STATE OF NORTH CAROLINA I
DEPARTMENT OF TRANSPORTATION
MICHAEL F EASLEY
GOVERNOR
August 1, 2008
LYNDO TYPPETT
SECAL ARY
U S Army Corps of Engineers -
Regulatory Field Office
Post Office Box 1000
Washington, NC 27889-1000
Attn Mr William Wescott 6200,6
NCDOT Coordinator 08
TOR Q4q41
Dear Su R*
H
Subs ect Application revision for the Section 404 Individual Permit and Section 401 Water
Quality Certification for construction of the SR 1923 Extension (Booker Daisy Road)
from US 70 Business to US 301 in Johnston County Federal Aid Project No STP-
1923(2) State Protect No 8 2312101 TIP No U-3334
References Application for Individual Section 404 and 401 permits and Neuse Riparian Buffer
Authorization, dated July 10, 2008
The purpose of this letter is to request a revision to the Section 404 and 401 permit application submitted
for U-3334 The project, located north of Smuthfield in Johnston County, is referred to as the Booker
Daisy Rd extension and is approximately 4 1 mules in length The project has been divided into two
sections, Section A and Section B The previously submitted permit application requested authorization
for the construction on Section A, between US 70 Business and the Booker Dairy/Buffalo Rd
intersection
This revision request is for additional temporary impacts of <0 01 acre in jurisdictional wetlands on
Section A
The revised design will not change the existing permit application with respect to
• Protected Species
• Proposed Aquatic Moratoria
• FEMA compliance
• Cultural Resources
• Avoidance and Minimization
Summary of Changes
The additional impact involves excavation in a jurisdictional wetland outside of proposed fill for the
project to allow installation of a proposed 10 inch diameter ductile iron gravity sanitary sewer line
Excavation will be approximately three feet wide and ninety feet in total length The excavated material
MAILING ADDRESS TELEPHONE 919-715-1500 LOCATION
NC DEPARTMENT OF TRANSPORTATION FAX 919-715-1501 2728 CAPITAL BLVD
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS PLB SUITE 168
1598 MAIL SERVICE CENTER WEBSITE WWW NCDOT ORG RALEIGH NC 27604
RALEIGH NC 27699-1598
will be placed back in the wetland and restored to preconstruction levels after the proposed sanitary sewer
line is installed As a maintained sewer line easement already exists where the installation will occur, the
NCDOT Roadside Environmental Unit will re-vegetate this area with a seed crux that contains native
wetland grasses
Additional impacts to jurisdictional wetlands are proposed at -L- 62+18 (see attached utility impact
drawing), which is included in permit drawing Site 1 (wetland WW) in the original application Total
additional temporary wetland impacts for the project are projected to be <0 01 acre Permanent impacts
to wetlands have not changed from what was requested in the original permit application
Compensatory Mitigation
Since the additional wetland impact is temporary, no additional compensatory wetland mitigation is
proposed
Regulatory Approvals
Section 404 Please mcorporate these revisions into the previously submitted Individual Section 404
permit application
Section 401 We are also submitting this as a revision to the Section 401 Water Quality Certification
application from the NCDWQ In compliance with Section 143-215 3D(e) of the NCAC, we have
provided $570 00 with the original application to act as payment for processing the Section 401 permit
We are providing five (5) copies of this revision to the NCDWQ, for their review and approval
If you have any questions or need additional information, please contact Amy James at 919-715-7216 or
aejames@ncdot gov
Sincerely,
Grego J Thorpe, PhD
Environmental Management Director, PDEA Branch
cc
W/attachment
Mr Brian Wrenn, NCDWQ (5 Copies)
Ms Kathy Matthews, USEPA
W/o attachment (see website for attachments)
Mr Clarence W Coleman, P E, FHWA Mr
Mr Scott McLendon, USACE, Wilmington Mr
Mr Art McMillan, P E, Highway Design Mr
Mr Travis Wilson, NCWRC Ms
Mr Gary Jordan, USFWS Mr
Mr Ron Sechler, NMFS Mr
Ms Anne Deaton, NCDMF Mr
Dr David Chang, P E, Hydraulics
Mr Greg Perfetti, P E, Structure Design
Mr Victor Barbour, P E, Project Services Unit
Richard E Greene, P E, Div 4 Engineer
Chad Coggms, Div 4 Environmental Officer
Jay Bennett, P E , Roadway Design
Jameelah El-Amin, Project Planning Engineer
Drew Joyner, PE, HEU
Mated Alghandour, P E , Programming and TIP
Mark Staley, Roadside Environmental
2
? era r
00 -b T
40
CHORD
UTILITY
4 ? II
- -
00
55 IMPACT
bb ? '
I D9
F /
21 b' , ?58 l2°E 2 q?
t
Ln
0
0 o NT
PROP. 0
'
47 SANITARY SE
'CHORD
/ r
w
7r0 UTILITY
IMPACT
m 0
O "' /i
?00
(v
J O
20
L0
9
(n NEUSE FORESTRY,LLC
?INSCAL?? I
0 50'
CL. B RIPRAP
100 /
OB 1492 PG 515