 and 17 were completed, and crossings 13, 14 and 15 had not been completed, but were to be completed in 2008. The Yr 1 Monitoring report dated 10/22/08 states that crossings 13, 14 and 15 were still not done, as "performing additional mitigation work at this time is not logistically feasible". They have currently completed 142 LF of the required 212 LF. We need to get someone out there to see how much of the impacts have been done. If the impacts exceed the mitigation, I feel we should issue a NOV. Please let me know how we should proceed. Eric Eric W. Kulz Environmental Specialist 401 Oversight and Express Permitting Unit 2321 Crabtree Blvd., Suite 250 Raleigh, NC 27604 Phone: (919) 715-9050 Fax: (919) 733-6893 1 of 1 1/7/2009 10:30 AM