Loading...
HomeMy WebLinkAbout20080524 Ver 1_Approval Letter_20080417Michael F. Easley, Governor O~O~ W A T ~RQG y William G. Ross Jr., Secretary r North Carolina Deparhnent of Environment and Natural Resources Q 'C' Coleen H. Sullins, Director Division of Water Quality April 17, 2008 DWQ Project # 08 - 0524 New Hanover County Marc Noel 1809 Futch Creek Road Wilmington NC 28411 Subject Property: Marc Noel -1809 Futch Creek Road Approval of 401Water Quality Certification with Additional Conditions Dear Mr. Noel: You have our approval, in accordance with the attached editions and those listed below, to expand the existing boat basin and construct a new bulkhead, platfurrri,~ #~oating dock, and boatlift as described within your application received by DWQ on March 18, X008. After revie~tiing your application, it has been determined that the impacts are covered by General Water Quality C'ertl~cation Numbers 3495 (GC3495), 3687 (GC3687), and 3698 (GC3698). The Certifications aiioH° you to ase the Regional General #'s 1.98700056, 198200277, and 197800080 Permits when issued by the US Army Corps of Engineers. In addition, you should obtain or otherwise comply Willi any.other required federal, state or local permits before you go ahead with your project including (but not limited-to),~rt':~ion and Sediment Control, Non-discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 1501inear feet of stream, compensatory mitigation maybe required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Internet: www ncwaterqualiri ore Location: 512 N. Salisbury St. Raleigh, NC 27604 Fax (919) 733-2496 An Equal OpportunitylAffirmative Action Employer - 50% Recycled/10% Post Consumer Paper N'o(ehCarolina ~afurally Customer Service 1-877-623-6748 2 Marc Noel - 1809 Futch Creek Road New Hanover County 2008-0524 2. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification~and itsconditions are final and binding unless you ask for a hearing. Violations of any condition herein set forth may rr'sult in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with'your proposed impacts or to conduct impacts to waters as depicted in your application and as-authorized by ths,C`ertification shall expire upon expiration of the 404 or CAMA Permit. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ian McMillan in the Central Office in Raleigh at 919- 733-1786 or Chad Coburn in the DWQ Wilmington Regional Office at 910-796-7215. Sincerely, ~~ ~-~~ Coleen H. Sullins, Director Division of Water Quality Enclosures: GC 3698, GC 3495, and GC 3687 Certificate of Completion cc: Ian McMillan -DWQ 401 Oversight Unit David Timpy -Corps of Engineers Wilmington Doug Huggett -DCM Morehead City Rob Mairs -DCM Wilmington Ed Flynn - F&S Marine Contractors, Inc., 868 Wrightsville Beach, NC 28480 Central Files WiRO r ~ir~ I ~~~ ~~~ ~ ~, I ~--~n1 Jet ~~~ Z I MEAN Lt3W WA T£R L/Nf eucxH~AD ~J~in x x~r 0 .~ x \~ x ~~ .~ X ~ ~ CH NEL x O x R/PARI L/N£ ~ t~PAR/AN ttN£ ~ `~ •~~ x A/EAN L©W ~ HIGH WATER c/NE* ' WA T£R L/NE v' ~V ~ ,J~..~tr~~w.rrr,srs r+r 55.85 Ftooo uNE AE1~ FtOQD N£ • LONE X RE~EBli~ MAR •0 5 2008 Nt7U0 RETAlN~NG E WALL ON -~ ' _ ~~'''rI ~, •p n ~ ~~ __ / f f f~ ~/ M s t t ~• 1 `~ ~.~ ¢' FENCF 45.09 X X ~ TOP OF THE BANK th+Z ~•~ P ~ EDGE [1F FU TCH CREEK ~: ~+ ~ `~ Q ~ PER MBS PG1225 -» ~ N g ~ ,~ z ~ a ~ 0 r; x~ X C x x~ l ~: '. a~' ^ SHED J J. 7 LOT 25 0.78 Acres canc. / `'~ ~ PA n ECx 2Q 5 ~~,,~: ,,` 3~i ~~ 2 % +w . , ~ 41~ ~s s~~ ~~ ~rntG f~~ ~~~~~ ~~13~ ~~" 2BY,r~ ~~ ~~~~~ ~~ ~~ ~Du~~' r~ it~on~e ~naTraarors, inc. Complete Marine Construction Services For Over 32 years! CAPT. ED FtYNN OURWVOOD SYk Piers, Floating Docks, pilings, BulkhAads, Boat Litts, House Pilings, Repairs P.O. Box 868 PhoneJFax: (910) 256-3C Wrigiritsville Beach, NC 28480 email: a msn.c~ RECE~\/'EI~ MAR 0 5 2008 DCM WILMINGTON, NC 3~'~ ~,~~ 3~~ ~ ?.~9 Certification of Completion DWQ Project No.: Applicant: Project Name: Date of Issuance of Wetland Permit: hereby state that, to the best of my abilities, due care and diligence was construction such that the construction was observed to be built within substantial Water Quality Certification and Buffer Rules, the approved plans and specifications, Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, used in the observation of the compliance and intent of the 401 and other supporting materials. Signature: Agent's Certification I, used in the observation of the compliance and intent of the 401 and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I' as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. County: Date: hereby state that, to the best of my abilities, due care and diligence was construction such that the construction was observed to be built within substantial Water Quality Certification and Buffer Rules, the approved plans and specifications, Signature: Registration No. Date Water Quality Certification N°. 