Loading...
HomeMy WebLinkAbout20080663 Ver 1_Approval Letter_20080430OW A ?F9QG y Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality April 30, 2008 DWQ Project # 08-0663 Wake County Mr. Matthew Livingston Town of Rolesville 200 East Young Street Rolesville, NC 27571 Subject Property Rolesville Main Street Park Sanford Creek [030402, 27-23-5, C, NSW] Authorization Certificate per the Neuse River Buffer Protection Rules (15A NCAC 2B.0233) with Additional Conditions Dear Mr. Livingston: You are authorized to place fill within or otherwise impact 640 square feet of Zone 1 Neuse River basin protected riparian buffers and 960 square feet of Zone 2 Neuse River basin protected riparian buffers, as described in your application dated April 8, 2008, and received by the Division of Water Quality (DWQ) on April 9, 2008, with additional information received from you on April 18, 2008, to provide access and walking trails for the park at the site. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Authorization and approval letter and is thereby responsible for complying with all conditions. This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Authorization are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Type of Impact Amount Approved Units Plan Location or Reference Buffers Zone 1 640 (square ft.) PCN page 7 of 8 Buffers Zone 2 960 (square ft.) PCN page 7 of 8 2. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur buffer areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management 401 Oversight/Express Review Permitting Unit ?VllrfllCllr/r!lJ- 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http•//h2o.enr.state.nc.us/ncwetiands An Equal Opportunity/Affirmative Action Employer- 50% Recycled/ 10% Post Consumer Paper Town of Rolesville Page 2 of 3 April 30, 2008 Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 3. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 4. Sediment and Erosion Control Measures Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project; 5. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities; 6. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not re-concentrate before discharging into a stream as identified within 15A NCAC 2B .0233 (5). If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. 7. Certificate of Completion Upon completion of all work approved within the Buffer Authorization, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Violations of any condition herein set forth may result in revocation of this Authorization and may result in criminal and/or civil penalties. I own Or KOIGSVUic Page 3 of 3 April 30, 2008 If you do not accept any of the conditions of this Authorization, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This Authorization and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. If you under the Neuse This letter completes the review of the A Division NCAC 2B 0233. Quality any questions, telephone protection rule as described within 1 Cyndi Karoly or Ian McMillan at 919-733-1786. Sinc e , Coleen H. Sullins CHS/ijm Enclosures: Certificate of Completion cc: USACE Raleigh Regulatory Field Office Lauren Witherspoon, DWQ Raleigh Regional Office DLR Raleigh Regional Office File Copy Central Files Pete Colwell, Mitchell Environmental, P.A., P.O. Box 341, Fuquay-Varina, NC 27526 Filename: 080663Rolesv i I IeMain streetPark(W ake)NBR