Loading...
HomeMy WebLinkAbout20070608 Ver 1_Approval Letter_20080214Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality February 14, 2008 DWQ Project # 07-0608 Henderson County Mr. Ralph Turner , Nappier and Turner Construction Company P.O. BOX 1870 Hendersonville; NC 28793 Subject Property: Wolfchase Ut to Wolfpen Creek [040302, 6-55-11-13, C] Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Turner: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 0.29 acres of 404/wetland and 2971inear feet of perennial stream, as described in your application dated April 2, 2007, and received by the Division of Water Quality (DWQ) on April 5, 2006, with additional information received from you on July 31, 2007, January 4, 2008, and February 8, 2008, and to construct a residential subdivision. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3705 (GC3705). The Certification(s) allows you to use Nationwide Permit(s) 29 (NW29), respectively, when issued by the US Army Corps of Engineers (USAGE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: T e of Im act Amount A roved Units Plan Location or Reference 404/Wetland 0.29 (acres) PCN a e 4 of 9 Stream - erennial 297 (linear feet) PCN a e 4 of 9 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 /Internet: http://h2o.enr.state.nc.us/ncwetlands N~~~~e hCarolina watura!!t~ An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Nappier and Turner Construction Company Page 2 of 5 February 14, 2008 2. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur... 3. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 4. Sediment and Erosion Control Measures Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project; 5. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities; Miti ag tion: 6. Compensatory Mitigation Using the Ecosystem Enhancement Program (EEP) Mitigation must be provided for the proposed impacts as specified in the table below. We understand that you wish to make a payment to the Wetlands Restoration Fund administered by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement. Until the EEP receives and clears your check (made payable to: DENR -Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 733-5205 if you have any questions concerning payment into a restoration fund. You have 60 calendar days from the date of this approval to make this payment. For accounting purposes, this Authorization Certificate authorizes payment into Nappier and Turner Construction Company Page 3 of 5 February 14, 2008 the Wetlands Restoration Fund to meet the following compensatory mitigation requirement: T e of Im act Com ensator Miti ation Re aired River and Sub-basin Number Stream - erennial 297 (linear feet) French Broad/06010105 7. Culvert Installation All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual (http://www.ncdot.org/doh/operations/BMP manual/download/BMP 1Vlanual.ndf) such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent head cutting of the streams. If any of the existing pipes are or become perched, the appropriate stream grade shall be re-established or, if the pipes installed in a perched manner, the pipes shall be removed and re- installed correctly. Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the stream up or down stream of the culvert(s). Existing stream dimensions (including the cross section dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each culvert. Therefore, you must provide plans with adequate details that indicate that the current stability of the stream will be maintained or enhanced. You must receive written approval from this Office for the above plans before the culvert(s) is installed. Culvert(s) must be installed according to approved plans. Placement of culverts and other structures in waters, streams, and wetlands must be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium shall be maintained if requested in writing by DWQ. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of Water Quality. Installation of culverts in wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. Upon completion of the project, the Applicant shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401 /Wetlands Unit of the NC Division of Water Quality upon completion of the project. Please Nappier and Turner Construction Company Page 4 of 5 February 14, 2008 send photographs upstream and downstream of each culvert site to document correct installation along with the Certificate of Completion form. 8. Stormwater Management Plan Implementation Procedures (No Further Approval Needed) The approved SMP must be constructed and operational before any permanent building or other structure is occupied at the site. If a development is phased, then the approved SMP for each future phase must be constructed and operational before any permanent building or other structure associated with that phase is occupied. The approved SMP as well as drainage patterns must be maintained in perpetuity. The SMP may not be modified without prior written authorization from the SMP approval authority. If the SMP falls under another state Stormwater program, then a copy of the approval letter and the modified SMP must be submitted to the 401 Oversight/Express Unit prior to the commencement of the modifications. 9. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project. 10. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Violations. of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. Nappier and Turner Construction Company Page 5 of 5 February 14, 2008 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly or Ian McMillan at 919-73 1786. Sincerely, CHSlijm Coleen H. Sullins Enclosures: GC3705 NCDWQ 401 WQC Summary of Permanent Impacts and Mitigation Requirements Certificate of Completion cc: USACE Asheville Regulatory Field Office Kevin Barnett, DWQ Asheville Regional Office DLR Asheville Regional Office File Copy Central Files Clement Riddle, CEC, 718 Oakland Avenue, Hendersonville, NC 28791 Filename: 070608 Wolfchase(Henderson)401 O~O~ W AT ~qpG >_ 1 V_wv~ _.~ ~ "'~ Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality North Carolina Division of Water Quality 401 Water Quality Certification Summary of Permitted Impacts and Mitigation Requirements In accordance with 15A NCAC 2H.0500, Mr. Ralph Turner and Nappier and Turner Construction Company, have permission to fill or otherwise impact 0.29 acres of'404/wetland and 297 linear feet of perennial stream, to construct the proposed Wolfchase residential development, which is located off US Highway 64 East, near Hendersonville, Henderson County, North Carolina. All activities associated with these authorized impacts must be conducted with the conditions listed in the attached Permit transmittal letter. THIS CERTIFICATION IS NOT VALID WITHOUT THE ATTACHMENTS. COMPENSATORY MITIGATION REQUIREMENTS, ECOSYSTEM ENHANCEMENT PROGRAM DWQ PROJECT #: 20070608 LOCATION: Hendersonville COUNTY Henderson BASIN/ SUB BASIN French Broad/06010105 As required by 15A NCAC 2H.0500, and the conditions of this Certification, you are required to compensate for the above mitigabee impacts through the restoration, creation, enhancement or preservation of wetlands, surface waters and riparian buffers as outlined below.prior to conducting any activities that impact or degrade the waters of the state. Note: Acreage requirements proposed to be mitigated through the Ecosystem Enhancement Program must be rounded to one-quarter acre increments and linear foot requirements must be rounded up to the nearest foot according to 15 2R.0503(b). Im acts Miti ation 297 Linear Feet of Perennial Stream 297 Linear Feet of Perennial Stream One of the options you have available to satisfy the compensatory mitigation requirement is through the payment of a fee to the Wetlands Restoration Fund per NCAC 2R.0503. If you choose this option, please sign this form and mail the form along with a copy of your 401 Certification or Buffer Approval to the Ecosystem Enhancement Program at the address below. An invoice for the appropriate amount of payment will be sent to you upon receipt of this form. PLEASE NOTE, THE ABOVE IMPACTS ARE NOT AUTHORIZED UNTIL YOU RECEIVE NOTIFICATION THAT YOUR PAYMENT HAS BEEN PROCESSED BY THE ECOSYTEM ENHANCMENT PROGRAM. Signature Date ECOSYSTEM ENHANCEMENT PROGRAM 1652 Mail Service Center RALEIGH, N.C. 27699-1652 (919)733-5205 Filename: 070608 Wolfchase(Henderson~101_EEP Noe Carolina 401 Oversight/Express Review Permitting Unit ~t`llCa!!y ]650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone (919) 733-1786 / Fax (919) 733-6893 Internet: http://www.ncwaterquality.org An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper ~' Certification of Completion DWQ Project No.: Applicant: Project Name: county: Date of Issuance of Certification or Authorization: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, lZa.leigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer.. It is not necessary to send certificates from all of these. Applicant's Certification I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, ~ ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within .substantial compliance and intent of the 401 Water QuaIfty Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional ~" I, as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina., having been authorized. to observe (periodically, weekly, full time) the construction of the project, for the Permiee hereby state that, to the best of my_ abilities, due care. and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date