3698 GENERAL CERTIFICATION FOR PROJECTS ELIGIBLE FOR U.S. ARMY CORPS Water Quality Certification Number 3698 is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality Regulations in 15A NCAC 2H, Section .0500 and 15A NCAC 26 .0201 for the discharge of fill material to waters and wetland areas as described in 33 CFR 330 Appendix A (B) (35) Maintenance Dredging of Existing Basins, or Regional (General) Permit Number 198200277 and 199602878 (Canals and Boat Basins in High Ground and Maintenance Dredging in Open Water), and for the.Riparian Area Protection Rules (Buffer Rules) in 15A NCAC 2B .020p. The State of North Carolina certifies that the specified cefegory Af ;activity will not violate applicable portions of Sections 301, 302, 303, 306 and 307 of the Public Laws 92-500 and 95-217 if conducted in accordance with the conditions hereinafter set forth. Excavation and/or filling of wetlands is not authorized by this.General Certification. Any proposed fill or modification of wetlands and/or waters, irietuciing streams, requires application to, and written approval from the Division of Water Quality (th.a :':Division"). Any impacts to streams and/or buffers in the Neuse, Tar-Pamlico, Randlerftarrarl~- Catawba River Basins (or any other basins with Riparian Area Protection Rules [Buffer R.~fes] in effect at the time of application [in accordance with 15A NCAC 2B .0200]), unless the activities are listed as "EXEMPT" from these Rules- In accordance with North Carolina General Statute Section 143-215.3D(e), any requirement for written approval fora 401 Water Quality Certification must include the appropriate fee. If a project also requires a CAMA Permit, then one payment to both agencies shall be submitted and will be the higher of the two fees. Conditions of Certification: 1. No Impacts Beyond those Authorized in the Written Approval No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts authorized in the written approval, including incidental impacts. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 2. Standard Erosion and Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices: a. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. Water Quality Certification No. 3698 AND RIPARIAN AREA PROTECTION RULES (BUFFER RULES( Water Quality Certification N°. 3698 b. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. c. Reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. d. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. e. If the project occurs in waters or watersheds classified as Primary Nursery Areas (PNA's), Trout (Tr), SA, WS-I, WS-II, High Quality (HQW), or Outstanding Resource (ORW) waters, then the sediment and erosion control requirements contained within Design Standards in Sensitive Watersheds (15A NCAC 046 .0124) supersede all other sediment and erosion control requirements. 3. No Sediment and Erosion Control Measures in Wetlands or Waters Sediment and erosion control measures should not be placed in wetlands or waters without prior approval from the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream-and down stream of the above structures. All sediment and erosion control devices..shall be`removed and the natural grade restored within two (2) months of the date that the tivision of Land Resources or locally delegated program has released the project 4. Construction stormwater Permit NCG010000 Upon the approval of an Erosion and Sedimentation Control Pfah issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation,control program, an NPDES General stormwater permit (NCG010000) administered by the'Division is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], fuN compliance with permit conditions including the sedimer>tation control plan, self-monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at http://h2o.enrstate.nc.us/su/Forms Documents.htm. 5. Construction Moratoriums and Coordination The timing of the dredging and discharge shall be coordinated with State and Federal agencies and the applicant in order to lessen impact on aquatic organisms and their reproduction. All moratoriums on construction activities established by the NC Wildlife Resources Commission {WRC), US Fish and Wildlife Service (USFWS), NC Division of Marine Fisheries (DMF), or National Marine Fisheries Service (NMFS) to protect trout, anadromous fish, larval/post-larval fishes and crustaceans, or other aquatic species of concern must be obeyed. 6. Work within the twenty-five (25) designated trout counties or identified state or federal endangered or threatened species habitat shall be coordinated with the appropriate WRC, USFWS, NMFS, and/or DMF personnel. Water Supply Watershed Buffers The 30-foot wide vegetative buffer (low-density development) or the 100-foot wide (high- density development) shall be maintained adjacent to all perennial waters except for allowances as provided in the Water Supply Watershed Protection Rules [15A NCAC 2B .0212 through .0215J. Water Quality Certification No. 3698 Water Quality Certification N°. 3698 7. Riparian Area Protection (Buffer) Rules Activities located in the protected 50-foot wide riparian areas (whether jurisdictional wetlands or not) within the Neuse, Tar-Pamlico, Randleman, Catawba (or any other basin with buffer rules), shall be limited to "uses" identified within and constructed in accordance with 15A NCAC 2B .0233, .0259, .0250, and .0243, and shall be located, designed, constructed, and maintained to have minimal disturbance to protect water quality to the maximum extent practicable through the use of best management practices. All riparian area protection rule requirements, including diffuse flow requirements, must be met. 8. The canal or boat basin shall be allowed to be dredged to its original depth and width. The applicant is required to supply information regarding the original depth and width of the site. The area shall not be dredged to a depth deeper than the receiving water. 