Loading...
HomeMy WebLinkAbout20081370 Ver 1_Certified Return Receipt_20080926 (2)Michael F Easley, Governor William G Ross Jr, Secretary North Carolina Department of Environment and Natural Resources Coleen H Sullins Director Division of Water Quality October 17, 2008 CERTIFIED MAIL - RETURN RECEIPT REQUESTED 7008 1300 0001 0434 8386 Mr Clay Willis Environmental Officer NC DOT, Division One 113 Airport Drive Suite 100 Edenton, NC 27932 Subject Request for additional information Proposed improvements to the barge loading and docking facility on the Little Alligator River in Tyrrell County DWQ project number 20081370 Dear Mr Willis The Division of Water Quality has reviewed your response, dated received October 6, 2008, to our hold letter requesting additional information for the aforementioned project After review of you response, the Division feels that impacts to coastal wetlands and PNA waters could be further avoided and minimized by relocating the proposed loading dock to the east side of the gravel lot where the current dock is located The 130' access pier and barge moormg slips could stay in the proposed location and barges could be moved the short distance to the loading dock when loading is necessary Water depth on the east side is adequate without dredging and impacts to coastal marsh would be minimal The total impacts to jurisdictional resources would therefore be greatly reduced The Division realizes that this would affect access to the current boat launching site, but feels this is justified given the concerns from the resource agencies that the current proposal "will result in significant adverse impacts to fisheries, resources and the associated habitat " Please explain why this would or would not be a feasible alternative Also, feel free to include in your response any other alternatives that would minimize impacts to jurisdictional resources Therefore, pursuant to 15A NCAC 2H 0507(a)(5), we will have to place the permit application on hold until we are supplied the necessary information You have 21 business days to respond in writing with the requested information or notification to this office that the information is forthcoming If, at the end of the 21 days, this office has not received this information in writing, we will assume you are withdrawing your application and it will be returned Furthermore, until the information is received by the NC Division of Water Quality, we request (by copy of this letter) that the US Army Corps of Engineers place the permit application on hold If you have any questions or require additional information, please contact Garcy Ward at (252) 948-3922 Sincerely, 11J,4 ,%C-, ,, ) Garcy Ward cc Mr Bill Biddlecome, US Army Corps of Engineers, Washington Field Office Mr Doug Huggett, Division of Coastal Management, Morehead City Mr Jim Hoadley, Division of Coastal Management, Elizabeth City Cathy Brittingham, Division of Coastal Management, Raleigh ?Sonia Gregory, DWQ, 401/Wetlands Unit File Copy Noe Carohna N C Division of Water Quality 943 Washington Square Mall Washington, N C 27889 Telephone (252) 946-6481 NturQli!t, FAX (252) 946-9215 Internet www ncwaterquality org An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Michael F Easley, Governor William G Ross Jr, Secretary North Carolina Department of Environment and Natural Resources Coleen H Sullins Director Division of Water Quaht) September 26, 2008 CERTIFIED MAIL - RETURN RECEIPT REQUESTED 7008 1300 0001 0434 8430 Mr Clay Willis Environmental Officer NC DOT, Division One 113 Airport Drive Suite 100 Edenton, NC 27932 Subject Proposed unprovements to the barge loading and docking facility on the Little Alligator River in Tyrrell County DWQ project number 20081370 Dear Mr Willis The Division of Water Quality has reviewed your submittal for a 401 Water Quality Certification for the aforementioned project Review of your application revealed it lacking necessary information required for making an informed permit decision The permit application was deficient in the following areas • Avoidance and minimization of jurisdictional areas. Please explain what efforts were made to avoid or minimize impacts to the coastal marsh and open water Also, please address the following (1) why the proposed fill of junsdictional areas can not be avoided by extending the loading dock further landward, or (2) why the proposed amount of filled area can not be reduced by reconfiguring the bulkhead and confining the filled area immediately behind the loading dock Therefore, pursuant to 15A NCAC 2H 0507(a)(5), we will have to place the permit application on hold until we are supplied the necessary information You have 21 business days to respond in writing with the requested information or notification to this office that the information is forthcoming If, at the end of the 21 days, this office has not received this information in writing, we will assume you are withdrawing your application and it will be returned Furthermore, until the information is received by the NC Division of Water Quality, we request (by copy of this letter) that the US Army Corps of Engineers place the permit application on hold If you have any questions or require additional information, please contact Garcy Ward at (252) 948-3922 Sincerely, Garcy Ward cc Mr Bill Biddlecome, US Army Corps of Engineers, Washington Field Office Mr Jim Hoadley, Division of Coastal Management, Elizabeth City Cathy Brittmgham, Division of Coastal Management, Raleigh Sonia Gregory, DWQ, 401/Wetlands Unit File Copy Nye Caro1?na N C Division of Water Quality 943 Washington Square Mall Washington, N C 27889 Telephone (252) 946-6481?IlCllll[/ FAX (252) 946-9215 Internet www ncwaterquality org An Equal Opportunely/Affirmative Action Employer- 50% Recycled/10°/6 Post Consumer Paper