Loading...
HomeMy WebLinkAbout20071915 Ver 1_More Info Letter_20071227pF W:ATFR Michael F. Easley, Governor William G. Ross Jr., Secretary N r North Carolina Department of Environment and Natural Resources >+ Coleen H. Sullins, Director w Division of Water Quality w Chuck Wakild, P.E., Deputy Director Division of Water Quality December 21, 2007 DWQ Project # 07-1915 Beaufort County Page 1 of 2 CERTIFIED MAIL: RETURN RECEIPT REQUESTED #7007 0220 0003 1484 8101 #,a, Smithwick Enterprises Attn: Lee Sheppard 806 Swan Point Drive 0 1 ?t7I Washington, NC 27889 Subject Property: Sheppard Park Boat Company, Hyw 17 South Tar Pamlico Basin, Tar River, 28-(102.5), NSW, C REQUEST FOR MORE INFORMATION Dear Mr. Sheppard: On November 13,2007, the Division of Water Quality (DWQ) received your a?plication dated October 30, 2007, to impact 0.058 acres of wetlands and 21,600 square feet (ft ) of Waters to construct the proposed Dry Stack Marina. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetland, streams and/or buffers on the subject property. Therefore, unless we receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and 2B .0259(8) and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Haul Out Facility Please provide information indicating all proposed activities associated with the Haul Out facility, (i.e. wash down of vessels, painting, bottom maintenance, ect.). If wash down of vessels is proposed please provide information pertaining to the containment BMP's to be utilized for the wastewater. Please contact Kyle Barnes of the Washington Regional Office and Ian McMillan of the DWQ Central Office in writing within four weeks of the receipt of this letter with the requested North Carolina Division of Water Quality Intemet: h2o.enr.state.nc.us 943 Washington Square Mall Phone: 252-946-6481 ?TOne Washington, NC 27889 FAX 252-946-9215 1 V Or, thCarolina Page 2 of 2 information. If we do not hear from you within four weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Kyle Barnes of the Washington Regional Office at 252-948-3917 or Ian McMillan of the DWQ Central Office at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss, this matter. Sincerely, --V I Al Hodge/Supervisor Division of Water Quality Surface Water Protection Washington Regional Office cc: 4010versight/Express Permitting Unit USACE Washington Regulatory Field Office File Copy Central Files CAMA/ Morehead Warren Eadus, Quible and Associates, P.C. 8 Juniper Trail, Southern Shores, NC 27947 Filename: 07-1916