November 4, 2008
DWQ Project # 08-1461
New Hanover County
CERTIFIED MAIL: RETURN RECEIPT REOUESTED
Cert. # 7008-1140-0002-9563-1793
Coffer Investment Properties II, LLC
Mr. Matt Murphy
1202 North Lake Park Boulevard, Suite A
Carolina Beach NC 28428
Subject Property: Coral Ridge
REQUEST FOR MORE INFORMATION
Dear Mr. Murphy:
On September 24, 2008, the Division of Water Quality (DWQ) received your Pre-Construction Notification (PCN)
application to impact approximately 0.405 acres of 404 Wetlands for construction of a residential subdivision. The
DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed
below. The DWQ will require additional information in order to process your application to impact protected
wetlands and/or streams on the subject property. Therefore, unless we receive the additional information requested
below, we will have to move toward denial of your application as required by 15A NCAC 2H.0506 and will place
this project on hold as incomplete until we receive this additional information. Please provide the following
information so that we may continue to review your project.
Additional Information Requested:
1. The applicant for this project is Mr. Matt Murphy for Coffer Investment Properties Il, LLC. On the
Secretary of State's website, Mr. Murphy is not identified as a member or agent. Please send the Secretary
of State information that lists Mr. Murphy as a new member or re-do the application with an existing
member/agent as applicant.
2. Please locate any planned sewer lines on the site plan.
3. Please provide cross sectional drawings of the proposed impact areas.
4. You are proposing two stub roads on the site plan drawings that directly impact wetlands. The DWQ
cannot permit such "roads to nowhere". Your Pre-Construction Notification application indicates, "No
future permit requests are anticipated, this application reflects all necessary impacts for the successful
completion of this project" under Item V. Please remove or change this stub road to a terminal feature such
as a cul-de-sac or provide details on the future development to which `Street A' is pointed.
5. Based on the submitted plan drawings, and from review of the State Stormwater Permit SW8080818, it
appears that hydrology will be removed from some of the wetlands. Explain how the hydrology will be
maintained to the wetlands specifically those adjacent to Pond A, Pond 2A, and Pond 2B.
6. Based on the "Request For Additional Information" letter from the U.S. Army Corps of Engineers dated
October 16, 2008, it does not appear that all impacts were disclosed. Please indicate all wetland and stream
impacts including all fill slopes, dissipaters, and bank stabilization on the site plan.
N latCarolina
North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215 Customer Service1-877.623-67 QtllCU11a
Wilmington Regional Office Wilmington, NC 28405-3845 FAX (910) 350-2004 Internet: h2o.enr.state.nc.us
An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper
2
BPG Properties
Brunswick County
2008-1407
7. General Certification 3705 (GC3705) requires that deed notifications or similar mechanisms be placed on
all retained jurisdictional wetlands and waters. Please provide a Draft Copy that includes the proposed
preservation language that will be recorded to accomplish this.
8. Several areas of possible non-compliance with the NCGO 10000 permit were noted during the site visit of
October 28, 2008. Please provide a written narrative explaining how you intend to comply with this Permit
and who will be delegated to inspect the site and maintain required rain gauge and monitoring reports.
9. Based on the "Request For Additional Information" letter from the U.S. Army Corps of Engineers dated
October 16, 2008, the accuracy of the wetland delineation map provided with the application appears to be
inaccurate with regards to the tributary located along the west side of the main road. Please provide a
wetland delineation map signed and approved by the U.S. Army Carps of Engineers.
10. Based upon review of the Pre-Construction Notification application as submitted, a revision or
modification of the existing State Stormwater Permit SW8080818 may be necessary. Please contact
Malcolm Boney with State Stormwater at 910-796-7215 to discuss possible revisions.
Please respond in writing within 30 calendar days of the date of this letter by sending a copy of this information to
me and to Ian McMillan, 401 Wetlands Unit, 2321 Crabtree Blvd, Raleigh, NC 27604-2260. If you will not be able
to provide the requested information within that timeframe, please provide written confirmation that you intend to
provide the requested information, and include a specific timetable delineating when the requested materials will be
provided. If we do not hear from you in 30 calendar days, we will assume that you no longer want to pursue this
project and we will consider the project as returned.
This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected
buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the
DWQ. Please call me at 910-796-7215 or Ian McMillan at 919-733-1786 if you have any questions regarding or
would like to set up a meeting to discuss this matter.
Sincerely,
Chad Coburn
Senior Environmental Specialist
cc: Mikaela Anderson - The Clark Group, P.O. Box 101136, Wilmington, NC 28404
Gary Mitchell - The Clark Group, P.O. Box 101136, Wilmington, NC 28404
Kim Garvey - USACE Wilmington Field Office
Ian McMillan - DWQ 401 Oversight and Express Unit
Malcolm Boney - DWQ Wilmington
W iRO