Loading...
HomeMy WebLinkAbout20080903 Ver 1_More Info Letter_20080714of W?A?Fq Michael F. Easley, Governor William G. Ross Jr., Secretary r North Carolina Department of Environment and Natural Resources O `C Coleen H. Sullins, Director Division of Water Quality -y Chuck Wakild, P.E., Deputy Director Division of Water Quality July 14, 2008 DWQ Project # 08-0903 Pamlico County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Cert. # 7007 3020 0001 8861 2252 Mr. Stephen Benjamin Post Office Box 399 Norwalk, CT 06856 Subject Property: 200 Bennett Place, Arapahoe Neuse River REQUEST FOR ADDITIONAL INFORMATION Dear Mr. Benjamin: On June 3, 2008, the Division of Water Quality (DWQ) received your application dated April 29, 2008, to impact 0.039 acres of wetlands and 5,514 square feet (ft) of shallow water impacts to construct the proposed residential boat dock, bulkhead, boathouse, and pool. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetland, streams and/or buffers on the subject property. Therefore, unless we receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 21-1.0506 and 2B .0233(8) and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Neuse River Riparian Buffer Rules Please note that in accordance with the Neuse Buffer Rules 15A NCAC 02B .0233 (4) (b) construction of retaining walls within the Neuse buffers is a prohibited activity; therefore, this Office request a revised set of plans be submitted showing retaining walls located outside the 50 foot Neuse Riparian Buffer. 2. Neuse River Riparian Buffer Rules North Carolina Division of Water Quality Internet: h2o.enr.state.nc.us 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper o One NhCarolina Aaturally Please note that it is required that Zone I of the Neuse Riparian Buffer be restored landward of the proposed bulkhead. The buffer restoration should start at the southeast corner of the existing shoreline riprap and continue down stream 135 feet to the southeast corner of the subject property. It is necessary that a Buffer Restoration Plan be submitted to this Office for approval. The restoration plan should include the following items: (i) A map of the proposed restoration site (drawn to scale). (ii) A vegetation plan. The vegetation plan shall include a minimum of at least two native hardwood tree species planted at a density sufficient to provide 320 trees per acre at maturity. (iii) A grading plan. The site shall be graded in a manner to ensure diffuse flow through the riparian buffer. (iv) A fertilization plan. (v) A schedule of implementation. (vi) Within one year after the Division had approved the restoration plan, the applicant shall present proof the Division that the riparian buffer has been restored. If proof is not presented within this timeframe, then the person shall be in violation of the State's riparian buffer protection program. Please respond in writing to the DWQ within four weeks of the date of this letter to with the requested information. If we do not hear from you within four weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Roberto Scheller of the Washington Regional Office at 252-948-3940 or Ian McMillan of the DWQ Central Office at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, For Coleen H. Sullins cc: Roger Schecter, Coastal Management Solutions, Inc. 401 Oversight/Express Permitting Unit USACE Washington Regulatory Field Office File Copy Central Files CAMA: Doug Hugget/Morehead CAMA: Brad Connell/Morehead Filename: 08-0903