9. All fill material shall be placed on high ground and be from an upland source, and excavation shall not occur in Primary Nursery Areas. 10. If an environmental document is required under NEPA or SEPA, then this General Certification is not valid"until a Finding of No`Significant Impact (FONSI) or Record of Decision (ROD) is issued`by the State Clearinghouse. 11. If concrete is used during this activity; then a dry work area should be maintained to prevent direct contact prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete should° not be discharged to surface waters due to the potential for elevated pH and possible aquatic fife/fish kills.11. Additional site-specific conditions may be added to the cover letter in order"to ensure compliance with all applicable water quality and effluent standards. 12. When written authorization is required for use of this certification,, upon completion of all permitted impacts included within the approval and any subsequent modifications, the applicant shall be required to return the certificate of completion attached to the approval. One copy of the certificate shall be sent to the DWQ Central Office in Raleigh at 1650 Mail Service Center, Raleigh, NC, 27699-1650. 13 This General Certification shall expire three (3) years from the date of issuance of the written approval or on the same day as the expiration date of the corresponding Nationwide Permit 35 or Regional Permit 198200277. The conditions in effect on the date of issuance of Certification for a specific project shall remain in effect for the life of the project, regardless of the expiration date of this Certification. If the construction process for approved activities will overlap the expiration and renewal date of the corresponding 404 Permit and the Corps allows for continued-use of the 404 Permit, then the General Certification shall also remain in effect without requiring re-application and re-approval to use this Certification for the specific impacts already approved. 14. The applicant/permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal Law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, then the Division may reevaluate and modify this General Water Quality Certification. Non-compliance with or violation of the conditions herein set forth by a specific fill project shall result in revocation of this General Certification for the project and may result in criminal and/or civil penalties. Water Quality Certification No. 3698 Water Quality Certification N°. 3698 The Director of the North Carolina Division of Water Quality may require submission of a formal application for Individual Certification for any project in this category of activity if it is determined that the project is likely to have a significant adverse effect upon water quality including state or federally listed endangered or threatened aquatic species or degrade the waters so that existing uses of the wetland or downstream waters are precluded. Public hearings may be held for specific applications or group of applications prior to a Certification decision if deemed in the public's best interest by the Director of the North Carolina Division of Water Quality. Effective date: November 1, 2007 DIVISION OF WATER QUALITY History Note: Water Quality Certification Number 3698 replaces Water Quality Certification (WQC) Number 3349 issued on March 18, 2002, Water Quality Certification (WQC) Number 3489 issued December 31, 2004, and Water Quality Certification (WQC) Number 3635 issued on March 19, 2007. This General Certification is rescinded when the Corps of Engineers re- authorizes this Regional (Genera!) Permit or when deemed appropriate by the Director of the DWQ. Water Quality Certification No. 3698 Water Quality Certification N°. 3687 IB Water Quality Certification Number 3687 is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWQ) Regulations in 15 NCAC 2H, Section .0500 and 15 NCAC 26 .0200 for the discharge of fill material to waters and wetland areas which are waters of the United States as described in 33 CFR 330 Appendix A (B) (3,.4, 5, 6, 7, 19, 20, 22, 25, 30, 32, and 36) of the Corps of Engineers regulations and. Regional Permits 197800056 and 19780125 and for the Riparian Area Protection Rules (Buffer Rules) in 15A~NCAC 2B .0200. The State of North Carolina certifies that the specified category of activity will not violate applicable portions of Sections 301, 302, 303, 306 and 307 of the Public Laws 92-500 and 95-217 if conducted in accordance with the conditions hereinafter.set forth. Activities meeting any one (1) of the following thresholds or circumstances require written approval fora 401 Water Quality Certification from the Division of Water:Qtality (the "Division"): a. Impacts equal or greater than 40 linear feet of additional permanent stream impact at an existing stream crossing location, or b. Temporary or permanent impacts equal to or exceeding: one-third (1/3) acre of wetlands East of Interstate-95, or one-tenth (1/10) of acre of wetlands West of