Loading...
HomeMy WebLinkAbout20080636 Ver 1_More Info Received_200808120-6636 KELLER ENVIRONMENTAL ENVIRONMENTAL CONSULTANTS 7921 Haymarket Lane, Raleigh, NC 27615 (919)844-7437 Fax(919)844-7438 LETTER OF TRANSMITTAL TO: DWQ 401 Wetlands Unit DATE: August 12, 2008 ATTENTION: Staff RE: The Knoll AUG 1 2 2008 DENR - MATER QUALfIY WETLANDS AND STORMYWATER BRANCH WE ARE SENDING YOU THE FOLLOWING: ? Pre-construction Notification (PCN) M Plans M Documents ? Other THESE ARE TRANSMITTED AS CHECKED BELOW: M For approval M As requested ? Please reply ? See below ? Maps M For review & comment M For your files ? Specifications ? Regular Mail ? Fed-Ex M Delivered by KE ? Picked Up COPIES DATE DESCRIPTION 5 08-08-08 Resubmittal Letter 5 07-30-08 DWQ Request for More Information 5 08-07-08 Pond Detail Plans (4) Rec'd By: THANK YOU! Signed 4 KELLER ENVIRONMENTAL ENVIRONMENTAL CONSULTANTS August 8, 2008 Cyndi Karoly NC Division of Water Quality 401 Wetlands WQ Certification Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1650 r= r= Re: The Knoll D 1Q 0_/ m [?, Ke ller Environmental Job No. 0701 DWQ Project # 08-0636 AUG 1 2 2008 Durham County, North Carolina UENR - WATER ClUALi lY VJETI.ANDS AND STORM'RCATER BRMC-1 Dear Ms. Karoly: Thank you for your staff's assistance with this project during recent phone and email correspondence and this morning's office meeting. We are submitting the additional information requested from written correspondence on July 30, 2008. We are requesting for NC Division of Water Quality (DWQ) written approval under Section 401, Clean Water Act, 33 USC 1344 and the Neuse River Buffer Rules. We have addressed your included written comments in the following paragraphs. 1. In the future, please provide a separate required items checklist for each proposed level spreader. Thank you for informing us and we will provide separate checklists for future projects and their proposed level spreader and other BMP structures. 2. As listed in Item 2 of the required items checklist, you must provide plan details that show one-foot topographic lines between the level lip and the top of the stream bank. Please provide this in a legible manner in your re-submittal. Please refer to the attached 30-scale pond details. One-foot topographic lines are shown along with 50 and 100-foot riparian buffers between the streams and level spreaders. 401 Certification & Neuse R. Buffer Rules Re-Submittal The Knoll August 8, 2008 Page 2 of 2 3. For level spreaders 1 and 4, the bypass device infringes on the filter strip. Please relocate these bypass devices such that they will not impede diffuse flow downslope of the level lip. Please refer to the attached 30-scale pond details. To prevent potential short- circuiting of the diffuse flow area, the input to the forebay from the bypass structure has been extended and/or slanted away. This should prevent any potential interference. 4. Please provide a separate high flow bypass for the proposed dry detention basins so that the level spreaders will not be compromised during larger storms such as the 10-year storm. Please refer to the attached 30-scale pond details. To prevent potential short- circuiting of the diffuse flow area, the input to the forebay from the high flow bypass structure has been extended and/or slanted away. This should prevent any potential interference. If you should have questions or require additional clarification please feel free to contact me at 844-7437 (office), 749-8259 (cell) or email: iayCa?kellerenvironmental.com. Sincerely, Keller Environmental, LLC Jay Keller Principal Cc: Amanda Boone, P.E. Attachments: • July 30, 2008 DWQ RFMI Letter • Stormwater Pond & Level Spreader 11"x 17"30-scale Details (4) William G. Ross .)r, Sccrctary Borth Carolina Department of Environment and Natural Resources Co#een H. Sullins, Director Division of Water Quality July 30, 2008 DWQ Project # 08-0636 Durham County CERTIFIED lY AIf,: RETURN RECEIPT REQUESTED Mr. Dave Hausfeld The Drees Company 7701 Six forks Road, Suite 132 Raleigh, NC 27615 Subject Pzn.?pc,rty... Thy >Kn?t?... .