Loading...
HomeMy WebLinkAbout20031508 Ver 2_Approval Letter_20080411Michael F. Easley, Governor William G. Ross Jr., Secretary North Cazolina Depaztment of Environment and Natural Resources April 11, 2008 Ruth Anne Wilson PO Box 2493 Manteo, NC 27954 Subject Property: Coleen H. Sullins, Director Division ofWaterQuality Chuck Wakild, P.E., Deputy Director Division ofWater Quality DWQ Project # 03.1508 vs 2 Hyde County Gun Barrel Point Marina Tar-Pamlico Basin, Silver Lake, 030308, 29-90, SC APPROVAL for the use of the "General" MAJOR VARIANCE; From the Neuse and Tar- Pamlico Riparian Buffer Rules for the Construction of Residential Structures on Existing Lots within the Coastal Counties as defined by the Coastal Area Management Act with Additional Conditions Dear Ms. Wilson: You have our approval, in accordance with the conditions listed below, to impact approximately 3800 square feet (ft2) of Zone 1 and 2785 square feet (ft2) of Zone 2 of the protected riparian buffers for the purpose of constructing a residential dwelling on the subject property as described within your application dated March 6, 2008. This letter shall act as your approval for the use of the "General" Major Variance; From the Neuse and Tar-Pamlico Riparian Buffer Rules for the Construction of Residential Structures on Existing Lots within the Coastal Counties as defined by the Coastal Area Management Act with ADDITIONAL CONDITIONS as approved by the Water Quality Committee (WQC) of the Environmental Management Commission (EMC) on May 10, 2001. In addition, you should get any other required federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control and CAMA permits. This approval shall expire when the variance expires on April 11, 2011 unless the variance is renewed before that time by the EMC. This approval is for the purpose and design that you described in your variance request, If you change your project, you must notify us and you may be required to send us a new request for approval. If the property is sold, the new owner must be given a copy of this approval and is thereby responsible for complying with all conditions. This approval requires you to fallow the conditions listed below. The Additional Conditions of the Certification are: 1. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to North Cazolina Division of Water Quality Internet: h2o.enr.state.nc.us 943 Washington Square Mall Phone: 252-946-64$1 One Washington, NC 27889 FAX 252-946-9215 NorthCaxo/l/ina An Equal OpportunitylAffirmativeAaion Employer - 50% Recycledli0% Post Consumer Paper ~aturq!!~ Wilson Page 2 of 3 return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Cazolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 2. Diffuse Flow All new stormwater drainage shall be directed to vegetated azeas as diffuse flow at non- erosive velocities prior to entering the protected ripazian buffers as identified within 15A NCAC 2B .0259(5). No new ditching or piping of stormwater through the protected buffers is allowed. 3. Stromwater Management Plan Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. At any time if it is determined that the BMP's implemented for this site do not function to meet the intent of the Tar-Pamlico River Basin Management Strategy 15A NCAC 2B .0258 then a new plan shall be submitted to the DWQ for approval. 4. Deed Restriction Language shall be placed in the deed for this property that all commercial use of this property shall cease. This information needs to be submitted to the DWQ prior to any occupancy of the proposed dwelling. 5. Buffer Mitigation (EEP) You are required to mitigate for impacts to the protected riparian buffers. The required area of mitigation to compensate for impacts to the protected riparian buffers is 3 800 square feet as required under this variance approval and 15A NCAC 2B .0259. We understand that you wish to make a payment into the Riparian Buffer Restoration Fund administered by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement. In accordance with 15A NCAC 2B .0259, this contribution will satisfy our compensatory mitigation requirements under 15A NCAC 2B .0259(9)(C). Until the EEP receives and clears your check (made payable to: DENR -Ecosystem Enhancement Program Office), no impacts specified in this vaziance approval shall occur. Ms. Susan Klimek should be contacted at (919) 733-5205 if you have any questions concerning payment into the EEP. For accounting purposes, this variance approval authorizes payment into the Riparian Buffer Restoration Fund to compensate for 3800 ftz of required riparian buffer mitigation for impacts to 3800 ftz of protected riparian buffers; 03-03-08, 29-90 river and subbasin." Wilson Page 2 of 3 If you do not accept any of the conditions of this approval, you may ask for and adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. This approval and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under the Tar-Pamlico River Riparian Buffer Protection Rules (15A NCAC 2B .0259 (9)(b)). Please call Kyle Barnes of the Washington Regional Office at 252-948-3917 or Amy Chapman of the DWQ 401 Oversight/Express Unit at 919-715-6823 if you have any questions or require copies of our rules or procedural materials. Sincerely, Al Hodge/Supervisor Division of Water Quality Surface Water Protection Washington Regional Office Enclosures: Certificate of Completion Project plan cc: ~WQ 401 Oversight/Express Unit CAMA, Morehead CAMA, WaRO File Copy Central Files Kim Williams, Land Management Group, Inc. PO Box 2522, Wilmington, NC 28402 Filename: 03-1508 vs 2