Interstate-95; or c. Any impact associated with a Notice of Violation or an enforcement action initiated by the Division and/or the Division of Land Resources; or d. Projects with any impacts to streams, wetlands, and/or waters that have received a Notice of Violation from the Division and/or Division of Land Resources; or e. Any impacts to streams and/or buffers in the Neuse, Tar-Pamlico, Randleman and Catawba River Basins (or any other basins with Riparian Area Protection Rules [Buffer Rules] in effect at the time of application) unless the activities are listed as "EXEMPT" from these Rules- In accordance with North Carolina General Statute Section 143-215.3D(e), written approval for a 401 Water Quality General Certification must include the appropriate fee. If a project also requires a CAMA Permit, then one payment to both agencies shall be submitted and will be the higher of the two fees. Activities included in this General Certification and below the thresholds listed above do not require written approval from the Division of Water Quality as long as they comply with the Conditions of Certification listed below. If any of these Conditions cannot be met, written approval from the Division is required. Water Quality Certification No. 3687 ..nv RirHruAn AKtA PROTECTION RULES (BUFFER RULESI Water Quality Certification N°. 3687 Conditions of Certification: 1. No Impacts Beyond Those Authorized for this General Certification No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the thresholds established for use of this General Certification, or beyond the footprint of the impacts authorized in the written approval, including incidental impacts. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 2. Standard Erosion and Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices: a. Design, installation, operation,; and maintenance of the sediment and erosion control measures must be such that they equal~or exceed, the requirements specified in the most recent version of the North,.Carolina Sediment and Erosion Control Manual. The devices shall be maintained on ,all construction sites,_borrow sites, and waste pile (spoil) projects, including contractor-ownedor teased bbrrow pits associated with the project. b. For borrow pit sites, the erosion and'sedimenf control measures. must be designed, installed, operated, and maintained in accordance`with the most recent version of the North Carolina Surface Mining Manual. c. Reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. d. Sufficient materials required for stabilization and/or repair of:erosioh control measures and stormwater routing and treatment shall be on site at all times: ,except for publicly funded linear transportation projects when materials can be accessed offsite in a timely manner. e. If the project occurs in waters or watersheds classified as Primary Nursery Areas (PNAs), Trout (Tr), SA, WS-I, WS-II, High Quality (HQW), or Outstanding Resource (ORW) waters, then the sediment and erosion control requirements contained within Design Standards in Sensitive Watersheds (15A NCAC 046 .0124) supercede all other sediment and erosion control requirements. 3. No Sediment and Erosion Control Measures in Wetlands or Waters Sediment and erosion control measures should not be placed in wetlands or waters outside of the permitted impact areas without prior approval from the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, then the design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project. 4. Construction stormwater Permit NCG010000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCG010000) administered by the Division is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If the Water Quality Certification No. 3687 Water Quality Certification N°. 3687 activity is covered by this permit [applicable to construction projects that disturb one (1) or more acresJ, full compliance with permit conditions including the sedimentation control plan, self-monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at http://h2o.enr.state.nc.us/su/Forms Documents.htm. NCDOT shall be required to be in full compliance with the conditions related to construction activities within the most recent version of their individual NPDES (NCS000250) stormwater permit. 5. Work in the Dry All work in or adjacent to stream waters shall be conducted in a dry work area. Approved best management practices from the most current version of the NC Sediment and Erosion Control Manual, or the NC DOT Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams, and other diversion structures shall be used to minimize excavation in flowing water. Exceptions to this condition require submittal to, and approval by, the Division. 6. Construction Moratoriums and Coordination If activities must occur during periods of high biological activity (i.e. sea turtle or bird nesting), then biological monitoring may be required at the request of other state or federal agencies and coordinated with these activities. This condition can be waived through written concurrence on a case by case basis upon reasonable justifiication. All moratoriums on construction activities established by the,NG Wildlife Resources Commission (WRC), US Fish and Wildlife Service (USFWS); NC Division of Marine Fisheries (DMF), or National Marine Fisheries Service (NMFS) to protect trout, anadromous fish, larval/post-larval fishes and crustaceans, or other aquatic species of concern shall be obeyed. This condition can be waived through written concurrence on a case by case basis upon reasonable justification. Work within the twenty-five (25) designated trout counties or identified state or federal endangered or threatened species habitat shall be coordinated with the appropriate WRC, USFWS, NMFS personnel. 