HomeMy WebLinkAbout20072046 Ver 4_Add Info Email_20170309Burdette, Jennifer a
From: Kim Williams <kwilliams@lmgroup.net>
Sent: Thursday, March 09, 2017 7:33 AM
To: Hair, Sarah E CIV CESAW CESAD (US); Coburn, Chad; Jeff Earp; Burdette, Jennifer a
Cc: Reusch, Eric G CIV USARMY CESAW (US)
Subject: RE: Brunswick Forest
Attachments: Site Plan 3-2-17.pdf, CROSSING NUMBER 14-march-2017.pdf, Old Timber type
maps.pdf
Hi All
Attached is the revised site plan for Brunswick Forest that includes the changes discussed at our meeting. The
channel in Phase 8 is shown (and avoided), the wetland finger in the southern area near the RR is avoided, and
a culverted crossing is shown at Crossing #14. 1 have also enclosed a cross section of that crossing. All of the
other crossings are unchanged. Impacts are as follows:
0.31 acre of wetlands
174 LF of stream (115 LF new and 59 LF existing culvert)
0.034 acre of RPW (Impact #18).
I have also attached timber maps that Jeff was able to locate that shows how long the areas in the
southwestern part of the site had been in timber production. These areas were all bedded and the typical
rotation was 25-30 years.
Liz- are you able to distribute this plan and timber map to SHPO for discussion purposes?
We will continue to work on a more robust on-site alternatives analysis.
Thanks,
Kim
-----Original Message -----
From: Hair, Sarah E CIV CESAW CESAD (US)[mailto:Sarah.E.Hair@usace.army.mil]
Sent: Wednesday, February 08, 2017 9:13 AM
To: Kim Williams <kwilliams@lmgroup.net>; Coburn, Chad <chad.coburn@ncdenr.gov>; Jeff Earp
<jearp@brunswickforest.com>; Burdette, Jennifer a <Jennifer.Burdette@ncdenr.gov>
Cc: Reusch, Eric G CIV USARMY CESAW (US) <Eric.G.Reusch@usace.army.mil>
Subject: RE: Brunswick Forest
The 28th works better for us. 10:30 is still a good time, here at the Corps office. We will reserve a conference
room.
Thank you,
Liz
1
GREEN SPRING BLVD.
PHASE 9
BRUNSWICK FOREST
II
IMPACT AREA #14
La �
w
cr xin.,.x . w x
REq. srgxe OP � ' Eie aetT
� tt• to aso Artgx
ncP
. rt. tr tr r r
eu t t t
Ift
t t t a�isWwe.eu�
rMn
OP .s >,xq �• a.. A.'qx ltmr" man.c.
ew
ttwl u• tr tv r r E to vm w m " tm�rc
OUTLET PROTECTION and 1.01 tr tr tr r t' apt ovmNRAA OM
ROCK STABILIZATION APRON f.uHNrn.t:. t. rA.wa.rt
NTS r ouncr Axmttmwr• Umnrrarur (op SIDE VIEW
ROG ltfAY/ZAl10N AMxwd RR A INtl111A/ ? LF
PEGYIVD A6 YrOMN pl PUIL T' Wt BO)IGW wpM. NTS
S
4'
IEXISTING GRADE
WETLANDS AREA
STANDARD OUTLET PROTECTION
WETLAND IMPACT # 14
CROSS SECTION VIEW
—16 LF TOTAL LENGTH OF IMPACT-
-
MPACT
—pFm 80'
FP
2
�« 1.5" S9.5A
ASPHAk
5' 11 5' I \
** a" ABC
BASE COURSE
nU. AREA
80' R/W GREEN SPRING BLVD
NOT TO SCALE
JJV aw. rI.
0.01 Ac.
WETLANDS IMPACT AREA
EXISTING GRADE
WETLANDS AREA
INV. 18"
I v RIP—RAP �........
I vv v v v v v v v v v vv
v
vvvv000oovooo
—�- vo
vvv
I
"
voooo°vo `ov°oo°o RIP -
I — c
— v000vo...�
I—
m I
X
N
;I 30' 15' 0 30'
o
s I SCALE IN FEET
I I w = 30 FT.
I I
11 IIIII/I��///
CAR,i
s$/c;
EAL
3830 4,
su�y6k-F��
I No-,
I
OF
f_TERNATIONAI PAPER
IE ELWOOD ARI
Are
0412212)003
5
11
6.76
'J }
fm17' 51
A " III RABON 44Y
i%5 25.
1980 —
z5 s:
r ,vaa
f5
166.61
1931 14
61.17 15 1fi15 . 66.15
61
ffs"2 1980 01 „s, 1996
11 414
s,-17 1081 6e , s
lliM6v rs: 11 16.35
4. 12.231996
.89 1963 1635
1996 1, ues
4z z� 1
82.1
1996 1963
L� _. ,
1G 4'!
194& OW
11 12.
16.56 1931
15
1963 12 33'
1931
SG
_ 16 id
312.04
1964
3'2oA 3:67 71.74
d 1931 1931 l
,y
76� '
t _r' 1931
1931
River, lake, creek — Canal Stand Label Key:
Perennial stream Marsh 0 Natural Pine O Natural Hwd/Pine
4M Pine Plantation Q Natural Hardwood Stand Number
Intermittent stream -0-0 Utility Lines
Primary ditch CD Non -Forest Forest Resources Property Acres
Year Established