__ _ _ __ .:.., __. __ .. .,.. CJt to Lick Creek [030401, 27-11-{1.5), WSIV, NSl , CA} REQUEST FOR MORE INFORMATION Dear Mr. Hausfeld: On April 4, 2008, the Division of Waiter Quality (DWQ) received your application. dated sprit 3, 2008, to fill or otherwise impact 0.021 acres of 404/wetland, 73 linear feet of perennial stream, '73 linear feet of intermittent stream and 9,581 square feet of Zone 1 Neuse River basin protected riparian buffers and 5,225 square feet of Zone 2 Neuse River basin protected riparian buffers to construct a residential development at the site. On June 20, 2008, the DWQ received additional information from you. however, the DWQ has determined that your application remains incomplete and/or provided inaccurate information as discussed below, The DWQ will require additional inforn-.ation in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will place this project on hold as incomplete until we receive this additional information. If we do not receive the requested information, your project will be formally returned as incomplete. Please provide the following information so that we may continue to review your project. Additional Information Requested 1. In the future, please provide a separate required items checklist for each proposed level spreader. 2„ As listed in Item 2 of the required items checklist, you must provide playa details that show one-foot topographic tines between the level lip and the top of the stream bank., Please provide this in a. legible manner in your re-submittal. 401 t)vcrsight'G'xpress Review Pertnitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabirce Boulevard, Suite 250, Raleigh, North Carolina 27604 Phoney 919-733-17861 PAX 919.73+3.6893 / Internet: htt7 Lh2r.±.ertr ?tpt?nc.gsfnewe?iantl2 -- - - oncMCarol.ina ElVfd?lll`C1ftrlf An l..qual ()pporttinity/,4frirmative Action Employer- 506,,•u Recycled/ 10% Post Consumer Paper The Drees Compaz;y Page 2of2 July 30, 2008 3. For level spreaders 1 and 4, the bypass device infringes on the filter strip. Please relocate these bypass devices such that tbey will not impede diffuse flow downslope of the level lip. 4. Please provide a separate high flow bypass for the proposed dry detention basins so that the level spreaders will not be compromised during larger storms such as the 10-year stoma, Please submit this information within 30 calendar days of the date of this letter. If we do not receive this requested information within 30 calendar days of the date of this letter, your project will be withdrawn and you will need to reapply with a new application and a new fee. "1°his letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application. are not authorized (at this tithe) by the LWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-1786 if you have any questions regarding or would. lil? to set up a meeting to discuss this matter. f ,{ , Since y C yndi Karoly, Supervisor 401 OvnrsighUExpress Review Permitting Unit: CBK1 Jm cc: Lauren Witherspoon, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Jay Keller, Keller Environmental, LLC, 7921 Haymarket Lane, Raleigh, NC 27615 Filename: 080636'1'heKna1l(Ou:•ham)On_ltold2 0 H NS T \ \ O \ F Q = 00 \ ' Z 0 (D zo J - ? a L.1 o = a U (n \ 00 ?I O O? 0_ I 0 II\O 1 /. 0 0 ? o Z a ? F- ii ?E = o o fD w \ g r w a U \ _ (n 00 Z N O 0_ I- 0 0 Z v¢ M ? ? II ? I z o g Wo ? ? = a N 00 H D Z N7 O 0_ LL 0 Ln Z_ Q ry Z g d 0 a Iz J 0 0 Z Y0 Z w CL 0 z ? O n. ?6? ?Z M<<0* ?`? goo s 0 2 co O J I? U N 00 ?la9? d7?