7. Riparian Area Protection Rules (Buffer Rules) Activities located in the protected 50-foot wide riparian areas (whether jurisdictional wetlands or not) within the Neuse, Tar-Pamlico, Randleman, Catawba (or any other basin with buffer rules), shall be limited to "uses" identified within and constructed in accordance with 15A NCAC 26 .0233, .0259, .0250, and .0243, and shall be located, designed, constructed, and maintained to have minimal disturbance to protect water quality to the maximum extent practicable through the use of best management practices. All riparian area protection rule requirements, including diffuse flow requirements, must be met. 8. Water Supply Watershed Buffers The 100-foot wide (high-density development) or the 30-foot wide vegetative buffer (all other development) must be maintained adjacent to all perennial waters except for allowances as provided in the Water Supply Watershed Protection Rules [15A NCAC 26 .0212 through .0215j. Water Quality Certification No. 3687 Water Quality Certification N°. 3687 9. Placement of Culverts and Other Structures in Waters and Wetlands The application must include construction plans with cross-sectional details in order to indicate that the current stability of the stream will be maintained or enhanced (i.e., not result in head cuts). Culverts required for this project shall be designed and installed in such a manner that the original stream profiles are not altered and allow for aquatic life movement during low flows. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Placement of culverts and other structures in waters, streams, and wetlands must be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life, unless otherwise justified and approved by the Division. Installation of culverts in wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. Additionally, when roadways, causeways or other fill projects are constructed across FEMA-designated floodways or wetlands, openings such as culverts or bridges must be provided to maintain the natural hydrology of the system as well as prevent constriction of the floodway that may result in destabilization of streams or wetlands. Any rip rap required for normal pipe burial and stabilization shall be buried such that the original stream elevation is restored and maintained. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of. rip-rap or other bank hardening methods. 10. If concrete is used during the construction, then a dry work area should be maintained to prevent direct contact between curing concrete and stream water.: Water that inadvertently contacts uncured concrete should not be discharged to surface waters due to the potential for elevated pH and possible aquatic life/fish kills. 11. Applications for riprap groins proposed in accordance with 15A NCAC 07H .1401 {NC Division of Coastal Management General Permit for construction of Wooden and Riprap Groins in Estuarine and Public Trust Waters) must meet all the specific conditions for design and construction specified in 15A NCAC 07H .1405. 12. Temporary Fills and/or Access Roads All temporary fill and culverts shall be removed and the impacted area returned to the original grade, including each stream's original cross sectional dimensions, plan form pattern, and longitudinal bed and bed profile after construction is complete or within two (2) months of the establishment of the crossing, which ever is sooner, and the various sites shall be stabilized with natural woody vegetation (except for the maintenance areas of permanent utility crossings) and restored to prevent erosion. If the crossings are not completely removed and restored as described above within the specified time above, then written approval from the Division must be obtained to modify this condition. Water Quality Certification No. 3687 4 Water Quality Certification N°. 3687 13. For activities requiring written approval, additional site-specific conditions may be added to the approval letter in order to ensure compliance with all applicable water quality and effluent standards. 14.Certificate of Completion When written authorization is required for use of this certification, upon completion of all permitted impacts included within the approval and any subsequent modifications, the applicant shall be required to return the certificate of completion attached to the approval. One copy of the certificate shall be sent to the DWQ Central Office in Raleigh at 1650 Mail Service Center, Raleigh, NC, 27699-1650. 15. If an environmental document is required-under NEPA or SEPA, then this General Certification is not valid untiCfi Finding of No Significant Impact (FONSI) or Record of Decision (ROD) is issued by the-State Clearinghouse. 16. This General Certification shall expire three {3) years-from the date of issuance of the written approval or on the same day as the expiration date of these corresponding Nationwide and Regional General Permits. In accoi-dance,with Genera] Statute 136-44.76, certifications issued to the NCDOT shall expire only upon expiration'of the federal 404 Permit. The conditions in effect on the date of issuance of Certification. for a specific project shall remain in effect for the life of the project, regardless `of the.expiration date-of this Certification. If the construction process for approved activities will overlap the expiration and renewal date of the corresponding 404 Permit and the Corps allows for continued use of the 404 Permit, then the General Certification shall also remain in effect without requiring re-application and re- approval to use this Certification for the specific impacts already approved. 17. The applicant/permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal Law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, then the Division may reevaluate and modify this General Water Quality Certification. Non-compliance with or violation of the conditions herein set forth by a specific fill project shall result in revocation of this General Certification for the project and may result in criminal and/or civil penalties. The Director of the North Carolina Division of Water Quality may require submission of a formal application for Individual Certification for any project in this category of activity if it is determined that the project is likely to have a significant adverse effect upon water quality, including state or federally listed endangered or threatened aquatic species, or degrade the waters so that existing uses of the wetland or downstream waters are precluded. Public hearings may be held for specific applications or group of applications prior to a Certification decision if deemed in the public's best interest by the Director of the North Carolina Division of Water Quality. Water Quality Certification No. 3687 Water Quality Certification N°. 3687 Effective date: November 1, 2007 DIVISION OF WATER QUALITY By Coleen H. Sullin Director History Note: Water Quality Certification Number 3687 replaces Water Quality Certification Number 3376 issued on March 18, 2002, Water Quality Certification Number 3494 issued December 31, 2004, and Water Quality Certification Number 3624 issued March 2007. This General Certiircation is rescinded when the Corps of Engineers re-authorizes any of these Nationwide or Regional Permits or when deemed appropriate by the Director of the Division of Water Quality. Water Quality Certification No. 3687 6 WQC #3495 STREAM RESTORATION, ENHANCEMENT AND STABILIZATION AND WETLAND AND RIPARIAN RESTORATION AND CREATION ACTIVITIES CERTIFICATION GENERAL CERTIFICATION FOR STREAM RESTORATION ENHANCEMENT AND STABILIZATION PROJECTS AND WETLAND AND RIPARIAN RESTORATION AND CREATION ACTIVITIES INCLUDING THOSE ELIGIBLE FOR CORPS OF ENGINEERS NATIONWIDE PERMIT NUMBERS 13 (BANK STABILIZATION) AND 27 (WETLAND AND RIPARIAN RESTORATION AND CREATION) AND REGIONAL PERMIT 197800080 LCONSTRUCTION AND MAINTENANCE OF BULKHEADS) This General Certification is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality Regulations in 15A NCAC 2H .0500 and 15A NCAC 26 .0200 for the discharge of fill material to waters as described in 33 CFR 330 Appendix A (B) (13) and (27) of the Corps of Engineers regulations (i.e. Nationwide Permit Numbers 13 and 27) and Regional Permit 197800080. The category of activities shall include stream bank stabilization or stream restoration activity as long as impacts to waters or significant wetlands are minimized. This Certification replaces Water Quality Certification (WQC) Number 3399 issued March 2003. This WOC is rescinded when the Corps of Engineers reauthorize Nationwide Permits 13 or 27 or Regional Permit 197800080 or when deemed appropriate by the Director of the Division of Water Quality (DWQ). The State of North Carolina certifies that the specified category of activity will not violate applicable portions of Sections 301, 302, 303,'-306 and 307 of-the Public Laws 92-500 and 95-217 if conducted in accordance with the conditions set forth. Conditions of Certification: Wetland and/or riparian area restoration and creation projects which are for compensatory mitigation or compensatory mitigation credit (and not including projects that only involve stream restoration or enhancement work described in condition nos. 2 and 3 below) that are proposed underthis Geheral Certification require written application to and approval from the Division of Water Quality. All applications for written DWQ approval will be reviewed and a response will be prepared within 30 days of stamped receipt of the application in the Division of Water Quality's Central Office in Raleigh. This 30-day period does not include time spent by the application or DWQ's response within US Postal Service or North Carolina's Mail Service Center mail systems; Wetland and riparian area restoration and creation projects (not including projects that involve work in or impacts to streams) which are not for compensatory mitigation or compensatory mitigation credit proposed under this General Certification do not require written application to and approval from the Division of Water Quality. In these cases, the applicant is required to notify the Division in writing with three copies of project specifications before the impact occurs. If the Division determines that the project would not result in an ecologically viable wetland and riparian area, then the Division shall prepare a response to notify the applicant in writing within 30 days of DWQ's receipt of the notification. In such cases, the applicant will be required to submit a formal application and pay of the appropriate fee, and DWQ will be required to process the application through normal procedures; 2. Proposed stream restoration projects (as defined and limited below), that do not disturb wetlands and thaf are not being conducted for compensatory mitigation or compensatory mitigation credit do not require written application to and approval WQC #3495 from the Division of Water Quality, and, therefore, do not require payment of an application fee to the Division of Water Quality. Projects that are intended for compensatory mitigation or compensatory mitigation credit, that are intended to resolve a violation, or that are in association with a development project shall require an application, fee, and written concurrence from the Division of Water Quality. Stream restoration is defined as the process of converting an unstable, altered or degraded stream corridor, including adjacent riparian zone and floodprone areas to its natural or referenced, stable conditions considering recent and future watershed conditions. This biological and chemical integrity, including transport of water and sediment is produced by the stream's watershed in order to achieve dynamic equilibrium. The applicant is required to notify the Division in writing with three copies of detailed restoration plans and specifications before the impact occurs. If the Division determines that the project does not meet the above definition of stream restoration, then the Division shall notify the applicant in writing within 30 days of receipt of the application. In such cases, the applicant will be required to submit a formal application and pay of the appropriate fee, and DWQ will be required to process the application through normal procedures; Stream enhancement projects (as defined and limited below), that do not disturb wetlands and that are not being conducted for compensatory mitigation or compensatory mitigation credit and do not include any stream channel relocation, do not require written application to and approval from the Division of Water Quality, and, therefore, do not require payment of an application fee to the Division of Water Quality. Projects that are intended for compensatory mitigation or compensatory mitigation credit, that are intended to resolve a violation, or that are in association with a development project shall require an application, fee, and written concurrence from the Division of Water Quality. 4. Stream enhancement is defined as the process of implementing stream rehabilitation practices in order to improve water quality and/or ecological function. These practices must only be conducted on streams that ai`e not experiencing severe aggradation or erosion. Stream enhancement does not include the relocation of the stream channel. Stream enhancement bank stabilization techniques include the use of woody vegetation as the primary means of long term stability, and "soft" techniques such as root wads that encourage the establishment of dense woody vegetation. Stream enhancement techniques do not typically include the use of stream bank or bed hardening techniques such as rip-rap or other rock, gabion, block or concrete structures. However, enhancement activities may also include the placement of in stream habitat or grade control structures such as cross vanes, j- hook vanes, and wing deflectors that do not affect the overall dimension, pattern, or profile of a stable stream. The applicant is required to notify the Division in writing with three copies of detailed enhancement plans and specifications before the impact occurs if the stream enhancement project disturbs greater than 500 feet of stream bank or if the project proposes the use of in stream structures. If the Division determines that the project does not meet the above definition of stream enhancement, then the Division shall notify the applicant in writing with an explanation within 30 days of receipt of the notification to require application and payment of the appropriate fee; 5. Stream stabilization projects that include the use of any structure or fill in the existing stream bed or disturb greater that 500 feet of stream bank that are proposed under this General Certification require written application to and approval from the Division of Water Quality. WQC #3495 Stream stabilization is defined as the in-place stabilization of an eroding stream bank using measures that consist primarily of "hard" engineering, such as but not limited to concrete fining; rip rap or other rock, and gabions. The use of "hard" engineering will not be considered as stream restoration or enhancement; Impacts to any stream length in the Neuse, Tar-Pamlico or Randleman River Basins (or any other major river basins with Riparian Area Protection Rules [Buffer Rules) in effect at the time of application) requires written concurrence for this Certification from DWO in accordance with 15A NCAC 28.0200. Activities listed as "exempt" from these rules do not need to apply for written concurrence under this Certification. New development activities located in the protected 50-foot wide riparian areas (whether jurisdictional wetlands or not) within the Neuse and Tar- Pamlico River Basins shall be limited to "uses" identified within and constructed in accordance with 15A NCAC 2B .0200. All new development shall be located, designed, constructed, and maintained to have minimal disturbance to protect water quality to the maximum extent practicable through the use of best management practices; 7. In order for the above conditions to be valid, any plans not requiring written concurrence to use this Certification must be built according to the plans provided to the Division of Water Quality. If written concurrence is required, then the project must be built and maintained according to the plans approved by the written , concurrence and Certification from the Division of Water Quality; 8. Appropriate sediment and erosion control practices which equal or exceed those outlined in the most recent version of the "North Carolina Erosion and Sediment Control Planning and Design Manual" or "North Carolina Surface Mining Manual" `~ whichever is more appropriate (available from the Division of Land Resources at the DENR Regional and Central Offices) shalt be designed, installed and maintained properly to assure compliance with the appropriate turbidity water quality standard (50 NTUs in streams and rivers not designated as trout waters by DWQ; 25 NTUs in all saltwater classes and all lakes and reservoirs; 10 NTUs in DWQ-classified trout waters); 9. All sediment and erosion control measures placed in wetlands or waters shall be removed and the original grade restored after the Division of Land Resources or delegated program has released the project; 10. Any rip-rap shall be of such a size and density so as not to be able to be carried off by wave or current action and consist of clean rock or masonry material free of debris or toxic pollutants. Rip-rap shall not be installed in the streambed except in specific areas required for velocity control and to ensure structural integrity of bank stabilization measures. If rip-rap is to be installed within the streambed, the amount and location must be approved in writing by the Division of Land Resources and Division of Water Quality. However rock vanes, wing deflectors, and similar structures for grade control and bank protection are acceptable; 11. Measures shall be taken to prevent live or fresh concrete from coming into contact with freshwaters of the state until the concrete has hardened; 12. If an environmental document is required, this Certification is not valid until a Finding of No Significant Impact or Record of Decision is issued by the State Clearinghouse; WQC #3495 13. Additional site-specific conditions may be added to projects which require written concurrence under this Certification in order to ensure compliance with all applicable water quality and effluent standards; 14. Projects with any impacts to streams, wetlands, and/or waters that have received a Notice of Violation from the Division of Land Resources and/or the Division of Water Quality are required to submit a complete application and receive written concurrence to use this Certification regardless of the proposed impact amount to streams, wetlands, andwaters; 15. Concurrence from DWQ that this Certification applies to an individual project shall expire three years from the date of the cover letter from DWQ or the notification sent to DWQ; 16. Standard Erosion and Sediment Control Practices: Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices: a. Erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. Reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. e. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 17. No Impacts Beyond those in Application No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 18. No Sediment and Erosion Control Measures in Wetlands Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources or locally delegated program has released the project. 4 WQC #3495 Non-compliance with or violation of the conditions herein set forth by a specific project shall result in revocation of this Certification for the project and may also result in criminal and/or civil penalties. The Director of the North Carolina Division of Water Quality may require submission of a formaF` application for Individual Certification for any project in this category of activity if it is determined that the project is likely to have a significant adverse effect upon water quality including state or federally listed endangered or threatened aquatic species or degrade the waters so that existing uses of the wetland or downstream waters are precluded. Public hearings may be held for specific applications or group of applications prior to a Certification decision if deemed in the public's best interest by the Director of the North Carolina Division of Water Quality. Effective date: 31 December 2004 DIVISION OF WATER QUALITY By Alan W. Klimek, P.E. Director W QC # 3495